About this file
This is a Specified or Sole Source Selection Form submitted by Gainesville Regional Utilities (GRU) in Florida for a comprehensive demolition and hazardous materials removal project involving multiple downtown structures. The project encompasses eight buildings requiring full asbestos abatement of all identified asbestos-containing materials, lead-based paint waste handling and disposal, removal of hazardous building components, complete structural demolition to slab/subgrade level, and site stabilization. The successful contractor must provide all labor, materials, equipment, permitting, and disposal documentation while maintaining full regulatory compliance with EPA, OSHA, DEP, and Florida Department of Health requirements. A mandatory pre-bid meeting is scheduled for January 9, 2026, at 9:30 a.m., with bid responses due by 5:00 p.m. on February 5, 2026, via the GRU e-Procurement Portal. Award is expected within 60 calendar days of the solicitation due date.
Contractors must possess specific credentials including a Florida Asbestos Contractor License, EPA Lead Abatement Firm Certification, and HAZWOPER 40-hour training certification. The project requires substantial insurance coverage with Commercial General Liability of $2,000,000, Contractor Pollution Liability of $2,000,000, Asbestos Abatement Liability, and Umbrella Liability of $5,000,000. A bid bond of 5% and performance/payment bonds of 100% will be required upon award. Contractors will be evaluated based on responsiveness, responsibility, and lowest bid pricing. No specific set-aside designations or restrictions for disadvantaged enterprises were detailed in the contract documents. Exact budgetary parameters were not disclosed, though the pricing response form allows for individual building demolition costs and a comprehensive single-project alternative, suggesting potential flexibility in project scope and contract value.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 21 Aug 2024
GAINESVILLE REGIONAL UTILITIES
SPECIFIED OR SOLE SOURCE SELECTION
PROJECT NAME: Date:
CHECK ONLY ONE METHOD OF SOURCE SELECTION
SOLE SOURCE:
This is the sole source provider because:
Replacement parts only available from the original equipment manufacturer (OEM)
(Example: Provide explanation letter from the manufacturer)
Services will require copyrighted drawings or specification documents only available from the OEM or authorized OEM service center or distributor.
(Example: Provide explanation letter from the manufacturer)
A unique good or service covered under an active U.S. patent or copyright.
(Example: Provide explanation letter from the manufacturer that includes but is not limited to Patent/Trademark and/or Copyright Number)
SPECIFIED SOURCE:
JUSTIFICATION FOR SPECIFIED SOURCE (REQUIRED):
Requestor Name: Title:
Signature:
Department Head Signature
Executive Team Signature
Fillable Form
| PROJECT NAME: |
| Date: |
| CHECK ONLY ONE METHOD OF SOURCE SELECTION: |
| This is the sole source provider because: |
| undefined: |
| undefined_2: |
| undefined_3: |
| JUSTIFICATION FOR SPECIFIED SOURCE REQUIRED 1: |
| JUSTIFICATION FOR SPECIFIED SOURCE REQUIRED 2: |
| JUSTIFICATION FOR SPECIFIED SOURCE REQUIRED 3: |
| Requestor Name: |
| Title: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
File details come from the government source that posted it. Updated .