ATTACHMENT 4 TO SPMYM2-19-Q-1056

View the file

Other files for this federal contract opportunity

Other files attached to 7, 000 GALLON ROUND HORIZONTAL TANK, newest first.
File Type Posted
A0007_TO_SPMYM2-19-Q-1056.pdf PDF
SPMYM2-19-Q-1056_(as_of_6-26-19).pdf PDF
A0006_TO_SPMYM2-19-Q-1056.pdf PDF
P0005_TO_SPMYM2-19-Q-1056.pdf PDF
EXHIBIT_A_-_Contractor_Performance_Data_Sheet.pdf PDF
A0004_TO_SPMYM2-19-Q-1056.pdf PDF
A0003_TO_SPMYM2-19-Q-1056.pdf PDF
A0002_TO_SPMYM2-19-Q-1056.pdf PDF
Government's_Response_to_Questions.pdf PDF
A0001_TO_SPMYM2-19-Q-1056.pdf PDF
ATTACHMENT_2_-_Spec_for_P701-19_7K_Tanks_Rev._B_(3-01-2019).pdf PDF
ATTACHMENT_3_-_CDRL.pdf PDF
SPMYM2-19-Q-1056.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL's / 7,000 Gallon Tanks

Dwg M-1480

Solicitation SPMYM2-19-Q-1056

Provided as Guidance / Specification, CDRL's and Drawings take Precedence

CDRL# Para Timing Description CLIN Accepted

A001 5.3.5 Pre-Delivery Final Fabrication Drawings (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AA

A002 5.3.5 Pre-Delivery Calculations (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AB

A003 5.3.8.4 Pre-Delivery Welder Qualifications (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AC

A004

5.3.5 Pre-Delivery NDT Procedures (For Modified Tanks, 1 set due 20 days prior to start of construction)

0004AD

A005

5.4.12.1 Pre-Delivery Paint Information (For Modified Tanks, 1 set due 20 days prior to start of construction)

0004AE

A006

5.4.5 Pre-Delivery

NRTL Report (1 report for each tank due 10 days prior to delivery/ Unless 3rd party NRTL certifies all

Modified Tanks based on their inspection of the 1st tank. A copy of NRTL shall be provided 10 days prior to delivery of each tank).

0004AF

G007 Note C.4 Pre-Delivery Charpy Impact Test Report (Drawing M-1480 requires test report for EACH of the load bearing members)

0004AG

A008 Note T21 Pre-Delivery Load Test Report (PROVIDE LOAD TEST REPORTS FOR EACH TANK, 1 set due 10 days prior to shipment of each tank)

004AH

A009 C3.I.2 Pre-Delivery

RT Info (Final)- Radiographic Film- Shooting Sketches- Radiograph Review Forms- Locator Map (For EACH Tank, 1 set due 10 days prior to shipment of each tank)

0004AJ

A010 5.3.3 Pre-Delivery Preliminary Work Schedule (For Modified Tanks, 1 set due 20 days prior to start of construction) 0004AK

A011 5.4.16 Upon

Delivery PCB Certification (For Modified Tanks, 1 set due upon delivery of each tank) 0004AL

A012 5.3.7

Upon

Delivery Technical Documentation (For Modified Tanks, 1 set due upon delivery of 1st tank )

0004AM

A013 5.4.18

Upon

Delivery OSHA Compliance Statement (For Modified Tanks, 1 set due upon delivery of 1st tank)

0004AN

A014 5.4.19 Upon

Delivery Swivel Hoist Ring (SHR) Certification (For EACH swivel hoist ring provided) 0004AP

A015 Note C3.C.1

Upon

Delivery

Measured tank weight PROVIDE A SEPARATE TEST REPORT OF THE MEASUREDWEIGHT OF

EACH COMPLETED TANK.

0004AQ

A016 Note C3.C.2

Upon

Delivery manway #1 weight PROVIDE SEPARATE TEST REPORT OF MEASUREDWEIGHT OF MANWAY

COVER #1 FOR EACH TANK PROVIDED

0004AR

Solicitation SPMYM2-19-Q-1056

Provided as Guidance / Specification, CDRL's and Drawings take Precedence

CDRL# Para Timing Description CLIN Accepted

A017 Note C3.C.3

Upon

Delivery

Certified report of actual manway #2 weight PROVIDE SEPARATE TEST REPORT OF

MEASUREDWEIGHT OF MANWAY COVER #2 FOR EACH TANK PROVIDED

0004AS

A018 Note C3.D

Upon

Delivery

Certified report of hydrostatic test of components PROVIDE A SEPARATE HYDROSTATIC TEST

REPORT FOR EACH COMPONENT FOR EACH TANK

0004AT

A019 Note C3.F

Upon

Delivery

Certified report of NDT on tank frame lifting lugs PROVIDE NDT TEST REPORTS FOR LIFTING LUGS

FOR EACH TANK

0004AU

A020 Note C3.G Upon

Delivery

Certified report of NDT on gauge guard brackets NDT TEST REPORTS FOR GAUGE GUARD

BRACKETS FOR EACH TANK

0004AV

A021 Note C3.H

Upon

Delivery

Certified report of NDT on manway covers PROVIDE NDT TEST REPORTS FOR MANWAY COVERS

FOR EACH TANK

0004AW

A022 Note C3.I.1

Upon

Delivery

Certified report of liquid penetrate tests PROVIDE LIQUID PENETRATE TEST REPORT FOR EACH

TANK

0004AX

A023 Note C3.J.1

Upon

Delivery

Certified report of satisfactory operational check of liquid level gauge and thermometer PROVIDE

SATISFACTORY OPERATIONAL CHECK REPORT ON THE LIQUID LEVEL GAUGE AND

THERMOMETER FOR EACH TANK

0004AY

A024 Note C3.J.2

Upon

Delivery

Certified report of satisfactory operational check of manway #1 camera PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON THE MANWAY #1 CAMERA FOR EACH TANK

0004AZ

A025 Note C3.J.3

Upon

Delivery

Certified report of satisfactory operational check of manway #2 camera PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON THE MANWAY #2 CAMERA FOR EACH TANK

0004BA

A026 Note C3.J.4

Upon

Delivery

Certified report of satisfactory operational check of rotating nozzles PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON ROTATING NOZZLES FOR EACH TANK

0004BB

A027 Note C3.J.5

Upon

Delivery

Certified report of satisfactory operational check of whirling nozzles PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON WHIRLING NOZZLES FOR EACH TANK

0004BC

A028 Note C3.K.1

Upon

Delivery

Certified report for interior tank surface finish PROVIDE INTERIOR TANK SURFACE FINISH REPORT

FOR EACH TANK

0004BD

A029 Note C3.K.2

Upon

Delivery

Certified report for interior tank weld surface finish PROVIDE INTERIOR TANK WELD SURFACE

FINISH REPORT FOR EACH TANK

0004BE

A030 Note C3.K.3

Upon

Delivery

Satisfactory check fit of HEPA filter and demister inside the HEPA filter/demister housing PROVIDE

HEPA FILTER AND DEMISTER CHECK FIT REPORT FOR EACH TANK

0004BF

Solicitation SPMYM2-19-Q-1056

Provided as Guidance / Specification, CDRL's and Drawings take Precedence

CDRL# Para Timing Description CLIN Accepted

A031 Note C3.K.4

Upon

Delivery

Interior filter/demister housing & cover interior surface & weld finish PROVIDE FILTER/DEMISTER

HOUSING AND COVER INTERIOR SURFACE AND WELD FINISH REPORT FOR EACH TANK

0004BG

A032 Note C3.K.5 Upon

Delivery Certified report for water quality PROVIDE WATER QUALITY REPORT FOR EACH TANK 0004BH

A033 Note C3.K.6

Upon

Delivery

Certified report for painted surfaces PROVIDE PAINTED METAL SURFACES PREPARATION

REPORT FOR EACH TANK

0004BJ

A034 Note C3.B

Upon

Delivery

Documentation per UG-120 of the ASME Boiler and Pressure Vessel Code Section VIII, Div 1.

PROVIDE ASME CERTIFICATION PER UG-120 OF THE ASME BOILER AND PRESSURE VESSEL

CODE SECTION VIII, DIVISION 1 for each tank.

0004BK

Solicitation SPMYM2-19-Q-1056

Provided as Guidance / Specification, CDRL's and Drawings take Precedence

CDRL# Para Timing Description CLIN Accepted

A001 5.3.5 Pre-Delivery Final Fabrication Drawings (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AA

A002 5.3.5 Pre-Delivery Calculations (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AB

A003 5.3.8.4 Pre-Delivery Welder Qualifications (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AC

A004

5.3.5 Pre-Delivery NDT Procedures (For Standard Tanks, 1 set due 20 days prior to start of construction)

0002AD

A005

5.4.12.1 Pre-Delivery Paint Information (For Standard Tanks, 1 set due 20 days prior to start of construction)

0002AE

A006

5.4.5 Pre-Delivery

NRTL Report (For Standard Tanks, 1 report for each tank due 10 days prior to delivery/ Unless 3rd party NRTL certifies all tanks based on their inspection of the 1st tank. A copy of NRTL shall be provided

0 days prior to delivery of each tank).

0002AF

G007 Note C.4 Pre-Delivery Charpy Impact Test Report (Drawing M-1480 requires test report for EACH of the load bearing members)

0002AG

A008 Note T21 Pre-Delivery Load Test Report (PROVIDE LOAD TEST REPORTS FOR EACH TANK, 1 set due 10 days prior to shipment of each tank)

0002AH

A009 C3.I.2 Pre-Delivery

RT Info (Final)- Radiographic Film- Shooting Sketches- Radiograph Review Forms- Locator Map (For EACH

Standard and Modified Tank, 1 set due 10 days prior to shipment of each tank)

0002AJ

A010 5.3.3 Pre-Delivery Preliminary Work Schedule (For Standard Tanks, 1 set due 20 days prior to start of construction) 0002AK

A011 5.4.16 Upon

Delivery PCB Certification (For StandardTanks, 1 set due upon delivery of each tank) 0002AL

A012 5.3.7

Upon

Delivery

Technical Documentation (For Standard Tanks, 1 set due upon delivery of 1st Standard tank and 1 set due upon delivery of 1st Modified Tank)

0002AM

A013 5.4.18

Upon

Delivery

OSHA Compliance Statement (For Standard Tanks, 1 set due upon delivery of 1st Standard tank and

1 set due upon delivery of 1st Modified Tank)

0002AN

A014 5.4.19 Upon

Delivery Swivel Hoist Ring (SHR) Certification (For EACH swivel hoist ring provided) 0002AP

A015 Note C3.C.1

Upon

Delivery

Measured tank weight PROVIDE A SEPARATE TEST REPORT OF THE MEASUREDWEIGHT OF

EACH COMPLETED TANK.

0002AQ

A016 Note C3.C.2

Upon

Delivery manway #1 weight PROVIDE SEPARATE TEST REPORT OF MEASUREDWEIGHT OF MANWAY

COVER #1 FOR EACH TANK PROVIDED

0002AR

A017 Note C3.C.3

Upon

Delivery

Certified report of actual manway #2 weight PROVIDE SEPARATE TEST REPORT OF

MEASUREDWEIGHT OF MANWAY COVER #2 FOR EACH TANK PROVIDED

0002AS

A018 Note C3.D

Upon

Delivery

Certified report of hydrostatic test of components PROVIDE A SEPARATE HYDROSTATIC TEST

REPORT FOR EACH COMPONENT FOR EACH TANK

0002AT

A019 Note C3.F

Upon

Delivery

Certified report of NDT on tank frame lifting lugs PROVIDE NDT TEST REPORTS FOR LIFTING LUGS

FOR EACH TANK

0002AU

A020 Note C3.G Upon

Delivery

Certified report of NDT on gauge guard brackets NDT TEST REPORTS FOR GAUGE GUARD

BRACKETS FOR EACH TANK

0002AV

A021 Note C3.H

Upon

Delivery

Certified report of NDT on manway covers PROVIDE NDT TEST REPORTS FOR MANWAY COVERS

FOR EACH TANK

0002AW

A022 Note C3.I.1

Upon

Delivery

Certified report of liquid penetrate tests PROVIDE LIQUID PENETRATE TEST REPORT FOR EACH

TANK

0002AX

Solicitation SPMYM2-19-Q-1056

Provided as Guidance / Specification, CDRL's and Drawings take Precedence

CDRL# Para Timing Description CLIN Accepted

A023 Note C3.J.1

Upon

Delivery

Certified report of satisfactory operational check of liquid level gauge and thermometer PROVIDE

SATISFACTORY OPERATIONAL CHECK REPORT ON THE LIQUID LEVEL GAUGE AND

THERMOMETER FOR EACH TANK

0002AY

A024 Note C3.J.2

Upon

Delivery

Certified report of satisfactory operational check of manway #1 camera PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON THE MANWAY #1 CAMERA FOR EACH TANK

0002AZ

A025 Note C3.J.3

Upon

Delivery

Certified report of satisfactory operational check of manway #2 camera PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON THE MANWAY #2 CAMERA FOR EACH TANK

0002BA

A026 Note C3.J.4

Upon

Delivery

Certified report of satisfactory operational check of rotating nozzles PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON ROTATING NOZZLES FOR EACH TANK

0002BB

A027 Note C3.J.5

Upon

Delivery

Certified report of satisfactory operational check of whirling nozzles PROVIDE SATISFACTORY

OPERATIONAL CHECK REPORT ON WHIRLING NOZZLES FOR EACH TANK

0002BC

A028 Note C3.K.1

Upon

Delivery

Certified report for interior tank surface finish PROVIDE INTERIOR TANK SURFACE FINISH REPORT

FOR EACH TANK

0002BD

A029 Note C3.K.2

Upon

Delivery

Certified report for interior tank weld surface finish PROVIDE INTERIOR TANK WELD SURFACE

FINISH REPORT FOR EACH TANK

0002BE

A030 Note C3.K.3

Upon

Delivery

Satisfactory check fit of HEPA filter and demister inside the HEPA filter/demister housing PROVIDE

HEPA FILTER AND DEMISTER CHECK FIT REPORT FOR EACH TANK

0002BF

A031 Note C3.K.4

Upon

Delivery

Interior filter/demister housing & cover interior surface & weld finish PROVIDE FILTER/DEMISTER

HOUSING AND COVER INTERIOR SURFACE AND WELD FINISH REPORT FOR EACH TANK

0002BG

A032 Note C3.K.5 Upon

Delivery Certified report for water quality PROVIDE WATER QUALITY REPORT FOR EACH TANK 0002BH

A033 Note C3.K.6

Upon

Delivery

Certified report for painted surfaces PROVIDE PAINTED METAL SURFACES PREPARATION

REPORT FOR EACH TANK

0002BJ

A034 Note C3.B

Upon

Delivery

Documentation per UG-120 of the ASME Boiler and Pressure Vessel Code Section VIII, Div 1.

PROVIDE ASME CERTIFICATION PER UG-120 OF THE ASME BOILER AND PRESSURE VESSEL

CODE SECTION VIII, DIVISION 1 for each tank.

0002BK

Deliverables by CDRL's-CLIN 0004(Solicitation)(Revised 7-3-2019).pdf
Deliverables by CDRL's-CLIN 0002(Solicitation)(Revised 7-3-2019).pdf

File details come from the government source that posted it.