ATTCH 0004 FAT WAIVER FORMS 052026.pdf
PDF 12 MB Posted
- Solicitation number
- SPRRA226R0071
- Issued by
-
Defense Logistics Agency Aviation
About this file
This document is a contract attachment listing FAT (Factory Acceptance Test) Waiver Forms associated with 17 part or drawing numbers. Each of the listed parts contains 3 pages of documentation. The part numbers included are: 13588680, 13690107, 13702370, 13747977, 13747978, 13747990, 13747995, 13748010, 13748110, 13748120, 13748149, 13748150, 13748151, 13748157, 13748158, 13748160, and 13783940. This is a reference document or index that does not contain substantive information regarding specific products, services, pricing, response dates, or other procurement details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Attachment 0005 FAT Waiver Forms
Part or Drawing No. No. of Pages 13588680 3 13690107 3 13702370 3 13747977 3 13747978 3 13747990 3 13747995 3 13748010 3 13748110 3 13748120 3 13748149 3 13748150 3 13748151 3 13748157 3 13748158 3 13748160 3 13783940 3
This information/supporting documentation is part of your request.
Contact the buyer if you have any questions about the acquisition offer/quote requirements.
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
BUYER'S NAME
Revision E 12 March 2020
1. CURRENT ACQUISITION INFORMATION:
NOUNPART #
CONTRACTOR NAME
NSN
TOP DRAWING #
SOLICITATION/CONTRACT # CONTRACTOR CAGE
REVISION LEVEL
2. TYPE OF REQUEST:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or solicitation. Partial waivers not acceptable on Aviation items.
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Remarks (if needed)
A) CURRENT OR RECENT PRODUCTION
YES NOCRITICAL SAFETY ITEM (CSI)
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
NO, continue to section 3B.
YES, provide date, contract number, and substantiation in Remarks.
Date Contract #
IN-HOUSE PRODUCTION, Provide copies of DD-250s, work orders, proof of installation on delivered end item, or other substantiation of past delivery within the past 3 years SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, or other substantiation of sub-tier past delivery; in addition to DD-250s of end item delivery, within the past 3 years
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
N/A NO YES,Provide revision level/date and details in Remarks
N/A YES
NO, provide planning revision level/date in Remarks
N/A NO YES,Provide details in Remarks
N/A NO YES,Provide company/CAGE&qualification in remarks
Provide a full explanation justifying why duplicate testing is unnecessary:
National Stock Number
Contract No.
Date of First Article Approval
Nomenclature
Part Number
Remarks:
If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request
Date of FAT Approval
Issuing Government Agency
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B) - Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract? YES, complete fill-ins >
NO, enter remarks below
YES, proceed to Section 4
C) - Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
A waiver may be requested in order to eliminate duplication of testing on the lower assembly.
YES, complete fill-ins below on Next Higher Assembly
NO, continue to 3.D.
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
NO, explain below
D) - Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
YES, complete fill-ins below on similar item
NO, continue to 3.E.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
Other: A waiver or partial waiver of the FAT is being requested based on the following:
Please be specific and attach supporting documentation* as appropriate:E)
4. OTHER PERTINENT INFORMATION
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
Please describe below.
B)
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to manufacture of this item. Please describe below. C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct.
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
PRINTED NAME
COMPANY NAME
PHONE NUMBER
TITLE
COMPANY ADDRESS
Signature
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
The add, open, and remove buttons are the preferred attachment method.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes> Attachments to save the attachments to local computer for viewing.
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
C)
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
If attachments do not open, please go to the attachment window by opening
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: MONOCULAR ASSEMBLY
PART_NO: 13588680
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 1240-01-464-1068
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: OPTICAL COMPONENT A
PART_NO: 13690107
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 1240-01-721-2087
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: GUIDANCE SET
PART_NO: 13702370
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 1430-01-721-2985
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: POWER SUPPLY
PART_NO: 13747977
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 6130-01-721-1969
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: CIRCUIT CARD ASSEMB
PART_NO: 13747978
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 5998-01-721-1330
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: VIEWER,NIGHT VISION
PART_NO: 13747990
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 5855-01-721-1229
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: RECEIVER-TRANSMITTE
PART_NO: 13747995
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 5895-01-721-1182
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: HEAD ASSEMBLY,ARMOR
PART_NO: 13748010
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 1240-01-721-1990
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-REMARKS:
B3RemarksforNO:
FATAPPROVALDATE:
CONTRACTNO:
IGA:
B3YESRADIO:
B3_NORADIO:
B3-NOREMARKS2:
C3YESRADIO2:
C3_NORADIO2:
D3_Remarks:
D3-NSN:
D3-ContractNO:
D3-FATDATEAPPROVAL:
D3-NOMENCALTURE:
D3-PN:
D3YESRADIO:
D3_NORADIO:
D3YESRADIO2:
D3_NORADIO2:
NumericField1: 0
TextField7:
SignatureField1:
Button1:
Button2:
ListBox1:
Button3:
RadioButtonStyle1:
RadioButtonStyle2:
RadioButtonStyle3:
RadioButtonStyle4:
RadioButtonStyle5:
RadioButtonStyle6:
RadioButtonStyle7:
RadioButtonStyle8:
Full Waiver: Includes waiver of all First Article Testing as required by the TDP, contract and/or solicitation.
Partial Waiver: Includes waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP), contract and/or
TDP Reference(s) of test(s) to be waived: (Please be specific and reference specification paragraph and/or drawing note as appropriate).
SUB-TIER SUPPLIER/VENDOR, Provide copies of purchase orders, shipping receipts of delivery, If NO, please describe the differences in detail below and include any considerations these changes will require for the First Article Test waiver request equipment, processes, and procedures in which the current item will be produced? YES, proceed to Section 4.
There are or have been quality issues (history) for this or similar items such as Quality Escapes, Product Quality Deficiency Reports (PQDRs), Corrective Action Requests, and/or show-cause letters. Please discuss/provide resolutions below:A)
There have been changes to the manufacturing data (e.g. drawing revisions that change materials, dimensions, processes, inspection or testing requirements) or subcontractors used to manufacture the items successfully in the past.
There have been Requests for Waiver/Deviation submitted or Material Review Board (MRB) actions related to
Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
If attachments do not open, please go to the attachment window by opening View>Show/Hide>Navigation Panes>
FIRST ARTICLE WAIVER WORKSHEET
Request for Information and Supporting Documentation
Revision E
12 March 2020
1. CURRENT ACQUISITION INFORMATION:
2. TYPE OF REQUEST:
3. JUSTIFICATION TO SUPPORT WAIVER REQUEST: (Check and complete all that apply)
Page of
A)
CURRENT OR RECENT PRODUCTION
1) Has the item been manufactured and delivered for a DoD contract within the past 3 years?
3) If past DoD contract delivery was sub-tier to an OEM, is this direct DoD contract delivery utilizing the same manufacturing planning?
4) Since the last delivery for a DoD contract, has there been any manufacturing changes to the following:
Technical Data, Drawings, or Configuration?
2) For the past delivery contracts cited above, where was the item actually manufactured?
Frozen planning, processes, procedure?
Facilities or location?
Equipment or tooling?
Sub-tier suppliers or processors?
Page of
- Was the above contract manufactured at the same facilities using the same equipment, processes, procedures, and subcontractors in which the current item will be produced?
B)
- Has there been a successful completion of a FAT for the same item on a contract within the past three years and the item tested per the same requirements as those referenced in the solicitation and/or contract?
- Has there been a successful performance of a first article test on the next higher assembly within the past three (3) years?
- Was the next higher assembly manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
D)
- Has there been a successful completion of a First Article for a similar item on a contract within the past three (3) years and the item tested per the same requirements as those referenced in the solicitation and/or contract.
- Was the similar item manufactured at the same facilities using similar equipment, processes, and procedures in which the current item will be produced?
Page of
E)
4. OTHER PERTINENT INFORMATION
A)
B)
C)
5. ATTACH SUPPORTING DOCUMENTATION
6. SUBMISSION
The submitter, by signing the below certifies that the above statements are true and correct. Please provide printed name, signature, company address, and phone number where you can be reached. Again, the signer must be an agent of the company.
*See the solicitation/contract for information on submitting supporting documentation, as well as, additional requirements regarding First Article Test Waiver requests.
View>Show/Hide>Navigation Panes>
Attachments to save the attachments to local computer for viewing.
8.2.1.4029.1.523496.503679
Buyers-name: SCOTT LAMOTHE
NOUN: CIRCUIT CARD ASSEMB
PART_NO: 13748110
CONTARCTOR-NAME: DRS NETWORK & IMAGING SYSTEMS, LLC
NSN: 5998-01-721-0725
TOP-DRAWING:
COntarct-NO: SPRRA226R0071
CAGE: 32865
REVISION:
FULL-WAIVER:
PART-WAIVER:
A2-REMARKS:
CurrentPage: 1.00000000
CurrentPage: 2.00000000
CurrentPage: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
PageCount: 3.00000000
ResetButton1:
A3REMARKS:
CSI_Y:
CSI_N:
TextField8:
C3_NORADIO:
C3YESRADIO:
date3:
C3_explanation:
C3-NSN:
C3-ContractNO:
C3-FATDATEAPPROVAL:
C3-NOMENCALTURE:
C3-PN:
C3-…
This is the start of the file's text. The full file is on GovTribe.