ATTACHMENT 4 TO SPMYM2-19-Q-1056
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0007_TO_SPMYM2-19-Q-1056.pdf | ||
| SPMYM2-19-Q-1056_(as_of_6-26-19).pdf | ||
| A0006_TO_SPMYM2-19-Q-1056.pdf | ||
| P0005_TO_SPMYM2-19-Q-1056.pdf | ||
| EXHIBIT_A_-_Contractor_Performance_Data_Sheet.pdf | ||
| A0004_TO_SPMYM2-19-Q-1056.pdf | ||
| A0003_TO_SPMYM2-19-Q-1056.pdf | ||
| A0002_TO_SPMYM2-19-Q-1056.pdf | ||
| Government's_Response_to_Questions.pdf | ||
| A0001_TO_SPMYM2-19-Q-1056.pdf | ||
| ATTACHMENT_2_-_Spec_for_P701-19_7K_Tanks_Rev._B_(3-01-2019).pdf | ||
| ATTACHMENT_3_-_CDRL.pdf | ||
| SPMYM2-19-Q-1056.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRL's / 7,000 Gallon Tanks
Dwg M-1480
Solicitation SPMYM2-19-Q-1056
Provided as Guidance / Specification, CDRL's and Drawings take Precedence
CDRL# Para Timing Description CLIN Accepted
A001 5.3.5 Pre-Delivery Final Fabrication Drawings (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AA
A002 5.3.5 Pre-Delivery Calculations (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AB
A003 5.3.8.4 Pre-Delivery Welder Qualifications (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AC
A004
5.3.5 Pre-Delivery NDT Procedures (For Modified Tanks, 1 set due 20 days prior to start of construction)
0004AD
A005
5.4.12.1 Pre-Delivery Paint Information (For Modified Tanks, 1 set due 20 days prior to start of construction)
0004AE
A006
5.4.5 Pre-Delivery
NRTL Report (1 report for each tank due 10 days prior to delivery/ Unless 3rd party NRTL certifies all
Modified Tanks based on their inspection of the 1st tank. A copy of NRTL shall be provided 10 days prior to delivery of each tank).
0004AF
G007 Note C.4 Pre-Delivery Charpy Impact Test Report (Drawing M-1480 requires test report for EACH of the load bearing members)
0004AG
A008 Note T21 Pre-Delivery Load Test Report (PROVIDE LOAD TEST REPORTS FOR EACH TANK, 1 set due 10 days prior to shipment of each tank)
004AH
A009 C3.I.2 Pre-Delivery
RT Info (Final)- Radiographic Film- Shooting Sketches- Radiograph Review Forms- Locator Map (For EACH Tank, 1 set due 10 days prior to shipment of each tank)
0004AJ
A010 5.3.3 Pre-Delivery Preliminary Work Schedule (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AK
A011 5.4.16 Upon
Delivery PCB Certification (For Modified Tanks, 1 set due upon delivery of each tank) 0004AL
A012 5.3.7
Upon
Delivery Technical Documentation (For Modified Tanks, 1 set due upon delivery of 1st tank )
0004AM
A013 5.4.18
Upon
Delivery OSHA Compliance Statement (For Modified Tanks, 1 set due upon delivery of 1st tank)
0004AN
A014 5.4.19 Upon
Delivery Swivel Hoist Ring (SHR) Certification (For EACH swivel hoist ring provided) 0004AP
A015 Note C3.C.1
Upon
Delivery
Measured tank weight PROVIDE A SEPARATE TEST REPORT OF THE MEASUREDWEIGHT OF
EACH COMPLETED TANK.
0004AQ
A016 Note C3.C.2
Upon
Delivery manway #1 weight PROVIDE SEPARATE TEST REPORT OF MEASUREDWEIGHT OF MANWAY
COVER #1 FOR EACH TANK PROVIDED
0004AR
Solicitation SPMYM2-19-Q-1056
Provided as Guidance / Specification, CDRL's and Drawings take Precedence
CDRL# Para Timing Description CLIN Accepted
A017 Note C3.C.3
Upon
Delivery
Certified report of actual manway #2 weight PROVIDE SEPARATE TEST REPORT OF
MEASUREDWEIGHT OF MANWAY COVER #2 FOR EACH TANK PROVIDED
0004AS
A018 Note C3.D
Upon
Delivery
Certified report of hydrostatic test of components PROVIDE A SEPARATE HYDROSTATIC TEST
REPORT FOR EACH COMPONENT FOR EACH TANK
0004AT
A019 Note C3.F
Upon
Delivery
Certified report of NDT on tank frame lifting lugs PROVIDE NDT TEST REPORTS FOR LIFTING LUGS
FOR EACH TANK
0004AU
A020 Note C3.G Upon
Delivery
Certified report of NDT on gauge guard brackets NDT TEST REPORTS FOR GAUGE GUARD
BRACKETS FOR EACH TANK
0004AV
A021 Note C3.H
Upon
Delivery
Certified report of NDT on manway covers PROVIDE NDT TEST REPORTS FOR MANWAY COVERS
FOR EACH TANK
0004AW
A022 Note C3.I.1
Upon
Delivery
Certified report of liquid penetrate tests PROVIDE LIQUID PENETRATE TEST REPORT FOR EACH
TANK
0004AX
A023 Note C3.J.1
Upon
Delivery
Certified report of satisfactory operational check of liquid level gauge and thermometer PROVIDE
SATISFACTORY OPERATIONAL CHECK REPORT ON THE LIQUID LEVEL GAUGE AND
THERMOMETER FOR EACH TANK
0004AY
A024 Note C3.J.2
Upon
Delivery
Certified report of satisfactory operational check of manway #1 camera PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON THE MANWAY #1 CAMERA FOR EACH TANK
0004AZ
A025 Note C3.J.3
Upon
Delivery
Certified report of satisfactory operational check of manway #2 camera PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON THE MANWAY #2 CAMERA FOR EACH TANK
0004BA
A026 Note C3.J.4
Upon
Delivery
Certified report of satisfactory operational check of rotating nozzles PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON ROTATING NOZZLES FOR EACH TANK
0004BB
A027 Note C3.J.5
Upon
Delivery
Certified report of satisfactory operational check of whirling nozzles PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON WHIRLING NOZZLES FOR EACH TANK
0004BC
A028 Note C3.K.1
Upon
Delivery
Certified report for interior tank surface finish PROVIDE INTERIOR TANK SURFACE FINISH REPORT
FOR EACH TANK
0004BD
A029 Note C3.K.2
Upon
Delivery
Certified report for interior tank weld surface finish PROVIDE INTERIOR TANK WELD SURFACE
FINISH REPORT FOR EACH TANK
0004BE
A030 Note C3.K.3
Upon
Delivery
Satisfactory check fit of HEPA filter and demister inside the HEPA filter/demister housing PROVIDE
HEPA FILTER AND DEMISTER CHECK FIT REPORT FOR EACH TANK
0004BF
Solicitation SPMYM2-19-Q-1056
Provided as Guidance / Specification, CDRL's and Drawings take Precedence
CDRL# Para Timing Description CLIN Accepted
A031 Note C3.K.4
Upon
Delivery
Interior filter/demister housing & cover interior surface & weld finish PROVIDE FILTER/DEMISTER
HOUSING AND COVER INTERIOR SURFACE AND WELD FINISH REPORT FOR EACH TANK
0004BG
A032 Note C3.K.5 Upon
Delivery Certified report for water quality PROVIDE WATER QUALITY REPORT FOR EACH TANK 0004BH
A033 Note C3.K.6
Upon
Delivery
Certified report for painted surfaces PROVIDE PAINTED METAL SURFACES PREPARATION
REPORT FOR EACH TANK
0004BJ
A034 Note C3.B
Upon
Delivery
Documentation per UG-120 of the ASME Boiler and Pressure Vessel Code Section VIII, Div 1.
PROVIDE ASME CERTIFICATION PER UG-120 OF THE ASME BOILER AND PRESSURE VESSEL
CODE SECTION VIII, DIVISION 1 for each tank.
0004BK
Solicitation SPMYM2-19-Q-1056
Provided as Guidance / Specification, CDRL's and Drawings take Precedence
CDRL# Para Timing Description CLIN Accepted
A001 5.3.5 Pre-Delivery Final Fabrication Drawings (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AA
A002 5.3.5 Pre-Delivery Calculations (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AB
A003 5.3.8.4 Pre-Delivery Welder Qualifications (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AC
A004
5.3.5 Pre-Delivery NDT Procedures (For Standard Tanks, 1 set due 20 days prior to start of construction)
0002AD
A005
5.4.12.1 Pre-Delivery Paint Information (For Standard Tanks, 1 set due 20 days prior to start of construction)
0002AE
A006
5.4.5 Pre-Delivery
NRTL Report (For Standard Tanks, 1 report for each tank due 10 days prior to delivery/ Unless 3rd party NRTL certifies all tanks based on their inspection of the 1st tank. A copy of NRTL shall be provided
0 days prior to delivery of each tank).
0002AF
G007 Note C.4 Pre-Delivery Charpy Impact Test Report (Drawing M-1480 requires test report for EACH of the load bearing members)
0002AG
A008 Note T21 Pre-Delivery Load Test Report (PROVIDE LOAD TEST REPORTS FOR EACH TANK, 1 set due 10 days prior to shipment of each tank)
0002AH
A009 C3.I.2 Pre-Delivery
RT Info (Final)- Radiographic Film- Shooting Sketches- Radiograph Review Forms- Locator Map (For EACH
Standard and Modified Tank, 1 set due 10 days prior to shipment of each tank)
0002AJ
A010 5.3.3 Pre-Delivery Preliminary Work Schedule (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AK
A011 5.4.16 Upon
Delivery PCB Certification (For StandardTanks, 1 set due upon delivery of each tank) 0002AL
A012 5.3.7
Upon
Delivery
Technical Documentation (For Standard Tanks, 1 set due upon delivery of 1st Standard tank and 1 set due upon delivery of 1st Modified Tank)
0002AM
A013 5.4.18
Upon
Delivery
OSHA Compliance Statement (For Standard Tanks, 1 set due upon delivery of 1st Standard tank and
1 set due upon delivery of 1st Modified Tank)
0002AN
A014 5.4.19 Upon
Delivery Swivel Hoist Ring (SHR) Certification (For EACH swivel hoist ring provided) 0002AP
A015 Note C3.C.1
Upon
Delivery
Measured tank weight PROVIDE A SEPARATE TEST REPORT OF THE MEASUREDWEIGHT OF
EACH COMPLETED TANK.
0002AQ
A016 Note C3.C.2
Upon
Delivery manway #1 weight PROVIDE SEPARATE TEST REPORT OF MEASUREDWEIGHT OF MANWAY
COVER #1 FOR EACH TANK PROVIDED
0002AR
A017 Note C3.C.3
Upon
Delivery
Certified report of actual manway #2 weight PROVIDE SEPARATE TEST REPORT OF
MEASUREDWEIGHT OF MANWAY COVER #2 FOR EACH TANK PROVIDED
0002AS
A018 Note C3.D
Upon
Delivery
Certified report of hydrostatic test of components PROVIDE A SEPARATE HYDROSTATIC TEST
REPORT FOR EACH COMPONENT FOR EACH TANK
0002AT
A019 Note C3.F
Upon
Delivery
Certified report of NDT on tank frame lifting lugs PROVIDE NDT TEST REPORTS FOR LIFTING LUGS
FOR EACH TANK
0002AU
A020 Note C3.G Upon
Delivery
Certified report of NDT on gauge guard brackets NDT TEST REPORTS FOR GAUGE GUARD
BRACKETS FOR EACH TANK
0002AV
A021 Note C3.H
Upon
Delivery
Certified report of NDT on manway covers PROVIDE NDT TEST REPORTS FOR MANWAY COVERS
FOR EACH TANK
0002AW
A022 Note C3.I.1
Upon
Delivery
Certified report of liquid penetrate tests PROVIDE LIQUID PENETRATE TEST REPORT FOR EACH
TANK
0002AX
Solicitation SPMYM2-19-Q-1056
Provided as Guidance / Specification, CDRL's and Drawings take Precedence
CDRL# Para Timing Description CLIN Accepted
A023 Note C3.J.1
Upon
Delivery
Certified report of satisfactory operational check of liquid level gauge and thermometer PROVIDE
SATISFACTORY OPERATIONAL CHECK REPORT ON THE LIQUID LEVEL GAUGE AND
THERMOMETER FOR EACH TANK
0002AY
A024 Note C3.J.2
Upon
Delivery
Certified report of satisfactory operational check of manway #1 camera PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON THE MANWAY #1 CAMERA FOR EACH TANK
0002AZ
A025 Note C3.J.3
Upon
Delivery
Certified report of satisfactory operational check of manway #2 camera PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON THE MANWAY #2 CAMERA FOR EACH TANK
0002BA
A026 Note C3.J.4
Upon
Delivery
Certified report of satisfactory operational check of rotating nozzles PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON ROTATING NOZZLES FOR EACH TANK
0002BB
A027 Note C3.J.5
Upon
Delivery
Certified report of satisfactory operational check of whirling nozzles PROVIDE SATISFACTORY
OPERATIONAL CHECK REPORT ON WHIRLING NOZZLES FOR EACH TANK
0002BC
A028 Note C3.K.1
Upon
Delivery
Certified report for interior tank surface finish PROVIDE INTERIOR TANK SURFACE FINISH REPORT
FOR EACH TANK
0002BD
A029 Note C3.K.2
Upon
Delivery
Certified report for interior tank weld surface finish PROVIDE INTERIOR TANK WELD SURFACE
FINISH REPORT FOR EACH TANK
0002BE
A030 Note C3.K.3
Upon
Delivery
Satisfactory check fit of HEPA filter and demister inside the HEPA filter/demister housing PROVIDE
HEPA FILTER AND DEMISTER CHECK FIT REPORT FOR EACH TANK
0002BF
A031 Note C3.K.4
Upon
Delivery
Interior filter/demister housing & cover interior surface & weld finish PROVIDE FILTER/DEMISTER
HOUSING AND COVER INTERIOR SURFACE AND WELD FINISH REPORT FOR EACH TANK
0002BG
A032 Note C3.K.5 Upon
Delivery Certified report for water quality PROVIDE WATER QUALITY REPORT FOR EACH TANK 0002BH
A033 Note C3.K.6
Upon
Delivery
Certified report for painted surfaces PROVIDE PAINTED METAL SURFACES PREPARATION
REPORT FOR EACH TANK
0002BJ
A034 Note C3.B
Upon
Delivery
Documentation per UG-120 of the ASME Boiler and Pressure Vessel Code Section VIII, Div 1.
PROVIDE ASME CERTIFICATION PER UG-120 OF THE ASME BOILER AND PRESSURE VESSEL
CODE SECTION VIII, DIVISION 1 for each tank.
0002BK
| Deliverables by CDRL's-CLIN 0004(Solicitation)(Revised 7-3-2019).pdf |
| Deliverables by CDRL's-CLIN 0002(Solicitation)(Revised 7-3-2019).pdf |