This document is a Narratives section for federal contract solicitation SPRRA226R0071, containing supplementary requirements and instructions for contractors.

The narrative provisions establish technical and administrative requirements across multiple areas. Export control requirements mandate that offerors and manufacturers possess active U.S./Canada Joint Certification Program (JCP) certification to access export-controlled technical data, with DLA declining to delay award for ineligible offers seeking such authority. Environmental testing provisions prohibit furnishing items that have undergone destructive testing or quality degradation to the government. For long lead time and long-term contracts, contractors must verify supply sources upon receipt and notify the Contracting Officer in writing within thirty days if procurement becomes impossible due to obsolescence, including recommendations with cost and schedule impacts. Wood packaging materials must comply with International Standards for Phytosanitary Measures (ISPM) 15, requiring heat treatment to 56 degrees Celsius for minimum thirty minutes and ALSC-approved marking on pallets, boxes, and dunnage, with non-compliance resulting in potential refusal, destruction, or government remediation cost recovery.

Additional requirements address revisions to drawings and part numbers, engineering change proposals using DD Form 1692, identification marking per MIL-STD-130, calibration per ANSI/NCSL Z540-3-2006 or ISO 10012:2003, bar code marking per MIL-STD-129 and ISO/IEC 16388, and first article testing with contractor inspection and comprehensive test reports. First article waiver requests require completion of a government-provided worksheet with supporting documentation. Electronic fabrication mandates ANSI/J-STD-001 Class 3 soldering standards, electronic/electrical parts control programs, lead-free control plans per GEIA-STD-0005-1 with tin whisker mitigation per GEIA-STD-0005-2, and counterfeit risk management per SAE AS5553. Defense Priority and Allocations System (DPAS) rated orders require preferential scheduling with DX and DO priority levels, mandatory notification to DLA within specified timeframes if performance cannot be met, and use of Form BIS-999 for special priorities assistance. The document also addresses Army Contract Writing System (ACWS) transition procedures, noting that contractors may receive documents from multiple contract writing systems during the transition period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRRA226R0071 NARRATIVES

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 1

SECTION A - NARRATIVES

A-1. EXPORT CONTROL

ARMS EXPORT CONTROL IS OR IS NOT OR MAY BE REQUIRED AND WHEN APPLICABLE THE

REQUIREMENT WILL BE IDENTIFIED AT THE CLIN LEVEL. THE TECHNICAL DATA PACKAGE

INCLUDES THE FOLLOWING REQUIRED STATEMENT. [WARNING – THIS DOCUMENT CONTAINS

TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT

(TITLE 22 U.S.C., SEC 2751 ET SEQ.) EXECUTIVE ORDER 12470. VIOLATION OF THESE

EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.] QUALIFIED INTERESTED

PARTIES CAN SUBMIT A REQUEST FOR TECHNICAL DATA PACKAGES TO THE AMCOM G-6

INFORMATION MANAGEMENT DIVISION CONTRACTOR USER DATA REQUEST AT

HTTPS://G6KMS.REDSTONE.ARMY.MIL/HOME/KMS_CCOSTS. ONCE REQUESTS ARE RECEIVED,

AND PROCESSED, TECHNICAL DATA PACKAGES WILL BE SENT VIA THE DOD SAFE SITE,

HTTPS://SAFE.APPS.MIL/. INTERESTED PARTIES HAVE 7 CALENDAR DAYS TO RETRIEVE

AND DOWNLOAD THE TECHNICAL DATA FROM THE DOD SAFE SITE BEFORE THE LINK

EXPIRES.

EXPORT CONTROL REQUIRES THE APPLICABLE CERTIFICATIONS TO BE CURRENT FOR BOTH

THE OFFEROR AND MANUFACTURER. THE OFFEROR AND ANY SOURCE(S) OF SUPPLY IT WILL

USE FOR CONTRACT PERFORMANCE MUST HAVE AN ACTIVE UNITED STATES/CANADA JOINT

CERTIFICATION PROGRAM (JCP) CERTIFICATION TO ACCESS EXPORT-CONTROLLED DATA.

DLA DOES NOT INTEND TO DELAY AWARD IN ORDER FOR AN INELIGIBLE OFFER OR ITS

SOURCE(S) SUPPLY TO APPLY FOR AND RECEIVE AUTHORITY APPROVAL TO ACCESS THE

EXPORT-CONTROLLED DATA.

A-2 ENVIRONMENTAL TEST

ENVIRONMENTAL TEST MAY BE REQUIRED, AND WHEN APPLICABLE THE REQUIREMENT WILL

BE IDENTIFIED AT THE CLIN LEVEL. ITEM(S) OR COMPONENT(S) WHICH ARE SUBJECTED

TO ENVIRONMENTAL TESTS OF A DESTRUCTIVE NATURE OR WHICH OTHERWISE DEGRADE THE

QUALITY OF THE ITEM(S) SHALL NOT BE FURNISHED TO THE GOVERNMENT IN

SATISFACTION OF THIS CONTRACT.

A-3. LONG LEAD TIME AND/OR LONG TERM CONTRACTS

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE

THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR PERFORMANCE OF THE

CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON

RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR

VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF

PERFORMANCE CONTRACTOR BECOMES AWARE THAT IT IS UNABLE TO PROCURE A PART OR

COMPONENT NECESSARY TO FULFILL THE REQUIREMENT OF THE CONTRACT, THE

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING WITHIN THIRTY

DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF

THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY.

THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION AND

PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH

IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN DIRECTION FROM THE

CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE

CONTRACT MAY BE TERMINATED IN WHOLE OR IN PART, AS APPROPRIATE.

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 2

SECTION H - NARRATIVES

H-1. WOOD PACKING MATERIALS REQUIREMENTS

A. WOOD PACKAGING MATERIAL (WPM) MEANS WOOD PALLETS, SKIDS, LOAD BOARDS,

PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAME AND CLEATS. THE

DEFINITION EXCLUDES MATERIALS THAT HAVE UNDERGONE A MANUFACTURING PROCESS,

SUCH AS CORRUGATED FIBERBOARD, PLYWOOD, PARTICLEBOARD, VENEER, AND ORIENTED

STRAND BOARD (OSD).

B. ALL WOOD PACKAGING MATERIAL (WPM) ACQUIRED BY DOD MUST MEET REQUIREMENTS

OF INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES (ISPM) 15, "GUIDELINES

FOR REGULATING WOOD PACKAGING MATERIALS INTERNATIONAL TRADE." DOD SHIPMENTS

INSIDE AND OUTSIDE OF THE UNITED STATES MUST MEET ISPM 15 WHENEVER WPM IS

USED TO SHIP DOD CARGO.

(1) ALL WPM SHALL COMPLY WITH THE OFFICIAL QUALITY CONTROL PROGRAM FOR

HEAT TREATMENT (HT) OR KILN DRIED HEAT TREATMENT (KD HT) IN ACCORDANCE WITH

AMERICAN LUMBER STANDARD COMMITTEE, INCORPORATED (ALSC) WOOD PACKAGING

MATERIAL PROGRAM AND WPM ENFORCEMENT REGULATIONS (SEE HTTP://WWW.ALSC.ORG/).

(2) ALL WPM SHALL INCLUDE CERTIFICATION/QUALITY MARKINGS IN ACCORDANCE

WITH THE ALSC STANDARD. MARKING SHALL BE PLACED IN AN UNOBSTRUCTED AREA THAT

WILL BE READILY VISIBLE TO INSPECTORS. PALLET MARKINGS SHALL BE APPLIED TO

THE STRINGER OR BLOCK ON DIAGONALLY OPPOSITE SIDES OF THE PALLET AND BE

CONTRASTING AND CLEARLY VISIBLE. ALL CONTAINERS SHALL BE MARKED ON A SIDE

OTHER THAN THE TOP OR BOTTOM, CONTRASTING AND CLEARLY VISIBLE. ALL DUNNAGE

USED IN CONFIGURING AND/OR SECURING THE LOAD SHALL ALSO COMPLY WITH ISPM 15

AND BE MARKED WITH AN ALSC APPROVED DUNNAGE STAMP.

C. FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS RESTRICTION MAY RESULT IN

REFUSAL, DESTRUCTION, OR TREATMENT AT ENTRY. THE AGENCY RESERVES THE RIGHT TO

RECOUP FROM THE CONTRACTOR ANY REMEDIATION COSTS INCURRED BY THE GOVERNMENT.

D. REPLACEMENT PRESERVATIVE FOR PENTACHLOROPHENOL

IF PACKAGING REQUIREMENTS OF THIS CONTRACT SPECIFY THE USE OF WOOD PRODUCTS

AND A PRESERVATIVE IS REQUIRED, PENTACHLOROPHENOL, COMMONLY REFERRED TO AS

"PENTA" OR "PCP" IS PROHIBITED. REPLACEMENT PRESERVATIVES ARE 2 PERCENT

COPPER NAPHTHENATE, 3 PERCENT ZINC NAPHTHENATE OR 1.8 PERCENT COPPER 8

QUINOLINOLATE.

(1) HEAT TREATMENT: BOXES/PALLETS AND ANY WOOD USED AS INNER PACKAGING

MADE OF NON-MANUFACTURED WOOD SHALL BE HEAT-TREATED. ALL NON-MANUFACTURED

WOOD USED IN PACKAGING SHALL BE HEAT TREATED TO A CORE TEMPERATURE OF 56

DEGREES CELSIUS FOR A MINIMUM OF 30 MINUTES. THE BOX/PALLET MANUFACTURER AND

THE MANUFACTURER OF WOOD USED AS INNER PACKAGING SHALL BE AFFILIATED WITH AN

INSPECTION AGENCY ACCREDITED BY THE BOARD OF REVIEW OF THE AMERICAN LUMBER

STANDARD COMMITTEE. THE BOX/PALLET MANUFACTURER AND THE MANUFACTURER OF WOOD

USED AS INNER PACKAGING SHALL ENSURE TRACEABILITY TO THE ORIGINAL SOURCE OF

HEAT TREATMENT.

(2) MARKING: EACH BOX/PALLET SHALL BE MARKED TO SHOW THE CONFORMANCE TO

THE INTERNATIONAL PLANT PROTECTION CONVENTION STANDARD. THE QUALITY MARK

SHALL BE PLACED ON BOTH ENDS OF THE OUTER PACKAGING, BETWEEN THE END CLEATS

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 3

OR END BATTENS: ON TWO SIDES OF THE PALLET. FOREIGN MANUFACTURERS SHALL HAVE

THE HEAT TREATMENT OF NON-MANUFACTURED WOOD PROCESS VERIFIED IN ACCORDANCE

WITH THEIR NATIONAL PLANT PROTECTION ORGANIZATION'S COMPLIANCE PROGRAM. IN

ADDITION, WOOD USED AS DUNNAGE FOR BLOCKING AND BRACING SHALL BE ORDERED WITH

ALSC CERTIFIED MARKING FOR DUNNAGE OR THE MARKINGS MAY BE APPLIED LOCALLY AT

TWO FOOT INTERVALS.

H-2. REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT

(A) SOURCES IN RECEIPT OF THIS SOLICITATION ARE REQUESTED, AT NO COST TO THE

GOVERNMENT, TO IMMEDIATELY NOTIFY THE CONTRACTING OFFICER IF THEY ARE AWARE

OF ANY CHANGE(S)/REVISION(S) TO THE DRAWING(S) OR PART NUMBER(S) IN THIS

SOLICITATION WHICH HAVE BEEN APPROVED BY THE GOVERNMENT FOR IMPLEMENTATION.

NOTIFICATION OF PART NUMBER CHANGES SHALL BE SUPPORTED BY DATA WHICH

INDICATES THE TYPE OF CHANGE, APPROVING AUTHORITY AS REQUIRED BY ANSI EIA 649

MIL-STD-973 AND DATE AND METHOD OF SUBMITTAL OF PROVISIONING DOCUMENTATION

AND DRAWINGS.

IF COMPLETE DATA PACKAGE HAS NOT BEEN PREVIOUSLY PROVIDED, THE CONTRACTOR

SHALL, AT NO DIRECT COST TO THE GOVERNMENT, IMMEDIATELY SUBMIT APPLICABLE

DRAWINGS, ALONG WITH A COPY OF THE APPROVAL CHANGE AUTHORITY, TO THE

CONTRACTING OFFICER, AT THE OFFICE SYMBOL AND MAILING ADDRESS LISTED IN THE

"ISSUED BY" BLOCK ON PAGE ONE (1) OF THIS DOCUMENT. THE MINIMUM ACCEPTABLE

DATA INCLUDES THE NEXT HIGHER ASSEMBLY AND THE ITEM OF SUPPLY DETAIL DRAWINGS

WHICH WILL ALLOW PROVISIONING, NATIONAL STOCK NUMBER ASSIGNMENT AND UPDATING

OF AMCOM'S DATA RECORDS.

(B) THE CONTRACTOR HEREBY VERIFIES PREVIOUS CONTRACTUAL SUBMISSION OF

TECHNICAL DATA:

CONTRACT NO.:____________________________________________

CONTRACTOR:______________________________________________

EXPLANATION OF DATA RIGHTS:______________________________

(C) THE GOVERNMENT IS NOT BY THIS REQUEST SOLICITING, NOR IS THE GOVERNMENT

LIABLE FOR COST INCURRED BY THE OFFEROR IN PREPARING OR DEVELOPING

MODIFICATIONS, DEVIATIONS, WAIVERS, OR OTHER CHANGES TO DRAWINGS OR PART

NUMBER(S). FURTHERMORE, THIS REQUEST DOES NOT AUTHORIZE CHANGES TO THE

DRAWING(S) OR PART NUMBER(S) FOR THIS ACQUISITION, ANOTHER CONTRACT, OR FOR

ANY OTHER PURPOSE. OFFERORS PERFORMING ANY CONTRACT AWARDED AS A RESULT OF

THIS SOLICITATION MUST COMPLY WITH THE DRAWING(S) AND SPECIFICATIONS AS SET

FORTH HEREIN, UNLESS THIS SOLICITATION IS AMENDED, OR ANY RESULTING CONTRACT

IS MODIFIED BY THE CONTRACTING OFFICER.

(D) ALL PROPOSED PART NUMBER CHANGES SHALL BE SUBMITTED PURSUANT TO THE

REQUIREMENTS OF THE REQUIREMENT ENTITLED, "ENGINEERING CHG PROPOSAL, VALUE

ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF

REVISION, AND SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION

INSTRUCTIONS.”

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 4

H-3. ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE,

ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE

PREPARATION AND SUBMISSION INSTRUCTIONS

1. CONTRACTOR INITIATED ENGINEERING CHANGE PROPOSALS (ECPS), VALUE

ENGINEERING CHANGE PROPOSALS (VECPS), AND REQUEST FOR VARIANCE (RFVS),

COLLECTIVELY REFERRED TO AS "PROPOSALS", SHALL BE PREPARED, SUBMITTED AND

DISTRIBUTED IN ACCORDANCE WITH PARAGRAPHS 2, 3 AND 4 BELOW EXCEPT AS

SPECIFIED IN PARAGRAPH 5 BELOW.;

2. FORMAT.;

A. CLASS I ECPS REQUIRE THE "LONG FORM PROCEDURE" FOR DOCUMENTING THE

CHANGE AND DESCRIBING THE EFFECTS OF THE CHANGE ON THE SUITABILITY AND

SUPPORTABILITY OF THE CONFIGURATION ITEM (CI). CLASS I ECPS SHOULD BE LIMITED

TO THOSE THAT ARE NECESSARY OR OFFER SIGNIFICANT BENEFIT TO THE GOVERNMENT.

CLASS I ECPS ARE THOSE THAT AFFECT THE PERFORMANCE, RELIABILITY,

MAINTAINABILITY, SURVIVABILITY, WEIGHT, BALANCE, MOMENT OF INERTIA, INTERFACE

CHARACTERISTICS, ELECTROMAGNETIC CHARACTERISTICS, OR OTHER TECHNICAL

REQUIREMENTS IN THE SPECIFICATIONS AND DRAWINGS. CLASS I ECPS ALSO INCLUDE

THOSE CHANGES THAT AFFECT GOVERNMENT FURNISHED EQUIPMENT, SAFETY,

COMPATIBILITY, RETROFIT, OPERATION AND MAINTENANCE MANUALSINTERCHANGEABILITY,

SUBSTITUTABILITY, REPLACEABILITY, SOURCE CONTROL SPECIFICATIONS AND DRAWINGS,

COSTS, GUARANTEES OR WARRANTIES, DELIVERIES, OR SCHEDULES. CLASS II ECPS ARE

THOSE THAT DO NOT AFFECT FORM, FIT AND FUNCTION, COST, OR SCHEDULE OF THE

SYSTEM CI AND DO NOT MEET THE OTHER CRITERIA DESCRIBED ABOVE FOR CLASS I

ECPS.;

B. LONG FORM PROCEDURE: CLASS I CHANGES TO THE CI REQUIRE THAT DD FORM

1692, PAGES 1 THROUGH 7 (AS APPLICABLE), BE PREPARED. USE OF THIS PROCEDURE

ASSURES THAT ALL EFFECTS OF THE CHANGE ON THE CI ARE PROPERLY ADDRESSED AND

DOCUMENTED TO THE NECESSARY DETAIL TO ALLOW PROPER EVALUATION OF THE PROPOSED

CHANGE.;

C. SHORT FORM PROCEDURE: ECPS AND VECPS, WHICH MEET THE REQUIREMENTS OF

CLASS II ECPS, SHALL BE PREPARED USING DD FORM 1692 (PAGE 1 ONLY).

SUPPLEMENTAL PAGES MAY BE USED WITH THE FORM AS NECESSARY. THE RESPONSIBLE

DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA) CONTRACT MANAGEMENT OFFICE (CMO)

WILL VALIDATE DATA ENTRIES IN BLOCK 5 "CLASS OF ECP", BLOCK 6 "PRIORITY", AND

BLOCK 8 "JUSTIFICATION CODES.";

D. THE CONTRACTOR SHALL NOT MANUFACTURE ITEMS FOR ACCEPTANCE BY THE

GOVERNMENT THAT INCORPORATE A KNOWN DEPARTURE FROM REQUIREMENTS, UNLESS THE

GOVERNMENT HAS APPROVED AN RFV. RFVS SHALL BE PREPARED USING DD FORM 1694.;

E. EACH ECP AND RFV SHALL BE ACCOMPANIED BY A WRITTEN AND SIGNED EVALUATION

PREPARED BY THE RESPONSIBLE DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA)

TECHNICAL REPRESENTATIVE. THE DCMA WRITTEN EVALUATION SHALL BE CONSIDERED

PART OF THE ECP/RFV PROPOSAL.;

F. CLASSIFICATION OF RFVS.;

(1) MAJOR RFVS. RFVS WRITTEN AGAINST CIS SHALL BE DESIGNATED AS MAJOR

WHEN THE RFV CONSISTS OF ACCEPTANCE OF AN ITEM HAVING A NONCONFORMANCE WITH

CONTRACT OR CONFIGURATION DOCUMENTATION INVOLVING HEALTH; PERFORMANCE

APPRAISAL <PERFORMANCEAPPRAISAL@DLAMIL.ONMICROSOFT.COM>; INTERCHANGEABILITY;

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 5

RELIABILITY; SURVIVABILITY; MAINTAINABILITY; EFFECTIVE USE OR OPERATION;

#WEIGHTPACK NORTH AMERICA INC <TO@WEIGHTPACK-NA.COM>; APPEARANCE (WHEN A

FACTOR); OR WHEN THERE IS A DEPARTURE FROM A REQUIREMENT CLASSIFIED AS MAJOR

IN THE CONTRACTUAL DOCUMENTATION.;

(2) CRITICAL RFVS. RFVS WRITTEN AGAINST CIS SHALL BE DESIGNATED AS

CRITICAL WHEN THE RFV CONSISTS OF ACCEPTANCE OF AN ITEM HAVING A

NONCONFORMANCE WITH CONTRACT OR CONFIGURATION DOCUMENTATION INVOLVING SAFETY

OR WHEN THERE IS A DEPARTURE FROM A REQUIREMENT CLASSIFIED AS CRITICAL IN THE

CONTRACTUAL DOCUMENTATION.;

(3) MINOR RFVS. RFVS WRITTEN AGAINST CIS SHALL BE DESIGNATED AS MINOR

WHEN THE RFV CONSISTS OF ACCEPTANCE OF AN ITEM HAVING A NONCONFORMANCE WITH

CONTRACT OR CONFIGURATION DOCUMENTATION WHICH DOES NOT INVOLVE ANY OF THE

FACTORS LISTED ABOVE IN PARAGRAPHS F(1) OR G(2), OR WHEN THERE IS A DEPARTURE

FROM A REQUIREMENT CLASSIFIED AS MINOR IN THE CONTRACTUAL DOCUMENTATION.;

G. PROPOSALS SHALL INCLUDE SUFFICIENT TECHNICAL DATA TO DESCRIBE ALL

CHANGES FROM EXISTING CONTRACT REQUIREMENTS.;

H. PROPOSALS SHALL INCLUDE SUFFICIENT JUSTIFICATION FOR MAKING THE CHANGE,

INCLUDING A STATEMENT OF CONTRACT IMPACT, IF THE CHANGE IS NOT AUTHORIZED.;

I. PROPOSALS FOR ECPS SHALL SET FORTH A "NOT TO EXCEED" PRICE AND DELIVERY

ADJUSTMENT ACCEPTABLE TO THE CONTRACTOR IF THE GOVERNMENT SUBSEQUENTLY

APPROVES THE PROPOSAL. IF APPROVED, THE EQUITABLE INCREASE SHALL NOT EXCEED

THIS AMOUNT.;

J. TIMES ALLOWED FOR TECHNICAL DECISIONS FOR ECP AND RFV PROPOSALS WILL BE

WORKED OUT VIA MUTUAL AGREEMENT BETWEEN THE CONTRACTOR AND THE GOVERNMENT.;

K. PROPOSALS FOR VECPS SHALL SET FORTH A "NOT LESS THAN" PRICE AND DELIVERY

ADJUSTMENT ACCEPTABLE TO THE CONTRACTOR IF THE GOVERNMENT SUBSEQUENTLY

APPROVES THE PROPOSAL. IF APPROVED, THE SAVINGS SHALL NOT BE LESS THAN THIS

AMOUNT.;

L. THE CONTRACTOR SHALL UTILIZE DD FORM 2617, "ENGINEERING RELEASE RECORD"

(ERR) TO RELEASE NEW OR REVISED CONFIGURATION DOCUMENTATION TO THE GOVERNMENT

FOR APPROVAL.; M. THE CONTRACTOR SHALL UTILIZE DD FORM 1695, "NOTICE OF

REVISION" (NOR) TO DESCRIBE THE EXACT CHANGE(S) TO CONFIGURATION

DOCUMENTATION SPECIFIED AS A DATA REQUIREMENT IN THE CONTRACT. THE CONTRACTOR

SHALL DESCRIBE THE CHANGE USING SUB-SECTIONS ENTITLED "WAS" TO DESCRIBE THE

CURRENT CONTRACTUAL TECHNICAL REQUIREMENT AND "IS" TO DESCRIBE THE PROPOSED

NEW REQUIREMENT.;

3. SUBMITTAL. THE PREFERRED METHOD OF SUBMITTAL IS DIGITALLY AS A SINGLE FILE

IN ADOBE ACROBAT PORTABLE DOCUMENT FORMAT (PDF). UNLESS OTHERWISE SPECIFIED,

ALTERNATE METHODS OF SUBMITTAL SHALL BE PROPOSED TO AND AUTHORIZED BY THE PCO

PRIOR TO SUBMITTAL. IF THE HARDCOPY METHOD IS REQUESTED AND APPROVED, THE

CONTRACTOR SHALL SUBMIT TWO (2) COPIES OF EACH PROPOSAL TO THE RESPONSIBLE

ADMINISTRATIVE CONTRACTING OFFICER (ACO). ONE (1) COPY OF EACH PROPOSAL SHALL

BE RETURNED TO THE CONTRACTOR WITHIN (5) WORKING DAYS AFTER RECEIPT BY THE

ACO, STATING WHETHER OR NOT THE PROPOSAL IS IN COMPLIANCE WITH THIS

PROVISION. ANY UNRESOLVED DIFFERENCES BETWEEN THE ACO AND THE CONTRACTOR

CONCERNING ECPS, VECPS, OR RFVS WILL BE SUBMITTED TO THE PCO FOR RESOLUTION.;

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 6

4. DISTRIBUTION.; A. ELECTRONIC DISTRIBUTION. THE PREFERRED METHOD OF

DISTRIBUTION FOR UNCLASSIFIED IS THROUGH THE EMAIL OR DOD SAFE SITE

(HTTPS://SAFE.APPS.MIL) ADDRESSED TO THE PCO. CLASSIFIED MATERIAL SHALL BE

DISTRIBUTED VIA SIPERNET OR BY CLASSIFIED EMAIL AS DETERMINED BY THE PCO.

MICROSOFT WORD IS REQUIRED FOR USE WITH THE TRANSMITTAL LETTER (E-MAIL).

REQUIRED FORMS WILL BE ATTACHED TO THE E-MAIL. ALL FORMS MAY BE OBTAINED FROM

THE OFFICE OF THE SECRETARY OF DEFENSE EXECUTIVE SERVICES DIRECTORATE DOD

DIRECTIVES DIVISION WEBSITE (HTTP://WWW.ESD.WHS.MIL/DD/) VIA THE DOD FORMS

MENU. THE FORMS ARE PROVIDED IN FILLABLE ADOBE ACROBAT PORTABLE DOCUMENT

FORMAT (PDF). IN ORDER TO ACCESS AND USE THE FORMS, THE USER MUST HAVE THE

"ADOBE ACROBAT" SOFTWARE INSTALLED ON THEIR COMPUTER. DRAWINGS MAY BE SCANNED

AND SENT AS AN ATTACHMENT. IN SOME CASES, BECAUSE OF SIZE, DRAWINGS MAY HAVE

TO BE SENT AS HARD COPIES OR SENT UNDER SPECIAL ELECTRONIC INSTRUCTIONS

PROVIDED BY THE PCO.;

5. ALTERNATE FORMAT, SUBMITTAL OR DISTRIBUTION PROCESS. PROPOSALS MAY BE

PREPARED IN A DIFFERENT FORMAT, SUBMITTED USING A DIFFERENT SUBMITTAL PROCESS

OR DISTRIBUTED IN A DIFFERENT MANNER THAN SPECIFIED IN PARAGRAPHS 2, 3 AND 4

ABOVE, SO LONG AS THE ALTERNATE APPROACH IS IN ACCORDANCE WITH A GOVERNMENT

APPROVED CONFIGURATION MANAGEMENT PLAN GOVERNED BY THIS CONTRACT OR THE PCO

AUTHORIZES THE ALTERNATE FORMAT, SUBMITTAL, OR DISTRIBUTION PROCESS.;

6. GOVERNMENT ACCEPTANCE. ACCEPTANCE OF A PROPOSAL BY THE GOVERNMENT SHALL BE

AFFECTED BY THE ISSUANCE OF A CHANGE ORDER OR EXECUTION OF A SUPPLEMENTAL

AGREEMENT INCORPORATING THE PROPOSAL INTO THE CONTRACT UNLESS THE PCO

AUTHORIZES ANOTHER METHOD OF ACCEPTANCE. THE GOVERNMENT WILL NOTIFY THE

CONTRACTOR IN WRITING IF A PROPOSAL IS DETERMINED TO BE UNACCEPTABLE.

H-4. IDENTIFICATION MARKING REQUIREMENTS

ITEM SHALL BE MARKED PER MIL-STD-130.

H-5. CALIBRATION REQUIREMENTS

THE CALIBRATION OF TEST, MEASUREMENT AND DIAGNOSTIC EQUIPMENT SHALL BE IN

ACCORDANCE WITH AMERICAN NATIONAL STANDARDS INSTITUTE/NATIONAL CONFERENCE OF

STANDARDS LABORATORIES (ANSI/NCSL) Z540-3-2006 (GENERAL REQUIREMENTS FOR

CALIBRATION LABORATORIES AND MEASURING AND TEST EQUIPMENT) OR ISO 10012:2003

(QUALITY ASSURANCE REQUIREMENTS FOR MEASURING EQUIPMENT). TERMINOLOGY SHALL

BE AS DEFINED BY INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO) 8402,

QUALITY MANAGEMENT AND QUALITY ASSURANCE – VOCABULARY.

H-6. BAR CODE MARKING REQUIREMENTS

BAR CODE MARKINGS ARE REQUIRED IN ACCORDANCE WITH THE LATEST REVISION OF MIL-

STD-129 AND ISO/IEC 16388 - INFORMATION TECHNOLOGY - AUTOMATIC IDENTIFICATION

AND DATA CAPTURE TECHNIQUES - BAR CODE SYMBOLOGY SPECIFICATION - CODE 39.

H-7. MSL FIRST ARTICLE TEST - CONTRACTOR TESTED - ADDITIONAL REQUIREMENTS

A. THE FIRST ARTICLE SHALL BE INSPECTED AND TESTED BY THE CONTRACTOR IN

ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT. THE FIRST ARTICLE SHALL BE

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 7

REPRESENTATIVE OF ITEMS TO BE MANUFACTURED USING THE SAME PROCESSES AND

PROCEDURES AND AT THE SAME FACILITY AS CONTRACT PRODUCTION. ALL PARTS AND

MATERIALS, INCLUDING PACKAGING AND PACKING, SHALL BE OBTAINED FROM THE SAME

SOURCE OF SUPPLY AS WILL BE USED DURING REGULAR PRODUCTION. ALL COMPONENTS,

SUBASSEMBLIES, AND ASSEMBLIES IN THE FIRST ARTICLE SAMPLE SHALL HAVE BEEN

PRODUCED BY THE CONTRACTOR (INCLUDING SUBCONTRACTORS) USING THE TECHNICAL

DATA PACKAGE APPLICABLE TO THIS PROCUREMENT. IF APPLICABLE, THE CONTRACTOR OR

ITS SUBCONTRACTOR SHALL PRODUCE OR DEMONSTRATE PROOF THAT ANY FIXTURES, TOOL

MASTERS, JIGS, OR SIMILAR DEVICES USED IN THE INSPECTION AND/OR TESTING OF

THE FIRST ARTICLE HAVE BEEN SUBJECTED TO AN INITIAL INSPECTION, OR OTHER

SUITABLE MEANS SUPPORTING THEIR ACCURACY, BEFORE BEING USED IN THE

MANUFACTURING/PRODUCTION PROCESS.

B. AT A MINIMUM, FIRST ARTICLE INSPECTION AND TEST SHALL INCLUDE:

(1) A 100% INSPECTION (OR AS SET FORTH IN RELEVANT SPECIFICATIONS) OF ALL

PHYSICAL AND FUNCTIONAL CHARACTERISTICS, TO INCLUDE BUT NOT LIMITED TO, ANY

DRAWINGS, AS WELL AS ANY OTHER REQUIREMENTS WHICH MAY BE SET FORTH BY OTHER

APPLICABLE SPECIFICATIONS, OR IN ANY TECHNICAL DATA PACKAGES, AND/OR ANY

OTHER SPECIAL/FUNCTIONAL TESTING AS SET FORTH IN THIS CONTRACT;

(2) A REVIEW OF PARTS, COMPONENTS AND/OR ASSEMBLIES FOR COMPLIANCE TO

IDENTIFICATION MARKINGS;

(3) A REVIEW OF PACKAGING FOR COMPLIANCE TO PRESERVATION, PACKAGING,

PACKING, AND MARKING REQUIREMENTS;

(4) A REVIEW FOR COMPLIANCE WITHIN THE TECHNICAL DATA PACKAGE OR AS

OTHERWISE STATED IN THIS CONTRACT THAT APPROVED MANUFACTURING SOURCES HAVE

BEEN USED FOR SPECIAL PROCESSES, CONTROLLED PARTS, COMPONENTS, AND/OR

ASSEMBLIES;

(5) THE VERIFICATION THROUGH DOCUMENTED EVIDENCE THAT ALL INSPECTION,

TESTING, MEASURING AND DIAGNOSTIC EQUIPMENT USED IN THE INSPECTION/TEST OF

THE FIRST ARTICLE PIECE(S) HAVE BEEN SUBJECTED TO AN INITIAL INSPECTION, OR

OTHER MEANS SUPPORTING THEIR ACCURACY, AND ARE MAINTAINED IN ACCORDANCE WITH

CONTRACTUAL CALIBRATION STANDARDS.

C. UNLESS OTHERWISE SPECIFIED IN THE CONTRACT, THE CONTRACTOR SHALL NOT

RETAIN THE FIRST ARTICLE PROVIDED UNDER THIS CONTRACT TO SERVE AS THE

MANUFACTURING STANDARD OF ACCEPTANCE.

D. A FIRST ARTICLE TEST REPORT (FATR) SHALL BE PREPARED AND SUBMITTED IN

ACCORDANCE WITH FAR 52.209-3. THE REPORT WILL INCLUDE ALL NECESSARY

DOCUMENTATION TO DEMONSTRATE AND SUPPORT FULL COMPLIANCE WITH THE FIRST

ARTICLE INSPECTION AND TEST REQUIREMENTS AS SET FORTH IN THIS CONTRACT

(INCLUDING SUPPLIER'S AND VENDOR'S INSPECTION RECORDS AND CERTIFICATIONS,

WHEN APPLICABLE). THE FATR SHALL INCLUDE ACTUAL INSPECTION AND TEST RESULTS

TO INCLUDE ALL MEASUREMENTS, RECORDED TEST DATA, AND CERTIFICATIONS (IF

APPLICABLE) KEYED TO EACH DRAWING, SPECIFICATIONS AND/OR QUALITY ASSURANCE

PROVISION (QAP) REQUIREMENT AND IDENTIFIED BY EACH INDIVIDUAL QAP

CHARACTERISTIC, DRAWING/SPECIFICATION CHARACTERISTIC AND UNLISTED

CHARACTERISTIC. THE FATR SHALL CONTAIN SUFFICIENT NARRATIVE CONTENT,

TECHNICAL DATA, ILLUSTRATIONS OR PHOTOGRAPHIC EVIDENCE, AND AN OBJECTIVE

DETERMINATION BY THE CONTRACTOR TO ALLOW THE DESIGNATED GOVERNMENT

REPRESENTATIVE TO DETERMINE THAT THE FIRST ARTICLE TEST WAS SUCCESSFULLY

COMPLETED.

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 8

E. ADDITIONAL FIRST ARTICLE TESTING MAY BE ORDERED BY THE CONTRACTING OFFICER

IN WRITING WHEN (I) A MAJOR CHANGE IS MADE TO THE TECHNICAL DATA, (II)

WHENEVER THERE IS A LAPSE IN PRODUCTION FOR A PERIOD IN EXCESS OF 3 YEARS, OR

(III) WHENEVER A CHANGE OCCURS IN PLACE OF PERFORMANCE, MANUFACTURING

LOCATIONS OR PROCESSES, MATERIAL USED, DRAWING, SPECIFICATION OR SOURCE OF

SUPPLY. WHEN CONDITIONS (I), (II), OR (III) ABOVE OCCURS, THE CONTRACTOR

SHALL NOTIFY THE CONTRACTING OFFICER SO THAT A DETERMINATION CAN BE MADE

CONCERNING THE NEED FOR THE ADDITIONAL FIRST ARTICLE SAMPLE OR PORTION

THEREOF, AND INSTRUCTIONS PROVIDED CONCERNING THE SUBMISSION, INSPECTION, AND

NOTIFICATION OF RESULTS. SHOULD THE GOVERNMENT REQUIRE ADDITIONAL FIRST

ARTICLE TESTING THE CONTRACTOR MAY BE ENTITLED TO AN EQUITABLE ADJUSTMENT.

H-8. REQUEST FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL

(A) THE REQUIREMENT FOR FIRST ARTICLE APPROVAL MAY BE WAIVED, IN WHOLE OR IN

PART, BY THE GOVERNMENT, PROVIDED THAT SUFFICIENT INFORMATION IS PROVIDED TO

DETERMINE WHETHER THE REQUEST IS TO BE APPROVED. A PARTIAL WAIVER IS DEFINED

AS A WAIVER OF ONLY A SPECIFIC TEST(S) OF THE FIRST ARTICLE TEST REQUIREMENT

AS REQUIRED BY THE TECHNICAL DATA PACKAGE (TDP) AND/OR THE

SOLICITATION/CONTRACT, I.E. VIBRATION TEST, SALTWATER SPRAY TEST, OR A TEST

ON A COMPONENT OR SUBASSEMBLY OF THE PROCURED ITEM. A FULL WAIVER IS DEFINED

AS A WAIVER OF ALL FIRST ARTICLE TESTING AS REQUIRED BY THE TDP AND/OR THE

SOLICITATION/CONTRACT.

(B) ALL WAIVER REQUESTS REQUIRE A FIRST ARTICLE WAIVER WORKSHEET TO BE

COMPLETED AND SUBMITTED TO THE GOVERNMENT ALONG WITH ALL SUPPORTING

DOCUMENTATION. THE WORKSHEET WILL BE PROVIDED BY THE BUYER UPON REQUEST. NO

REQUESTS WILL BE CONSIDERED IF THE WORKSHEET AND SUPPORTING DOCUMENTATION ARE

NOT SUBMITTED TO THE GOVERNMENT. THE WORKSHEET MUST BE COMPLETED IN ITS

ENTIRETY. FOR THOSE SECTIONS OF THE WORKSHEET WHICH DO NOT APPLY, ANNOTATE

WITH N/A (NOT APPLICABLE). TO SUBSTANTIATE OR CLARIFY INFORMATION PROVIDED,

THE GOVERNMENT MAY REQUEST ADDITIONAL INFORMATION.

(C) SUBMISSION OF THE FAT WAIVER REQUEST (AND SUPPORTING DOCUMENTATION) TO

THE GOVERNMENT DOES NOT GUARANTEE THAT THE WAIVER WILL BE GRANTED.

(D) THE FIRST ARTICLE WAIVER WORKSHEET AND ADDITIONAL SUPPORTING

DOCUMENTATION MUST BE SUBMITTED ON COMPANY LETTERHEAD AND SIGNED BY AN

AUTHORIZED AGENT OF THE COMPANY.

(E) SUPPORTING DOCUMENTATION.

(1) THE REQUEST FOR WAIVER MUST BE ACCOMPANIED BY THE FIRST ARTICLE WAIVER

WORKSHEET, AND DOCUMENTATION IN SUPPORT OF THE REQUEST. THE DOCUMENTATION MAY

INCLUDE, BUT IS NOT LIMITED TO:

(I) COPY OF THE ADMINISTRATIVE CONTRACTING OFFICER’S (ACO’S) OR PROCURING

CONTRACTING OFFICER’S (PCO’S) LETTER APPROVING A FIRST ARTICLE TEST REPORT ON

A RECENT CONTRACT FOR THE SAME OR SIMILAR ITEM;

(II) COPY OF A FIRST ARTICLE TEST REPORT FOR THE SAME OR A SIMILAR ITEM

AS THAT SOLICITED HEREIN;

(III) COPY OF AN ACO OR PCO LETTER APPROVING A PRIOR WAIVER REQUEST; OR

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 9

(IV) IF THE WAIVER REQUEST IS BASED ON SIMILARITY, A COPY OF THE

DRAWING/OTHER APPROPRIATE TECHNICAL REQUIREMENTS OF THE SIMILAR ITEM.

(2) IF A COPY OF A FIRST ARTICLE TEST REPORT IS SUBMITTED IN SUPPORT OF A

REQUEST FOR WAIVER, THE TEST REPORT MUST HAVE BEEN APPROVED AND SIGNED BY AN

AUTHORIZED REPRESENTATIVE OF THE UNITED STATES GOVERNMENT.

(3) THE FIRST ARTICLE WAIVER WORKSHEET AND ALL SUPPORTING DOCUMENTATION

SHOULD BE SUBMITTED BY EMAIL. IF THE FIRST ARTICLE WAIVER WORKSHEET AND

SUPPORTING DOCUMENTATION CANNOT BE TRANSMITTED BY EMAIL, THE PCO SHOULD BE

CONTACTED FOR FURTHER INSTRUCTION.

(F) NOTE: IF A WAIVER IS GRANTED, AN ACCELERATED DELIVERY SCHEDULE WILL

APPLY.

(G) NOTE: COST CONSIDERATIONS SHALL APPLY FOR APPROVING A WAIVER OR A

PORTION THEREOF OF A FIRST ARTICLE TEST.

H-9. ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC

ASSEMBLIES

1. NOTWITHSTANDING ANY OTHER PROVISION CONTAINED IN ANY PART OF THIS CONTRACT

TO THE CONTRARY, THE MINIMUM REQUIREMENTS/STANDARDS FOR SOLDERING ELECTRICAL

AND ELECTRONIC ASSEMBLIES SHALL BE THE NON-MILITARY JOINT INDUSTRY STANDARD,

ANSI/J-STD-001, CLASS 3. THE REVISION OF ANSI/J-STD-001 IN EFFECT ON THE

EFFECTIVE DATE OF THE CONTRACT SHALL GOVERN THE HARDWARE PRODUCED HEREUNDER.

A COPY OF ANSI/J-STD-001 MAY BE OBTAINED FROM THE INSTITUTE FOR

INTERCONNECTING AND PACKAGING ELECTRONIC CIRCUITS (IPC), 3000 LAKESIDE DRIVE,

105N, BANNOCKBURN, IL, 60015, HTTPS://WWW.IPC.ORG.

2. THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN AN ELECTRONIC/ELECTRICAL PARTS

CONTROL PROGRAM AND SHALL MAINTAIN AND MAKE AVAILABLE TO THE GOVERNMENT

RECORDS AND DATA WHICH WILL PROVIDE VISIBILITY AND TRACEABILITY OF ALL PARTS

USED IN THE PRODUCTION OF THE EQUIPMENT UNDER THIS CONTRACT. THIS SELECTION

OF PARTS SHALL NOT BE CONSTRUED TO RELIEVE THE CONTRACTOR OF MEETING

SPECIFIED PERFORMANCE OF THE END ITEM IN WHICH THE PART IS USED.

3. THE TECHNICAL DATA PACKAGE (TDP) SHALL SERVE AS THE BASELINE PROGRAM PARTS

SELECTION LIST (PPSL) AND THE PARTS AND SOURCES LISTED THEREIN ARE THE

STANDARD PARTS AND SOURCES. A NON STANDARD PART IS DEFINED AS A PART OR

SOURCE OTHER THAN THAT CITED IN THE PPSL. WHEN THE CONTRACTOR DESIRES TO USE

A PART OR SOURCE OTHER THAN THOSE CITED IN THE PPSL, THE CHANGE MUST BE

APPROVED BY THE GOVERNMENT VIA A REQUEST FOR DEVIATION (RFD) AS DEFINED

ELSEWHERE IN THIS CONTRACT. FAILURE ON THE PART OF THE CONTRACTOR TO SUBMIT

SUCH RFDS MAY RESULT IN THE REPLACEMENT OF THE NONSTANDARD PART WITH THE

STANDARD PART BY THE GOVERNMENT AT THE CONTRACTOR’S EXPENSE FOR ALL AFFECTED

ITEMS.

4. THE CONTRACTOR SHALL PROVIDE OBJECTIVE EVIDENCE SUCH AS FORM, FIT,

FUNCTION, AND INTERCHANGEABILITY DATA THAT SHOWS THE PROPOSED PART COMPLIES

WITH THE REQUIREMENTS OF APPLICABLE PARTS DOCUMENTATION. THE RFD SHALL DETAIL

THE TECHNICAL JUSTIFICATION FOR THE USE OF THE PART AND ADVANTAGES OF THE

NONSTANDARD PART, IF ANY. COMPARE THE NONSTANDARD PART TO THE STANDARD PART

WHOSE CHARACTERISTICS ARE NEAREST TO THOSE REQUIRED FOR THE APPLICATION.

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 10

INCLUDE, WHEN APPLICABLE:

A. PART NUMBER AND SOURCE

B. SIZE AND WEIGHT DATA.

C. ELECTRICAL AND MECHANICAL CHARACTERISTICS

D. RELIABILITY (WITH DATA IF REQUESTED)

E. AVAILABILITY OF THE STANDARD PART (DELIVERY SCHEDULES, STILL AVAILABLE

ETC.)

F. SUPPLEMENTAL DATA SUCH AS EXISTING CONTROL DRAWINGS, SPECIFICATIONS,

VENDOR DATA SHEETS, AND OTHER PERTINENT DATA. DATA NEED NOT BE FURNISHED FOR

NONSTANDARD PARTS COVERED BY DOCUMENTS LISTED IN THE DEPARTMENT OF DEFENSE

INDEX OF SPECIFICATIONS AND STANDARDS (DODISS) OR STANDARDIZED MILITARY

DRAWINGS (SMD).

5. THE CONTRACTOR SHALL MAINTAIN A LEAD FREE CONTROL PLAN (LFCP) AND MAKE

AVAILABLE TO THE GOVERNMENT UPON REQUEST. THE REQUIREMENT FOR A LEAD FREE

CONTROL PLAN SHALL BE FLOWED DOWN TO SUPPLIERS OF EQUIPMENT THAT MAY INCLUDE

LEAD-FREE MATERIALS. THE LFCP SHALL FOLLOW THE GUIDELINES SET FORTH IN GEIA-

STD-0005-1, "PERFORMANCE STANDARD FOR AEROSPACE AND HIGH PERFORMANCE

ELECTRONIC SYSTEMS CONTAINING LEAD- FREE SOLDER" OR ITS EQUIVALENT. IN

ADDITION, THE LFCP SHALL ALSO INCLUDE TIN WHISKER MITIGATION PLANS IN

ACCORDANCE WITH GEIA-STD-0005- 2, "STANDARD FOR MITIGATING THE EFFECTS OF TIN

WHISKERS IN AEROSPACE AND HIGH PERFORMANCE ELECTRONIC SYSTEMS" OR ITS

EQUIVALENT, AT CONTROL LEVEL 2C OR EQUIVALENT. THE CONTRACTOR SHOULD INCLUDE

IN THE LFCP ANY SPECIAL DESIGN CONSIDERATIONS, MANUFACTURING PROCESS

CONTROLS, TEST AND QUALIFICATION REQUIREMENTS, QUALITY INSPECTION AND

SCREENING, MARKING AND IDENTIFICATION, MAINTENANCE AND REPAIR PROCESSES, AND

OTHER STEPS TAKEN TO MITIGATE RISK.

6. THE CONTRACTOR SHALL PREPARE, OR UPDATE EXISTING, COUNTERFEIT RISK

MANAGEMENT PLAN AND MAKE AVAILABLE TO THE GOVERNMENT UPON REQUEST. THE PLAN

SHALL MEET THE REQUIREMENTS OF SAE AS5553 FOR ELECTRONIC ITEMS. THE

CONTRACTOR SHALL PROCURE PARTS FROM ORIGINAL MANUFACTURERS OR THE ORIGINAL

MANUFACTURERS’ FRANCHISED DISTRIBUTORS. CONTRACTORS SHALL REPORT

COUNTERFEITS AND SUSPECTED COUNTERFEITS TO THE GOVERNMENT AND IN THE

GOVERNMENT INDUSTRY DATA EXCHANGE PROGRAM (GIDEP), IN ACCORDANCE WITH THE

GIDEP OPERATIONS MANUAL, SO300-BT-PRO- 010.

H-10. NOTICE: ENVIRONMENTAL TEST

ITEM(S) OR COMPONENTS THEREOF WHICH ARE SUBJECTED TO ENVIRONMENTAL TESTS OF A

DESTRUCTIVE NATURE OR WHICH OTHERWISE DEGRADE THE QUALITY OF THE ITEM(S)

SHALL NOT BE FURNISHED TO THE GOVERNMENT IN SATISFACTION OF THIS CONTRACT.

H-11. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS

DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS (JUNE 2025)

A DPAS RATED ORDER INDICATES THE PRIORITY THE CONTRACTOR MUST GIVE TO THE

PERFORMANCE OF THE AWARD. THERE ARE TWO PRIORITY RATINGS: “DX” AND “DO”. ALL

“DX” RATED ORDERS HAVE EQUAL PRIORITY WITH EACH OTHER AND TAKE PREFERENCE

OVER “DO” RATED ORDERS AND UNRATED ORDERS. ALL “DO” RATED ORDERS HAVE EQUAL

PRIORITY WITH EACH OTHER AND TAKE PREFERENCE OVER UNRATED ORDERS. (SEE 15 CFR

700.11 AND DODM 4400.1-M).

MANDATORY CONTRACTOR PERFORMANCE SCHEDULING

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 11

A CONTRACTOR MUST SCHEDULE OPERATIONS, INCLUDING THE ACQUISITION OF ALL

NEEDED PRODUCTION ITEMS, IN A TIMELY MANNER TO SATISFY THE DELIVERY

REQUIREMENTS OF EACH DPAS RATED ORDER. ADDITIONALLY, CONTRACTORS ARE

REQUIRED TO USE DPAS RATED ORDERS WITH THEIR U.S. SUPPLIERS TO OBTAIN ITEMS

NEEDED TO FILL RATED ORDERS (15 CFR 700.15). CONTRACTORS MAY ALSO USE DPAS

RATED ORDERS TO OBTAIN REPLACEMENTS OF INVENTORIED ITEMS USED TO FILL RATED

ORDERS (SEE 15 CFR 700.17(B)). MODIFYING PRODUCTION OR DELIVERY SCHEDULES IS

NECESSARY ONLY WHEN REQUIRED DELIVERY DATES FOR A RATED ORDER CANNOT

OTHERWISE BE MET. SINCE “DX” INDICATES THE HIGHEST RATED ORDER, THE

MANUFACTURER WILL SCHEDULE ITS PRODUCTION BEFORE PROCESSING OTHER LOWER OR

UNRATED ORDERS. “DX” RATED ORDERS MUST BE GIVEN PRODUCTION PREFERENCE OVER

“DO” RATED ORDERS AND UNRATED ORDERS IF NECESSARY TO MEET REQUIRED DELIVERY

DATES, EVEN IF THIS REQUIRES THE DIVERSION OF ITEMS BEING PROCESSED OR READY

FOR DELIVERY AGAINST UNRATED ORDERS. SIMILARLY, “DO” RATED ORDERS MUST BE

GIVEN PREFERENCE OVER UNRATED ORDERS. IF AN ACCEPTED RATED ORDER OF EQUAL

PRIORITY STATUS CONFLICTS WITH OTHER ACCEPTED RATED ORDERS OF EQUAL PRIORITY

STATUS, THE CONTRACTOR MUST PRIORITIZE THE RATED ORDERS IN THE SEQUENCE IN

WHICH THE RATED ORDERS ARE TO BE DELIVERED OR PERFORMED (SEE 15 CFR 700.14).

CONTRACTOR ACCEPTANCE OF A DPAS RATED ORDER:

CONTRACTORS RECEIVING AN AWARD THAT INCLUDES A DPAS RATING SHALL ADVISE DLA

VIA THE POST AWARD MAILBOX (DLAHSVPOSTAWARDTEAM@DLA.MIL), IF THEY CANNOT

PERFORM IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLIED DPAS RATING. WHEN

REJECTING AN ORDER IN FULL, COMMUNICATION TO THE CONTRACTING OFFICER MUST

INCLUDE A DETAILED REASON FOR REJECTION. IF THE ORDER CAN BE FULFILLED AT A

LATER DATE, THE CONTRACTOR MUST PROVIDE, A) THE EARLIEST POSSIBLE DELIVERY

DATE, B) A DETAILED REASON WHY THE AWARDED DELIVERY DATE CANNOT BE MET (E.G.

REASON SHOULD NOT SIMPLY STATE A PRODUCTION DELAY) AND, C) AN OFFER TO ACCEPT

THE ORDER BASED ON THAT DATE. CONTRACTORS MUST ADVISE DLA WITHIN FIFTEEN (15)

WORKING DAYS AFTER RECEIPT OF A “DO” RATED ORDER, AND WITHIN TEN (10) WORKING

DAYS AFTER RECEIPT OF A “DX” RATED ORDER IF THEY CANNOT PERFORM IN ACCORDANCE

WITH THE DPAS RATING. CONTRACTORS THAT DO NOT CONTACT DLA ARE SELF-ATTESTING

THAT THEY ACKNOWLEDGE RECEIPT OF THE AWARD AND WILL CONFORM TO THE DPAS

RATING REQUIREMENT. IF THE PRESCRIBED RESPONSE TIME HAS PASSED AND THE

CONTRACTOR LEARNS THAT SHIPMENT OR PERFORMANCE WILL BE DELAYED, THE

CONTRACTOR IS STILL REQUIRED TO NOTIFY DLA IMMEDIATELY.

SPECIAL PRIORITY ASSISTANCE:

PREFERENTIAL SCHEDULING IS A MUST FOR DPAS RATED ORDERS (SEE 15 CFR 700.14).

IF A CONTRACTOR LEARNS THAT A SHIPMENT OR PERFORMANCE WILL BE DELAYED AFTER

THE ALLOTTED RESPONSE TIME HAS PASSED OR ANY OTHER ISSUE ARISES THAT WILL

AFFECT DELIVERIES DURING THE DURATION OF THE CONTRACT, THE CONTRACTOR IS

REQUIRED TO NOTIFY DLA IMMEDIATELY THROUGH THE USE OF FORM BIS-999, SPECIAL

PRIORITIES ASSISTANCE (SPA). DEVIATIONS FROM SCHEDULES CANNOT BE APPROVED

WITHOUT THE COMPLETION AND SUBMISSION OF THIS FORM. ONCE SUBMITTED, DLA AND

ITS CUSTOMERS WILL DISCUSS THE SPA FOR APPROVAL. THE DEPARTMENT OF COMMERCE

REQUIRES AN APPROVED BIS-999 PRIOR TO REPRIORITIZING DPAS RATED ORDERS AND

ITS SCHEDULES (SEE 15 CFR 700.50). PLEASE CONTACT DLA POST AWARD FOR ANY SPA

QUESTIONS OR CONCERNS.

H-12. ARMY CONTRACT WRITING SYSTEM (ACWS) TRANSITION INFORMATION FOR

CONTRACTORS

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 12

A. DLA HUNTSVILLE UTILIZES THE U.S. ARMY’S CONTRACTING ENTERPRISE (ACE)

SYSTEMS. ACE IS IN THE PROCESS OF DEPLOYING NEW SOLICITATION AND CONTRACT

WRITING SOFTWARE TO ARMY CONTRACTING OFFICES WORLDWIDE. KNOWN AS THE ARMY

CONTRACT WRITING SYSTEM (ACWS), THIS MODERN SOFTWARE SUITE WILL SOON REPLACE

MOST EXISTING ARMY CONTRACT WRITING SYSTEMS, INCLUDING THE SYSTEM USED TO

CREATE AND RELEASE THIS CONTRACT.

B. DURING THIS TRANSITION PERIOD, CONTRACTORS ARE HEREBY ADVISED:

1. THE CONTRACTING OFFICE MAY USE ANY COMBINATION OF CONTRACT WRITING

SYSTEMS TO GENERATE DISTRIBUTABLE COPIES OF THIS CONTRACT DURING ITS PERIOD

OF PERFORMANCE, AS WELL AS ANY SUBSEQUENT MODIFICATIONS OR ORDERS (IF

APPLICABLE). AS A RESULT:

I. SUBSEQUENT DOCUMENTS YOU RECEIVE MAY APPEAR NOTICEABLY DIFFERENT THAN

THE ORIGINAL AWARD OR PREVIOUS CONTRACTUAL DOCUMENTS FROM THE SAME

CONTRACTING OFFICE.

II. A CHANGE BETWEEN CONTRACT WRITING SYSTEMS MAY CAUSE IMPORTANT

INFORMATION CONCERNING CONTRACT TERMS AND CONDITIONS TO TAKE ON DIFFERENT

FORMATTING OR APPEAR IN DIFFERENT PARTS OF LATER DOCUMENTS ISSUED.

III. CONTRACTORS SHALL ENSURE CUSTOMER RELATIONSHIP MANAGEMENT (CRM)

SYSTEMS AND PERSONNEL INTERACTING WITH THIS CONTRACT ARE PREPARED TO IDENTIFY

AND RESPOND APPROPRIATELY TO DIFFERENCES BETWEEN DOCUMENT VERSIONS.

2. THE GOVERNMENT DOES NOT INTEND TO USE THE SHIFT BETWEEN CONTRACT WRITING

SYSTEMS TO EFFECT ANY CHANGES TO CONTRACT TERMS AND CONDITIONS. THEREFORE:

I. CONTRACTORS SHOULD VIEW CHANGES TO TERMS OR CONDITIONS BETWEEN

DOCUMENT VERSIONS AS SYSTEM-GENERATED AND POTENTIALLY ERRONEOUS UNLESS

ACCOMPANIED BY NARRATIVE(S) DESIGNATING SUCH CHANGES AS DELIBERATE AND

DESIRED.

II. CONTRACTORS SHALL INFORM THE CONTRACTING OFFICER LISTED ON THE FIRST

PAGE OF THE MOST RECENT DOCUMENT ISSUED FOR GUIDANCE REGARDING ANY SUSPECTED

OR OBSERVED INADVERTENT OR SYSTEM-GENERATED CHANGES (E.G. NOTICING SOMETHING

MISSING IN A NEW CONFORMED COPY).

III. THE GOVERNMENT WILL CORRECT ANY INADVERTENT OR SYSTEM-GENERATED

CHANGES, ADDITIONS, OR OMISSIONS DISCOVERED BY EITHER PARTY, VIA BILATERAL

MODIFICATION, AT NO COST TO THE CONTRACTOR.

IV. THE TERMS AND CONDITIONS CONTAINED IN THE LATEST DOCUMENT REFLECTING

DELIBERATE ACTION BY THE CONTRACTING OFFICER (E.G. THE LAST CONFORMED COPY OF

THE AWARD NOT AFFECTED BY THE OBSERVED ISSUE) WILL TAKE PRECEDENCE UNTIL

THESE PROBLEMS ARE CORRECTED.

3. IN THE UNLIKELY EVENT AWARD INFORMATION IS CORRUPTED OR MUTILATED DURING

SYSTEM MIGRATION AND REPLACEMENT OR RE-ISSUANCE OF THIS CONTRACT IS NECESSARY

FOR CONTINUED CONTRACT ADMINISTRATION, THE CONTRACTING OFFICER WILL:

I. ISSUE A CONTINUATION CONTRACT IN ACCORDANCE WITH DFARS 204.1601(C) AND

DFARS PGI 204.1601(C), CARRYING OVER ALL TERMS AND CONDITIONS FROM THE LAST-

KNOWN VERSION OF THIS CONTRACT ACCURATELY REFLECTING MUTUAL AGREEMENT OF THE

PARTIES.

CUI / SOURCE SELECTION INFORMATION - SEE FAR 2.101 & 3.104 13

II. INCORPORATE THE LAST-KNOWN VERSION OF THIS CONTRACT ACCURATELY

REFLECTING MUTUAL AGREEMENT OF THE PARTIES AS AN ATTACHMENT TO THE

REPLACEMENT OR CONTINUATION CONTRACT FOR FUTURE REFERENCE.

III. ENSURE ANY SUCH REISSUANCE OR CONTINUANCE IS PROPERLY REPORTED TO

PRESERVE THE INTEGRITY OF CONTRACTOR PERFORMANCE MEASUREMENT DATA, IF ANY

(E.G. FAPIIS, CPARS).

SECTION A - NARRATIVES
SECTION H - NARRATIVES
H-1. WOOD PACKING MATERIALS REQUIREMENTS
H-2. REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT
H-3. ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
H-4. IDENTIFICATION MARKING REQUIREMENTS
H-5. CALIBRATION REQUIREMENTS
H-6. BAR CODE MARKING REQUIREMENTS
H-7. MSL FIRST ARTICLE TEST - CONTRACTOR TESTED - ADDITIONAL REQUIREMENTS
H-8. REQUEST FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL
H-9. ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES
H-10. NOTICE: ENVIRONMENTAL TEST
H-11. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS