UNIT 4 CELL 5 GEOSYNTHETIC MATERIALS
Solicitation number
RFP #26108
Issued by
Greenville County, South Carolina

About this file

This is a technical drawing document for Greenville County, South Carolina's Twin Chimneys Landfill Unit 4 Cell 5 liner system, prepared by HDR Engineering Inc. The drawing illustrates the geosynthetic materials layout and specifications for the landfill base liner construction, including the placement of geosynthetic clay liner (GCL), 60-mil HDPE geomembrane, and geocomposite drainage media across the proposed 5.0-acre Cell 5. The document specifies construction requirements for clay soil liner installation from stockpiled materials, HDPE liner panel layouts with seaming parallel to maximum slope, leachate collection pipe systems with perforations and fusion welds, and locations for monitoring wells, piezometers, and methane monitoring stations. Multiple notes detail surveying requirements for as-built documentation, permeability testing procedures, CQA certification requirements prior to HDPE installation, and construction baseline specifications. The drawing references related details in sheets 15C-08 and 15C-09 and indicates a delivery timeline of October-November 2026.

The related procurement solicitation seeks geosynthetic materials consisting of GCL, 60-mil HDPE geomembrane, and geocomposite drainage media for this project. The vendor must procure and store these materials to ensure production and delivery to the landfill by October-November 2026. The solicitation specifies that materials must be purchased by a geosynthetics installer approved by the materials manufacturer, though the manufacturer may also serve as the storage provider. Critically, material storage does not guarantee the proposer will be awarded the separate contract for material installation, which will be competitively solicited independently. This procurement is strictly for material supply and storage, not construction services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LF@1.1%

LF@2.5%

LF@2.5%

LF@2.0%

LF@2.5%

LF@2.0%

740740740

ACTIVE

CELL 2

8.6 ACRES

ACTIVE

CELL 4

10.3 ACRES

PROPOSED

CELL 5

ACRES

5.0

5.0%

2.9%

4.4

5.0%

5.0% 4.0%

4.0%

3:1

3:1

3:1 3:1

MW-27

MW-62

MW-24

MW-63

OW-103

MW-18

MW-19

MW-20

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

PZ-23s

PZ-78

PZ-25

PZ-25d

MW-21

MW-23

MW-22

MW-25

UNIT 4 CELL 4 TOP OF LINER

15C-04.dwg

1"=60 15C-04

J.GAUL

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

KEY MAP

NTS

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

LEGEND

UNIT AND CELL BASELINES

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

1. CLAY FOR THE SOIL LINER SHALL BE OBTAINED

FROM THE CLAY STOCKPILE .

2. BACKFILL THE ANCHOR TRENCH WITH THE SAME

MATERIAL AS USED FOR SOIL LINER

COMPONENT.

3. THE CONSTRUCTION BASELINE GENERALLY

REPRESENTS THE HORIZONTAL EXTENT OF THE

LINER SYSTEM. SEE LINER DETAILS.

4. THESE CONTOURS REPRESENT THE TOP OF

SOIL LINER GRADES.

5. REFER TO SPECIFICATIONS AND CQA PLAN FOR

SURVEYING REQUIREMENTS TO PRODUCE

AS-BUILT DRAWINGS AND TO PROVIDE BASIS

FOR VERIFYING EXCAVATION QUANTITIES AND

REQUIRED LINER THICKNESS.

6. RECORD ALL PERMEABILITY TEST LOCATIONS BY

GPS, OR CONVENTIONAL SURVEY. DOCUMENT

LOCATION OF ALL OTHER TESTS BY METHOD

APPROVED BY CQA CONSULTANT.

7. CERTIFY IN WRITING TO THE CQA ENGINEER

THAT THE CLAY LINER MEETS SPECIFICATIONS

INCLUDING THICKNESS VERIFICATION PRIOR TO

INSTALLING HDPE LINER.

8. SUBMIT A HDPE LINER PANEL LAYOUT TO THE

ENGINEER FOR APPROVAL PRIOR TO

INSTALLATION. THE PANELS SHALL BE SEAMED

PARALLEL TO LINE OF MAXIMUM SLOPE. FLOOR

PANELS SHALL GENERALLY BE LAPPED ON THE

DOWNHILL SIDE. REFER TO SPECIFICATIONS AND

CQA PLAN.

9. USE TEXTURED 60 MIL HDPE GEOMEMBRANE

FOR ALL AREAS.

10. ALL LEACHATE PIPES TO BE PERFORATED. ALL

CONNECTIONS TO BE FUSED.

11. JOIN INTERSECTING PIPES WITH

APPROPRIATELY SIZED FITTINGS AND BUTT

FUSION WELDS.

12. PIPES SHOULD BE LAID STRAIGHT BETWEEN

CONTROL POINTS. ALL CLEANOUTS SHALL RUN

PERPENDICULAR TO SLOPE.

NOTES

SEDIMENT BASIN #12

EXISTING STORMWATER

PIPE TO REMAIN

PROPOSED

CONSTRUCTION

BASELINE

A15C-09

C

C -0

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PZ-# PZ-#

MM-#

MW-A

CELL 4 TIE-IN WITH

CELL 3 W/ PIPE

15C-08

LEACHATE PIPE3

15C-08

LEACHATE COLLECTION PIPE

(SIZE VARIES)

EXISTING MAJOR CONTOURS780

EXISTING MINOR CONTOURS

PIPE PERFORATION

(TYP)

15C-08

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 ISSUED FOR

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

B 15C-09

CELL 4 TIE-IN WITH

CELL 3 W/O PIPE

15C-08

LEACHATE

CLEANOUT

15C-08

SLOPE DRAIN

CONNECT TO EXISTING

SLOPE DRAIN

TEMPORARY

STORMWATER PIPE

15C-08

FOR

INFORMATION

NOT FOR

CONSTRUCTION

8.6

PWESTMOR

Text Box 04/2026

PWESTMOR

Text Box

PROPOSAL

File details come from the government source that posted it. Updated .