Price Schedule - Repair Ft. Griffin Ave (Phase 5).pdf
PDF 223 KB Posted
- Attached to
- Repair Ft. Griffin Ave (Phase 5)
- Solicitation number
- FA303026R0002
About this file
This is a Price Schedule for a federal construction contract at Goodfellow Air Force Base, Texas. Project #JCGU 25-7001 involves the repair of Fort Griffin Avenue (Phase 5), requiring complete demolition and replacement of existing curb, gutter, and pavement to extents indicated on project drawings. The contractor must construct a new concrete swale for storm drainage complete with traffic bollards, adhering to standard profiles detailed in project drawings and specifications while complying with all applicable environmental regulations. The contract contains a single line item (CLIN 0001) priced on a lump-sum, fixed-price basis for one job, with a total performance period of 120 calendar days. All labor, equipment, materials, and incidentals necessary to accomplish the work are included in the contractor's price, which is to be filled in by the bidder in USD. The price schedule does not specify response dates, award dates, or other contract administration details beyond the scope of work and performance timeline.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
PROJECT #JCGU 25-7001
REPAIR FT. GRIFFIN AVE (PHASE 5)
GOODFELLOW AIR FORCE BASE, TEXAS
SCHEDULE OF ITEMS
Provide all labor, equipment, materials, and incidentals necessary to accomplish CLIN 0001 in accordance with the specifications and photos subject to the terms and conditions of the complete contract. Total performance period of CLIN 0001 shall be ONE HUNDRED and TWENTY (120) calendar days.
CLIN DESCRIPTION QTY UNIT PRICE AMOUNT
CLIN 0001 PRICE: Repair FT. GRIFFIN AVE - This project encompasses the complete demolition and replacement of existing curb, gutter, and pavement to the extents indicated on the drawings. A new concrete swale must be constructed for storm drainage complete with traffic bollards. Construction will adhere to standard profiles as detailed in project drawings and specifications and comply with all applicable environmental regulations.
____ ________ $ USD
| QTY: 1 |
| UNIT: Job |
| PRICE: |
File details come from the government source that posted it. Updated .