This document contains standard detail plans and specifications for the Federal Open Channel Drainage Repair Work Order Contract - Package 2 in Pinellas County, Florida. The project involves emergency repair work including re-establishing open channel slopes, removing debris, implementing erosion control measures, and providing fill material and sodding as required. The work order contract structure allows individual projects to be issued as standalone tasks under this umbrella agreement. Key specifications outlined in the plans include restrictions on equipment use within protected tree areas (hand labor only), prohibition of construction materials and soil deposits near vegetation, and mandatory erosion control measures including soil tracking prevention devices (STPDs) at designated egress points.
The technical specifications detail comprehensive environmental protection requirements, including STPD construction parameters (standardized 15' x 50' dimensions with potential 30' width options), sediment pit retention volumes of 3,600 cubic feet per acre of surface area, and daily maintenance and cleaning protocols. Compensation for STPDs is structured as a unit price contract covering all associated costs including excavation, grading, filter fabric, aggregate materials, paved turnouts, sediment removal and disposal, water rinsing, and restoration work. Additional items such as synthetic bales and silt fence are paid separately under their respective unit price line items. The plans specify FDOT Size #1 aggregates and include detailed grading requirements with minimum 0.2% and maximum 1.0% grades for swale ditches. All materials tracked or spilled onto public roads must be removed daily or as directed by the project engineer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REF # 26-0694
FEDERAL OPEN CHANNEL
DRAINAGE REPAIR
WORK ORDER CONTRACT - PACKAGE 2
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
Y I
THIERRY KU
FLORI'A
88713
NOTES:
1. NO TRUCKS OR HEAVY EQUIPMENT ALLOWED WITHIN BARRIERS, ONLY HAND LABOR ALLOWED.
2. NO CONSTRUCTION MATERIALS, SOIL DEPOSITS, OR SOLVENTS SHALL BE ALLOWED WITHIN BARRIERS.
3. BARRIERS ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN TREE AREA.
4. BARRIERS ARE TO STAY IN PLACE UNTIL ALL PAVING, CONSTRUCTION, AND HEAVY EQUIPMENT IS REMOVED
FROM THE AREA.
LARGE TREES AND BUSHESPALMS AND SMALL TREES
1. A SOIL TRACKING PREVENTION DEVICE (STPD) SHALL BE CONSTRUCTED AT LOCATIONS DESIGNATED BY THE ENGINEER FOR POINTS OF EGRESS FROM UNSTABILIZED AREAS OF THE PROJECT TO PUBLIC ROADS WHERE OFF SITE TRACKING OF MUD COULD OCCUR. TRAFFIC FROM UNSTABILIZED AREAS OF THE CONSTRUCTION PROJECT SHALL BE DIRECTED THROUGH STPD BARRIERS. FLAGGING, OR OTHER POSITIVE MEANS SHALL BE USED AS REQUIRED TO LIMIT AND DIRECT VEHICULAR EGRESS ACROSS THE STPD.
2. THE CONTRACTOR MAY PROPOSE AN ALTERNATIVE TECHNIQUE TO MINIMIZE OFF SITE TRACKING OF SEDIMENT. THE ALTERNATIVE MUST
BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO ITS USE.
3. ALL MATERIALS SPILLED, DROPPED, OR TRACKED ONTO PUBLIC ROADS (INCLUDING THE STPD AGGREGATE AND CONSTRUCTION MUD)
SHALL BE REMOVED DAILY, OR MORE FREQUENTLY IF SO DIRECTED BY THE ENGINEER.
4. AGGREGATES SHALL BE DESCRIBED IN SECTION 901 EXCLUDING 901-2.3. AGGREGATES SHALL BE FDOT SIZE #1. IF THIS SIZE IS NOT AVAILABLE, THE NEXT AVAILABLE SMALLER SIZE AGGREGATE MAY BE SUBSTITUTED WITH THE APPROVAL OF THE ENGINEER. SIZES CONTAINING EXCESSIVE SMALL AGGREGATE WILL TRACK OFF THE PROJECT AND
ARE NOT SUITABLE.
5. THE SEDIMENT PIT SHOULD PROVIDE A RETENTION VOLUME OF 3600 CUBIC FEET/ACRE OF SURFACE AREA DRAINING TO THE PIT. WHEN THE STPD IS ISOLATED FROM OTHER DRAINAGE AREAS, THE FOLLOWING PIT VOLUMES WILL SATISFY THIS REQUIREMENT:
15'X50'=100 FT³
30'X50'=200 FT³
AS AN OPTION TO THE SEDIMENT PIT, THE WIDTH OF THE SWALE BOTTOM CAN BE INCREASED TO OBTAIN THE VOLUME.
WHEN THE SEDIMENT PIT OR SWALE VOLUME HAS BEEN REDUCED TO ONE HALF, IT SHALL BE CLEANED. WHEN A SWALE IS USED, SYNTHETIC BALES OR SILT FENCE SHALL BE PLACED ALONG THE ENTIRE LENGTH.
6. THE SWALE DITCH DRAINING THE STPD SHALL HAVE A 0.2% MINIMUM AND A 1.0% MAXIMUM GRADE ALONG THE STPD
AND TO THE SEDIMENT PIT.
7. MITERED END SECTIONS ARE NOT REQUIRED WHEN THE SIDE DRAIN PIPE SATISFIES THE CLEAR ZONE REQUIREMENTS.
8. THE STPD SHALL BE MAINTAINED IN A CONDITION THAT WILL ALLOW IT TO PERFORM ITS FUNCTION. TO PREVENT OFFSET TRACKING, THE STPD SHALL BE RINSED (DAILY WHEN IN USE) TO MOVE ACCUMULATED MUD DOWNWARD THROUGH THE STONE. ADDITIONAL STABILIZATION OF THE VEHICULAR ROUTE LEADING TO THE STPD MAY BE REQUIRED
TO LIMIT MUD TRACKED.
9. A STPD SHALL BE PAID FOR UNDER THE CONTRACT UNIT PRICE FOR SOIL TRACKING PREVENTION DEVICE, EA. THE UNIT PRICE SHALL CONSTITUTE FULL COMPENSATION FOR CONSTRUCTION, MAINTENANCE, REPLACEMENT OF MATERIALS, REMOVAL, AND RESTORATION OF THE AREA UTILIZED FOR THE STPD: INCLUDING BUT NOT LIMITED TO EXCAVATION, GRADING, TEMPORARY PIPE (INCLUDING M.E.S. WHEN REQUIRED), FILTER FABRIC, AGGREGATE, PAVED TURNOUT
(INCLUDING ASPHALT AND BASE CONSTRUCTION), DITCH STABILIZATION, APPROACH ROUTE STABILIZATION, SEDIMENT REMOVAL AND DISPOSAL, WATER, RINSING AND CLEANING OF THE STPD AND CLEANING OF PUBLIC ROADS, GRASSING AND SOD. SYNTHETIC BALES SHALL BE PAID FOR UNDER THE CONTRACT UNIT PRICE FOR HAY OR STRAW BALED, EA. SILT FENCE SHALL BE PAID FOR UNDER THE
CONTRACT UNIT PRICE FOR STAKED SILT FENCE, L.F.
10. THE NOMINAL SIZE OF A STANDARD STPD IS 15'X50' UNLESS OTHERWISE SHOWN IN THE PLANS. IF THE VOLUME OF ENTERING AND EXITING VEHICLES WARRANT, A 30' WIDTH STPD MAY BE USED IF APPROVED BY THE ENGINEER. WHEN A DOUBLE WIDTH (30')
STPD IS USED, THE PAY QUANTITY SHALL BE 2 FOR EACH LOCATION.
PALM TREES DECIDUOUS TREES CONIFEROUS TREES
TRANSITION DETAIL
SECTION A-A RURAL CONNECTION
DETAIL
SECTION B-B
EL. 10
EL. 15
EL. 20
EL. 25
EL. 30
DISTURBED AREA
PROTECTED AREA
10 L.F. PER END PLACED AT A 30° ANGLE
TO PREVENT END-AROUND FLOW
WOODEN STAKES
WOODEN STAKES
(4' O.C. FOR TYPE S,
6' O.C. FOR TYPE NS)DISTURBED AREA
PROTECTED AREA
1:1 MAX. SLOPE
COMPOST FILTER SOCK
(SEE PLAN FOR HEIGHT)
SECTION NTS
PLAN NTS
| Sheets and Views |
| 1 25-537-KEY - 01 |
| 2 25-537-DTL - General Notes |
| 3 Channel Repair Typical - Channel Typical 1 |
| 4 Channel Repair Typical - Channel Typical 2 |
| 5 Channel Repair Typical - Installation Typical 1 |
| 6 25-537-GEN - 004973A SWPPP 1 |
| 7 25-537-GEN - 004973A SWPPP 2 |
| 8 25-537-GEN - 004973A EROSION CONTROL DETAILS |
| 9 25-537-GEN - 004973A EROSION CONTROL NOTES |