About this file
This specification document outlines the procurement requirements for geosynthetic materials for the Twin Chimneys Landfill Unit 4 Cell 5 project in Greenville County, South Carolina. The project requires the provision of three primary geosynthetic materials: Geosynthetic Clay Liner (GCL) at 431,920 square feet, High-Density Polyethylene (HDPE) Geomembrane Liner at 454,220 square feet, and Geocomposite Drainage Layer at 431,920 square feet. Materials must be purchased, stored offsite in a secured and insured location under manufacturer specifications, and delivered to the Twin Chimneys Landfill during October-November 2026. The proposer is responsible for all costs associated with material delivery to offsite storage, offloading, storage facility protection, monthly inspections, documentation, and subsequent reloading and shipping to the landfill site. The storage location must be inspected monthly by the proposer with documentation provided to the owner, and site visits by the owner or engineer are permitted with adequate notice.
Pricing for each line item is submitted as a lump sum payment structured on milestone deliverables: delivery to storage location, provision of storage inspection reports, inspection by owner/engineer, and final delivery to the Twin Chimneys Landfill. The contractor must submit manufacturer names for each material, a detailed schedule including notice to proceed, material submittal and review timelines, manufacturing timeline, storage facility details, and the physical storage address. Acceptable manufacturers are limited to specified vendors: GCL options include Agru America, CETCO, and Solmax; HDPE options include Agru America and Solmax; and geocomposite drainage layer options include Agru America, Skaps Industries, and Solmax. All materials must meet rigorous quality standards including interface friction testing at specified normal stresses, with a minimum peak friction angle of 21 degrees required for each interface in the system. Failure to properly store materials as specified constitutes grounds for non-payment by Greenville County.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This page intentionally left blank.
HDR Project No. 10404585 Greenville County April 2026 Twin Chimneys MSW Unit 4 Cell 5 Landfill Geosynthetics Issued for Proposal
TABLE OF CONTENTS
00 01 10 - 1
TABLE OF CONTENTS
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - PROJECT MANUAL COVER
00 01 10 - TABLE OF CONTENTS
00 42 13 - PROPOSAL FORM
DIVISION 01 — GENERAL REQUIREMENTS
01 30 00 - SPECIAL CONDITIONS
01 33 00 - SUBMITTALS
01 45 26 - INTERFACE FRICTION TESTS
DIVISION 31 — EARTHWORK
31 05 19 - GEOSYNTHETIC CLAY LINER (GCL)
31 32 18 - DRAINAGE GEOCOMPOSITE
31 32 19 - GEOTEXTILES
DIVISION 33 — UTILITIES
33 47 14 - HIGH-DENSITY POLYETHYLENE (HDPE) GEOMEMBRANE
PROPOSAL FORM
00 42 13 - 1
SECTION 00 42 13
PROPOSAL FORM
PROJECT IDENTIFICATION: Twin Chimneys Landfill MSW Unit 4 Cell 5 – Geosynthetic Materials
THIS PROPOSAL IS SUBMITTED TO: Mr. Robert Brewer, Director, Procurement Services Division, Greenville County, hereinafter referred to as OWNER.
1. PROPOSAL PRICE
A. The Proposal Schedule in the following section outlines all major components required to complete the project as specified. The Proposal Total indicated in numbers and in words at the end of the Proposal Schedule, shall be used for determination of the successful Proposer.
B. The Proposer is directed to Proposal Schedule and Measurement and Basis for Payment for a narrative description of each item in the Proposal Schedule.
C. The quantities outlined below represent an approximation as estimated by the Engineer. The quantities include:
1. Cell Limits (8.6 acres)
2. Run-out
3. Anchor Trench
4. Tie-In to adjacent cells
5. Rain flap along future cell
D. Lump sum line items will constitute the total payment for the Work.
2. PROPOSAL SCHEDULE
A. PROPOSER will complete the Work in accordance with the Contract Documents for the following prices:
Item
Description
Estimate d
Quantity
Units
Payment
Total Cost
1.
Geosynthetic Clay Liner
(GCL) 431,920 SF LS $________________
2. HDPE Geomembrane Liner 454,220 SF LS $________________
3.
Geocomposite Drainage Layer
431,920
SF LS $________________
TOTAL PROPOSAL PRICE IN NUMBERS $
IN WORDS
3. MEASUREMENT AND BASIS FOR PAYMENT
The line items below provide further description of the Work listed in the Proposal Schedule. The price associated with each Lump Sum item shall be the full compensation paid for the Work described.
PROPOSAL FORM
00 42 13 - 2
It is the intent of this Proposal that the materials would be purchased and stored by a geosynthetic installer. However, the manufacturer could also submit a Proposal to include storage of the materials.
After approvals are received, material shall be produced and stored at an offsite location.
Materials shall be stored per manufacturer’s recommendations for each product. Materials shall be stored offsite in an insured and secured location (secured to include fenced and gated). Materials and material used to cover materials shall be inspected monthly and maintained as required per manufacturer’s recommendations. Documentation of inspections shall be provided to the Owner. All cost associated with delivery to offsite storage location, including cost of offloading, along with cost of reloading and shipping to the Twin Chimneys Landfill in October – November 2026 shall be included with cost for each item. Proof of delivery in the form of Bill of Landing and/or photos of stored materials shall be submitted at time of delivery. Site visits from Owner or Engineer while materials are stored shall be allowed with ample notice. Failure to store materials as outlined herein shall constitute grounds for non-payment by the County.
A. Base Proposal Schedule:
1. GEOSYNTHETIC CLAY LINER (GCL): This item shall include material purchasing, temporary storage, protection at storage facility, and delivery and off-loading at the Twin Chimneys Landfill. Payment will be on made on milestones: delivery to storage location, provide storage inspection report, inspection by Owner/Engineer, and delivery to Twin Chimneys Landfill.
2. HDPE GEOMEMBRANE LINER: This item shall include material purchasing, temporary storage, protection at storage facility, and delivery and off-loading at the Twin Chimneys Landfill. Payment will be on made on milestones: delivery to storage location, provide storage inspection report, inspection by Owner/Engineer, and delivery to Twin Chimneys Landfill.
3. GEOCOMPOSITE DRAINAGE LAYER: This item shall include material purchasing, temporary storage, protection at storage facility, and delivery and off-loading at the Twin Chimneys Landfill. Payment will be on made on milestones: delivery to storage location, provide storage inspection report, inspection by Owner/Engineer, and delivery to Twin Chimneys Landfill.
4. COMPLETION
PROPOSER agrees that final payment will be made after materials are delivered to the Twin Chimneys Landfill.
PROPOSER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete delivery the materials within the times specified in the Agreement.
5. ATTACHED DOCUMENTS
The following must be included with the proposal:
• Name of proposed manufacturer for each material
• A schedule that includes following:
o Notice to Proceed (assumed) o Material submittal & review by Engineer o Manufacturing timeline for each product o Delivery date to storage facility o Delivery date to Twin Chimneys Landfill
• Physical address the materials will be stored.
• Indicate whether the materials will be stored under roof or tarps.
PROPOSAL FORM
00 42 13 - 3
6. ADDRESS FOR COMMUNICATIONS
Communications concerning this Proposal shall be addressed to
Contact Name: ____________________________________________
Contact Address: _____________________________________________
Contact Email address: _________________________________________
Contact Telephone Number: _____________________________________
SUBMITTED on ________________________________________, 2026.
If PROPOSER is:
An Individual
By_____________________________________________________ (SEAL) (Individual's name)
Doing business as _____________________________________________
Business address: _______________________________________
A Partnership
By_____________________________________________________(SEAL) (Firm name)
(General partner)
Business address: _______________________________________
PROPOSAL FORM
00 42 13 - 4
A Corporation
By_____________________________________________________ (SEAL) (Corporation name)
(State of incorporation)
By_____________________________________________________ (SEAL) (Name of person authorized to sign)
(Title)
(Corporate Seal)
Attest ____________________________________________________
(Secretary)
Business address: _________________________________
Date of Qualification to do business is _____________________
A Joint Venture
By____________________________________________________ (SEAL) (Name)
Business address: _________________________________
By____________________________________________________ (SEAL)
(Name)
Business address: _________________________________
NOTE: Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.
END OF SECTION
SPECIAL CONDITIONS
01 30 00 - 1
SECTION 01 30 00
SPECIAL CONDITIONS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Specifier: Edit this list to reflect the content of this Specification Section.
Conditions specific to this project.
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Bidding Requirements, Contract Forms, and Conditions of the Contract.
2. Division 01 - General Requirements.
3. Section 01 45 26 – Interface Friction Tests
1.2 CONDITIONS SPECIFIC TO THIS PROJECT
A. CQC/CQA Duties: In general, the CQC Consultant will perform all testing related to earthwork and soil liner work and provide documentation to the CQA Consultant. The CQA Consultant will conduct the destructive geosynthetic testing and official construction documentation for submission to the SCDES. CQC and CQA documentation will be used by the CQA Consultant to prepare and submit final certification to SCDHEC. The majority of the CQC responsibilities and all of the testing requirements are defined by these specifications. However, CQC/CQA communication is addressed in the CQA Plan. The majority of the CQA responsibilities are defined by the CQA Plan.
B. The CONTRACTOR (Geosynthetic Installer/Supplier) is responsible for construction of any additional access/haul roads; however their locations are subject to approval by the OWNER.
The Contractor shall repair/reconstruct all existing roads and features to preconstruction condition or better, regardless of use of these by others. In the absence of preconstruction condition documentation by the contractor, they shall be repaired to the satisfaction of the OWNER. All roads shall be passible by a pickup truck traveling 15 mph at the completion of work.
C. Site Access:
1. The primary access to the site available to the CONTRACTOR is entering through the existing contractor’s entrance on U.S. Highway 25. The CONTRACTOR is responsible for securing this entrance at all times.
2. Access via the paved landfill entrance shall be only for attending meetings and as allowed by the OWNER.
1.3 DATA AND MEASUREMENTS
A. The data given in the Specifications and shown on the Drawings is believed to be accurate but the accuracy is not guaranteed. The Contractor must take all levels, locations, measurements, and verify all dimensions of the job site prior to construction and must adapt his work into the exact construction. Larger scale Drawings take precedence over smaller scale Drawings, and approved shop drawings take precedence over all others.
PART 2 - PRODUCTS
2.1 INTERFACE FRICTION TESTS
A. If any interface doesn’t meet the requirements, or if the CONTRACTOR changes geosynthetic materials, then the additional cost to qualify those materials shall be borne by the CONTRACTOR. Refer to 01 45 26 – INTERFACE FRICTION TESTS.
SPECIAL CONDITIONS
01 30 00 - 2
PART 3 - EXECUTION – NOT USED
SUBMITTALS
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mechanics and administration of the submittal process for:
a. Shop Drawings.
b. Samples.
c. Informational submittals.
2. General content requirements for Shop Drawings.
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Bidding Requirements, Contract Forms, and Conditions of the Contract.
2. Division 01 - General Requirements.
3. Technical Specification Sections identifying required submittals.
1.2 DEFINITIONS
A. Shop Drawings:
1. See General Conditions.
2. Product data and samples are Shop Drawing information.
B. Informational Submittals:
1. Submittals other than Shop Drawings and samples required by the Contract Documents that do not require review and/or approval by the Engineer.
2. Representative types of informational submittal items include but are not limited to:
a. As indicated in each specification section.
3. For-Information-Only submittals upon which the Engineer is not expected to conduct review or take responsive action may be so identified in the Contract Documents.
1.3 PREPARATION OF SUBMITTALS
A. Legibility:
1. All submittals and all pages of all copies of a submittal shall be completely legible.
2. Submittals which, in the Engineer’s sole opinion, are illegible will be returned without review.
B. Shop Drawings, Product Data, and Samples:
1. Scope of any submittal and letter of transmittal:
a. Limited to one (1) Specification Section.
b. Do not submit under any Specification Section entitled (in part) "Basic Requirements" unless the product or material submitted is specified, in total, in a "Basic Requirements" Specification Section.
2. Numbering letter of transmittal:
SUBMITTALS
01 33 00 - 2
a. Use the Specification Section number followed by a series number ("-xx" and beginning with "01"); increase the series number sequentially with each additional transmittal for that Specification Section.
3. Describing transmittal contents:
a. Provide listing of each component or item in submittal capable of receiving an independent review action.
b. Identify for each item:
1) Manufacturer and Manufacturer's Drawing or data number.
2) Contract Document tag number(s).
3) Contract Drawing Section or detail number if appropriate.
4) Specification Section Article/Paragraph number if appropriate.
5) Unique page numbers for each page of each separate item.
c. When submitting "or-equal" items that are not the products of named manufacturers, include the words "or-equal" in the item description.
4. Contractor certification of review and approval:
a. Contractor shall execute Exhibit AA, Contractor's Submittal Certification form, to indicate Contractor has reviewed and approved the submittal contents.
1) Clearly identify the person who reviewed the submittal and the date it was reviewed."
b. Submittals containing multiple independent items shall be prepared with each item listed on the letter of transmittal or on an index sheet for all items listing the discrete page numbers for each page of each item, which shall be stamped with the Contractor's review and approval stamp.
1) Each independent item shall have a cover sheet with the transmittal number and item number recorded.
a) Provide clear space of 3 IN SQ for Engineer stamping.
2) Individual pages or sheets of independent items shall be numbered in a manner that permits the entire contents of a particular item to be readily recognized and associated with Contractor's certification.
5. Resubmittals:
a. Number with original Specification Section and series number with a suffix letter starting with "A" on a (new) duplicate transmittal form.
b. Do not increase the scope of any prior transmittal.
c. Provide cover letter indicating how each "B", "C", or "D" Action from previous submittal was addressed and where the correction is found in the resubmittal.
d. Account for all components of prior transmittal.
1) If items in prior transmittal received "A" or "B" Action code, list them and indicate "A" or "B" as appropriate.
a) Do not include submittal information for items listed with prior "A" or "B" Action in resubmittal.
2) Indicate "Outstanding-To Be Resubmitted At a Later Date" for any prior "C" or "D" Action item not included in resubmittal.
a) Obtain Engineer's approval to exclude items.
6. Transmittal contents:
a. Contractor shall not use red color for marks on transmittals.
b. Duplicate all marks on all copies transmitted, and ensure marks are photocopy reproducible.
SUBMITTALS
01 33 00 - 3
c. Engineer will use red marks or enclose marks in a cloud.
d. Coordinate and identify Shop Drawing contents so that all items can be easily verified by the Engineer.
e. Provide submittal information or marks defining specific equipment or materials utilized on the Project.
1) Generalized product information, not clearly defining specific equipment or materials to be provided, will be rejected.
f. Identify equipment or material project application, tag number, Drawing detail reference, weight, and other Project specific information.
g. Provide sufficient information together with technical cuts and technical data to allow an evaluation to be made to determine that the item submitted is in compliance with the Contract Documents.
h. Do not modify the manufacturer's documentation or data except as specified herein.
i. Submit items such as equipment brochures, cuts of fixtures, product data sheets or catalog sheets on 8-1/2 x 11 IN pages.
1) Indicate exact item or model and all options proposed.
j. When a Shop Drawing submittal is called for in any Specification Section, include as appropriate, scaled details, sizes, dimensions, performance characteristics, capacities, test data, anchoring details, installation instructions, storage and handling instructions, color charts, layout Drawings, rough-in diagrams, wiring diagrams, controls, weights and other pertinent data in addition to information specifically stipulated in the Specification Section.
1) Arrange data and performance information in format similar to that provided in Contract Documents.
2) Provide, at minimum, the detail specified in the Contract Documents.
k. If proposed equipment or materials deviate from the Contract Drawings or Specifications in any way, clearly note the deviation and justify the said deviation in detail in a separate letter immediately following transmittal sheet.
Any deviation from plans or specifications not depicted in the submittal or included but not clearly noted by the Contractor may not have been reviewed.
Review by the Engineer shall not serve to relieve the Contractor of the contractual responsibility for any error or deviation from contract requirements.
7. Samples:
a. Identification:
1) Identify sample as to transmittal number, manufacturer, item, use, type, project designation, tag number, Specification Section or Drawing detail reference, color, range, texture, finish and other pertinent data.
2) If identifying information cannot be marked directly on sample without defacing or adversely altering samples, provide a durable tag with identifying information securely attached to the sample.
b. Include application specific brochures, and installation instructions.
c. Provide Contractor's review and approval certification stamp or Contractor's Submittal Certification form as indication of Contractor's checking and verification of dimensions and coordination with interrelated work.
d. Resubmit revised samples of rejected items.
C. Informational Submittals:
SUBMITTALS
01 33 00 - 4
1. Prepare in the format and detail specified in Specification requiring the informational submittal.
1.4 TRANSMITTAL OF SUBMITTALS
A. Shop Drawings and Samples:
1. Transmit all submittals to:
HDR
440 South Church Street, Suite 1200 Charlotte, NC 28020-2075 Attn: Philip Westmoreland, PE philip.westmoreland@hdrinc.com
2. Utilize attached Exhibit A to transmit all Shop Drawings and samples.
3. All submittals must be from Contractor.
a. Submittals will not be received from or returned to subcontractors.
B. Informational Submittals:
1. Transmit using attached Exhibit A.
2. Submit as specified in individual Specification Section.
3. Transmit to:
HDR
440 South Church Street, Suite 1200 Charlotte, NC 28020-2075 Attn: Philip Westmoreland, PE philip.westmoreland@hdrinc.com
C. Electronic Transmission of Submittals:
1. Transmittals may be made electronically.
a. Use email.
b. Protocols and processes will be determined at the Pre-Construction Conference.
2. Scan all transmittals into Adobe Acrobat Portable Document Format (PDF), latest version, with printing enabled.
a. Do not password protect or lock the PDF document.
b. Rotate sheets that are normally viewed in landscape mode so that when the PDF file is opened the sheet is in the appropriate position for viewing.
3. Required signatures may be applied prior to scanning for transmittal.
4. Engineer may use commenting features of Adobe for review comments. This may require the Contractor’s selection of the appropriate software features to view the comments.
1.5 ENGINEER'S REVIEW ACTION
A. Shop Drawings and Samples:
1. Items within transmittals will be reviewed for overall design intent and will receive one (1) of the following actions:
a. A - FURNISH AS SUBMITTED.
b. B - FURNISH AS NOTED (BY ENGINEER).
SUBMITTALS
01 33 00 - 5
c. C - REVISE AND RESUBMIT.
d. D - REJECTED.
e. E - ENGINEER'S REVIEW NOT REQUIRED.
2. Submittals received will be initially reviewed to ascertain inclusion of Contractor's approval stamp.
a. Submittals not stamped by the Contractor or stamped with a stamp containing language other than that specified herein will not be reviewed for technical content and will be returned rejected.
3. In relying on the representation on the Contractor’s review and approval stamp, Owner and Engineer reserve the right to review and process poorly organized and poorly described submittals as follows:
a. Submittals transmitted with a description identifying a single item and found to contain multiple independent items:
1) Review and approval will be limited to the single item described on the transmittal letter.
2) Other items identified in the submittal will:
a) Not be logged as received by the Engineer.
b) Be removed from the submittal package and returned without review and comment to the Contractor for coordination, description and stamping.
c) Be submitted by the Contractor as a new series number, not as a re-submittal number.
b. Engineer, at Engineer’s discretion, may revise the transmittal letter item list and descriptions, and conduct review.
1) Unless Contractor notifies Engineer in writing that the Engineer’s revision of the transmittal letter item list and descriptions was in error, Contractor’s review and approval stamp will be deemed to have applied to the entire contents of the submittal package.
4. Submittals returned with Action "A" or "B" are considered ready for fabrication and installation.
a. If for any reason a submittal that has an "A" or "B" Action is resubmitted, it must be accompanied by a letter defining the changes that have been made and the reason for the resubmittal.
b. Destroy or conspicuously mark "SUPERSEDED" all documents having previously received "A" or "B" Action that are superseded by a resubmittal.
5. Submittals with Action "A" or "B" combined with Action "C" (Revise and Resubmit) or "D" (Rejected) will be individually analyzed giving consideration as follows:
a. The portion of the submittal given "C" or "D" will not be distributed (unless previously agreed to otherwise at the Preconstruction Conference).
1) One (1) copy or the one (1) transparency of the "C" or "D" Drawings will be marked up and returned to the Contractor.
a) Correct and resubmit items so marked.
b. Items marked "A" or "B" will be fully distributed.
c. If a portion of the items or system proposed are acceptable, however, the major part of the individual Drawings or documents are incomplete or require revision, the entire submittal may be given "C" or "D" Action.
1) This is at the sole discretion of the Engineer.
SUBMITTALS
01 33 00 - 6
2) In this case, some Drawings may contain relatively few or no comments or the statement, "Resubmit to maintain a complete package."
3) Distribution to the Owner and field will not be made (unless previously agreed to otherwise).
6. Failure to include any specific information specified under the submittal paragraphs of the Specifications will result in the submittal being returned to the Contractor with "C" or "D" Action.
7. Calculations required in individual Specification Sections will be received for information purposes only, as evidence calculations have been stamped by the professional as defined in the specifications and for limited purpose of checking conformance with given performance and design criteria. The Engineer is not responsible for checking the accuracy of the calculations and the calculations will be returned stamped "E. Engineer's Review Not Required" to acknowledge receipt.
8. Contractor shall furnish required submittals with sufficient information and accuracy to obtain required approval of an item with no more than three submittals. Engineer will record Engineer’s time for reviewing a fourth or subsequent submittal of a Shop Drawings, sample, or other item requiring approval, and Contractor shall be responsible for Engineer’s charges to Owner for such time. Owner may impose a set-off against payments due to Contractor to secure reimbursement for such charges.
9. Transmittals of submittals which the Engineer considers as "Not Required" submittal information, which is supplemental to but not essential to prior submitted information, or items of information in a transmittal which have been reviewed and received "A" or "B" action in a prior submittal, will be returned with action "E.
Engineer's Review Not Required."
10. Samples may be retained for comparison purposes.
a. Remove samples when directed.
b. Include in bid all costs of furnishing and removing samples.
11. Approved samples submitted or constructed, constitute criteria for judging completed work.
a. Finished work or items not equal to samples will be rejected.
PART 2 - PRODUCTS - (NOT APPLICABLE TO THIS SPECIFICATION SECTION)
PART 3 - EXECUTION - (NOT APPLICABLE TO THIS SPECIFICATION SECTION)
SUBMITTALS
01 33 00 - 7
EXHIBIT A
SUBMITTALS
01 33 00 - 8
EXHIBIT AA Contractor's Submittal Certification
Shop Drawing Transmittal No.:
Contract/Project Name:
Company Name:
has
1. reviewed and coordinated this Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents;
2. determined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;
3. determined and verified the suitability of all materials offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and
4. determined and verified all information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto.
This Submittal does not contain any variations from the requirements of the Contract Documents.
This Submittal does contain variations from the requirements of the Contract Documents. A separate description of said variations and a justification for them is provided in an attachment hereto identified as:
"Shop Drawing Transmittal No. __________________________Variation and Justification Documentation"
Insert picture file or electronic signature of Authorized Representative
Authorized Representative Date
Copyright 1991-2013 HDR Engineering, Inc. - Revised Oct 2011
INTERFACE FRICTION TESTS
01 45 26 - 1
SECTION 01 45 26
INTERFACE FRICTION TESTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for:
a. Testing of Interface Friction between landfill layers.
B. Related Sections include but are not necessarily limited to:
1. Division 00 - Procurement and Contracting Requirements.
2. Division 01 - General Requirements.
3. Section 31 05 19 - Geosynthetic Clay Liner (GCL).
4. Section 31 32 18 - Drainage Geocomposite.
5. Section 31 32 19 - Geotextiles.
6. Section 33 47 14 - High-Density Polyethylene (HDPE) Geomembrane.
1.2 QUALITY ASSURANCE
A. Referenced Standards:
1. ASTM International (ASTM):
a. D5321, Standard Test Method for Determining the Shear Strength of Soil-Geosynthetic and Geosynthetic-Geosynthetic Interfaces by Direct Shear.
b. D6243, Standard Test Method for Determining the Internal and Interface Shear Strength of Geosynthetic Clay Liner by the Direct Shear Method.
1.3 DEFINITIONS
A. CQA Consultant: Hired by the Owner to perform testing.
1.4 SUBMITTALS
A. Not Applicable
PART 2 - PRODUCTS
2.1 INTERFACE FRICTION TESTS
A. Laboratory interface friction tests shall be conducted, on behalf of the Owner by the CQA Consultant, with representative samples of the materials selected by the Contractor for use in the Work. The CQA Consultant must approve the testing laboratory used for these tests. The Contractor is responsible for shipping materials to the testing laboratory. The CQA Consultant will pay the shipping cost. Testing will include the interfaces between the following adjacent materials.
Material Specification
Section
Operational Layer 31 38 20
Drainage Composite 31 32 18
High-Density Polyethylene (HDPE) Geomembrane 33 47 14
Geosynthetic Clay Liner (GCL) 31 05 19
Base Soil Barrier 31 38 10
INTERFACE FRICTION TESTS
01 45 26 - 2
B. The testing shall be performed in accordance with ASTM D5321 or D6243 as appropriate.
1. The materials shall be tested at normal stresses of 500, 1,000, and 2,000 PSF.
2. Displacement rates shall be in accordance with ASTM method appropriate for the individual interface.
3. Soil components shall be compacted to the same moisture-density requirements specified for full-scale field placement and saturated prior to shear.
4. All geosynthetic interfaces shall be tested in a wet condition. Geosynthetics shall be oriented such that the shear force is parallel to the downslope orientation of these components in the field.
5. The hydration fluid shall be distilled water. GCL Samples shall be allowed to hydrate for a minimum of three days prior to shear testing.
6. The testing laboratory shall confirm these criteria with the CQA firm prior to performing the tests.
C. A minimum peak friction angle of 21 DEG is required for each interface in the system defined in Paragraph A.
D. Report tests and results in accordance with applicable ASTM standard.
PART 3 - EXECUTION (NOT USED)
GEOSYNTHETIC CLAY LINER (GCL)
31 05 19 - 1
SECTION 31 05 19
GEOSYNTHETIC CLAY LINER (GCL)
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Geosynthetic Clay Liner (GCL).
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Procurement and Contracting Requirements.
2. Division 01 - General Requirements.
3. Section 31 32 18 – Drainage Geocomposite.
4. Section 33 47 14 – High Density Polyethylene (HDPE) Geomembrane
1.2 QUALITY ASSURANCE
A. Referenced Standards:
1. ASTM International (ASTM):
a. D2216, Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass.
b. D4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles.
c. D4643, Standard Test Method for Determination of Water (Moisture) Content of Soil by Microwave Oven Heating.
d. D4833, Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products.
e. D4873, Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples.
f. D5261, Standard Test Method for Measuring Mass per Unit Area of Geotextiles.
g. D5321, Standard Test Method for Determining the Shear Strength of Soil-Geosynthetic and Geosynthetic-Geosynthetic Interfaces by Direct Shear
h. D5887, Standard Test Method for Measurement of Index Flux Through Saturated Geosynthetic Clay Liner Specimens Using a Flexible Wall Permeameter.
i. D5888, Standard Guide for Storage and Handling of Geosynthetic Clay Liners.
j. D5889, Standard Practice for Quality Control of Geosynthetic Clay Liners.
k. D5890, Standard Test Method for Swell Index of Clay Mineral Component of Geosynthetic Clay Liners.
l. D5891, Standard Test Method for Fluid Loss of Clay Component of Geosynthetic Clay Liners.
m. D5993, Standard Test Method for Measuring Mass Per Unit of Geosynthetic Clay Liners.
n. D6072, Obtaining Samples of GCL
o. D6102, Standard Guide for Installation of Geosynthetic Clay Liners.
p. D6243, Standard Test Method for Determining the Internal and Interface Shear Resistance of Geosynthetic Clay Liner by the Direct Shear Method.
q. D6496, Determining Average Bonding Peel Strength Between Top and Bottom Layers of Needle Punched GCLs.
r. D6766, Evaluation of Hydraulic Properties of GCLs permeated with Potentially Incompatible Liquids.
s. D6768, Tensile Strength of Geosynthetic Clay Liner.
GEOSYNTHETIC CLAY LINER (GCL)
31 05 19 - 2
2. Geosynthetic Research Institute (GRI):
a. GCL-3, Test Methods, Required Properties, and Testing Frequencies of Geosynthetic Clay Liners (GCLs).
B. Quality Assurance:
1. The Owner's representative may conduct independent testing to support construction quality assurance program and to provide documentation of such to appropriate regulatory agencies.
a. Facilitate and provide opportunities as Owner's representative require.
2. Manufacture, store, place, seam, test and protect GCL as described in ASTM D4873, ASTM D5888 and ASTM D6102.
C. Qualifications:
1. Each manufacturing firm shall demonstrate five (5) years continuous experience, including a minimum of 5,000,000 SF of manufacture/fabrication of geosynthetic clay liner production in the past three (3) years.
a. Aggregate experience shall not apply.
1.3 DEFINITIONS
A. Manufacturer:
1. Manufacturer produces geosynthetic clay liner panels from first quality geotextiles and sodium bentonite.
2. The manufacturer is responsible for producing panels which comply with this Specification Section.
B. Hydrated GCL is defined as material which has become soft as determined by squeezing the material with finger pressure, material which has exhibited swelling, or material which as a moisture content greater than 100 percent as determined by ASTM D2216.
1.4 SUBMITTALS
A. See Specification Section 01 33 00 for requirements for the mechanics and administration of the submittal process.
B. Shop Drawings:
1. Manufacturer's documentation that bentonite, geotextiles and GCL comply with required material properties.
2. Manufacturer and Installer quality control manuals.
3. In order to confirm the quantity prior to manufacturing, provide a GCL layout plan
a. Proposed details for connecting the GCL materials to appurtenances.
b. Proposed methods of seaming (overlapping) GCL panels.
C. Informational Submittals:
1. Test results:
a. Bentonite, geotextile and GCL tests at frequency specified in respective quality control manuals.
b. Results shall include or bracket the rolls delivered for use in the Work.
2. Qualification documentation specified in the QUALITY ASSURANCE Article in PART 1 of this Specification Section.
3. Submit written certifications that:
a. The GCL delivered to site meets the requirements of this Specification Section.
b. The GCL was received and accepted in undamaged condition from shipper.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Do not place GCL rolls directly on the ground.
GEOSYNTHETIC CLAY LINER (GCL)
31 05 19 - 3
B. Store and protect GCL from dirt, water, ultraviolet light and other sources of damage.
C. Label, handle, and store GCL in accordance with ASTM D4873 and as specified herein.
1. Wrap each roll in an opaque and waterproof layer of plastic during shipment and storage.
2. Do not remove the plastic wrapping until deployment.
D. Label each roll with the manufacturer's name, lot number, roll number, and roll dimensions (length, width, gross weight).
1. Repair or replace GCL or plastic wrapping damaged as a result of storage or handling, as directed.
2. Do not expose GCL to temperatures in excess of 71 DegC (160 DegF) or less than 0 DegC (32 DegF) unless recommended by the manufacturer.
E. Do not use hooks, tongs or other sharp instruments for handling the GCL.
1. Do not lift rolls by use of cables or chains in contact with the GCL.
2. Do not drag GCL along the ground.
1.6 WARRANTY
A. The Manufacturer shall provide a 5-year warranty to the OWNER against manufacturing defects. The warranty shall include defective product found to be not in compliance with the requirements of this specification.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Subject to compliance with the Contract Documents, the following manufacturers are acceptable:
1. Geosynthetic Clay Liners:
a. Agru America
b. CETCO
c. Solmax
2.2 MATERIALS
A. Geosynthetic Clay Liner: The GCL shall be reinforced.
1. The active ingredient of the GCL shall be natural sodium bentonite.
a. Encapsulate bentonite between two (2) geotextiles.
b. Provide material meeting GRI-GCL 3 except as specified in Table 1.
GEOSYNTHETIC CLAY LINER (GCL)
31 05 19 - 4
TABLE 1: REQUIRED GCL PROPERTIES
Required Value
GCL Property Test Method Reinforced Nonreinforced
Maximum Hydraulic Conductivity
ASTM D5887 5x10-9 cm/s 5x10-9 cm/s
Minimum Bentonite Content
ASTM D5993
(Oven dry basis)
0.75 lb/sf 0.75 lb/sf
MARV Grab Tensile Strength ASTM D4632 90 lbs 75 lbs
Typical Shear Strength ASTM D5321 500 psf (when hydrated) 50 psf
Minimum Free Swell ASTM D5890 24 mL 24 mL
Maximum Fluid Loss ASTM D5891 18 mL 18 mL
Minimum Peel Strength, MD ASTM D6496 2.1 ppi 2.1 ppi
MARV Tensile Strength, MD ASTM 6768 23 ppi 23 ppi
2. Lock-stitch or heat-seal needle punched geotextile backed GCL with high strength polypropylene thread to provide internal shear strength reinforcing.
a. The internal shear reinforcing mechanism shall resist failure due to thread pull-out over long-term creep situations.
3. Continuously adhere the bentonite to both geotextiles to ensure that the bentonite will not be displaced during handling, transportation, storage and installation, including cutting, patching and fitting around penetrations.
a. The bentonite sealing compound or bentonite granules used to seal penetrations and make repairs shall be made of the same natural sodium bentonite as the GCL and shall be as recommended by the GCL manufacturer.
b. The permeability of the GCL overlap seams shall be equal to or less than the permeability of the body of the GCL sheet.
2.3 SOURCE QUALITY CONTROL
A. Interface Friction Tests:
1. Laboratory friction tests shall be conducted, on behalf of the Owner by the CQA Laboratory, with representative samples of the materials selected by the Contractor for use in the Work.
The Contractor is responsible for shipping materials to the testing laboratory. Testing requirements are provided in Section 01 30 00, Part 2.
DRAINAGE GEOCOMPOSITE
31 32 18 - 1
SECTION 31 32 18
DRAINAGE GEOCOMPOSITE
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the bonded geotextile-geonet drainage geocomposite.
B. Related sections include but are not necessarily limited to:
1. Division 00 – Procurement and Contracting Requirements.
2. Division 01 – General Requirements.
3. Section 31 05 19 – Geosynthetic Clay Liner (GCL).
4. Section 31 32 19 – Geotextiles.
5. Section 33 47 14 – High-Density Polyethylene (HDPE) Geomembrane.
1.2 QUALITY ASSURANCE
A. Referenced Standards:
1. ASTM International (ASTM):
a. D1238, Standard Test Method for Melt Flow Rates of Thermoplastics by Extrusion Plastometer.
b. D1505, Standard Test Method for Density of Plastics by the Density-Gradient Technique.
c. D1603, Standard Test Method for Carbon Black in Olefin Plastics.
d. D1987 Test Method for Biological Clogging of Geotextile or Soil/Geotextile Filters.
e. D4716, Constant Head Hydraulic Transmissivity (In-Plane Flow) of Geotextiles and Geotextile Related Products.
f. D4873, Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples.
g. D5199, Standard Method for Measuring Nominal Thickness of Geotextiles and Geomembranes.
h. D5321, Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method
i. D7005, Determining the Bond Strength (Ply Adhesion) of Geocomposite.
j. D5035, Standard Test Method for Breaking Force and Elongation of Textile Fabrics (strip method).
2. Geosynthetic Research Institute (GRI).
a. GRI GC8 – Determination of the Allowable Flow Rate of a Drainage Geocomposite.
B. Qualifications:
1. Each manufacturing and fabricating firm shall demonstrate five (5) years continuous experience, including a minimum of 5,000,000 SF of drainage geocomposite production in the past three (3) years.
DRAINAGE GEOCOMPOSITE
31 32 18 - 2
1.3 DEFINITIONS
A. Manufacturer: Manufacturer producing drainage geocomposite from geonet cores and geotextiles.
1.4 SUBMITTALS
A. Shop Drawings:
1. Manufacturer's documentation that raw materials and roll materials comply with required drainage geocomposite physical properties.
2. Manufacturer and Installer quality control manuals.
3. Original test results for resins and roll material at frequency specified in respective quality control manuals and Paragraph 2.2 of this Section.
1.5 DELIVERY, STORAGE AND HANDLING
A. Label, handle, and store drainage geocomposite in accordance with ASTM D4873 and as specified herein.
B. Wrap each roll in an opaque and waterproof layer of plastic during shipment and storage.
1. Do not remove the plastic wrapping until deployment.
C. Label each roll with the manufacturer's name, drainage geocomposite type, lot number, roll number, and roll dimensions (length, width, gross weight).
D. Repair or replace, as directed by the Engineer, drainage geocomposite or plastic wrapping damaged as a result of storage or handling.
E. Do not expose drainage geocomposite to temperatures in excess of 71 DegC (160 DegF) or below 0 DegC (32 DegF) unless recommended by the Manufacturer.
F. Do not use hooks, tongs or other sharp instruments for handling the drainage geocomposite.
G. Do not lift rolls by use of cables or chains in contact with the drainage geocomposite.
H. Do not drag drainage geocomposite along the ground or across textured geomembranes.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Subject to compliance with the Contract Documents, the following Manufacturer is acceptable:
1. Agru America.
2. Skaps Industries
3. Solmax
2.2 MATERIALS AND MANUFACTURE
A. Geonet Core:
1. Use nonthermally degraded polyethylene polymer which is clean and free of any foreign contaminants.
DRAINAGE GEOCOMPOSITE
31 32 18 - 3
2. Manufactured geonet to conform to the property requirements listed in Table 1 and be free of defects including tears, nodules or other manufacturing defects which may affect its serviceability.
TABLE 1 - GEONET PROPERTIES
Property Test Method Required Value Min. MQC Test Frequency
Specific Gravity/ Density (g/cm3) (min)
ASTM D1505 >0.94 g/cc 1 per 50,000 ft2 and every resin lot
Thickness (mil) ASTM D5199 250 mil (min) 1 per 50,000 ft2 and every resin lot
Carbon Black Content ASTM D4218 2 percent 1 per 50,000 ft2 and every resin lot
Tensile Strength ASTM D7179 75 lbs/in MD 1 per 50,000 ft2 and every resin lot
Melt Index ASTM D1238 1.0g/10 min (max) 1 per every resin lot
B. Geotextile:
1. Cover geonet core on both sides or single side, as shown on Drawings, with a geotextile complying with Type 2 geotextile requirements specified in Section 31 32 19: Geotextiles.
C. Drainage Geocomposite:
1. Create a geocomposite by heat bonding geotextiles to the geonet.
2. Minimum Transmissivity ≥ 6.0 x10-4m2/sec @ 100 hrs and at the conditions indicated in Section 2.3.
3. Ply adhesion ASTM D7005 MARV of 1 lb/in at a frequency of 1 test for every 90,000 SF of installed product.
2.3 SOURCE QUALITY CONTROL
A. Transmissivity Testing:
1. Measure transmissivity using water at 68 DegF with a normal compressive load of 1,000 and 9,000 psf. and a hydraulic gradient of 0.25 with a seat time of 100 hours.
2. Attach geotextiles to the geonet in the same configuration as will be used in the field.
3. Boundary conditions are soil interface on the upper geotextile and textured 60 mil HDPE geomembrane against the lower geotextile.
4. Maximum design normal load testing shall be conducted for a minimum period of 100 hours. Calculate and report results after 15 minutes, 1 hour, 24 hours, and 100 hours, at a minimum.
5. Testing frequency: 1 test for every 200,000 SF of installed product.
6. Product net meeting specifications shall be replaced.
B. Interface Friction Tests.
1. Laboratory friction tests shall be conducted, on behalf of the Owner by the CQA Laboratory, with representative samples of the materials selected by the Contractor for use in the Work.
The Contractor is responsible for shipping materials to the testing laboratory. Testing requirements are provided in Section 01 30 00, Part 2.
DRAINAGE GEOCOMPOSITE
31 32 18 - 4
2.4 CONFORMANCE TESTING
A. Not required.
GEOTEXTILES
31 32 19 - 1
SECTION 31 32 19
GEOTEXTILES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Nonwoven geotextile material.
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Bidding Requirements, Contract Forms, and Conditions of the Contract.
2. Division 01 - General Requirements.
3. Section 31 05 19 – Geosynthetic Clay Liner (GCL)
4. Section 33 47 14 – High-Density Polyethylene (HDPE) Geomembrane
5. Section 31 32 18 – Drainage Composite.
1.2 QUALITY ASSURANCE
A. Referenced Standards:
1. American Association of State Highway Transportation Officials (AASHTO):
a. M288, Standard Specification for Geotextile Specification for Highway Applications.
2. ASTM International (ASTM):
a. D1987, Standard Test Method for Biological Clogging of Geotextile or Soil/Geotextile Filters.
b. D3776, Standard Test Method for Mass Per Unit Area (Weight) of Fabric.
c. D3786, Standard Test Method for Bursting Strength of Textile Fabrics-Diaphragm Bursting Strength Tester Method.
d. D4354, Standard Practice for Sampling of Geosynthetics and Rolled Erosion Control Products (RECPs) for Testing.
e. D4355, Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Arc Type Apparatus.
f. D4491, Standard Test Methods for Water Permeability of Geotextiles by Permittivity.
g. D4533, Standard Test Method for Trapezoid Tearing Strength of Geotextiles.
h. D4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles.
i. D4751, Standard Test Method for Determining Apparent Opening Size of a Geotextile.
j. D4759, Standard Practice for Determining the Specification Conformance of Geosynthetics.
k. D4833, Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products.
l. D4873, Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples.
m. D4884, Standard Test Method for Strength of Sewn or Bonded Seams of Geotextiles.
n. D5261, Standard Test Method for Measuring Mass per Unit Area of Geotextiles.
o. D6193, Standard Practice for Stitches and Seams.
p. D6241, Standard Test Method for Static Puncture Strength of Geotextiles and Geotextile-Related Products Using a 50-mm Probe.
B. Qualifications:
GEOTEXTILES
31 32 19 - 2
1. Each manufacturing, fabricating firm shall demonstrate five (5) years continuous experience, including a minimum of 10,000,000 SF of geotextile installation in the past three
(3) years.
1.3 DEFINITIONS
A. Manufacturer: Manufacturer producing geotextile sheets from resin and additives.
B. MARV: Minimum Average Roll Value.
1.4 SUBMITTALS
A. Shop Drawings:
1. See Specification Section 01 33 00 for requirements for the mechanics and administration of the submittal process.
2. Manufacturer's documentation that raw materials and roll materials comply with required geotextile physical properties.
3. Manufacturer and Installer quality control manuals.
4. Original test results for resins, roll material and factory seam tests at frequency specified in respective quality control manuals.
a. Results shall include or bracket the rolls delivered for use in the Work.
B. Informational Submittals:
1. See Specification Section 01 33 00 for requirements for the mechanics and administration of the submittal process.
2. For needle punched geotextiles, the manufacturer shall certify that the geotextile has been continuously inspected using permanent on-line full-width metal detectors and does not contain any needles which could damage other geosynthetic layers.
3. Qualification documentation specified in the QUALITY ASSURANCE Article in PART 1 of this Specification Section.
1.5 DELIVERY, STORAGE AND HANDLING
A. Label, handle, and store geotextiles in accordance with ASTM D4873 and as specified herein.
B. Wrap each roll in an opaque and waterproof layer of plastic during shipment and storage.
1. Do not remove the plastic wrapping until deployment.
C. Label each roll with the manufacturer's name, geotextile type, lot number, roll number, and roll dimensions (length, width, gross weight).
D. Repair or replace geotextile or plastic wrapping damaged as a result of storage or handling, as directed.
E. Do not expose geotextile to temperatures in excess of 71 DegC (160 DegF) or less than 0 DegC (32 DegF) unless recommended by the manufacturer.
F. Do not use hooks, tongs or other sharp instruments for handling geotextile.
1. Do not lift rolls lifted by use of cables or chains in contact with the geotextile.
2. Do not drag geotextile along the ground.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Subject to compliance with the Contract Documents, the following manufacturers are acceptable:
1. Agru America
2. Solmax.
3. Propex Geosynthetics.
GEOTEXTILES
31 32 19 - 3
4. SKAPS Industries.
5. TenCate Mirafi.
6. Tenax.
2.2 MATERIALS AND MANUFACTURE
A. Geotextile:
1. Nonwoven pervious sheet of polymeric material.
2. Geotextile fibers:
a. Long-chain synthetic polymer composed of at least 85 percent by weight polyolefins, polyesters, or polyamides.
b. Filaments resistant to deterioration by ultraviolet light, oxidation, and heat exposure.
c. Do not use reclaimed or recycled fibers or polymer to the formulation.
3. Form geotextile into a network such that the filaments or yarns retain dimensional stability relative to each other, including the selvages.
4. The geotextile physical properties shall equal or exceed the minimum average roll values listed below. Values shown are for the weaker principal direction. Acceptance of geotextile shall be in accordance with ASTM D4759.
a. Cushion geotextile.
PROPERTY
TEST
METHOD
MARV
Mass per Unit Area, OZ/SY ASTM D5261 =10
Puncture, LBS ASTM D6241 =600
Grab Tensile, LBS ASTM D4632 =250
Trapezoidal Tear, LBS ASTM D4533 =90
Ultraviolet Degradation % retained @ 500 HRS ASTM D4355 =70
Sewn Seam Strength, LBS ASTM D4884 =200
b. Type 2 Geotextile: for use in drainage composite, gravel columns and other areas shown on the Drawings.
PROPERTY
TEST
METHOD
MARV
Mass per Unit Area, OZ/SY ASTM D5261 =8
AOS, U.S. Standard Sieve ASTM D4751 80
Permittivity, SEC-1 ASTM D4491 =0.5
Puncture, LBS ASTM D6241 =600
Grab Tensile, LBS ASTM D4632 =220
Trapezoidal Tear, LBS ASTM D4533 =90
Elongation ASTM D4632 >50%
Ultraviolet Degradation % retained @ 500 HRS ASTM D4355 =70
GEOTEXTILES
31 32 19 - 4
PROPERTY
TEST
METHOD
MARV
Sewn Seam Strength, LBS ASTM D4884 =175
B. Thread:
1. High-strength polyester, nylon, or other approved thread type.
2. Equivalent chemical compatibility and ultraviolet light stability as the geotextile.
3. Contrasting color with the geotextile.
HIGH-DENSITY POLYETHYLENE (HDPE) GEOMEMBRANE
33 47 14 - 1
SECTION 33 47 14
HIGH-DENSITY POLYETHYLENE (HDPE) GEOMEMBRANE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Furnishing, installation, quality control, and testing of a new HDPE geomembrane liner.
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Procurement and Contracting Requirements.
2. Division 01 - General Requirements.
3. Section 31 05 19 – Geosynthetic Clay Liner (GCL).
4. Section 31 28 15 – Drainage Geocomposite
1.2 QUALITY ASSURANCE
A. Referenced Standards:
1. ASTM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .