RFB-212-24 HVAC Condensing Unit Repl DMA London JSO LondonKY
Solicitation number
RFB 785 2400000494 2
Issued by
Jessamine County, Kentucky

About this file

This is a Request for Bid specification document for the Daikin HVAC Condensing Unit Replacements project at the Joint Support Operations (JSO) Building located at 405 CAP Drive in London, Kentucky. The project involves the replacement of eight existing outdoor Daikin condensing units on a like-kind basis, with all indoor units and line sets to be salvaged and reused. Additionally, seven branch selector boxes on System 1 require replacement, and a programmable thermostat must be installed for each of the eight systems. The scope of work includes refrigerant recovery, removal and disposal of existing condensing units, vacuum and pressure testing of all systems, system startup and testing, and thermostat installation. A pre-bid meeting is scheduled for February 20, 2024, at 2:00 p.m., with the Daikin Manager Area Point of Contact Charles Miles available at 502-607-5136 (work) or 606-627-5972 (cell) for inquiries.

Bidders must provide a written 10-year warranty on all condenser units with 1-year coverage on parts and labor. The specific condensing unit model numbers are identified for each of the eight systems (CU-1 through CU-8), with model numbers including REYQ96MTJU, RXYMQ36MVJU, RXYQ96PYDN, RXYMQ48MVJU, REMQ120PYDN, and RXYQ72PYDN. No pricing terms, set-asides, incumbent information, funding amounts, or contract term details are specified in this specification document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BID - SPECIFICATIONS

Daikin HVAC Condensing Unit Replacements

Joint Support Operations (JSO) Building, 405 CAP Drive, London, KY 40744

Scope of Work:

There are eight (8) existing Daikin HVAC systems that serve the JSO building. All 8 outdoor condensing units are to be replaced, like kind, in this project (see model numbers for each below). One of the 8 systems (System 1) requires the replacement of seven (7) branch selector boxes. All indoor units and line sets shall be salvaged and reused. A programable thermostat shall be installed for each system.

1. Remove/recover all refrigerant.

2. Remove and dispose of all outdoor condensing units.

3. Vacuum and pressure test all systems.

4. Check, test and start all systems.

5. Install a programmable thermostat for each individual system.

6. Provide a written 10-year warranty on all condenser units with 1 year on parts and labor.

7. Replace 7 branch selector boxes on system #1.

Condensing Units

CU-1 REYQ96MTJU / REYQ96MTJU

CU-2 RXYMQ36MVJU

CU-5 RXYQ96PYDN

CU-4 RXYMQ48MVJU

CU-3 RXYMQ48MVJU

CU-6 RXYMQ36MVJU

CU-7 REMQ120PYDN/REMQ120PYDN

CU-8 RXYQ72PYDN / RXYQ72PYDN

On site pre-bid meeting 1400 20FEB24.

DMA POC Charles Miles 502-607-5136 (work) or 606-627-5972 (cell)