This specifications document outlines a Request for Purchase and Installation of High Density Compact Storage System for the Maine State Museum, comprising two distinct components requiring separate quotes from bidders. Component 1 involves the installation of an existing Systematics high density electrical compact storage system (12 feet long, 24 5/8" wide) that requires transport from current storage to a new location within one of two museum collections storage facilities in Hallowell or Augusta, Maine, along with installation of existing shelving on the unit's carriages. Component 2 requires the purchase and installation of a new industrial compact storage system consisting of ten mechanical-assist carriages approximately 25 feet long that must accommodate the museum's existing variable-depth wide-span/pallet rack style shelving. Mandatory participation in a walkthrough at the project location sites is required, scheduled for September 26, 2013 at 10 a.m., with bidders required to contact Paula Work, Museum Registrar (207-287-8109) to schedule participation and obtain specific site addresses. The project must be completed by March 1, 2014, with failure to meet this deadline resulting in penalties of $100 per work day unless delays are caused by acts of God or circumstances beyond the supplier's control.
Scoring of proposals will be based on a 100-point scale weighted as follows: Cost Proposal (75 points) and Organization Qualifications and Experience (25 points). All bids must include separate quotes for both components, proof of Liability Insurance, and responses to two mandatory questions addressing specific experience with museums or similar institutions in planning and installing compacting storage systems and a realistic implementation work plan. Component 2 carries specific technical requirements including reinforced welded-steel carriage construction with minimum 5-inch sealed ball-bearing wheels and 1,000 lbs. per foot weight capacity, fully grouted anti-tip rail systems with integrated catch mechanisms, solid wood flooring level with rail tops capable of supporting 3,000 lb motorized equipment and 2,000 lb loads, and entrance ramps constructed of 22-inch wide diamond plate 1/8-inch steel with powder coat finish. The State reserves the right to accept one or both components in the final purchase order award. Bidders must provide three references from museums or collections-based organizations demonstrating prior relevant experience.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendments.docx | DOCX document | |
| Solicitation_terms.docm | DOCM document | |
| RFQ Solicitation 130912_200.doc | DOC document | |
| Concept_Hollowell Annex-Electric System.pdf | ||
| Questions and Answers.doc | DOC document | |
| Plan B - Options A and B.pdf | ||
| Concept_Hollowell Annex-Industrial System.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PURCHASE AND INSTALLATION OF HIGH DENSITY COMPACT STORAGE SYSTEM
NOTE: This project consists of two components: 1) installation of an existing Systematics high density electrical compact storage system, already owned by the Maine State Museum; and 2) purchase and installation of a new variable width industrial style mechanical-assist compact storage system.
Bids must include a separate quote for each of the two components of the project; each bidder must answer both questions at the bottom of this document and include proof of Liability Insurance. Failure to comply will result in your bid being considered non-conforming. The State reserves the right to accept one or both of these components in the final purchase order award.
A. Scoring Weights and Process
Scoring Weights: The score will be based on a 100 point scale and will measure the degree to which each proposal meets the following criteria.
1) Cost Proposal (75 points)
2) Organization Qualifications and Experience (25 points)
Participation by bidders in a walkthrough at the project location sites is required. Locations for the walkthrough are two Maine State Museum collections storage facilities in Hallowell and Augusta, Maine. The walkthrough will be held on September 26th 2013 at 10 am.
To schedule participation in the walkthrough and receive specific addresses of the walkthrough site locations, bidders should contact:
Paula Work, Museum Registrar Phone: 207-287-8109 Paula.Work@Maine.gov
Description of project
Component 1 - Installation of Existing Electrical Compact Storage System: Rail and raised flooring system.
Existing system is a 12 foot long, 24 5/8” wide high density unit by Systematics. It includes a rail and raised flooring system that must be placed on a concrete floor.
a. Ramp access must be provided.
b. Exact location of this unit is to be determined. See Plan A for “concept” location within the storage facility only.
c. Price to include transport of existing Systematics unit from current storage location to new installation location (less than 4 miles). Existing system is disassembled.
d. Price to include transportation and installation of shelving on the carriages. The museum already owns this shelving.
Total Price of Component 1______
Component 2 - Purchase and Installation of New Unit: Industrial compact storage system that consists of ten mechanical-assist carriages that are approximately 25 feet long; carriages must accommodate existing variable-depth wide-span/pallet rack style shelving owned by the museum (see Plan B).
a. Exact location of the new unit within the storage facility is to be determined. Plan B provides “concept” location within the storage facility only.
b. System must attempt to maximize the storage footprint while taking into account overhead pipes, lights, and ductwork as well as other structural elements within the space.
c. Carriage construction must be reinforced welded-steel construction with a minimum of 5” sealed ball-bearing wheels, and a minimum weight capacity of 1000 lbs. per carriage foot.
d. Mechanical-assist carriages should be equipped with three prong ergonomic handles; a locking device should be centrally located in the face panel but separate from the handle to prevent carriage movement during loading.
e. The locking device should be constructed of, at minimum, 11 gauge steel; manually operated; and plainly labeled. In addition it must be robust enough to hold the fully loaded 25,000 lb carriage in place while being loaded/unloaded.
f. Rail system must be fully grouted anti-tip rail with an integrated “catch system” to prevent the carriage from being dislodged if struck by motorized loading equipment.
g. Carriage will be equipped with existing 12 foot high wide-span/pallet rack style shelving of variable depth.
h. Solid wood flooring is required between the rails, and must be level with the top of the load rail and capable of supporting 3,000 lb motorized pallet handling equipment and 2,000 lb load.
i. Entrance ramps to the system will be 22” wide diamond plate 1/8” steel with powder coat finish.
j. Ramp must be fully grouted and anchored to support motorized loading equipment.
k. Unit must incorporate the following mandatory safety features:
1) The locking device, due to mandatory safety requirements, should be constructed of minimum 11 gauge steel, manually operated, and plainly labeled.
2) Rail system must be fully grouted anti-tip rail with an integrated “catch system” to prevent the carriage from being dislodged if struck by motorized loading equipment.
3) Solid wood flooring is required between the rails; ramps must be fully grouted and anchored to support motorized loading equipment.
l. Delivery and installation of the rail, floor, ramp, carriages and existing pallet rack will be the responsibility of the bidder and should be included in the price. Existing wide-span, pallet racking is located approximately 4 miles from installation site.
Total Price of Component 2 __________________
Please answer the following questions; provide the answers and related information with your price quotes.
1) Experience: What specific experience do you have in working with museums or similar institutions in the planning and installation of compacting storage systems in collections storage areas? Please provide three references for your work, preferably from other museums or collections-based organizations.
2) Implementation Work Plan: Once this project begins, it will be critical that it proceed to completion in an organized way according to a set schedule. Provide a realistic work plan for the implementation of the project through to its completion.
Please note: Unless a schedule change is approved in writing by the Maine State Museum, failure to complete the job by March 1, 2014 will result in a fine of $100.00 per work day . If the delay is caused by an "Act of God" such as flood, blizzard, hurricane, or a strike which is not directly under the supplier's control, then the penalty will not apply.