This is a Request for Bid specification document for the Daikin HVAC Condensing Unit Replacements project at the Joint Support Operations (JSO) Building located at 405 CAP Drive in London, Kentucky. The project involves the replacement of eight existing outdoor Daikin condensing units on a like-kind basis, with all indoor units and line sets to be salvaged and reused. Additionally, seven branch selector boxes on System 1 require replacement, and a programmable thermostat must be installed for each of the eight systems. The scope of work includes refrigerant recovery, removal and disposal of existing condensing units, vacuum and pressure testing of all systems, system startup and testing, and thermostat installation. A pre-bid meeting is scheduled for February 20, 2024, at 2:00 p.m., with the Daikin Manager Area Point of Contact Charles Miles available at 502-607-5136 (work) or 606-627-5972 (cell) for inquiries.
Bidders must provide a written 10-year warranty on all condenser units with 1-year coverage on parts and labor. The specific condensing unit model numbers are identified for each of the eight systems (CU-1 through CU-8), with model numbers including REYQ96MTJU, RXYMQ36MVJU, RXYQ96PYDN, RXYMQ48MVJU, REMQ120PYDN, and RXYQ72PYDN. No pricing terms, set-asides, incumbent information, funding amounts, or contract term details are specified in this specification document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BID - SPECIFICATIONS
Daikin HVAC Condensing Unit Replacements
Joint Support Operations (JSO) Building, 405 CAP Drive, London, KY 40744
Scope of Work:
There are eight (8) existing Daikin HVAC systems that serve the JSO building. All 8 outdoor condensing units are to be replaced, like kind, in this project (see model numbers for each below). One of the 8 systems (System 1) requires the replacement of seven (7) branch selector boxes. All indoor units and line sets shall be salvaged and reused. A programable thermostat shall be installed for each system.
1. Remove/recover all refrigerant.
2. Remove and dispose of all outdoor condensing units.
3. Vacuum and pressure test all systems.
4. Check, test and start all systems.
5. Install a programmable thermostat for each individual system.
6. Provide a written 10-year warranty on all condenser units with 1 year on parts and labor.
7. Replace 7 branch selector boxes on system #1.
Condensing Units
CU-1 REYQ96MTJU / REYQ96MTJU
CU-2 RXYMQ36MVJU
CU-5 RXYQ96PYDN
CU-4 RXYMQ48MVJU
CU-3 RXYMQ48MVJU
CU-6 RXYMQ36MVJU
CU-7 REMQ120PYDN/REMQ120PYDN
CU-8 RXYQ72PYDN / RXYQ72PYDN
On site pre-bid meeting 1400 20FEB24.
DMA POC Charles Miles 502-607-5136 (work) or 606-627-5972 (cell)