This document is a contract attachment that lists CTFA (Commercial/Tactical Fabric Test Attachment) Test Plans. It provides a table of 17 part or drawing numbers with their corresponding documentation, each consisting of 2 pages. The parts listed are: 13588680, 13690107, 13702370, 13747977, 13747978, 13747990, 13747995, 13748010, 13748110, 13748120, 13748149, 13748150, 13748151, 13748157, 13748458, 13748160, and 13783940.

This is an index or reference document that serves as an appendix to a larger contract. It does not contain information regarding required products or services, response dates, pricing terms, award dates, or other substantive contract requirements. The attachment appears to function solely as a consolidated list of test plan drawings that are incorporated by reference into the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Attachment 0008

CTFA Test Plans

Part or Drawing No. No. of Pages 13588680 2

13690107 2

13702370 2

13747977 2

13747978 2

13747990 2

13747995 2

13748010 2

13748110 2

13748120 2

13748149 2

13748150 2

13748151 2

13748157 2

13748458 2

13748160 2

13783940 2

Approved by Dated 6/23/2026

Test Plan 13588680 Sheet 1 of 2

FIRST ARTICLE INSPECTION AND TEST REQUIREMENTS (CONTRACTOR TESTING)

FOR

LTAS Monocular Assembly APN 13588680

1. SCOPE

This Test Plan is applicable to IBAS LTAS Monocular Assembly APN 13588680. This Test Plan contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract. The actual requirements call out below are referenced on MIS-PRF-52937.

A Government representative of DEVCOM AvMC Systems Readiness Directorate (SRD) Sustainment Division Quality Requirements Branch shall witness the First Article Test.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First article inspections and tests shall be limited to the following requirements:

(1) Operating requirements

a. Performance Compatibility per para. 3.4.1.1

b. Aperture Stop per para. 3.4.1.2

c. Magnification per para. 3.4.1.3

d. Resolution per para. 3.4.1.4

e. Exit Pupils per para. 3.4.1.5

f. Eye Relief per para. 3.4.1.6

g. Field of View per para. 3.4.1.7

h. Diopter Range per para. 3.4.1.8

i. Light Transmission per para. 3.4.1.9

j. Optical Characteristics per para. 3.4.1.10

k. NFOV Performance per para. 3.4.1.10.1

l. WFOV Performance per para. 3.4.1.10.2

m. Dimensions per para. 3.4.2.1

n. Weight per para. 3.4.2.3

o. Sealing per para. 3.4.2.4

p. Interface requirements per para. 3.4.3

(2) No Environmental Test shall be conducted

(3) Workmanship per para. 3.4.8.2

(4) A review for compliance with identification and marking per para. 3.4.10

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented results.

Test Plan 13588680 Sheet 2 of 2

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in accordance with applicable calibration standards.

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all the following:

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article inspection and test.

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before being used in the manufacturing/production process.

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all inspection, measuring, diagnostic and test equipment used.

(c) The first article’s test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article’s test requirements as set forth in this test plan. The paperwork (including manufacturing planning, travelers, process sheets, work instructions, and drawings) resulting from verification of the above requirements shall constitute as the formal test report.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.

3. REJECTION CRITERIA

Any noncompliance with the contractual requirements shall be cause for rejection of the First Article Test.

(End of Plan)

2026-06-23T07:19:38-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

Test Plan 13690107 Sheet 1 of 2

Field of View Assembly APN 13690107

This Test Plan is applicable to IBAS Field of View Assembly APN 13690107. This Test Plan contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out for the following Army part numbers in the technical data package:

a. 13690107

b. 13494799-3

c. 13494829-1

d. 13494851

e. 13494856

f. 13494854

g. 13494855

h. 13690116

i. 13480813

j. 13494955

k. 13494959

l. 13703755

m. 13494963

n. 13494964

o. 13480836-12

p. 13917769

q. 13494813

r. 13494910

s. 13696498

t. 13620158-024

(3) Workmanship per standard practice

(4) A review for compliance with identification and marking per drawing requirements

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

Test Plan 13690107 Sheet 2 of 2

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all the following:

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article’s test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article’s test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, and drawings.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance with the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:10-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

Test Plan 13702370 Sheet 1 of 2

Focus Assembly APN 13702370

This Test Plan is applicable to IBAS Focus Assembly APN 13702370. This Test Plan contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out for the following Army part numbers in the technical data package:

a. 13702370

b. 13702371

c. 13702372

d. 13494891

e. 13480764

f. 13494969

g. 13498381

h. 13498380

i. 13495193

j. 13690105

k. 13480836-16

l. 13480813

m. 13704412

n. 13696499

o. 13620158

(3) Workmanship per standard practice

(4) A review for compliance with identification and marking per drawing requirements

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

Test Plan 13702370 Sheet 2 of 2

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all the following:

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article’s test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article’s test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, and drawings.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance with the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:19:01-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

QUALITY ASSURANCE PROCEDURE (QAP)

IBAS Spare Items

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First article inspections and tests shall include the following requirements:

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out for all Army Part Numbers in the TDP).

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional testing as set forth in this contract.

(3) Workmanship (as set forth in the relevant specification)

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented results (e.g. photographs of marking or narrative description)

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in accordance with applicable calibration standards and validation procedures.

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

(End of QAP)

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the time of the first article inspection and test. These records shall include, but are not limited to, records encompassing the manufacturing, processing, inspecting, accepting/rejecting, controlling and testing of parts, components, and/or assemblies. Examples of such records may include, but are not limited to, receiving/incoming/in-process/final inspection, process control, disposition of non-conforming material, inspection and testing done during fabrication and assembly, certification and qualification of special processes and special process personnel, written schedules and records of required periodic inspections, and the calibration and certification of all

(c) The first article test report shall consist of all the necessary documentation to demonstrate and support full compliance with the first article test requirements as set forth in this contract. The test report shall include manufacturing planning, travelers, process sheets, work instructions, drawings, and any applicable checklists.

(d) The Contractor shall not retain the first article provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(e) The first article unit shall be representative of the production lot and be produced at the same facilities using the same equipment as the production lot. The contractor shall include a statement to that effect as part of the inspection report.

(f) Unless otherwise specified in this contract, any item destroyed or consumed during the inspection and testing process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items

Any noncompliance to the contractual requirements shall be cause for rejection of the First Article Test.

2026-06-23T07:20:39-0500

RODRIGUEZ.ROSALIO.JR.1230486324

Approved by Dated 6/23/2026

IBAS Generic Contractor FAT Test Plan Sheet 1 of 2

This QAP is applicable to IBAS Target Acquisition Subsystems (TAS), Lower Target Acquisition Subsystem (LTAS), and Periscope Head (PH) spare subassemblies. This QAP contains unique First Article Testing requirements that will be conducted by the Contractor on the sample size specified on the contract.

2. First Article Test

(a) The first article test shall be in accordance with the technical data package and contractual requirements. First

(1) Performance (if part number is controlled by a specification – all characteristics with D, E or T under the FAT column on the Requirement/Verification Cross-Reference Matrix table (the “Reliability” requirement and below are not required to be documented)) or (if part number is controlled by a technical data package (TDP) – all technical requirements as defined on forms 1, 2, and 3 per AS9102 or equivalent. These forms shall be filled out

(2) Physical Characteristics - A 100% inspection (as set forth in the relevant specification) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings, technical data packages, and/or any other special/functional

(4) A review for compliance to identification marking for parts, components and/or assemblies with documented

(5) A review for compliance with preservation, packaging, packing, and marking requirements with documented

(6) The verification through objective evidence with documented results that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article pieces(s) are maintained in

(7) Any features/characteristics that will not be able to be verified when part is complete will be subject to in-process verification. The Government will be afforded an opportunity to witness any in-process inspections.

(b) Unless otherwise agreed upon by the Government and the Contractor, the first article inspection and test shall be conducted at a single location, at the intended site of manufacture. As part of the first article inspection and test, the Government requires the Contractor and/or its subcontractor to produce or demonstrate any or all of the following:

IBAS Generic Contractor FAT Test Plan Sheet 2 of 2

(1) Proof that a quality/inspection program/system exists, is in place and functional at the time of the first article

(2) Proof that any fixtures, tool masters, jigs, or similar devices used, in the inspection and/or testing of the first article, have been subjected to an initial inspection, or other suitable means supporting their accuracy, before

(3) A complete detailed description of inspection/test records shall be prepared and available at the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .