ATTACHMENT_3_-_CDRL.pdf

PDF 7 MB Posted

Attached to
7, 000 GALLON ROUND HORIZONTAL TANK Federal contract opportunity
Solicitation number
SPMYM2-19-Q-1056
Issued by
Defense Logistics Agency Land and Maritime

About this file

ATTACHMENT 3 TO SPMYM2-19-Q-1056

View the file

Other files for this federal contract opportunity

Other files attached to 7, 000 GALLON ROUND HORIZONTAL TANK, newest first.
File Type Posted
A0007_TO_SPMYM2-19-Q-1056.pdf PDF
ATTACHMENT_4_-_SUBMISSION_GUIDANCE_FOR_CDRL.pdf PDF
SPMYM2-19-Q-1056_(as_of_6-26-19).pdf PDF
A0006_TO_SPMYM2-19-Q-1056.pdf PDF
P0005_TO_SPMYM2-19-Q-1056.pdf PDF
EXHIBIT_A_-_Contractor_Performance_Data_Sheet.pdf PDF
A0004_TO_SPMYM2-19-Q-1056.pdf PDF
A0003_TO_SPMYM2-19-Q-1056.pdf PDF
A0002_TO_SPMYM2-19-Q-1056.pdf PDF
Government's_Response_to_Questions.pdf PDF
A0001_TO_SPMYM2-19-Q-1056.pdf PDF
ATTACHMENT_2_-_Spec_for_P701-19_7K_Tanks_Rev._B_(3-01-2019).pdf PDF
SPMYM2-19-Q-1056.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY

TDP ___(DRPR)______ TM ____________________ OTHER

D. SYSTEM/ITEM

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

2. TITLE OF DATA ITEM

Engineering Drawings 3. SUBTITLE

Final Fabrication Drawings

4. AUTHORITY (Data Acquisition Document No.)

DI-DRPR-80651

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

A D

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

A. ADDRESSEE

Final

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL SUBMIT FINAL FABRICATION DRAWINGS SHOWING

ALL INFORMATION REQUIRED TO FABRICATE 7,000 GALLON HORIZONTAL TANK AS

REQUIRED BY SPECIFICATION PARAGRAPH 5.3.5.

MEDIA REQUIREMENTS: DRAWINGS SHALL BE PROVIDED IN AN ELECTRONIC

UNPROTECTED PDF FORMAT.

BLOCK 8: DRAWINGS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL. APPROVAL

WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

DRAWINGS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD CODE 980 AT

michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE CONTRACTOR SHALL

HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD AND DOD

CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY, EFFECTIVE 3/7/2019.

OTHER U.S. REQUESTS SHALL BE REFERRED TO COMNAVSEASYSCOM.

BLOCK 11 and 12: DRAWINGS SHALL BE PROVIDED NO LESS THAN 20 WORKING DAYS

PRIOR TO THE START OF CONSTRUCTION OF THE 7,000 GALLON HORIZONTAL TANK.

Block 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN THE WIDE

AREA WORKFLOW (WAWF) e-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN ELECTRONIC

UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL ADDRESSEES.

Document Number 83463021

PSNS C/980.2 1 1 0

N4532A 1

TOTAL 1 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Mike Wood 21 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AA A

A001 mailto:michael.j.wood@navy.mil

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDP _________ TM ____________________ OTHER X (GDRQ)

Design Data and Calculations 3. SUBTITLE

Calculations

4. AUTHORITY (Data Acquisition Document No.)

DI-GDRQ-80650

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL SUBMIT MANUFACTURER DESIGN CALCULATIONS

FOR THE 7,000 GALLON HORIZONTAL TANK AS REQUIRED BY SPECIFICATION PARAGRAPH

5.3.5.

MEDIA REQUIREMENTS: DESIGN CALCULATIONS SHALL BE PROVIDED IN AN ELECTRONIC

BLOCK 8: DESIGN CALCULATIONS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

DESIGN CALCULATIONS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: DESIGN CALCULATIONS SHALL BE PROVIDED NO LESS THAN 20

WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OF THE 7,000 GALLON

HORIZONTAL TANK.

Mike Wood 21 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AB B

A002

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDP ___(MISC)______ TM ____________________ OTHER

CERTIFICATION/DATA REPORT 3. SUBTITLE

Welder Qualifications

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE WELDER’S QUALIFICATION RECORDS

REQUIRED BY SPECIFICATION PARAGRAPH 5.3.8.4.

MEDIA REQUIREMENTS: WELDER’S QUALIFICATION RECORDS SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT.

BLOCK 8: WELDER’S QUALIFICATION RECORDS SHALL BE SUBMITTED FOR GOVERNMENT

REVIEW. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

WELDER’S QUALIFICATION RECORDS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C

MICHAEL WOOD CODE 980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: WELDER’S QUALIFICATION RECORDS SHALL BE PROVIDED NO LESS

THAN 20 WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OF THE 7,000 GALLON

Mike Wood 21 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AC C

A003

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDP _________ TM ____________________ OTHER X (QCIC)

CERTIFICATION/DATA REPORT 3. SUBTITLE

NDT Procedures

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-80553A

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE PRIME CONTRACTOR SHALL PROVIDE THEIR NDT PROCEDURES MANUAL

AS REQUIRED BY SPECIFICATION PARAGRAPH 5.3.5.

MEDIA REQUIREMENTS: NDT PROCEDURES MANUAL SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT.

BLOCK 8: NDT PROCEDURES MANUAL SHALL BE SUBMITTED FOR GOVERNMENT

APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

NDT PROCEDURES MANUAL SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL

WOOD CODE 980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: NDT PROCEDURES MANUAL SHALL BE PROVIDED NO LESS THAN 20

WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OF THE 7,000 GALLON

Mike Wood 25 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AD D

A004

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDP _________ TM _________ X ___________ OTHER

Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data

3. SUBTITLE

Paint Information

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-80527C

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE PAINT INFORMATION WHICH SHALL

INCLUDE MANUFACTURER’S INFORMATION, PAINT FORMULA, AND SAFETY DATA SHEETS

DATA AS REQUIRED BY SPECIFICATION PARAGRAPH 5.4.12.1.

MEDIA REQUIREMENTS: PAINT INFORMATION SHALL BE PROVIDED IN AN ELECTRONIC

BLOCK 8: PAINT INFORMATION SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

REQUIREMENTS.

PAINT INFORMATION SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD CODE

980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: PAINT INFORMATION SHALL BE PROVIDED NO LESS THAN 20 WORKING

DAYS PRIOR TO THE START OF CONSTRUCTION OF THE 7,000 GALLON HORIZONTAL TANK.

Mike Wood 25 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AE E

A005

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDP _________ TM ____________________ OTHER X (NDTI)

TEST/INSPECTION REPORT 3. SUBTITLE

NRTL TEST REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE A 3rd PARTY NRTL TEST REPORT AS

REQUIRED BY SPECIFICATION PARAGRAPH 5.4.5.

MEDIA REQUIREMENTS: NRTL TEST REPORT SHALL BE PROVIDED IN AN ELECTRONIC

BLOCK 8: NRTL TEST REPORT SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

REQUIREMENTS.

NRTL TEST REPORT SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD CODE

980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: NRTL TEST REPORT SHALL BE PROVIDED NO LESS THAN 10 WORKING

DAYS PRIOR TO SHIPMENT OF THE 7,000 GALLON HORIZONTAL TANK.

Mike Wood 25 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AF F

A006

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

CHARPY IMPACT TEST REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE SATISFACTORY DROP WEIGHT OR CHARPY

IMPACT TESTING RESULTS AS REQUIRED BY DRAWING M-1480 REV. B, GENERAL NOTE C4.

MEDIA REQUIREMENTS: DROP WEIGHT OR CHARPY IMPACT TESTING RESULTS SHALL BE

PROVIDED IN AN ELECTRONIC UNPROTECTED PDF FORMAT.

BLOCK 8: DROP WEIGHT OR CHARPY IMPACT TESTING RESULTS SHALL BE SUBMITTED

FOR GOVERNMENT APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND

COMPLIANCE WITH CONTRACT REQUIREMENTS.

DROP WEIGHT OR CHARPY IMPACT TESTING RESULTS SHALL BE PROVIDED VIA E-MAIL TO

GOVT P.O.C MICHAEL WOOD CODE 980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: DROP WEIGHT OR CHARPY IMPACT TESTING RESULTS SHALL BE

PROVIDED NO LESS THAN 10 WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OF

THE 7,000 GALLON HORIZONTAL TANK.

Mike Wood 25 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AG G

G007

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

LOAD TEST REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

ASREQ Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE LOAD TEST REPORTS FOR EACH TANK AS

REQUIRED BY DRAWING M-1480 REV. B, GENERAL NOTE C3.E.

1. LIFTING LUGS PER GENERAL NOTE T21.

2. GAUGE GUARD BRACKETS PER GENERAL NOTE T20.

3. MANWAY COVER #1 THREADED HOLES (QTY 3) PER GENERAL NOTE T22.

4. MANWAY COVER #2 THREADED HOLES (QTY 3) PER GENERAL NOTE T22.

MEDIA REQUIREMENTS: LOAD TEST REPORTS SHALL BE PROVIDED IN AN ELECTRONIC

BLOCK 8: LOAD TEST REPORTS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

REQUIREMENTS.

LOAD TEST REPORTS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

BLOCK 11 and 12: LOAD TEST REPORTS SHALL BE PROVIDED NO LESS THAN 10

WORKING DAYS PRIOR TO SHIPMENT OF THE 7,000 GALLON HORIZONTAL TANK.

Mike Wood 25 Feb 2019 Thomas E. Larson 28 Feb 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AH H

A008

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP _________ TM ____________________ OTHER X (NDTI)

D. SYSTEM/ITEM

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT 3. SUBTITLE

FINAL RADIOGRAPHIC FILM

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

A. ADDRESSEE

Final

ASREQ

Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE A COMPLETE SET OF FINAL RADIOGRAPHIC

TEST INFORMATION AS REQUIRED BY DRAWING M-1480 REV. B, GENERAL NOTE C3.I.2.

MEDIA REQUIREMENTS: THE RADIOGRAPH SHOOTING SKETCH(S), REVIEW FORMS, AND

LOCATOR MAP REPORT SHALL BE PROVIDED IN AN ELECTRONIC UNPROTECTED PDF

FORMAT. THE RADIOGRAPHIC FILM SHALL BE SENT TO THE ADDRESSEE BELOW.

BLOCK 8: FINAL RADIOGRAPHIC TEST INFORMATION SHALL BE SUBMITTED FOR

GOVERNMENT APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND

COMPLIANCE WITH CONTRACT REQUIREMENTS.

THE RADIOGRAPHIC FILM, SHOOTING SKETCH(S), REVIEW FORMS, AND LOCATOR MAP

REPORT SHALL BE SENT TO THE ADDRESSEE BELOW.

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE CONTRACTOR SHALL

HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD AND DOD

CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY, EFFECTIVE 3/7/2019.

OTHER U.S. REQUESTS SHALL BE REFERRED TO COMNAVSEASYSCOM.

BLOCK 11 and 12: FINAL RADIOGRAPHIC TEST INFORMATION SHALL BE PROVIDED NO

LESS THAN 10 WORKING DAYS PRIOR TO SHIPMENT OF THE 7,000 GALLON HORIZONTAL

TANK.

Block 14: FINAL SUBMISSION OF RADIOGRAPH SHOOTING SKETCH(S), REVIEW FORMS, AND LOCATOR MAP REPORT SHALL BE ATTACHED IN THE WIDE AREA WORKFLOW (WAWF) e-BUSINESS SUITE.

MEDIA REQUIREMENTS: THE RADIOGRAPH SHOOTING SKETCH(S), REVIEW FORMS, AND

LOCATOR MAP REPORT SHALL BE PROVIDED IN AN ELECTRONIC UNPROTECTED PDF

FORMAT WITH EMAIL NOTIFICATION TO ALL ADDRESSEES. THE RADIOGRAPHIC FILM SHALL

BE SENT TO THE ADDRESSEE BELOW.

Addressee:

Mr. Michael Wood, Code 980.2MW Puget Sound Naval Shipyard & Intermediate Maintenance Facility Bldg. 448, 2nd flr., Room 232, Mail Stop 2001 1400 Farragut Ave.

Bremerton, WA 98314-5001

Document Number 83463021

PSNS C/980.2 1 1 0

N4532A 1

TOTAL 1 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Mike Wood 25 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AJ J

A009

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP ___(MISC)______ TM ____________________ OTHER

D. SYSTEM/ITEM

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT 3. SUBTITLE

Preliminary Work Schedule

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

A. ADDRESSEE

Final

ASREQ

Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE PRELIMINARY WORK SCHEDULE REQUIRED

BY SPECIFICATION PARAGRAPH 3.1.1.1.4.

MEDIA REQUIREMENTS: PRELIMINARY WORK SCHEDULE SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT.

BLOCK 8: THE PRELIMINARY WORK SCHEDULE SHALL BE SUBMITTED FOR GOVERNMENT

APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

THE REQUESTED DOCUMENTATION SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C

MICHAEL WOOD CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE CONTRACTOR SHALL

HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD AND DOD

CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY, EFFECTIVE 3/7/2019.

OTHER U.S. REQUESTS SHALL BE REFERRED TO COMNAVSEASYSCOM.

BLOCK 11 and 12: THE REQUESTED DOCUMENTATION SHALL BE PROVIDED NO LESS

THAN 20 WORKING DAYS PRIOR TO THE START OF CONSTRUCTION OF THE 7,000 GALLON

HORIZONTAL TANK.

Block 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN THE WIDE

AREA WORKFLOW (WAWF) e-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN ELECTRONIC

UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL ADDRESSEES.

Document Number 83463021

PSNS C/980.2 1 1 0

N4532A 1

TOTAL 1 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Mike Wood 21 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AK K

A010

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDF TM OTHER X (MISC)

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

PCB CERTIFICATION

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

OTIME

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASGEN

A. ADDRESSEE

Final

Draft Reg Repr o

16. REMARKS:

BLOCK 3: THE CONTRACTOR SHALL PROVIDE CERTIFICATION STATING ALL

COMPONENTS USED IN THE MANUFACTURE OF THE COMPLETED 7,000 GALLON

HORIZONTAL TANK(S) ARE FREE FROM POLYCHLORINATED BIPHENYLS (PCB) AS

REQUIRED BY SPECIFICATION PARA: 5.4.16. THE CERTIFICATION SHALL BE

SIGNED BY AN AUTHORIZED OFFICIAL OF THE CONTRACTOR DESIGNATED AS

BEING RESPONSIBLE FOR COMPLIANCE.

BLOCK 8: CERTIFICATION SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

CERTIFICATION SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: CERTIFICATION SHALL BE PROVIDED WITH THE 7,000

GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021

TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AL

A011

L

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDP__________ TM X OTHER _____________

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data

3. SUBTITLE

Technical Documentation

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-80527C

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASGEN

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

See Block 16

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

A. ADDRESSEE

Final

ASGEN

Draft Reg Repr

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE TECHNICAL DOCUMENTATION,

ON EQUIPMENT INSTALLED ON THE 7,000 GALLON HORIZONTAL TANK(S) AS

REQUIRED IN SPECIFICATION SECTION 5.3.7.

BLOCK 8: DRAWINGS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

TECHNICAL DOCUMENTATION SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C

MICHAEL WOOD CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: TECHNICAL DOCUMENTATION SHALL BE PROVIDED WITH

THE 7,000 GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF TECHNICAL DOCUMENTATION SHALL BE

ATTACHED IN THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: TECHNICAL DOCUMENTATION SHALL BE PROVIDED IN

AN ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO

ALL ADDRESSEES.

Document Number 83463021

PSNS Code 980.2 1 1 0

N4532A 1 1

TOTAL 1 2 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

0002AM M

A012

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

OSHA COMPLIANCE STATEMENT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASGEN

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASGEN

A. ADDRESSEE

Final

Draft Reg Repr o

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE OSHA COMPLIANCE STATEMENT

AS REQUIRED BY SPECIFICATION PARAGRAPH 5.4.18.

BLOCK 8: OSHA COMPLIANCE STATEMENT SHALL BE SUBMITTED FOR

GOVERNMENT APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT

AND COMPLIANCE WITH CONTRACT REQUIREMENTS.

OSHA COMPLIANCE STATEMENT SHALL BE PROVIDED VIA E-MAIL TO GOVT

P.O.C MICHAEL WOOD CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: OSHA COMPLIANCE STATEMENT SHALL BE PROVIDED WITH

THE 7,000 GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021

TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 4 Mar 2019

DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AN N

A013

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL

TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

SWIVEL HOIST RING CERTIFICATION

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

OTIME

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

BLOCK 3: THE CONTRACTOR SHALL PROVIDE THE MANUFACTURER’S SIGNED,

WRITTEN CERTIFICATION OF COMPLIANCE FOR ALL SWIVEL HOIST RINGS (SHR)

SUPPLIED AS PART OF THIS EQUIPMENT AS REQUIRED BY PARA 5.4.19.

BLOCK 8: CERTIFICATION SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

CERTIFICATION SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: CERTIFICATION SHALL BE PROVIDED WITH THE 7,000

GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021

TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AP P

A014

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

TDF TM OTHER X (NDTI)

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

MEASURED WEIGHT REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

16. REMARKS

BLOCK 3: THE CONTRACTOR SHALL PROVIDE A SEPARATE TEST REPORT OF

THE MEASURED WEIGHT OF EACH COMPLETED TANK AS REQUIRED BY

DRAWING M-1480 REV. B, GENERAL NOTE C3.C.1 AND GENERAL NOTE T30.

BLOCK 8: WEIGHT REPORTS SHALL BE SUBMITTED FOR GOVERNMENT

APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND

COMPLIANCE WITH CONTRACT REQUIREMENTS.

WEIGHT REPORTS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL

WOOD CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: WEIGHT REPORTS SHALL BE PROVIDED WITH THE 7,000

GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021 TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AQ Q

A015

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

MEASURED WEIGHT REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

16.

BLOCK 3: THE CONTRACTOR SHALL PROVIDE SEPARATE TEST REPORT OF

MEASURED WEIGHT OF MANWAY COVER #1 FOR EACH TANK PROVIDED AS

REQUIRED BY DRAWING M-1480 REV. B, GENERAL NOTE C3.C.2 AND GENERAL

NOTE T31.

BLOCK 8: TEST REPORT SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

TEST REPORT SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: TEST REPORT SHALL BE PROVIDED WITH THE 7,000 GALLON

HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021 TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AR R

A016

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

MEASURED WEIGHT REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

16.

BLOCK 3: THE CONTRACTOR SHALL PROVIDE SEPARATE TEST REPORT OF

MEASURED WEIGHT OF MANWAY COVER #2 FOR EACH TANK PROVIDED AS

REQUIRED BY DRAWING M-1480 REV. B, GENERAL NOTE C3.C.3 AND GENERAL

NOTE T31.

BLOCK 8: TEST REPORT SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

TEST REPORT SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: TEST REPORT SHALL BE PROVIDED WITH THE 7,000 GALLON

HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021 TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AS S

A017

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

HYDROSTATIC TEST REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

N/A 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

16.

BLOCK 3: THE CONTRACTOR SHALL PROVIDE A SEPARATE HYDROSTATIC TEST

REPORT FOR EACH COMPONENT FOR EACH TANK AS REQUIRED BY DRAWING

M-1480 REV. B, GENERAL NOTE C3.D.

BLOCK 8: HYDROSTATIC TEST REPORT SHALL BE SUBMITTED FOR

GOVERNMENT APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT

AND COMPLIANCE WITH CONTRACT REQUIREMENTS.

HYDROSTATIC TEST REPORT SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C

MICHAEL WOOD CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: HYDROSTATIC TEST REPORT SHALL BE PROVIDED WITH THE

7,000 GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021 TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 4 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AT T

A018

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

NDT TEST REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASGEN

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

16.

BLOCK 3: THE CONTRACTOR SHALL PROVIDE NDT TEST REPORTS FOR LIFTING

LUGS FOR EACH TANK AS REQUIRED BY DRAWING M-1480 REV. B, GENERAL

NOTE C3.F.

BLOCK 8: NDT TEST REPORTS SHALL BE SUBMITTED FOR GOVERNMENT

APPROVAL. APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND

COMPLIANCE WITH CONTRACT REQUIREMENTS.

NDT TEST REPORTS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL

WOOD CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO DOD

AND DOD CONTRACTORS ONLY. ADMINISTRATION AND OPERATIONS ONLY,

EFFECTIVE 3/7/2019. OTHER U.S. REQUESTS SHALL BE REFERRED TO

COMNAVSEASYSCOM.

BLOCK 11 AND 12: NDT TEST REPORTS SHALL BE PROVIDED WITH THE 7,000

GALLON HORIZONTAL TANK(S).

BLOCK 14: FINAL SUBMISSION OF DOCUMENTATION SHALL BE ATTACHED IN

THE WIDE AREA WORKFLOW (WAWF) E-BUSINESS SUITE.

MEDIA REQUIREMENTS: DOCUMENTATION SHALL BE PROVIDED IN AN

ELECTRONIC UNPROTECTED PDF FORMAT WITH EMAIL NOTIFICATION TO ALL

ADDRESSEES.

PSNS C/980.2 1 1 0

N4532A 1

Document Number 83463021 TOTAL 1 2 0

G. PREPARED BY H. DATE H. APPROVED BY J. DATE

Mike Wood 27 Feb 2019 Thomas E. Larson 1 Mar 2019

DD Form 1423-1, FEB 2001 previous edition may be used. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

0002AU U

A019

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302.

Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed

7,000 GALLON HORIZONTAL TANK

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

NDT TEST REPORTS

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

ASGEN

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

D 11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

A. ADDRESSEE

Final

Draft Reg Repr o

16.

BLOCK 3: THE CONTRACTOR SHALL PROVIDE NDT TEST REPORTS FOR GAUGE

GUARD BRACKETS FOR EACH TANK AS REQUIRED BY DRAWING M-1480 REV. B,

GENERAL NOTE C3.G.

BLOCK 8: TEST REPORTS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.

APPROVAL WILL BE BASED ON TECHNICAL CONTENT AND COMPLIANCE WITH

CONTRACT REQUIREMENTS.

TEST REPORTS SHALL BE PROVIDED VIA E-MAIL TO GOVT P.O.C MICHAEL WOOD

CODE 980 AT michael.j.wood@navy.mil

THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW. THE

CONTRACTOR SHALL HAVE 10 WORKING DAYS TO REVISE (IF REQUIRED) AND

RESUBMIT FOR A NEW REVIEW.

BLOCK 9: DISTRIBUTION STATEMENT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.