MSPRC PERFORMANCE STANDARDS
1 Attachment J-6
SOW
Section
Performance
Standard
Evaluation
Methodology
Sampling
Methodology
Data
Source
Frequency
C.3.1 The infrastructure is available 98% of the time during all required hours of operation.
CMS receives a report of infrastructure hours of operation and any down-time.
Sampling MSPRC report and sampling report.
Annually
C.3.2.8 Supply 95% of requested case files and documentation to the PO within seven (7) calendar days of the request.
PO will track the date of request and receipt.
Sampling Report tracked by
PO.
Annually
C.3.3.1.1 The quality improvement plan is successful when the contractor makes improvements in its business process in accordance with the plan and can show the effectiveness of those changes.
CMS receives a report from the MSPRC to document quality actions and outcomes.
Sampling Report tracked by
PO.
Annually
C.3.3.1.1 Plan is successful when trends and their outcomes are captured and communicated to interrelated operational areas to improve the overall quality and efficiency of the recovery operations.
CMS receives a report from the MSPRC to document quality actions and outcomes.
Sampling Report tracked by
PO.
Annually
2 Attachment J-6
C.3.3.4.3 The MSPRC shall issue the RAR letter within fifteen (15) calendar days after the NGHP case is created in
ReMAS (SKL status).
CMS receives a report from
MSPRC of number of
RAR letters sent.
Report MSPReco very system.
Weekly
C.3.3.4.6
Standard 1
Ninety-five (95) percent of all newly created
NGHP cases out of SKL status by the 21st calendar day from the case creation date shall be filtered, and an interim
CPL/CPN/”No
Claims to Date”
Letter mailed to all authorized individuals/entitie s with valid addresses on file within fifty-five
(55) calendar days after the date of the RAR letter including scenario 5 for
ORM but excluding scenarios 1 through 4.
CMS receives a report from
MSPRC of conditional payment letters sent and the timeframes associated.
Report MSP
Recovery
System
Every other week
3 Attachment J-6
Standard 2
All complete
Proof of
Representation and/or Consent to
Release documentation received prior to the issuance of the initial
CPL/CPN shall be applied to ninety-eight (98) percent of the appropriate MSP
Recovery System cases prior to the issuance of the initial CPL or
CPN. If received after the issuance of the initial
CPL/CPN,
normal correspondence timeframes apply.
(“Applied” indicates that representative information is added to the case and the system will release documentation to the authorized parties with valid addresses on file.)
Compare
Receipts, CPL/CPN/”N o Claims to
Date” Letters mailed, and closures.
Sampling done during an On-site review
MSP
Recovery
System
4 Attachment J-6
Standard 3
Ninety-eight
(98) percent of all incomplete Proof of Representation and/or Consent to
Release documentation shall be resolved and applied to the appropriate MSP
Recovery System case within thirty
(45) calendar days. Any case that contains documentation of appropriate actions to obtain the needed information will be considered as meeting this standard.
(“Applied” indicates that representative information is added to the case and the system will release documentation to authorized parties)
(“Resolved” indicates the
MSPRC has proactively performed/docum ented its due diligence to obtain or has obtained appropriate and complete documentation
Compare
Receipts, CPL/CPN/”N o Claims to
Date” Letters mailed, closures, and case notes.
Sampling done during an On-site review
MSP
Recovery
5 Attachment J-6 for a case.)
Addresses and telephone numbers are not required to complete a Proof of Representation and/or Consent to
Release.
C.3.3.4.7
For an existing
MSP Recovery
System case where the initial
CPL has been sent, upon receiving notification of a settlement, judgment, award or other payment from the beneficiary or their representative, the MSPRC shall issue a recovery demand letter to the appropriate debtor and copy all authorized individuals with valid addresses on file within twenty (20) calendar days from the receipt of the notice of the settlement, judgment, award, 6 Attachment J-6 or other payment for 98% of these cases.
Ninety-five (95) percent of all newly created
ORM cases out of
SKL status by the
21st calendar day from the case creation date shall be filtered, and
Demand Letter mailed to the appropriate debtor and copy all authorized individuals with valid addresses on file within fifty-five (55) calendar days after the date of the RAR letter with the exception of
Scenario 5 for
ORM.
All complete
Proof of
Representation and/or Consent to
Release documentation received prior to the issuance of the demand, for
Scenarios 1 through 4 of
ORM, shall be applied to ninety-
PO receives report from
MSPRC for the number of status changes from CPL to
CPN.
Report MSP
Recovery
System
7 Attachment J-6 eight (98) percent of the appropriate
MSP Recovery
System ORM cases prior to the issuance of the demand. If received after the issuance of the demand, normal correspondence timeframes apply.
(“Applied” indicates that representative information is added to the case and the system will release documentation to authorized parties.)
Standard 4
Ninety-eight (98) percent of all incomplete Proof of Representation and/or Consent to
Release documentation shall be resolved and applied to the appropriate MSP
Recovery System
ORM case within forty-five (45) calendar days for
Scenarios 1 through 4 of
ORM. Any ORM case that contains documentation of appropriate actions to obtain the needed
Report MSP
Recovery
System
8 Attachment J-6 information will be considered as meeting this standard.
(“Applied” indicates that representative information is added to the case and the system will release documentation to authorized parties.)
(“Resolved” indicates the
MSPRC has proactively performed/docum ented its due diligence to obtain or has obtained appropriate and complete documentation for a case.)
Standard 5
MSP Recovery
System case, upon receiving notification of a settlement, judgment, award or other payment via Section 111 reporting and no settlement information has been provided by the beneficiary or their representative including
PO receives report from
MSPRC for the number of status changes from CPL to
CPN.
Report MSP
Recovery
System
9 Attachment J-6 scenario 5 for
ORM but excluding scenarios 1 through 4, the
MSPRC shall issue a CPN to all authorized parties with valid addresses on file within forty-five
(45) calendar days from the receipt of the
Section 111 notification for
98% of these
Standard 6
MSP Recovery
System case, upon receiving notification of a settlement, judgment, award or other payment via Section 111 reporting and/or settlement information has been provided by the beneficiary or their representative, including scenario 5 for
ORM but excluding scenarios 1 through 4, before the initial CPL has been issued, the MSPRC shall issue a CPN to all
PO receives report from
MSPRC for the number of status changes from CPL to
CPN.
Report MSP
Recovery
System
10 Attachment J-6 individuals with valid addresses on file within fifty-five (55) calendar days from the date of the RAR for 98% of these cases.
Standard 7
: For an existing
MSP Recovery
System case, upon receiving notification of
ORM Scenarios 1 through 4 via
Section 111 reporting, the
MSPRC shall issue a demand to the appropriate debtor and copy all authorized individuals with valid addresses on file within forty-five (45) calendar days from the date the lead associated to a case for 98% of these cases.
Standard 8
For cases identified as
MMSEA Section
111 and other settled cases not previously established in the
MSP Recovery
System, when the notice of the settlement, PO receives report from
MSPRC for the number of cases initially in CPN status.
11 Attachment J-6 judgment, award, or other payment is received, the
MSPRC shall:
a) Issue the
RAR letter to the beneficiary and any representative s/entities, as applicable, within fifteen
(15) calendar days after the
NGHP case is created in the
MSP
Recovery
System for
99% of such cases with the exception of non valid addresses.
This includes all scenarios for ORM reported via
Section 111.
b) Issue a
CPN to all authorized individuals/en tities within fifty-five (55) calendar days from the date of the RAR for 98% of these cases where claims have been retrieved.
This includes
a) CMS receives a report from
MSPRC of number of
RAR letters sent.
b) CMS report from
MSPRC of conditional payment notices sent and the timeframes associated.
c) CMS receives a report from
MSPRC of demands sent as a result of the CPN and the timeframes
12 Attachment J-6 scenario 5 for
ORM but excludes scenarios 1 through 4.
c) If a response to the CPN is received timely, issue a recovery demand letter to the appropriate debtor and copy all authorized individuals with valid addresses on file within forty-five (45) calendar days from the response due date printed on the notice plus five (5) calendar days, for 98% of these cases.
d) If no response to the CPN is received by the response due date plus five (5) calendar days, issue a recovery demand letter to the appropriate debtor and copy all associated.
d) CMS report from
MSPRC of demands sent as a result of the CPN and the timeframes associated.
13 Attachment J-6 individuals with valid addresses on file within twenty (20) calendar days from the response due date printed on the notice for 98% of the
C.3.3.4.8 The MSPRC shall close 100% of NON-GHP records upon settlement, judgment, award, or other payment at issuance of the demand, except for ORM reported pursuant to
Section 111.
Sampling Use
MSPRC
report above and compare with CWF updates.
C.3.3.4.13
The MSPRC mails 100% of all complete and assumed valid demand packages by the date printed on the demand letters.
Note: The AR-established date shall equal the date of the demand.
Sampling done during an On-site review
Compare a day’s mail- outs to dates on the letter.
For every PPN sent, including
PPNs that receive no response, the
MSPRC shall
PO receives
PPN Tracking report from the MSPRC.
Report MSP
Recovery
Monthly
14 Attachment J-6 determine if the debt is valid, based upon the
PPN responses or lack thereof, and issue a demand letter or send a letter to the responsible party closing the case for 98% of cases within ninety-five
(95) calendar days of the date of the PPN.
If a response is received, the
MSPRC has eighteen (18) calendar days from the response due date of the
PPN plus five (5) calendar days to enter any applicable ECRS requests for 98% of cases.
PO receives
PPN Tracking report from the MSPRC.
Report MSP
Recovery
System
Monthly
C.3.3.4.14 resolves ninety-five percent
(95%) of all correspondence, except checks, within forty-five calendar days
(unless directed otherwise, depending on the type of correspondence).
This includes misrouted
Sampling . Annually
15 Attachment J-6 correspondence, based upon the
MSPRC receipt date, that the
MSPRC transfers to the Medicare claims processing contractors including
Medicare
Administrative
Contractors
(MACs) and
/Durable Medical
Equipment
Medicare
Administrative
Contractors
(DME MACS).
The MSPRC shall accurately post one hundred percent 100% of all checks received with correspondence to a known debt within twenty
(20) calendar days (this does not affect the requirement that the MSPRC shall deposit all checks within twenty-four (24) hours of receipt; see
Section C.3.6, Banking
Relations).
MSPRC
supply a report of correspondenc e showing
Julian date.
Sampling done during an On-site review
Compare corr.
Report with actual action.
shall deposit voluntary/unsolici ted checks within
24 hours of
Sampling done during an On-site review
Compare check deposit logs with date of
16 Attachment J-6 receipt from a provider, physician or other supplier into its
Treasury General
Account (TGA;
see Section C.3.6, Banking
Relations). The
MSPRC shall reissue the deposited amount and all related correspondence to the appropriate
Medicare claims processing contractor via first class mail no later than seven
(7) calendar days after receiving the requested funds from the PO.
AR
posting.
All correspondence received, before the initial
CPL/CPN is issued, shall be worked and any responses shall be sent out simultaneously with the initial
CPL/CPN for
98% of all such cases. (Includes
Notice of
Settlement and excludes Appeals, Waivers, and
Compromises)
Compare
Receipts, CPL/CPN/”N o Claims to
Date” Letters mailed, closures, and case notes.
Sampling MSP
Recovery
17 Attachment J-6
Standard 5
For ORM scenarios 1 through 4, all correspondence received before the demand is issued shall be worked and any responses shall be sent out simultaneously with the demand for 98% of all such cases.
C.3.3.4.15 The MSPRC shall answer 98% of all voicemail messages and complete callbacks within one business day after the message was left.
Sampling done during
On-site review
Confirm call sheets are with the case file and the call sheet is dated.
C.3.3.4.16.
3.3.
Standard
14.16.
The MSPRC shall resolve seventy (70) percent of individual beneficiary GHP debts (with payment or valid documented defense) prior to the debts becoming 180 calendar days delinquent. This is a test standard for CY2010 after the inception of the PPN.90% of
Non- t.
Sampling done during
On-site review
Confirm call sheets are with the case file and the call
18 Attachment J-6
C,3.3.4.163
2.3.4.16 shall resolve ninety (90) percent of
NGHP debts prior to the debts becoming 180 calendar days delinquent. This is a test standard for CY2010 after the inception of the CPN.
Sampling done during
On-site review
Confirm call sheets are with the case file and the call
3.3.4.16 shall refer one hundred (100) percent of eligible delinquent
NGHP and GHP debts to Treasury before the 181st calendar day of delinquency
(241 calendar days after the date of the demand).
Sampling done during
On-site review
Confirm call sheets are with the case file and the call
MSPRC shall resolve debts deemed to be “in appeal” status within forty-five
(45) calendar days of that designation.
Sampling Annually
19 Attachment J-6
C.3.5.4 forwards all second-level appeal requests and all supporting documentation, including the case file, to the designated QIC within five (5) calendar days.
MSPRC
supply a Corr.
Tracking report with the appeal requests categorized outside of the general universe.
Sampling Obtain report showing date of referral and compare to the
MSPRC
corr.
Tracking.
Report.
Misrouted appeal requests are forwarded to the
QIC or OMHA within 5 calendar days of receipt.
MSPRC
supply a Corr.
Tracking report with the appeal requests categorized outside of the general universe.
Sampling Obtain report showing date of referral and compare to the
MSPRC
corr.
Tracking.
effectuates 95% of all appeal decisions, whether made at or above the QIC level or by a court, within the same monthly financial reporting period as the date(s) of the decisions or within thirty (30) calendar days, whichever is longer.
Sampling Obtain report showing date of referral and compare to the
MSPRC
corr.
Tracking.
C.3.5.5 The MSPRC shall deposit voluntary/unsolici ted checks within
Sampling MSP
Recovery
Systems
20 Attachment J-6
24 hours of receipt from a provider, physician or other supplier into its
Treasury General
Account (TGA;
see Section C.3.6, Banking
Relations). The
MSPRC shall reissue the deposited amount and all related correspondence to the appropriate
Medicare claims processing contractor via first class mail no later than seven
(7) calendar days after receiving the requested funds from the PO.
C.3.6 deposits funds into its TGA within twenty-four (24) hours of receipt.
On-site
Sampling
Obtain report showing date of referral for refund and compare to the
MSPRC
date of response.
C.3.6
Recording and reconciliations are accurate and timely. The TGA will allow for deposit through the U.S. Treasury into the Medicare
On-site
Sampling
Obtain report showing date of referral for refund and compare
21 Attachment J-6
Trust Funds.
These deposits will be categorized in
CMS’ cash link to the
MSPRC
date of response.
C.3.6.1 request 95% of refunds within fifteeen (15) calendar days of the identification of the situation requiring a refund and 100% within thirty (30) calendar days unless otherwise directed by the
SOW. (This standard excludes
Treasury refunds.)
On-site
Sampling
Obtain report showing date of referral for refund and compare to the
MSPRC
date of response.
C.3.7.4
Initial CAP reports are timely when submitted to CMS within 45 calendar days of receiving a final audit report.
Sampling Obtain and
Review all audit reports.-
C.3.7.4
The MSPRCs
CAPs are successful when its deficiencies have been corrected within one year of being identified.
Sampling CMS will confirm and obtain proof from
MSPRC
of completio n.
Annually
C.3.7.7 The MSPRCs deficiencies have been corrected within one year of being identified.
Sampling CMS will confirm and obtain proof from
MSPRC
of
22 Attachment J-6 completio n.
C.3.9.3 All MSPRC
A123 findings under the direct control of the
MSPRC shall be corrected within one (1) year (or less based on
CMS’
determination of criticality).
Sampling A123 auditors
Annually
C.3.9.6 The MSPRC (as a prime contractor together with any and all subcontractors, if any) shall deploy a Six Sigma and/or Lean Six
Sigma Quality
Program to drive continuous business process improvement.
Sampling A123
Auditors or Internal
C.3.10.3 correct its weaknesses, findings, gaps, or other deficiencies according to
CMS/OIS
required timeframes unless otherwise authorized by
CMS.
Sampling A123Audi tors or
Internal
Security auditors.
C.4.1.1
The implementation is successful when all Medicare MSP recovery
23 Attachment J-6 functions are performed by the new MSPRC beginning on the specified implementation date.
C.4.1.1
The workload transition is successful when all Medicare MSP recovery information, records, and data have been accepted from the current Medicare contractor and are performed by the new MSPRC beginning on the specified implementation date.