SPECS - Repair Ft. Griffin.pdf

PDF 731 KB Posted

Attached to
Repair Ft. Griffin Ave (Phase 5)
Solicitation number
FA303026R0002
Issued by

About this file

This is a comprehensive specifications document for road repair and construction work at Goodfellow Air Force Base, Texas, specifically for the Ft. Griffin Avenue project (Phase 5).

The project encompasses asphalt roadway and sidewalk construction including demolition, earthwork, aggregate base course installation, hot-mix bituminous paving, concrete curbs and gutters, traffic signage, and pavement markings. Key specifications require all work to comply with Texas Department of Transportation (TxDOT) standards, ASTM testing requirements, and Air Force safety and environmental regulations. The contractor must maintain normal working hours of 7:30 AM to 4:30 PM, Monday through Friday, excluding federal holidays and AETC Resiliency Days, with written permission required for extended hours. All contractor personnel require security screening and base access passes, with background checks conducted by the 17 SFS Pass & Registration section. The contractor must furnish its own portable toilet facilities, establish storage areas with written Contracting Officer approval, and maintain the construction site in a clean, orderly condition throughout the project. Concrete placement requires a minimum 3,500 psi compressive strength at 28 days, with specialized curing procedures and protective coatings for deicing chemical exposure. Critical environmental requirements include hazardous materials authorization through AF Form 3952 prior to use, monthly reporting of chemical usage, prohibited dumping of concrete trucks on base, and management of construction waste through approved disposal facilities. Testing must be performed by Corps-validated laboratories with results submitted within 24 hours, and the contractor must maintain as-built drawings and provide final inspections with a minimum seven-day advance notice. The contract includes specific tolerance requirements for pavement thickness, compaction percentages, smoothness measurements using 12-foot straightedges, and retroreflective values for pavement markings of minimum 200 mcd/m²/lx for white markings and 175 mcd/m²/lx for yellow markings.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Ft Griffin Rd GOODFELLOW AFB

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 01010 GENERAL

01 01020 UTILITIES (CONTRACTOR IDENTIFIED)

01 01400 ENVIRONMENTAL PROTECTION

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

DIVISION 10 - SPECIALTIES

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 05/22 AGGREGATE BASE COURSE ANDGRADED

CRUSHED AGGREGATE BASE COURSE FOR

FLEXIBLE PAVING

32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR

ROADS AND STREETS

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

FT GRIFFIN REPAVING GOODFELLOW AFB

MAR 20, 2024

DOCUMENT 00 01 15

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows for Phase 1:

DRAWING NO. TITLE

CX-1 COVER SHEET

CX-2 ABBREVIATIONS, NOTES, AND INDEX OF DRAWINGS

CX-3 GENERAL NOTES

CS-1 ROADWAY ALIGNMENTS

CS-2 ROADWAY TYPICAL SECTIONS

CS-3 FT. GRIFFIN PLAN AND PROFILE

CS-4 ROADWAY DETAILS

CS-5 PEDESTRIAN CROSSING DETAILS

Contract drawings are as follows for Phases 2-5:

DRAWING NO. TITLE

CX-1 COVER SHEET

CX-2 ABBREVIATIONS, NOTES, AND INDEX OF DRAWINGS

CX-3 GENERAL NOTES

CS-1 ROADWAY ALIGNMENTS

CS-2 ROADWAY TYPICAL SECTIONS

CS-3 FT. GRIFFIN PLAN AND PROFILE

DOCUMENT 00 01 15 Page 1

FT GRIFFIN REPAVING GOODFELLOW AFB

MAR 20, 2024

DRAWING NO. TITLE

CS-4 FT. GRIFFIN PLAN AND PROFILE

CS-5 ROADWAY DETAILS

CS-6 PEDESTRIAN CROSSING DETAILS

[] -- End of Document --

DOCUMENT 00 01 15 Page 2

Section 01010 – Page 1 of 11

TECHNICAL PROVISIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01010 - GENERAL

1. SCOPE: The work covered by this project consists of the Contractor furnishing all layout, survey, plans, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, supplies, and incidentals and performing all operations in connection with the construction of asphalt roadways and walkways at Goodfellow AFB, Texas, complete and in strict accordance with the plans and specifications.

2. WORKING CONDITIONS:

Post Office B337 to always remains accessible during improvements. Troop walk to remain unimpeded during improvements.

3. WORK SCHEDULE:

Working hours for the Contractor will normally be between the hours of 7:30 A.M. and 4:30 P.M. excluding Saturdays, Sundays, and Federal holidays. Refer to Section H of the solicitation/contract document for further information on working days. If the Contractor desires to work during periods other than above, a request must be made to the Contracting Officer in writing three (3) calendar days in advance of his/her intention. If the required base personnel are reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.

NORMAL WORK HOURS: The Contractor shall schedule all work to commence between the hours of 7:30 AM and 4:30 PM, Monday through Friday, except on the Federal holidays and days designated as “Resiliency Days” by Air Education and Training Command (AETC) as listed below. Permission to work outside these normal business hours may be granted by the Contracting Officer. Requests to work outside the normal work hours must be submitted in writing to the Contracting Officer at least 3 working days in advance of the date requested.

Federal Holiday New Year’s Day 01 Jan Martin Luther King’s

3rd Monday in January

President’s Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth 19 Jun Independence Day 4 Jul Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 Nov Thanksgiving Day 4th Thursday in November Christmas Day 25 Dec

It is anticipated that the same number of AETC Resilency days will be declared each year.

Any Holiday falling on a Saturday will be observed the preceding Friday. Any Holiday falling on a Sunday will be observed the following Monday.

The base could close due to security problems, adverse weather, or other events. Unless otherwise notified by the Government, the Contractor should monitor local television stations, radio stations, or Goodfellow’s Facebook page for notification of a possible base closure or late opening. The Contractor may not receive any other form of notification of a base closure from the Government, unless contacted by the Contracting Officer (CO) or the Contracting Officer Representative (COR). The Contractor is responsible for notifying his/her employees.

Contractor(s) do not report when the base is closed due to security problems and/or adverse weather.

3.1 TOBACCO USE IN AETC FACILITIES

Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas. Additional information, to include locations of designated smoking areas, will be provided to the contractor at the pre-performance conference.

3.3 UTILITY CONSERVATION

The Contractor will be required to participate in government energy conservation programs.

For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.

4. SAFETY AND HEALTH:

4.1 All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, Air Force Instruction 91-203, AFOSH standards including but not limited to ANSI, NFPA, ASTM, and CPSC as applicable, and handbooks, and the Corps of Engineers (COE) Safety Manual 385-1-1 all editions in effect on the date of the solicitation. The Contractor shall comply with all mandatory requirements for lockout/tag out, confined space, hazard communication, fall protection, personnel protection equipment, scaffolding, powered construction equipment, and all project related safety and health requirements.

4.2 All companies who conduct business within the state of Texas must, in accordance with Texas Worker’s Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Worker’s Compensation Commission (TWCC) and meeting all of the requirements of the COE Safety

Section 01010 – Page 2 of 11

Section 01010 – Page 3 of 11

Manual, shall be submitted For Information Only (FIO) in accordance with paragraph 16, SUBMITTAL REQUIREMENTS.

4.3 All holes/pits/trenches/manway openings, etc, that are to be left open shall be surrounded with a 48 inch high mesh fence with highly visible orange plastic coating with warning signs posted “Keep Out” and blinking light from dusk to dawn. Guardrails, fences, barricades, and warning lights or other illumination shall be provided in roadwork construction or near vehicular traffic areas. Fence shall be securely anchored with tension wires and posts as required to prevent sagging and located a minimum of 3 feet from the opening so as to prevent an individual, should they fall across the fencing, from falling into the opening. All exposed trenches/Holes shall also be covered, when not being worked in, with three quarter inch plywood or a metal grating that will prevent anyone from entering the trench/hole.

4.4 Welding, Cutting, and Brazing: Inspection of all welding, cutting, and brazing operations shall be completed by Fire Protection prior to any operation. The Contractor shall provide the appropriate operable fire extinguisher. Fire extinguishers shall comply with NFPA 10.

Contractor shall comply be with OSHA STD 29 CFR 1910.252 Welding, Cutting, and Brazing (General Requirements) and AFMAN 91-203 Air Force Occupational Safety, Fire, and Health Standards, which may be viewed at the following website:

https://static.e-publishing.af.mil/production/1/af_se/publication/afman91-203/afman91-203.pdf. Air Force Form 592 USAF Welding, Cutting, and Brazing permit will be issued prior to any operation and shall be kept on site till completion of operation or permit expires. Contact Fire Protection at 325-654-3532/33/34 for issuance of permit.

4.5 Base Fire Regulations: The Contractor shall comply with Base Fire Regulations as set forth in DAFMAN 91-203 AIR FORCE OCCUPATIONAL SAFETY, FIRE AND HEALTH STANDARDS in effect as of the date of this solicitation. All work shall be in strict compliance with NFPA-101. The Contractor shall call (325)654-7000 for all emergencies. The Contractor shall use no explosives or fire in performing the work.

5. STREET CLOSINGS:

The project will include closing portions of Ft Griffin road for improvements. The contractor is to provide a traffic control plan.

5.1 When road closures are required, written notification must be made to the Contracting Officer a minimum of 7 calendar days in advance. One lane of traffic shall be maintained at all times unless otherwise approved in writing by the Contracting Officer. The Contractor shall notify the Security Forces at 325-654-3504 and Base Fire Protection at 325-654-3532 three days prior to any closures. Personnel exposed to a traffic environment during hours of darkness, periods of reduced visibility, or as part of construction or maintenance activities, will be provided and use reflective vest/accessories.

5.2 The final street repair shall be completed within 14 days after the start of any street demolition for utility crossings or other purposes. Any part of the street returned to service prior to final repair shall be maintained smooth with temporary cold-lay asphalt surface course.

https://static.e-publishing.af.mil/production/1/af_se/publication/afman91-203/afman91-203.pdf

All physically exposed portions of the work shall be properly covered or repaired the same business day that the work began.

6. DISPOSITION OF WASTE AND EXCESS MATERIALS:

6.1 Dumping/cleaning out of concrete trucks on Goodfellow AFB is prohibited. Concrete truck chutes only may be rinsed at the construction site. Wastewater and concrete from this rinse shall be collected in a high-density polyethylene (HDPE) plastic-lined box or pit provided by the Contractor at the site. At the end of pouring operations, the Contractor shall excavate all the waste and liner and properly dispose of same. The pit shall be completely backfilled and the site restored to original conditions.

6.2 All equipment and materials to be removed from the project site not specifically identified for turn-in to the Government shall become the property of the Contractor upon issuance of the Notice to Proceed (NTP). The Contractor shall turn-in all materials specifically designated for turn-in to the Government to a location at Goodfellow AFB, as designated by the Contracting Officer. The Contractor shall obtain a receipt from the Government employee responsible for receiving the returned equipment or material as evidence of compliance. A copy of the receipt(s) shall be submitted to the Contracting Officer prior to final inspection of the project.

Following is a list of equipment or materials to be turned-in: Not Applicable.

7. STORAGE AREA (I.E. TEMPORARY FIELD OFFICE, STAGING AREAS, TOOL/JOB

SHACKS, AND OTHER CONSTRUCTION FACILITIES):

There are no Government furnished covered or secure storage areas. Limited storage may be permitted at the discretion of the Contracting Officer and on a space available basis. The location on Goodfellow AFB of the Contractor’s temporary field office, storage, and other construction buildings required temporarily in the performance of the work, shall require written approval of the Contracting Officer. Plans showing temporary field office, storage, and other construction buildings shall be submitted for Government Approval (GA). Utilities at the storage area may or may not be available for Contractor use. The Government implies no responsibility for lost or stolen materials, equipment, or tools, the security of which lies solely with the Contractor. Contractor shall keep his storage areas clean, neat, and orderly.

Contractor shall mow grass and weedy vegetation when it reaches a height of 6 inches.

Mowing shall be to a height of 3 inches. Mowing shall be accomplished with a rotary mower that leaves the clippings evenly distributed on the soil surface. Mowing shall be accomplished during periods and in a manner that the soil and grass will not be damaged. Towed or self-propelled riding mowers shall not be operated within 3 feet of shrubs or trees. Contractor shall mow areas adjacent to shrubs and trees with hand propelled mowers.

Temporary fencing used by the Contractor to delineate construction sites shall be securely anchored with tension wires and posts as required to prevent sagging and an unsightly appearance. Fencing shall be maintained by the Contractor in this manner throughout the life of the contract. Due to high winds in west Texas, Contractor shall take every precaution to preclude trash and materials from blowing off site.

Section 01010 – Page 4 of 11

Section 01010 – Page 5 of 11

8. TOILET FACILITIES:

There are no toilet facilities available for Contractor use. Contractor shall provide his own portable/temporary toilet facilities.

9. CLEAN-UP:

The Contractor shall at all times keep the construction site, construction trailer(s)/building(s), and storage area(s) in a clean, neat, workman like condition, free from accumulation of waste, rubbish, weeds, overgrown grass, or construction debris, to the satisfaction of the Contracting Officer. All loose or light weight materials shall be secured to prevent blowing or scattering.

The burning of trash or construction debris is strictly prohibited on Goodfellow AFB. Prior to final inspection, the Contractor shall remove all construction debris, tools, equipment, and materials not the property of the Government. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory to the Contracting Officer. Refer to Section 01400 - Environmental Protection, paragraph 2.4.6, Post-Construction Cleanup or Obliteration.

10. RED ZONE MEETING & FINAL INSPECTION:

RED ZONE MEETING: The term “Red Zone” refers to the last 20% or so of actual construction during which BCE, Contractor, and Installation Stakeholders must make a coordinated effort to complete physical construction, as well as all required documentation, financial actions, permit requirements, system commissioning and training of operators. The Contractor shall initiate, schedule, organize and lead this meeting. Upon request additional information on the Red Zone meeting will be provided to the Contractor.

FINAL INSPECTION: The Contractor shall advise the Contracting Officer in writing of the Contractor’s desired final inspection date seven (7) calendar days in advance of that desired date to permit proper coordination. The date selected shall provide adequate time for Contractor performed corrections of final inspection deficiencies within the contract performance time. The Contracting Officer will be the final authority for determining whether or not the Contractor’s performance is sufficiently advanced to warrant a final inspection.

11. TESTING:

11.1 Costs of all tests, unless specifically indicated as being performed by the Government, shall be at the Contractor’s expense. The Contractor shall schedule all tests and notify the Contracting Officer or his/her representative in a timely manner prior to any required testing.

All test results shall be submitted to the Contracting Officer on AF Form 3000, Material Approval Submittal. Where test reports are to be submitted to the Contracting Officer within 24 hours after the tests are performed, the results may be faxed to the Contracting Officer at a number provided at the preconstruction conference.

11.2 Testing laboratories must be licensed to operate in the State of Texas and must meet the following:

Section 01010 – Page 6 of 11

- “Recommended Requirements for Independent Laboratory Qualification”, published by American Council of Independent Laboratories

- Basic requirements of latest edition of ASTM E329 “Standard Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials Used in Construction”

- Latest edition of ASTM E 548, “Qualifications for Testing Labs”

12. AS-BUILT DRAWINGS AND REAL PROPERTY DOCUMENTATION:

The Contractor shall maintain two sets of project drawings with red-lined “as-built” notations and markings. The Contractor shall update these plans to indicate “as-built” construction and shall submit them to the Contracting Officer prior to final inspection under the cover of an AF Form 3000. Updated notations and markings shall be neat, clear, legible, and accurate in all respects.

13. SECURITY REQUIREMENTS:

13.1 Goodfellow Air Force Base is a closed/controlled access base. As an effort to minimize peak traffic flows at the entry gates, the Contractor, his employees, and his subcontractors are highly encouraged to avoid scheduling deliveries through the entry control gates from 7:00 A.M. to 8:00 A.M. Monday through Friday as there could be significant delays.

The Government will conduct security/background checks on all construction personnel as required. Security requirements will be briefed at the pre-construction conference and handouts outlining specific requirements will be provided. Screening measures are in place and suitability for employees to access the installation will be determined during the conference.

Requirements are subject to change dependent upon current world situations, potential threats, and base exercises. Full cooperation by Contractor work forces is required. Contractor should anticipate certain notification and reporting requirements, preparation of forms, and lists for pass and identification of employees and their vehicles, entry restrictions, key/lock control, and compliance with all base traffic rules and regulations. The Jacobson Gate Visitor Control Center 325-654-4122 is the OPR for passes.

13.2 Goodfellow AFB security may be viewed as being one of two broad levels, the level in effect being dependent on the location or area of project.

a. The lowest level of security exists in general access areas. These areas are all of Goodfellow AFB outside of the “USAF Controlled” areas.

b. “USAF Controlled” access areas are the higher-level security areas. Presence within these controlled access areas are by authorization and/or escort. The movement of authorized personnel in and out of these areas may be limited. Contractor personnel are permitted access to these areas on a need basis only. Access to controlled areas will require the Contractor to coordinate all requests through the Government organization occupying the project site. The Contractor is advised there may be delays gaining access to controlled areas. No delay less than one hour in duration will be considered

Section 01010 – Page 7 of 11 for down time, nor will delays of less than one hour be cumulative over several time periods.

13.3 Referencing the above, the work on this contract will be in a General Access area.

13.4 BASE ASCCESS SECURITY REQUIREMENTS: The Contractor shall comply at all times with base law enforcement and security requirements to include base pass requirements.

13.4.1 Contractor Installation Access Pass. Before arrival, a Government identification card-holding person from the sponsoring agency, Base Contracting office/administrator or applicable local project manager will submit a request for base access using the 17 Training Wing’s Base Access List (BAL) memorandum as a form of registration for each credential applicant. The base sponsor/sponsoring agency/Contracting Officer and the contracted management team should establish an accountability process to account for each applicant, to oversee the BAL process, and to retrieve installation passes when access is no longer required. Base sponsors/sponsoring agencies or contract officers will ensure the BAL is accurate, it is signed and forwarded to the 17 SFS Pass & Registration section for completion of the vetting and fitness determination processes. The BAL should be delivered to Pass & Registration, located at the Visitor Control Center (VCC). When delivery is not possible, the BAL may be forwarded to Pass & Registration via a “.mil” email account located on Goodfellow AFB. The BAL will include pertinent visitor information, reason for entry, frequency of entry, destination, times each day requiring entry, and duration of request.

Contractor Initial (and periodic) Installation Access Screening. The Contractor shall provide Pass and Registration with two forms of identification, one of which will be a state issued photo identification. Prior to being allowed access, a minimum of a background/National Crime Information Center (NCIC) check will be completed on all contractors, requesting unescorted access for official business. This screening process will validate the contractor's suitability to visit Goodfellow and certify that the contractor does not pose an increased threat to the base populace. The contractor will then be issued a temporary Defense Biometric Identification System (DBIDS) pass or AF Form 75A through the expiration date on the BAL request. Possession of an authorized access pass does not automatically authorize or guarantee access to the installation. The individual must still have a valid purpose to be on the installation and properly sponsored, as applicable.

13.4.2 Access Denial. If it is determined a Contractor requesting access has been convicted of a felony or pled guilty to a felony charge within the past 10 years, or is considered not fit to obtain authorized access based on the information obtained during the identity vetting, or criminal history indicates the individual may present a threat to the good order, discipline and morale of the installation, Security Forces personnel will deny entry. The contractor will be informed of the access denial, will be issued an Access Denial Letter, and will be informed on how they may appeal this order.

Access Denial Appeal Process. When denied access, contract visitors will be informed to report back their manager. If the contract worker and management are considering an appeal, it will be submitted by letter to the 17 SFS Commander, within 30 days of access denial. The contract manager should first contact the military contract officer/administrator or on-base sponsor for additional guidance and clarification. The appeal may be delivered to the installation Visitor Control Section or mailed to Security Forces, addressed to 17 SFS/CC, 361 Apache Trail, Goodfellow AFB, 76908. The Contractor's appeal should discuss all facts and reasons to support rescinding access denial. The 17 TRW/CC will approve/disapprove all appeals for entry.

13.4.3 For installation access on non-duty hours or down days:

Identify which workers need access on weekends, federal holidays/resiliency days, or down days.

Ensure only workers that are already vetted are on the Extended-Hours request (no new personnel). New personnel require a new BAL and formal vetting.

Complete the “After Hours” BAL for workers requiring down day access to the installation.

Identify the vehicle requirements. If operations cannot support the search procedures for large vehicles/special purpose equipment, the request may be declined unless arrangements are made to deliver the vehicle/equipment prior, during normal duty hours.

During the above-mentioned days, the Contract officering, contract representative sponsoring ID cardholder is required to be present during hours of the work request.

13.4.4 All BALs are accomplished each time employees or personnel change, not to exceed 180 days. Oversight for BAL updates and establishment of procedures to ensure Physical Access Control System (PACS) credentials and locally created access credentials from individuals who no longer require installation access is the responsibility of the contracting officer/contract administrator.

When an employee (regardless of position) is no longer employed by the contractor or subcontractor all DBIDS passes are to be returned to the Contract Officer/Administrator or to the Visitor Control Center. If a local issued access credential/pass is not returned, the contract officer may withhold funds or the Installation Commander may consider permanent debarment to the installation. Immediate access denial may be initiated by Pass & Registration updating the DBIDS database until disposition of the DBIDS pass is resolved.

13.4.5 TRAFFIC LAWS. Contractor and employees shall comply with Texas transportation code, base traffic regulations and posted signs while on the installation.

13.4.6 WEAPONS, FIREARMS, AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within their contractor-owned vehicle or privately-owned vehicles while on base.

Section 01010 – Page 8 of 11

Section 01010 – Page 9 of 11

14. IDENTIFICATION OF CONTRACTOR VEHICLES:

Contractor vehicles should be marked on each side with company name with either permanent or semi-permanent/magnetic signage to aid the Security Forces in identifying and permitting them exemption from basewide exercises.

15. WARRANTIES:

Any warranties given to the Contractor or subcontractor at any tier from a manufacturer of equipment or other items, which are provided under this contract, shall be transferred to the Government upon final acceptance in accordance with the clause contained in the basic contract, Section I. Contractor shall submit in writing a single listing with all applicable warranties attached, complete Equipment List AF Form 3136 with submission of DD Form 1354. Negative responses are likewise required in writing.

16. SUBMITTAL REQUIREMENTS:

16.1 The submittals listed on the attached AF Form 66 shall be required and shall be submitted for approval or information using AF Form 3000. Where a submittal cannot be provided within the required submission date, Contractor shall submit in writing a letter stating the reasons why and furnishing a new projected submission date.

16.2 Submittal Classification: Submittals are classified as follows and delineated as such on AF Form 66 under the “Remarks” column:

16.2.1 Government Approved - GA: Government approval is typically required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Within the terms of the contract clause entitled “Specifications and Drawings for Construction,” they are considered to be “shop drawings”.

16.2.2 For Information Only - FIO:

All submittals not requiring Government approval will be for information only. They are not considered to be “shop drawings” within the terms of the Contract clause referred to above.

16.3 General Requirements:

a. GA and FIO submittal data shall be transmitted under separate AF Forms 3000 and assigned different Submission Numbers.

b. The Contractor shall designate on each AF Form 3000, in the “Submission Number” block, either FIO or GA to show the transmittal type. This procedure allows ready identification of FIO or GA submittals.

Section 01010 – Page 10 of 11

c. Submittals transmitted with AF Form 3000 shall be identified by marking it with the same Submission Number appearing in the “Line Number” column on the AF Form 66.

d. Prior to final inspection, submit completed AF Form 3136.

16.4 Specific Requirements for FIO Submittals:

a. A single fully coordinated FIO submittal shall be made for each technical section listed/required on the AF Form 66. Each FIO submittal listed on the AF Form 66 shall be submitted as a separate item on the AF Form 3000 in the order they appear on the AF Form 66. Technical data provided with the AF Form 3000 shall conform to the requirements in each Technical Section. Submittals involving colors and interior design shall all be transmitted concurrently.

b. Items such as mill certificates or other test data that are usually unavailable until the equipment/material is actually manufactured/fabricated must still be identified on the initial AF Form 3000. An explanation stating this data shall be submitted later by Submittal Number (fill in Submission Number) after materials are manufactured / fabricated (or other explanations as appropriate) shall be included with this identification. A separate submittal for long lead-time equipment or material may be made if sufficient data is furnished to show contract compliance. (An explanation shall be provided on a separate sheet, if necessary, explaining why a partial submittal is being made. Explanation shall include the estimated delivery date of the equipment/material and the Submission Number of the submittal that shall contain data required by the particular specification section for the remaining equipment/materials.) Samples of materials must be submitted along with technical data, not under separate transmittals.

16.5 FIO Submittal Review:

a. The Contractor has full responsibility for reviewing and certifying that all FIO submittal data and all equipment and/or materials fully comply with the contract. FIO Submittals are for the Government’s information and real property record purposes; they will not be approved/disapproved nor returned to the Contractor.

b. The Government may perform quality assurance reviews and re-reviews of FIO submittals at any time during the contract. If the Government determines submittal data is incomplete or not in compliance with contract, comments will be provided.

Comments will state, “Disagree with Contractor’s Certified Compliance” and list items not in compliance or not provided as required by the contract. The Contractor shall respond to all comments by return FIO resubmittal on a new AF Form 3000.

16.6 Specific Requirements for Government (GA) Approved Submittals:

a. The Contractor is responsible for controlling and ensuring all data submitted is complete and in full compliance with contract requirements.

Section 01010 – Page 11 of 11

b. A separate submittal shall be made for each technical section with GA submittals.

FIO submittal data shall not be mixed with GA submittal data.

c. The Government will provide written comments and/or approval/disapproval action as appropriate. One (1) copy of the submittal, along with any comments, will be provided to the Contractor. The Contractor shall provide a resubmittal with all data necessary to show compliance with Government comments on all disapproved submittals.

16.7 Variations/Deviations/Departures from the Contract Drawings or Specifications:

a. Contractor proposed variations, deviations, or departures from the contract requirements shall be noted/marked in red on the face/cover of each copy of the submittal data and shall be provided with a letter attachment to the AF Form 3000 summarizing the proposed variation, deviation, or departure. For FIO submittal deviations an asterisk “*” shall be placed in the block under “Submission Number” next to the “FIO.” These submittals will then be automatically redesignated GA. Variations, deviations, or departures will be processed and approved the same as GA submittals.

Variations, deviations, or departures shall contain sufficient information to permit complete evaluation. Additional sheets may be used to fully explain why a variation, deviation, or departure is requested. The Government reserves the right to disapprove or rescind inadvertent approval of submittals containing unnoted/unmarked variations, deviations, or departures.

b. Any submittal annotated by a supplier/vendor with “Field Verify,” “Select Color,” and the like must be accompanied by the Contractor’s written response to the supplier’s query.

16.8 Government approval of submittals indicates only that the general method of construction, materials, detailing, and other information appear satisfactory. Approval does not relieve the Contractor of the responsibility for any error which may exist. The Contractor remains responsible for the dimensions and design of adequate connections, details, material compatibility, and satisfactory construction of all work necessary to fulfill the intent of this project.

17. CYBERSECURITY: The Contractor shall complete and submit via AF Form 3000 the spreadsheet included as Appendix “A” of the Division 01, General Requirements specification.

The Contractor shall submit one comprehensive spreadsheet listing all products to be connected to the internet (IP address). The spreadsheet (Excel) document will be provided by the Government upon request following contract award.

END OF SECTION

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01020 - UTILITIES (CONTRACTOR IDENTIFIED)

1. SCOPE: This section covers identification, interruption, and use of utilities.

2. IDENTIFICATION: The Government does not know the exact location of all utilities in the work area. The Contractor shall take reasonable precautions in determining the exact location of all existing utilities within the contract work area prior to any excavating, trenching, backfilling, or disturbance. Upon request by the Contractor, the Government shall furnish all available information in its possession concerning utilities in the contract work area. However, the accuracy of the information provided by the Government is not guaranteed and is only intended to provide some measure of assistance to the Contractor. The Government does not have, nor will it provide, record drawings of Verizon telephone cable plant and Suddenlink cable. The Contractor shall call 17 CS/SCMP at 325-654-3010 a minimum of five (5) calendar days in advance to have underground communications cable routes marked. In addition, the Contractor shall also notify 1-800-DIG-TESS. In the event the Contractor identifies utilities in the contract work area, which interfere with the newly proposed construction, the Contracting Officer shall be immediately notified and the Government will take necessary corrective action at no cost to the Contractor. The Contractor shall furnish to the Contracting Officer as-built drawings clearly identifying the exact location of all utilities identified in the work area prior to project final inspection.

2.1 Contractor must initiate and process for approval a Work Clearance Request AF Form 103 through 17 CES/CENMP a minimum of fourteen (14) calendar days prior to the start of any construction work. Excavation is not authorized without issuance of a completed and approved AF Form 103. After initial issue, it is the Contractor’s responsibility to keep the Work Clearance Request coordinated and up-to-date/current through the remainder of the contract.

2.2 Any removal/relocation/reconnection of any communication device shall be coordinated in advance with 17 CS/SCMP at 325-654-3010. Any removal/relocation/reconnection of any Cable TV device shall be coordinated in advance with 17 CS. Communications and Cable TV devices to remain shall be protected as required when work proximity dictates.

3. INTERRUPTIONS:

3.1 Planned Utility Outages: The Contractor shall coordinate all requests for utility outages with the Contracting Officer in writing fourteen (14) calendar days prior to date of requested outage.

Water, gas, sewer, and electrical outages shall be held to a maximum duration of 2 hours unless otherwise approved in writing.

3.2 Unplanned Utility Outages (Accidental Disruption of Utilities): In the event of accidental disruption of any utility, the Contractor shall immediately notify the Contracting officer of the unplanned outage. The Contractor shall immediately take every reasonable step to repair the damage in a manner acceptable to the Government and shall restore the utility to full use as soon as practicable. Additionally, if the unplanned interruption affects Military Family Housing

(MFH) areas, the Contractor shall provide verbal or written notice to each affected family. If the Contractor so desires, and the Government agrees, the Government will complete necessary repairs to the damaged utility and withhold from payments due to the Contractor the necessary amount to defray all costs associated with the repair of the utility.

3.3 For all drinking water disruptions and new construction, the Contractor shall adhere to 30 TAC 290 Subchapter D paragraph 290.46(g and j). Submit Drinking Water Analysis Report and a “Drinking Water Customer Service Inspection checklist” via an AF Form 3000 for Government Approval. Contact Bioenvironmental Engineering at 325-654-3126 prior to restoring drinking water service.

4. USE AND AVAILABILITY: All reasonable quantities of existing utilities will be made available to the Contractor without charge. Proposed temporary connections must be coordinated with the Civil Engineering Utilities Shop at 325-654-5186 in advance of any connection. Any temporary connections or lines required will be installed by the utility owner.

The Contractor shall provide all metering as well as maintain meters as required. Any damage associated with the use of these utilities shall be repaired and/or replaced in a manner satisfactory to the Contracting Officer at Contractor’s expense. Prior to using any fire hydrant on Goodfellow AFB, the Contractor must fully abide by and complete the Contractor Use of Goodfellow AFB Fire Hydrants (a copy is attached) and submit to the Contracting Officer and notify the GAFB Fire Dept. at 325-654-3532. Contractor shall take appropriate measures to prevent backflow into the base’s potable water supply system. Contractor shall always strive to conserve the electric, natural gas, and water utilities at Goodfellow Air Force Base.

Goodfellow AFB Fire Hydrant Use Request

GAFB CE - 20250211

ACKNOWLEDGMENT OF REQUIREMENTS

The undersigned Contractor acknowledges that approval to use the base fire hydrants is contingent upon compliance with the following requirements:

1. Connection and Backflow Prevention:

1.1. The Company shall provide a suitable connection with a Class III Back Flow Preventer (Reduced

Pressure Principle Device) and Screw Type Globe Valve, attached to the hydrant with a 2½” National Standard fire thread.

1.2. The backflow device and valve shall be properly supported to prevent damage to the fire hydrant threads.

2. Inspection and Testing:

2.1. The Company shall ensure that the installed backflow preventer assembly is inspected and tested by a licensed backflow prevention assembly tester, certified to be operating within specifications.

2.2. The signed and dated original test report shall be submitted via an AF Form 3000 to the 17th

Contracting Squadron for approval and coordination with the Utilities Element prior to use of the base fire hydrants.

2.3. The test report shall be on TCEQ Form 20700.

2.4. The Contractor shall maintain a copy of the report for the duration of hydrant use.

3. Connection Maintenance and Removal:

3.1. The connection shall remain in place during the approval period.

3.2. Any change in hydrant usage or removal may require an additional inspection and testing to ensure protection of the water system.

4. Hydrant Operation:

4.1. The hydrant shall be fully opened and left in that position during the approval period, except in periods of freezing weather.

5. Approved Equipment:

5.1. An approved fire hydrant wrench shall be used to open and close the hydrant.

6. Servicing and Safety:

6.1. All servicing from the hydrant shall be done at the top of the vehicle or tank. No bottom servicing shall be permitted.

6.2. No quick opening valves shall be used, causing excess water hammer in the main.

7. Malfunction or Leakage:

7.1. Hydrant use shall be discontinued immediately if there is any hydrant malfunction or leakage from underground.

7.2. The Fire Department shall be notified at 325-654-3532 in the event of a malfunction or leakage.

ASSUMPTION OF LIABILITY

The Company assumes full responsibility for any damage to the hydrant, water system, water mains, adjacent grounds, vegetation, buildings, or streets resulting from filling operations. By signing below, the Contractor acknowledges that they have read, understand, and agree to comply with the above requirements and assume liability for any damages or losses incurred.

CONTRACTOR SIGNATURE

Print Name Contract Number Fire Hydrant #/Location

Signature Date Request Start Date

Print Position/Company Expected Completion Date

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01400 - ENVIRONMENTAL PROTECTION

1. APPLICABLE ENVIRONMENTAL REGULATIONS, LAWS, AND PUBLICATIONS:

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. All publications shall be the latest version / edition / revision of the documents listed below, in effect on the date of this solicitation, except where a date is given.

1.1 Code of Federal Regulations (CFR):

29 CFR, Part 1910 Hazardous Waste Operation and Emergency Response

40 CFR 61, Subpart M National Emissions Standard for Hazardous Air Pollutants

40 CFR, Part 82 Protection of Stratospheric Ozone

40 CFR, Part 117 Determination of Reportable Quantities for Hazardous

Substances

40 CFR, Part 122 National Pollutant Discharge Elimination System (NPDES)

Regulations

40 CFR, Parts 260 - 282 Solid Waste Regulations

40 CFR, Part 302 Designation, Reportable Quantities, and Notification

49 CFR, Parts 171-176 Hazardous Materials Regulations, Department of

Transportation, (DOT) Rules

1.2 Environmental Protection Agency Publication (EPA):

EPA Publication No. SW-846 Test Methods for Evaluating Solid Waste

1.3 Environmental Laws:

• Clean Air Act (CAA) and all amendments

• Clean Water Act (CWA) as amended

• Federal Water Pollution Control Act (FWPCA)

• Pollution Prevention Act (PPA)

• Resources Conservation and Recovery Act (RCRA)

• Safe Drinking Water Act (SDWA), as amended

1.4 State Regulations (Texas Administrative Code):

25 TAC 295 Occupational Health 30 TAC 205 General Permit to Discharge Waste 30 TAC 290 Public Drinking Water 30 TAC 335 Industrial Solid Waste and Municipal Hazardous Waste

1.5 Air Force Instruction (AFI):

32-7001 Environmental Management 32-7040 Air Quality Compliance 32-7086 Hazardous Materials Management

2. ENVIRONMENTAL ISSUES

2.1 Activities which are implemented, in whole or in part with approved funding, must comply with applicable legislation and regulations established to protect the human or physical environment. The contractor will remain in compliance with federal statutes during the performance of the contract, including but not limited to the Clean Air Act, Clean Water Act, Endangered Species Act, Resource Conservation and Recovery Act, and other applicable laws, regulations, and requirements.

2.2 In order to comply with all Environmental Laws and Regulations as set forth by Federal, State, Department of Defense, Air Force and any other mandated requirements for Federal installations, Goodfellow AFB (GAFB) must comply with and are required to track all chemicals (hazardous materials), stormwater and construction and debris (C&D) that are transported, managed, used and disposed from any part of this installation are properly identified, managed, and tracked. This requirement is for all installation organizations, workplaces, work centers, shops and for all Contractors doing any work on the installation. Contractors shall investigate, comprehend, and comply with all environmental rules and regulations applicable to their chosen method of accomplishment of the work under this contract.

2.3 The contractor will be responsible for and will indemnify and hold the Government harmless for any and all spills, releases, emission, and discharges of any toxic or hazardous substance, any pollutant, or any waste, whether sudden or gradual, caused by or arising under the performance of this contract or any substance, material, equipment, or facility utilized therefore for the purposes of any environmental statute or regulation, the contractor will be considered the "operator" for any facility utilized in the performance of the contract, and will indemnify and hold the Government harmless for the failure to adhere to any applicable law or regulation established to protect the human or physical environment. The contractor will be responsible in the same manner as above regardless of whether activities leading to or causing a spill, release, emission or discharge is performed by the contractor, its agent or designee, an offender, visitor, or any third party.

3. PROTECTION OF RESOURCES: Construction activities are NOT exempt from air emission, stormwater, hazardous waste, and other environmental compliance rules and regulations.

3.1 Protection of Land Resources: The Contractor shall confine his construction activities to areas defined by the plans and specifications and/or as approved in his/her Storage Area submittal (refer to paragraph 7 of Section 01010). Except in areas to be cleared, the Contractor shall not remove, cut, deface, injure or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorage unless authorized by the Contracting Officer. Where such use of ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.

3.2 Protection of Historical and Archaeological Resources: All known Historical, Archaeological, and Cultural Resources, if any, within the Contractors work area will be designated on the contract drawings. The Contractor shall take precautions during the contract to preserve all resources as they existed at the time of contract award and comply with AHPA and ARPA. The Contractor shall provide all protective devices such as off limit markings, fencing, barricades or other devices as designated on the contract drawings and shall be responsible for preservation of the sites during this contract. As of 25 June 2024, the Goodfellow AFB has confirmed that there are no known historical, archaeological or cultural resources withing the boundaries of this task order. The applicability of this paragraph is if and when the construction contractor encounters this during construction; unforeseen site condition.

3.2.1 Recording and Preserving Historical and Archaeological Finds: All items having any apparent historical or archaeological interest outside of designated areas which are discovered in the course of any construction activities shall be carefully preserved. The Contractor shall protect the find in-place by leaving the archaeological find undisturbed and by using flags to mark a 50-foot radius area around the find. The find shall be immediately reported to the Contracting Officer so that the proper authorities may be notified. All work shall be stopped in the immediate area of the discovery until directed by the Contracting Officer to resume work. Any work required to preserve or protect these finds shall be accomplished before work resumes.

3.3 Protection of Water Resources: The Contractor shall not pollute streams, lakes, or reservoirs with fuels, oils, bitumens, calcium chloride, acids, construction wastes, siltation from stormwater runoff, or other harmful materials identified in 40 CFR Parts 117 and 302. It is the responsibility of the Contractor to investigate, comprehend, and comply with all applicable federal and state regulations, and county, and municipal ordinances concerning pollution of rivers and streams.

All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in lakes, reservoirs, or streams through or adjacent to the project areas.

3.3.1 Regardless of the amount of soil disturbed, all non-storm water discharges shall conform with the base’s Storm Water Management Program regulated by TPDES General Permit TXR040000 for Small Municipal Separate Storm Sewer Systems (MS4).

3.3.2 Post-Construction Cleanup or Obliteration: The Contractor shall obliterate all evidence of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess materials, or any other vestiges of construction. It is anticipated that excavation, filling, and plowing of roadways shall be required to restore the area to near natural conditions, which will permit the growth of vegetation thereon. The disturbed areas shall be graded and filled as identified in Section 31 00 00 – Earthwork and Section 32 92 19 – Seeding. ,

3.4 Protection of Air Quality: All work under this contract shall be performed in such a manner that objectionable or nuisance conditions will not be created in the air nor will objectionable particulates be released to the air. Material usage of welding rods, welding gases, paints, thinners, solvents, and asphalt will require reporting to (through Contracting Officer) GAFB Air Quality Program Manager, 17 CES/CEIEC (325)-654-5946 monthly throughout the project (VIA AF Form 3000). No open burning shall be permitted on base.

3.4.1 Dust Control: The Contractor shall maintain all excavations, embankments, stockpiles, haul roads, permanent access roads, plant sites, waste areas, borrow areas, and all other work areas within or without the project boundaries free from dust in accordance with all applicable local, state, and Federal regulations for the control of dust and particulate emissions. Temporary methods of stabilization consisting of sprinkling with water are required to control dust.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .