Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx
XLSX spreadsheet 139 KB Posted
- Attached to
- Prop 411 Wards 2 & 6 Mill and Fill
- Solicitation number
- 250042
- Issued by
- Pima County, Tucson City, Arizona
About this file
This bid schedule document from the City of Tucson, Arizona outlines the itemized construction costs for Proposition 411 Phase 1 covering Wards 2 through 6. The project encompasses comprehensive street resurfacing and infrastructure improvements across approximately 342,017 square yards of roadway, including removal of bituminous pavement by milling, roadway grading, and installation of asphaltic concrete mix. Additional work includes construction of 169 curb access ramps totaling 18,540 square feet, installation of 25 speed humps and 2 speed tables, concrete curb work of approximately 6,264 linear feet, concrete sidewalk installation of 10,140 square feet, and adjustment of 229 sewer manholes and 349 potable water valve boxes. The project also incorporates traffic control, pavement marking installation in multiple configurations, and miscellaneous landscape work. A pre-bid meeting is scheduled for October 21, 2024, at 2:00 pm, with final bids due on October 30, 2024, at 2:00 pm local Arizona time. The project must be completed within 240 consecutive calendar days from the notice to proceed.
The bid schedule includes line items for bituminous material price adjustment allowances, mobilization, and incidental items allowance of $60,000, with a miscellaneous landscape work allowance of $40,000. The total construction cost column is currently blank, indicating this is a blank bid form awaiting contractor pricing. The project is funded through Proposition 411 and requires contractors to meet a 4% Small Business Enterprise participation goal with identified subcontracting opportunities. Performance and payment bonds equal to 100% of the contract amount are required, with the Engineer's Opinion of Probable Cost estimated at $10,314,917. Liquidated damages are set at $2,790 per calendar day for project delays.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prop_411_Wards_2_&_6_Mill_and_Fill.pdf | ||
| IFB_250042_Bid_Schedule.xlsx | XLSX spreadsheet | |
| IFB_250042_Special_Provisions.pdf | ||
| IFB_250042_SBE_Provisions.pdf | ||
| Standard_Specifications_for_DTM.pdf | ||
| Contractor_Responsibilty_Form.pdf | ||
| Offer_and_Acceptance_Page.pdf | ||
| COT_ARPA_Terms_and_Conditions.pdf | ||
| Prop_411_Phase_1_Ward_2_-_Ward_6_SP_2024-09-19.pdf | ||
| HUD-5370.pdf | ||
| Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx | XLSX spreadsheet | |
| SBE_Commitment_form.doc | DOC document | |
| Prop_411_Goal_Memo_FY25.pdf | ||
| Standard_Specifications_notice.docx | DOCX document | |
| HUD-5369.PDF | ||
| Prop_411_Phase_1_Ward_2_-_Ward_6_Est_2024-09-19.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| CITY OF TUCSON |
| PROP 411 PHASE 1 WARD 2 - WARD 6 |
| BID SCHEDULE |
| Agency : | City of Tucson |
| Project No : | - |
| Project : | Prop 411 Phase 1 Ward 2 - Ward 6 |
| ITEM NO. | ITEM DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | AMOUNT |
| 1100201 | PAVEMENT DEFICIENCY CREDITS | - | NO BID | ||
| 2020001 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | L.S. | 1 | ||
| 2020029 | REMOVAL OF BITUMINOUS PAVEMENT (BY MILLING) | S.Y. | 342,017 | ||
| 2050004 | ROADWAY GRADING (DISCRETIONARY) | S.Y. | 342,017 | ||
| 3030003 | AGGREGATE BASE (DISCRETIONARY) | C.Y. | 4,800 | ||
| 4060012 | ASPHALTIC CONCRETE (MIX NO. 2) | TON | 37,964 | ||
| 4060014 | ASPHALTIC CONCRETE (CRACKS BETWEEN 1" AND 3") (DISCRETIONARY) | TON | 380 | ||
| 4060015 | ASPHALTIC CONCRETE (MISC PVMT PATCHING) (DISCRETIONARY) | TON | 1,139 | ||
| 4060200 | ASPHALTIC CONCRETE (SPEED HUMP) | EACH | 25 | ||
| 4060201 | ASPHALTIC CONCRETE (SPEED TABLE) | EACH | 2 | ||
| 4060510 | BITUMINOUS MATERIAL PRICE ADJUSTMENT ALLOWANCE | L.S. | 1 | ||
| 5090110 | SEWER MANHOLE/CLEANOUT, ADJUSTMENT | EACH | 229 | ||
| 5103101 | POTABLE WATER, ADJUST VALVE BOX AND COVER | EACH | 349 | ||
| 7010005 | TRAFFIC CONTROL | L.S. | 1 | ||
| 7010025 | FLASHING ARROW PANEL | EA/DAY | 480 | ||
| 7010027 | CHANGEABLE MESSAGE BOARD | EA/DAY | 480 | ||
| 7040005 | PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") | L.F. | 18,790 | ||
| 7040006 | PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") | L.F. | 23,590 | ||
| 7040130 | PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) TRANSVERSE) (0.090") | L.F. | 2,810 | ||
| 7050090 | PAVEMENT MARKING, PREFORMED, TYPE I, SYMBOL | EACH | 19 | ||
| 7060025 | PAVEMENT MARKER, REFLECTIVE, (TYPE D, YELLOW, TWO-WAY) | EACH | 594 | ||
| 7080001 | PAINTED PAVEMENT MARKING | EACH | 45,190 | ||
| 7080100 | PAVEMENT MARKING (PORTLAND GREEN PERMANENT PAINT) | S.Y. | 154 | ||
| 8080111 | MISCELLANEOUS LANDSCAPE WORK ALLOWANCE | USD | 40,000 | $ 1.00 | |
| 9010001 | MOBILIZATION | L.S. | 1 | ||
| 9080001 | CONCRETE CURB, (STD. DTL. 209) (TYPE 1) | L.F. | 281 | ||
| 9080005 | CONCRETE CURB, (STD. DTL. 209) (TYPE 2) | L.F. | 198 | ||
| 9080006 | CONCRETE WEDGE CURB (STD. DTL. 209) | L.F. | 2,113 | ||
| 9080040 | CONCRETE CURB (RAMP CURB) | L.F. | 3,672 | ||
| 9080201 | CONCRETE SIDEWALK | S.F. | 10,140 | ||
| 9080290 | CURB ACCESS RAMP | S.F. | 18,540 | ||
| 9090031 | SURVEY MONUMENT, RESET FRAME AND COVER | EACH | 167 | ||
| 9300100 | INCIDENTAL ITEMS ALLOWANCE | USD | 60,000 | $ 1.00 | |
| TOTAL CONTRUCTION COST | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8&A &"Arial,Regular"&8&P of &N
File details come from the government source that posted it. Updated .