Prop_411_Phase_1_Ward_2_-_Ward_6_Bid_Schedule_2024-09-19.xlsx

XLSX spreadsheet 139 KB Posted

Attached to
Prop 411 Wards 2 & 6 Mill and Fill
Solicitation number
250042
Issued by
Pima County, Tucson City, Arizona

About this file

This bid schedule document from the City of Tucson, Arizona outlines the itemized construction costs for Proposition 411 Phase 1 covering Wards 2 through 6. The project encompasses comprehensive street resurfacing and infrastructure improvements across approximately 342,017 square yards of roadway, including removal of bituminous pavement by milling, roadway grading, and installation of asphaltic concrete mix. Additional work includes construction of 169 curb access ramps totaling 18,540 square feet, installation of 25 speed humps and 2 speed tables, concrete curb work of approximately 6,264 linear feet, concrete sidewalk installation of 10,140 square feet, and adjustment of 229 sewer manholes and 349 potable water valve boxes. The project also incorporates traffic control, pavement marking installation in multiple configurations, and miscellaneous landscape work. A pre-bid meeting is scheduled for October 21, 2024, at 2:00 pm, with final bids due on October 30, 2024, at 2:00 pm local Arizona time. The project must be completed within 240 consecutive calendar days from the notice to proceed.

The bid schedule includes line items for bituminous material price adjustment allowances, mobilization, and incidental items allowance of $60,000, with a miscellaneous landscape work allowance of $40,000. The total construction cost column is currently blank, indicating this is a blank bid form awaiting contractor pricing. The project is funded through Proposition 411 and requires contractors to meet a 4% Small Business Enterprise participation goal with identified subcontracting opportunities. Performance and payment bonds equal to 100% of the contract amount are required, with the Engineer's Opinion of Probable Cost estimated at $10,314,917. Liquidated damages are set at $2,790 per calendar day for project delays.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

CITY OF TUCSON
PROP 411 PHASE 1 WARD 2 - WARD 6
BID SCHEDULE
Agency :City of Tucson
Project No :-
Project :Prop 411 Phase 1 Ward 2 - Ward 6
ITEM NO.ITEM DESCRIPTIONUNITQUANTITYUNIT PRICEAMOUNT
1100201PAVEMENT DEFICIENCY CREDITS-NO BID
2020001REMOVAL OF STRUCTURES & OBSTRUCTIONSL.S.1
2020029REMOVAL OF BITUMINOUS PAVEMENT (BY MILLING)S.Y.342,017
2050004ROADWAY GRADING (DISCRETIONARY)S.Y.342,017
3030003AGGREGATE BASE (DISCRETIONARY)C.Y.4,800
4060012ASPHALTIC CONCRETE (MIX NO. 2)TON37,964
4060014ASPHALTIC CONCRETE (CRACKS BETWEEN 1" AND 3") (DISCRETIONARY)TON380
4060015ASPHALTIC CONCRETE (MISC PVMT PATCHING) (DISCRETIONARY)TON1,139
4060200ASPHALTIC CONCRETE (SPEED HUMP)EACH25
4060201ASPHALTIC CONCRETE (SPEED TABLE)EACH2
4060510BITUMINOUS MATERIAL PRICE ADJUSTMENT ALLOWANCEL.S.1
5090110SEWER MANHOLE/CLEANOUT, ADJUSTMENTEACH229
5103101POTABLE WATER, ADJUST VALVE BOX AND COVEREACH349
7010005TRAFFIC CONTROLL.S.1
7010025FLASHING ARROW PANELEA/DAY480
7010027CHANGEABLE MESSAGE BOARDEA/DAY480
7040005PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090")L.F.18,790
7040006PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090")L.F.23,590
7040130PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) TRANSVERSE) (0.090")L.F.2,810
7050090PAVEMENT MARKING, PREFORMED, TYPE I, SYMBOLEACH19
7060025PAVEMENT MARKER, REFLECTIVE, (TYPE D, YELLOW, TWO-WAY)EACH594
7080001PAINTED PAVEMENT MARKINGEACH45,190
7080100PAVEMENT MARKING (PORTLAND GREEN PERMANENT PAINT)S.Y.154
8080111MISCELLANEOUS LANDSCAPE WORK ALLOWANCEUSD40,000$ 1.00
9010001MOBILIZATIONL.S.1
9080001CONCRETE CURB, (STD. DTL. 209) (TYPE 1)L.F.281
9080005CONCRETE CURB, (STD. DTL. 209) (TYPE 2)L.F.198
9080006CONCRETE WEDGE CURB (STD. DTL. 209)L.F.2,113
9080040CONCRETE CURB (RAMP CURB)L.F.3,672
9080201CONCRETE SIDEWALKS.F.10,140
9080290CURB ACCESS RAMPS.F.18,540
9090031SURVEY MONUMENT, RESET FRAME AND COVEREACH167
9300100INCIDENTAL ITEMS ALLOWANCEUSD60,000$ 1.00
TOTAL CONTRUCTION COST$0

&"Arial,Regular"&8&F &"Arial,Regular"&8&A &"Arial,Regular"&8&P of &N

File details come from the government source that posted it. Updated .