!Dwgs_TCLF_Cell_5_Geosynthetis_IFP.pdf

PDF 3 MB Posted

Attached to
UNIT 4 CELL 5 GEOSYNTHETIC MATERIALS
Solicitation number
RFP #26108
Issued by
Greenville County, South Carolina

About this file

This is an engineering drawing document for Greenville County, South Carolina, prepared by HDR Engineering Inc., detailing the geosynthetic materials and liner construction specifications for Unit 4, Cell 5 of the Twin Chimneys Landfill. The drawing specifies the procurement and installation requirements for a 5.0-acre proposed cell utilizing geosynthetic clay liner (GCL), 60-mil high-density polyethylene (HDPE) geomembrane, and geocomposite drainage media. The project includes detailed liner sections, leachate collection systems with perforated and solid HDPE pipes, monitoring well locations, and anchor trench configurations with specific slope ratios of 3:1. Materials are to be purchased and stored between October and November 2026, with the drawing noting that while storage by the proposer or manufacturer ensures material availability, it does not guarantee that the proposer will serve as the installer, as installation is subject to a separate solicitation.

The drawing specifications include detailed construction notes addressing clay sourcing from stockpiles, backfill requirements, HDPE liner panel layouts to be submitted for engineer approval, and textured 60-mil HDPE geomembrane requirements for all areas. All leachate pipes must be perforated with fused connections using appropriately sized fittings and butt fusion welds. The document mandates that clay liner certification be provided in writing to the Construction Quality Assurance (CQA) engineer prior to HDPE installation, with all permeability test locations recorded by GPS or conventional survey. The contractor must ensure proper pipe spacing of 4 inches for center holes with staggered perforations ranging from 3/8 to 1/2 inches depending on location, and all cleanouts must run perpendicular to slope. This solicitation is for material procurement and storage only, not construction installation, requiring vendors to be approved by the geosynthetic materials manufacturer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LF@1.1%

LF@2.5%

LF@2.5%

LF@2.0%

LF@2.5%

LF@2.0%

740740740

ACTIVE

CELL 2

8.6 ACRES

ACTIVE

CELL 4

10.3 ACRES

PROPOSED

CELL 5

ACRES

5.0

5.0%

2.9%

4.4

5.0%

5.0% 4.0%

4.0%

3:1

3:1

3:1 3:1

MW-27

MW-62

MW-24

MW-63

OW-103

MW-18

MW-19

MW-20

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

PZ-23s

PZ-78

PZ-25

PZ-25d

MW-21

MW-23

MW-22

MW-25

UNIT 4 CELL 4 TOP OF LINER

15C-04.dwg

1"=60 15C-04

J.GAUL

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

KEY MAP

NTS

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

LEGEND

UNIT AND CELL BASELINES

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

1. CLAY FOR THE SOIL LINER SHALL BE OBTAINED

FROM THE CLAY STOCKPILE .

2. BACKFILL THE ANCHOR TRENCH WITH THE SAME

MATERIAL AS USED FOR SOIL LINER

COMPONENT.

3. THE CONSTRUCTION BASELINE GENERALLY

REPRESENTS THE HORIZONTAL EXTENT OF THE

LINER SYSTEM. SEE LINER DETAILS.

4. THESE CONTOURS REPRESENT THE TOP OF

SOIL LINER GRADES.

5. REFER TO SPECIFICATIONS AND CQA PLAN FOR

SURVEYING REQUIREMENTS TO PRODUCE

AS-BUILT DRAWINGS AND TO PROVIDE BASIS

FOR VERIFYING EXCAVATION QUANTITIES AND

REQUIRED LINER THICKNESS.

6. RECORD ALL PERMEABILITY TEST LOCATIONS BY

GPS, OR CONVENTIONAL SURVEY. DOCUMENT

LOCATION OF ALL OTHER TESTS BY METHOD

APPROVED BY CQA CONSULTANT.

7. CERTIFY IN WRITING TO THE CQA ENGINEER

THAT THE CLAY LINER MEETS SPECIFICATIONS

INCLUDING THICKNESS VERIFICATION PRIOR TO

INSTALLING HDPE LINER.

8. SUBMIT A HDPE LINER PANEL LAYOUT TO THE

ENGINEER FOR APPROVAL PRIOR TO

INSTALLATION. THE PANELS SHALL BE SEAMED

PARALLEL TO LINE OF MAXIMUM SLOPE. FLOOR

PANELS SHALL GENERALLY BE LAPPED ON THE

DOWNHILL SIDE. REFER TO SPECIFICATIONS AND

CQA PLAN.

9. USE TEXTURED 60 MIL HDPE GEOMEMBRANE

FOR ALL AREAS.

10. ALL LEACHATE PIPES TO BE PERFORATED. ALL

CONNECTIONS TO BE FUSED.

11. JOIN INTERSECTING PIPES WITH

APPROPRIATELY SIZED FITTINGS AND BUTT

FUSION WELDS.

12. PIPES SHOULD BE LAID STRAIGHT BETWEEN

CONTROL POINTS. ALL CLEANOUTS SHALL RUN

PERPENDICULAR TO SLOPE.

NOTES

SEDIMENT BASIN #12

EXISTING STORMWATER

PIPE TO REMAIN

PROPOSED

CONSTRUCTION

BASELINE

A15C-09

C

C -0

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PZ-# PZ-#

MM-#

MW-A

CELL 4 TIE-IN WITH

CELL 3 W/ PIPE

15C-08

LEACHATE PIPE3

15C-08

LEACHATE COLLECTION PIPE

(SIZE VARIES)

EXISTING MAJOR CONTOURS780

EXISTING MINOR CONTOURS

PIPE PERFORATION

(TYP)

15C-08

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 ISSUED FOR

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

B 15C-09

CELL 4 TIE-IN WITH

CELL 3 W/O PIPE

15C-08

LEACHATE

CLEANOUT

15C-08

SLOPE DRAIN

CONNECT TO EXISTING

SLOPE DRAIN

TEMPORARY

STORMWATER PIPE

15C-08

FOR

INFORMATION

NOT FOR

CONSTRUCTION

8.6

04/2026 PROPOSAL

GEOCOMPOSITE DRAINAGE MEDIA

HDPE GEOMEMBRANE

GEOSYNTHETIC CLAY LINER

2'

1'

1" = 1'

ANCHOR TRENCH2

24" INITIAL SOIL BARRIER

GEOSYNTHETIC CLAY LINER (GCL)

HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

24" OPERATIONAL LAYER

SUBGRADE

NOTES:

1. GCL AND GEOCOMPOSITE DRAINAGE NET ARE PRESENT

IN ALL LOCATIONS WHERE HDPE IS DETAILED.

2. THE REQUIRED THICKNESS OF LAYERS IS MEASURED

PERPENDICULAR TO THE SURFACE. THE HORIZONTAL

LOCATION OF THE SLOPE TOES WILL VARY BASED ON

INTERSECTING SLOPES.

3. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

RAINCOVER

RAINCOVER

CONSTRUCTION

BASELINE

WELDED CAP

1.00'

LINER AND RAINCOVER

ANCHOR TRENCH

LEACHATE

PIPE

2.00'

SLOPESLOPE

B

SEPARATOR

GEOTEXTILE

2' M

IN

RAINCOVER

PERFORATED PIPE

RAINCOVER

CONSTRUCTION

BASELINE

1.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

2.

0'

12'

12'

RAINCOVER

CONSTRUCTION

BASELINE

WELDED CAP TO BE

REMOVED AND NEW PIPE

WELDED TO EXISTING PIPE

6'

LINER AND RAINCOVER

ANCHOR TRENCH

LEACHATE

PIPE

2.00'

LEACHATE

PIPE

EXISTING

CELL 1 OR 2

SLOPE

SLOPE

2.0'

SEPARATOR

GEOTEXTILE

2' M

IN

RAINCOVER

4'

CONSTRUCTION

BASELINE

FLAP (60-mil)

PERFORATED PIPE

WELD FLAP TO

BASE LINER

6'

15.7'

RAINCOVER

CONSTRUCTION

BASELINE

6.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

2.

0'

EXISTING

CELL 1 OR 2

CELL 3

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

NOTES:

1. SEE DETAIL 3 FOR DIMENSIONS OF THE STONE COLUMN.

2. GEOSYNTHETIC MATERIAL THICKNESS ARE EXAGGERATED FOR ILLUSTRATION

PURPOSES WHERE SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT SHOWN.

1" = 5'

LINER SECTION1

1" = 5'

LEACHATE COLUMN3

15C-05 1" = 5'

CELL 1 & 2 TIE-IN

WITH CELL 3 W/O PIPE4

15C-04 1" = 5'

CELL 1 & 2 TIE-IN

WITH CELL 3 W/O PIPE5

15C-02

LINER

SECTION

1" = 5'

CELL 3 FUTURE TIE IN W/PIPE6

15C-04

1" = 5'

CELL 1 & 2 TIE-IN

WITH CELL 3 W/PIPE7

15C-04

1" = 5'

TERMINATION8

15C-04

LINER

SECTION

1" = 5'

TEMPORARY STOMWATER PIPE10

15C-04

10'

3.

6'

1.

3'

3.0'

0.

7' 3.5'

10'

A B C QTY

8 12 10 12

1" = 5'

LEACHATE COLLECTION CLEANOUT9

15C-04

NOTE: ALL LEACHATE COLLECTION

HARDWARE TO BE STAINLESS STEEL

CAST IN PLACE

CONCRETE

PERIMETER CHANNEL

FRONT VIEW

SOLID HDPE PIPE "A"Ø

WASTE

SOLID HDPE CLEANOUT

PIPE "A"Ø

HDPE PROTECTIVE CASING "C"ØANCHOR BLOCK

"B"Ø PIPE

CONSTRUCTION BASELINE

PERFORATED HDPE PIPE "A"Ø

BLIND FLANGE

15" SMOOTH WALL

HDPE STORM DRAIN

PIPE @ 0.5% SLOPE

LINER SECTION

SPACING

4" CENTER

HOLE/PATTERN: 6/STAGGERED

3/8"Ø STAGGERED

PERFORATIONS

6" TO 14"

6" CENTER SPACING

1/2"Ø STAGGERED

PERFORATIONS

HOLE/PATTERN: 16/STAGGERED

16"- 36"

NOT TO SCALE

PIPE PERFORATION11

LINER DETAILS

15C-08.dwg

1"=60 15C-08

J.GAUL

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 ISSUED FOR

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

FOR

INFORMATION

NOT FOR

CONSTRUCTION

04/2026 PROPOSAL