Specifications Vol 2 Physical Security phase II.pdf
PDF 7 MB Posted
- Solicitation number
- 36C24825R0066
About this file
This is a detailed specification document for electrical and communications system upgrades for the James A. Haley Veterans Affairs Medical Center in Tampa, Florida. The project involves a comprehensive physical security system upgrade, specifically Phase II, with a set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220 with a size standard of $45 million.
The specification covers extensive technical requirements for security systems, including physical access control systems, personal identity verification (PIV), intrusion detection systems, communications infrastructure, and related electronic safety and security components. Key technical specifications include detailed requirements for fiber optic equipment, interior detection devices, sensor technologies, power supplies, and communication system installations. The project will involve installing and integrating new security systems, replacing selected doors and equipment, and ensuring comprehensive electronic security coverage. The anticipated solicitation posting date is March 27, 2025, with the contract being 100% set-aside for SDVOSB contractors, and the project magnitude is estimated between $1,000,000 and $2,000,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24825R0066 0001.pdf | ||
| Davis Bacon Wage Determination FL20250208 dtd 14 Mar 2025.txt | TXT text file | |
| DIVISIONAL BREAKDOWN SHEET.docx | DOCX document | |
| EMR.docx | DOCX document | |
| 36C24825R0066_15_Apr_2025.pdf | ||
| RFP Attachment Past Performance Questionaire.doc | DOC document | |
| 852.222-71, Compliance with Executive Order 13899. DEVIATION APR 2025 - 1 Page.docx | DOCX document | |
| NARA RM Contract Language Clause.docx | DOCX document | |
| Instruction to Offerors.docx | DOCX document | |
| PIV Reader Spec.pdf | ||
| 36C24825R0066 Pre Sol Posted 10 Mar 2025.docx | DOCX document | |
| SOW 673-18-617 Physical Security phase II 7 Mar 2025.pdf | ||
| Specifications Vol 1 Physical Security phase II.pdf | ||
| 36C24825R0066.docx | DOCX document | |
| Drawings.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade Facility Physical Security - Phase II at the
James A. Haley VAMC Tampa, Florida
Construction Documents
100% (CD)
Specification - Vol. 2 Submittal
30 November 2023 Project Number: 673-18-617
TMM 2202
Print front and back cover in color on letter size card stock.
Print the rest of the specification submittal double sided on letter size paper in b&w.
Bind with 3 hole punch and screws.
Upgrade Facility Physical Security – Phase II, Project No. 673-18-617, TMM-2202 James A. Haley VAMC, Tampa, Florida
VAMC Tampa Upgrade Facility Physical Security, Project No. 673-18-617, TMM-2202 Tampa VAMC, Tampa, Florida 01-23
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 09-22 01 35 26 Safety Requirements 08-22 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 82 11 Traditional Asbestos Abatement, HazMat Report Attached 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 60 00 Flashing and Sheet Metal 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 17 10 Integrated Door Assemblies 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 71 00 Door Hardware 05-22 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21
Tampa VAMC, Tampa, Florida 01-23
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 91 00 Painting 01-21
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors & Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 27 26 Wiring Devices 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 51 23 Intercommunications and Program Systems 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 16 00 Intrusion Detection System 10-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15
Tampa VAMC, Tampa, Florida 01-01-21
08 80 00 - 1
SECTION 08 80 00
GLAZING
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the following:
1. Glass.
2. Glazing materials and accessories for both factory and field glazed assemblies.
1.2 RELATED WORK
A. Section 08 11 13, HOLLOW METAL DOORS AND FRAMES, and Section 08 14 00, WOOD DOORS: Sound resistant doors.
1.3 LABELS
A. Temporary labels:
1. Provide temporary label on each light of glass and plastic material identifying manufacturer or brand and glass type, quality and nominal thickness.
2. Label in accordance with NFRC label requirements.
3. Temporary labels are to remain intact until glass and plastic material is approved by Contracting Officer Representative (COR).
B. Permanent labels:
1. Locate in corner for each pane.
2. Label in accordance with ANSI Z97.1 and SGCC label requirements.
a. Tempered glass.
b. Laminated glass or have certificate for panes without permanent label.
c. Organic coated glass.
3. Fire rated glazing assemblies: Mark in accordance with IBC.
1.4 PERFORMANCE REQUIREMENTS
A. General: Design glazing system consistent with guidance and practices presented in the GANA Glazing Manual, GANA Laminated Glazing Manual, and GANA Sealant Manual, as applicable to project. Installed glazing is to withstand applied loads, thermal stresses, thermal movements, building movements, permitted tolerances, and combinations of these conditions without failure, including loss or glass breakage attributable to defective manufacture, fabrication, or installation;
failure of sealants or gaskets to remain watertight and airtight;
deterioration of glazing materials; unsafe engagement of the framing system; deflections beyond specified limits; or other defects in construction.
08 80 00 - 2
B. Glazing Unit Design: Design glass, including engineering analysis meeting requirements of authorities having jurisdiction. Thicknesses listed are minimum. Coordinate thicknesses with framing system manufacturers.
1. Design glass in accordance with ASTM E1300, and for conditions beyond the scope of ASTM E1300, by a properly substantiated structural analysis.
2. Design Wind Pressures: In accordance with ASCE 7 and in accordance with applicable code.
3. Wind Design Data: In accordance with ASCE 7 and in accordance with applicable code.
4. Maximum Lateral Deflection: For glass supported on all four edges, limit center-of-glass deflection at design wind pressure to not more than the structural capacity of the glazing unit, the threshold at which frame engagement is no longer safely assured, 1/100 times the short-side length, or 19 mm (0.75 inch), whichever is less.
C. Windborne-Debris-Impact Resistance: Comply with enhanced-protection testing requirements in ASTM E1996 for project wind zone when tested according to ASTM E1886, based upon testing of specimens not less than the size required for project and utilizing installation method identical to that specified for project.
1. Project Wind Zone: Wind Zone 2.
2. Large-Missile Test: For glazing located within 9.1 m (30 feet) of grade.
D. Building Enclosure Vapor Retarder and Air Barrier:
1. Utilize the inner pane of multiple pane sealed units for the continuity of the air barrier and vapor retarder seal.
2. Maintain a continuous air barrier and vapor retarder throughout the glazed assembly from glass pane to heel bead of glazing sealant.
1.5 SUBMITTALS
A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Manufacturer's Certificates:
1. Certificate stating that fire-protection and fire-resistive glazing units meet code requirements for fire-resistance-rated assembly and applicable safety glazing requirements.
2. Certificate on solar heat gain coefficient when value is specified.
3. Certificate on "R" value when value is specified.
C. Manufacturer Warranty.
08 80 00 - 3
D. Manufacturer's Literature and Data:
1. Glass, each kind required.
2. Insulating glass units.
3. Glazing cushion.
4. Sealing compound.
E. Samples:
1. Size: 305 mm by 305 mm (12 inches by 12 inches).
2. Tinted glass.
F. Preconstruction Adhesion and Compatibility Test Report: Submit glazing sealant manufacturer’s test report indicating glazing sealants were tested for adhesion to glass and glazing channel substrates and for compatibility with glass and other glazing materials.
1.6 DELIVERY, STORAGE AND HANDLING
A. Delivery: Schedule delivery to coincide with glazing schedules so minimum handling of crates is required. Do not open crates except as required for inspection for shipping damage.
B. Storage: Store cases according to printed instructions on case, in areas least subject to traffic or falling objects. Keep storage area clean and dry.
C. Handling: Unpack cases following printed instructions on case. Stack individual windows on edge leaned slightly against upright supports with separators between each.
1.7 PROJECT CONDITIONS:
A. Field Measurements: Field measure openings before ordering tempered glass products to assure for proper fit of field measured products.
1.8 WARRANTY
A. Construction Warranty: Comply with the FAR clause 52.246-21 “Warranty of Construction”.
B. Manufacturer Warranty: Manufacturer shall warranty their glazing from the date of installation and final acceptance by the Government as follows. Submit manufacturer warranty.
1. Insulating glass units to remain sealed for ten (10) years.
2. Laminated glass units to remain laminated for five (5) years.
1.9 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
B. American Architectural Manufacturers Association (AAMA):
800-16..................Test Methods for Sealants
08 80 00 - 4
C. American National Standards Institute (ANSI):
Z97.1-15(R2020).........Safety Glazing Material Used in
Building - Safety Performance Specifications and Methods of Test
D. American Society of Civil Engineers (ASCE):
7-22....................Wind Load Provisions
E. ASTM International (ASTM):
C542-05(2017)...........Lock-Strip Gaskets
C794-18(2022)...........Adhesion-in-Peel of Elastomeric Joint Sealants
C864-05(2019)...........Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers
C920-18.................Elastomeric Joint Sealants
C964-20.................Standard Guide for Lock-Strip Gasket Glazing
C1036-21................Flat Glass
C1048-18................Heat-Treated Flat Glass-Kind HS, Kind FT Coated and Uncoated Glass.
C1172-19................Laminated Architectural Flat Glass
C1376-21a...............Pyrolytic and Vacuum Deposition Coatings on
Flat Glass
E119-22.................Standard Test Methods for Fire Test of Building
Construction and Material
E1300-16................Load Resistance of Glass in Buildings
E1886-19................Standard Test Method for Performance of
Exterior Windows, Curtain Walls, Doors, and
Impact Protective Systems Impacted by
Missile(s) and Exposed to Cyclic Pressure
Differentials
E1996-23................Standard Specification for Performance of
Exterior Windows, Curtain Walls, Doors, and
Impact Protective Systems Impacted by Windborne
Debris in Hurricanes
E2190-19................Insulating Glass Unit
F. Code of Federal Regulations (CFR):
16 CFR 1201-23..........Safety Standard for Architectural Glazing
Materials
G. Glass Association of North America (GANA):
2022 Edition............GANA Glazing Manual
2008 Edition............GANA Sealant Manual
2019 Edition............GANA Laminated Glazing Reference Manual
08 80 00 - 5
2010 Edition............GANA Protective Glazing Reference Manual
H. International Code Council (ICC):
IBC.....................International Building Code
I. Insulating Glass Certification Council (IGCC) J. Insulating Glass Manufacturer Alliance (IGMA):
TB-3001-01..............Guidelines for Sloped Glazing
TM-3000-90(2016)........North American Glazing Guidelines for Sealed
Insulating Glass Units for Commercial and
Residential Use
K. Intertek Testing Services – Warnock Hersey (ITS-WHI)
L. National Fire Protection Association (NFPA):
80-22...................Fire Doors and Windows
252-22..................Fire Tests of Door Assemblies
257-22..................Standard on Fire Test for Window and Glass
Block Assemblies
M. National Fenestration Rating Council (NFRC)
N. Safety Glazing Certification Council (SGCC):
Certified Products Directory (Issued Semi-Annually).
O. Underwriters Laboratories, Inc. (UL):
9-09(R2020).............Fire Tests of Window Assemblies
263-11(R2022)...........Fire Tests of Building Construction and
Materials
P. Department of Veterans Affairs:
Q. Physical Security Design Manual for VA Mission Critical Protected Facilities January 2015
R. Architectural Design Manual for VA Facilities (VASDM)
S. Environmental Protection Agency (EPA):
40 CFR 59(2023).........National Volatile Organic Compound Emission
Standards for Consumer and Commercial Products
PART 2 - PRODUCT
2.1 GLASS
A. Provide minimum thickness stated and as additionally required to meet performance requirements.
1. Provide minimum 6 mm (1/4 inch) thick glass units unless otherwise indicated.
B. Obtain glass units from single source from single manufacturer for each glass type.
C. Clear Glass:
1. ASTM C1036, Type I, Class 1, Quality q3.
08 80 00 - 6
2.2 HEAT-TREATED GLASS
A. Clear Tempered Glass:
1. ASTM C1048, Kind FT, Condition A, Type I, Class 1, Quality q3.
B. Tinted Tempered Glass.
1. ASTM C1048, Kind FT, Condition A, Type I, Class 2, Quality q3.
2.3 INSULATING GLASS UNITS
A. Provide factory fabricated, hermetically sealed glass unit consisting of two panes of glass separated by a dehydrated air space and comply with ASTM E2190. The exterior and inner glass units shall be fully tempered.
B. Assemble units using glass types specified in Insulating Glass
Schedule.
2.4 FIRE PROTECTION GLAZING
A. Fire-Protection-Rated Glazing: Glazing units tested for use in fire door assemblies or fire windows, UL, ITS-WHI or equivalent listed and labeled by testing agency in accordance with IBC, for fire-protection ratings as indicated on construction documents scheduled, based upon positive-pressure testing per NFPA 257 or UL 9, and complying with NFPA
80.
1. Hose-Stream Test: Units must comply, except units having fire-protection rating of 20 minutes.
2. Temperature Rise Limitation: Units over 0.065 square meter (100 square inch) must comply with 232 deg. C (450 degrees F) limitation.
3. Labeling: Permanently label fire-protection-rated glazing units in accordance with IBC.
4. Safety Glazing: Comply with 16 CFR 1201, Category II.
5. Fire-Protection-Rated Laminated Ceramic Glazing: Units made from two lites of clear, ceramic glass, 8 mm (5/16 inch) total thickness, for rating scheduled.
6. Fire-Protection-Rated Laminated Glass with Intumescent Interlayers:
Units made from multiple lites of uncoated, ultra-clear (low-iron) float glass, in intumescent interlayers, of thickness and rating scheduled.
2.5 GLAZING ACCESSORIES
A. As required to supplement the accessories provided with the items to be glazed and to provide a complete installation. Ferrous metal accessories exposed in the finished work are to have a finish that will not corrode or stain while in service. Fire rated glazing to be
08 80 00 - 7 installed with glazing accessories in accordance with the manufacturer’s installation instructions.
B. Setting Blocks: ASTM C864:
1. Silicone type.
2. Channel shape; having 6 mm (1/4 inch) internal depth.
3. Shore A hardness of 80 to 90 Durometer.
4. Block lengths: 50 mm (2 inches) except 100 to 150 mm (4 to 6 inches) for insulating glass.
5. Block width: Approximately 1.6 mm (1/16 inch) less than the full width of the rabbet.
6. Block thickness: Minimum 4.8 mm (3/16 inch). Thickness sized for rabbet depth as required.
C. Spacers: ASTM C864:
1. Channel shape having a 6 mm (1/4 inch) internal depth.
2. Flanges not less 2.4 mm (3/32 inch) thick and web 3 mm (1/8 inch) thick.
3. Lengths: 25 to 76 mm (1 to 3 inches).
4. Shore A hardness of 40 to 50 Durometer.
D. Glazing Tapes:
1. Semi-solid polymeric based closed cell material exhibiting pressure-sensitive adhesion and withstanding exposure to sunlight, moisture, heat, cold, and aging.
2. Shape, size and degree of softness and strength suitable for use in glazing application to prevent water infiltration.
3. Complying with AAMA 800 for the following types:
a. AAMA 800, Type 1, for glazing applications in which tape acts as the primary sealant.
b. AAMA 800, Type 2, for glazing applications in which tape is used in combination with a full bead of liquid sealant.
E. Spring Steel Spacer: Galvanized steel wire or strip designed to position glazing in channel or rabbeted sash with stops.
F. Glazing Gaskets: ASTM C864:
1. Firm dense wedge shape for locking in sash.
2. Soft, closed cell with locking key for sash key.
3. Flanges may terminate above the glazing-beads or terminate flush with top of beads.
G. Lock-Strip Glazing Gaskets: ASTM C542, shape, size, and mounting as indicated.
H. Glazing Sealants: ASTM C920, silicone neutral cure:
08 80 00 - 8
1. Type S.
2. Class 25 or 50 as recommended by manufacturer for application.
3. Grade NS.
4. Shore A hardness of 25 to 30 Durometer.
5. VOC Content: For sealants used inside the weatherproofing system, not more than 250 g/L or less when calculating according to 40 CFR
59, (EPA Method 24).
I. Structural Sealant: ASTM C920, silicone acetoxy cure:
1. Type S.
2. Class 25.
3. Grade NS.
4. Shore a hardness of 25 to 30 Durometer.
J. Neoprene, EPDM, or Vinyl Glazing Gasket: ASTM C864.
1. Channel shape; flanges may terminate above the glazing channel or flush with the top of the channel.
2. Designed for dry glazing.
K. Color:
1. Color of glazing compounds, gaskets, and sealants used for aluminum color frames to match color of the finished aluminum and be nonstaining.
2. Color of other glazing compounds, gaskets, and sealants which will be exposed in the finished work and unpainted are to be black, gray, or neutral color.
L. Smoke Removal Unit Targets: Adhesive targets affixed to glass to identify glass units intended for removal for smoke control. Comply with requirements of local Fire Department.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions:
1. Examine openings for glass and glazing units; determine they are proper size; plumb; square; and level before installation is started.
2. Verify that glazing openings conform with details, dimensions and tolerances indicated on manufacturer is approved shop drawings.
B. Review for conditions which may adversely affect glass and glazing unit installation, prior to commencement of installation. Do not proceed with installation until unsatisfactory conditions have been corrected.
C. Verify that wash down of adjacent masonry is completed prior to erection of glass and glazing units.
08 80 00 - 9
3.2 PREPARATION
A. For sealant glazing, prepare glazing surfaces in accordance with
GANA Sealant Manual.
B. Determine glazing unit size and edge clearances by measuring the actual unit to receive the glazing.
C. Shop fabricate and cut glass with smooth, straight edges of full size required by openings to provide GANA recommended edge clearances.
D. Verify that components used are compatible.
E. Clean and dry glazing surfaces.
F. Prime surfaces scheduled to receive sealants, as determined by preconstruction sealant-substrate testing.
3.3 INSTALLATION – GENERAL
A. Install in accordance with GANA Glazing Manual, GANA Sealant Manual, IGMA TB-3001, and IGMA TM-3000 unless specified otherwise.
B. Glaze in accordance with recommendations of glazing and framing manufacturers, and as required to meet the Performance Test
Requirements specified in other applicable sections of specifications.
C. Set glazing without bending, twisting, or forcing of units.
D. Do not allow glass to rest on or contact any framing member.
E. Glaze doors and operable sash, in a securely fixed or closed and locked position, until sealant, glazing compound, or putty has thoroughly set.
F. Tempered Glass: Install with roller distortions in horizontal position unless otherwise directed.
G. Laminated Glass:
1. Tape edges to seal interlayer and protect from glazing sealants.
2. Do not use putty or glazing compounds.
H. Insulating Glass Units:
1. Glaze in compliance with glass manufacturer's written instructions.
2. When glazing gaskets are used, they are to be of sufficient size and depth to cover glass seal or metal channel frame completely.
3. Do not use putty or glazing compounds.
4. Do not grind, nip, cut, or otherwise alter edges and corners of fused glass units after shipping from factory.
I. Fire Protective Glass:
1. Other fire protective glass: Glaze in accordance with manufacturer’s installation instructions and NFPA 80.
3.4 INSTALLATION - DRY METHOD (TAPE AND GASKET SPLINE GLAZING)
A. Cut glazing tape or spline to length; install on glazing pane. Seal corners by butting and sealing junctions with butyl sealant.
08 80 00 - 10
B. Place setting blocks at 1/4 points with edge block no more than 150 mm
(6 inches) from corners.
C. Rest glazing on setting blocks and push against fixed stop with sufficient pressure to attain full contact.
D. Install removable stops without displacing glazing spline. Exert pressure for full continuous contact.
E. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites.
F. Trim protruding tape edge.
3.5 INSTALLATION - WET/DRY METHOD (PREFORMED TAPE AND SEALANT)
A. Cut glazing tape to length and set against permanent stops, 5 mm
(3/16 inch) below sight line. Seal corners by butting tape and dabbing with butyl sealant.
B. Apply heel bead of butyl sealant along intersection of permanent stop with frame ensuring full perimeter seal between glass and frame to complete the continuity of the air and vapor seal.
C. Place setting blocks at 1/4 points with edge block no more than 152 mm (6 inches) from corners.
D. Rest glazing on setting blocks and push against tape and heel bead of sealant with sufficient pressure to achieve full contact at perimeter of pane or glass unit.
E. Install removable stops, with spacer strips inserted between glazing and applied stops, 6 mm (1/4 inch) below sight line. Place glazing tape on glazing pane or unit with tape flush with sight line.
F. Fill gap between glazing and stop with sealant to depth equal to bite of frame on glazing, but not more than 9 mm (3/8 inch) below sight line. Sealant type is to be compatible with glazing tape.
G. Apply cap bead of sealant along void between the stop and the glazing, to uniform line, flush with sight line. Tool or wipe sealant surface smooth.
3.6 INSTALLATION - WET METHOD (SEALANT AND SEALANT)
A. Place setting blocks at 1/4 points and install glazing pane or unit.
B. Install removable stops with glazing centered in space by inserting spacer shims both sides at 600 mm (24 inch) intervals, 6 mm (1/4 inch) below sight line.
C. Fill gaps between glazing and stops with sealant to depth of bite on glazing, but not more than 9 mm (3/8 inch) below sight line to ensure full contact with glazing and continue the air and vapor seal.
08 80 00 - 11
D. Apply sealant to uniform line, flush with sight line. Tool or wipe sealant surface smooth.
3.7 INSTALLATION - EXTERIOR BUTT GLAZED METHOD (SEALANT ONLY)
A. Perform adhesion testing in accordance with ASTM C794. Provide primer per sealant manufacturer’s recommendations. Submit test results.
B. Temporarily brace glass in position for duration of glazing process.
Mask edges of glass at adjoining glass edges and between glass edges and framing members.
C. Temporarily secure a small diameter non-adhering foamed rod on back side of joint.
D. Apply sealant to open side of joint in continuous operation; thoroughly fill the joint without displacing the foam rod. Tool the sealant surface smooth to concave profile.
E. Permit sealant to cure then remove foam backer rod. Apply sealant to opposite side, tool smooth to concave profile.
F. Remove masking tape.
3.8 INSTALLATION - INTERIOR WET/DRY METHOD (TAPE AND SEALANT)
A. Cut glazing tape to length and install against permanent stops, projecting 1.6 mm (1/16 inch) above sight line.
B. Place setting blocks at 1/4 points with edge block no more than 150 mm
(6 inches) from corners.
C. Rest glazing on setting blocks and push against tape to ensure full contact at perimeter of pane or unit.
D. Install removable stops, spacer shims inserted between glazing and applied stops at 600 mm (24 inch) intervals, 6 mm (1/4 inch) below sight line.
E. Fill gaps between pane and applied stop with sealant to depth equal to bite on glazing, to uniform and level line. Sealant type is to be compatible with glazing tape.
F. Trim protruding tape edge.
3.9 INSTALLATION - INTERIOR WET METHOD (COMPOUND AND COMPOUND)
A. Install glazing resting on setting blocks. Install applied stop and center pane by use of spacer shims at 600 mm (24 inch) centers, kept 6 mm (1/4 inch) below sight line.
B. Locate and secure glazing pane using glazers' or spring wire clips.
C. Fill gaps between glazing and stops with glazing compound until flush with sight line. Tool surface to straight line.
08 80 00 - 12
3.10 REPLACEMENT AND CLEANING
A. Clean new glass surfaces removing temporary labels, paint spots, and defacement after approval by COR.
B. Replace cracked, broken, and imperfect glass, or glass which has been installed improperly.
C. Leave glass, putty, and other setting material in clean, whole, and acceptable condition.
3.11 PROTECTION
A. Protect finished surfaces from damage during erection, and after completion of work. Strippable plastic coatings on colored anodized finish are not acceptable.
3.12 MONOLITHIC GLASS SCHEDULE
A. Glass Type MG# 1 : Clear fully tempered float glass.
1. Unit Thickness: 6 mm (0.23 inch).
2. Safety glazing label required.
3.13 INSULATING GLASS SCHEDULE
A. Glass Type IG# 1 : Low-E-coated, tinted insulating glass.
1. Overall Unit Thickness: 25 mm (1 inch).
2. Minimum Thickness of Each Glass Lite: 4 mm (0.16 inch)6 mm (0.23 inch).
3. Outdoor Lite: Tinted annealed float glass, except heat-strengthened float glass where required, and fully tempered float glass where indicated.
a. Tint Color: Match adjacent exterior existing tint color.
4. Interspace Content: Argon.
5. Indoor Lite: Fully tempered float glass.
6. Low-E Coating: Sputtered on second or sputtered on third surface.
7. Safety glazing label required.
3.14 FIRE-PROTECTIVE GLAZING SCHEDULE
A. Glass Type FR# 1: Fire-protection-rated laminated ceramic glazing or laminated Glass with intumescent interlayers.
1. Thickness: 6 mm (1/4 inch) minimum.
2. Rating: 20-,45-,60-, or 90- minute as indicated in door schedule.
3. Application: Fire-protection-rated door and window assemblies.
- - - E N D - - -
V A M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M
T a m p a
V A M C
T a m p a
F l o r i d i
S E C T I O N
C H E D U L E
F O R
F I N I S H
C T I O N
S C H E D U L E
F O R
F I N I S H
M C
J a m e s
A
H a l e y
L o c a t i o n
T a m p a
F l o r i
P r o j e c t n o a n d
N a m e
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P h a s e
I u b m i s s i o n
D a t e
J u n e
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
C T I O N
H E D U L E
F O R
F I N I S H
R T
G E N E R
D E S C R I P T I O N
T h i s s e c t i o n c o n t a i n s a c o o r d i n a t e d s y s t e m i n w h i c h r e q u i r e m e n t s f o r m a t e r i a l s s p e c i f i e d i n o t h s c t i o n s s h o w n a r e i d e n t i f i e d b y a b b r e v i a t e d m a t e r i a l n a m e s a n d f i n i s h c o d e s i n t h e r o o m f i n i h c h e d u l e o r s h o w n f o r o t h e r l o c a t i o n
M
N U F A C T U R E R
M a n u f a c t u r e r s t r a d e n a m e s a n d n u m b e r s u s e d h e r e i n a r e o n l y t o i d e n t i f y c o l o r s f i n i s h e s t e x t u r n d p a t t e r n s
P r o d u c t s o f o t h e r m a n u f a c t u r e r s e q u i v a l e n t t o c o l o r s f i n i s h e s t e x t u r e s a n d p a t t e r f m a n u f a c t u r e r s l i s t e d t h a t m e e t r e q u i r e m e n t s o f t e c h n i c a l s p e c i f i c a t i o n s w i l l b e a c c e p t a b l e u p p p r o v a l i n w r i t i n g b y c o n t r a c t i n g o f f i c e r f o r f i n i s h r e q u i r e m e n t
U B M I T A
S u b m i t i n a c c o r d a n c e w i t h
S E C T I O N
S H O P
D R A W I N G S
P R O D U C T
D A T A
A N D
S A M P L E S p r o v i q a d r u p l i c a t e s a m p l e s f o r c o l o r a p p r o v a l o f m a t e r i a l s a n d f i n i s h e s s p e c i f i e d i n t h i s s e c t i o
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
P L I C A B L E
P U B L I C A T I O
P u b l i c a t i o n s l i s t e d b e l o w f o r m a p a r t o f t h i s s p e c i f i c a t i o n t o t h e e x t e n t r e f e r e n c e d
P u b l i c a t i o e r e f e r e n c e d i n t e x t b y b a s i c d e s i g n a t i o n o n l
B
M A S T E R
P A I N T I N G
I N S T I T U T E
M P
A r c h i t e c t u r a l
P a i n t i n g
S p e c i f i c a t i o n
M a n u l
R T
P R O D U C
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
D I V I S I O N
W O O D
P L A S T I C S
A N D
C O M P O S I T
D
S I G N E R
N O T E
I n c l u d e i t e m s o n l y w h e n e x p o s e d t o v i e w
S E C T I O N
R O U G H
C A R P E N T
Y t m
F n i l
S E C T I O N
F L A S H I N G
A N D
S H E E T
M E T t e r i n i p i n g p p a i n l e s s s t e u m i n
S E C T I O N
J O I N T
S E A L A N c a t i l n u f a c t u r n u f a c t u r e r
C o l s o n r y
E x p a n s i o n
J o i n
U
C o n t r o l
J o i n e c a s t
C o n c r e t e
P a n e w t o
E x i s t i n g
W a l i l d i n g
E x p a n s i o n
J o i n
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i s o n r y
S e a l e d
J o i n o n e
S e a l e d
J o i n
V I S I O N
O P E N I N G
S E C T I O N
H O L L O W
M E T A L
D O O R S
A N D
F R A M
P a i n t b o t h s i d e s o f d o o r a n d f r a m e s s a m e c o l o r i n c l u d i n g f e r r o u s m e t a l l o u v e r s a n d h a r d w a t a c h e d t o d o m p o n e l o r o f
P a i n t
T y p e a n d
G l o a
W n d o w f r a
S E C T I O N
I N T E R I O R
W O O D
D O O m p o n e n i s h C o l o a m
S E C T I O N
A C C E S S
D O O R S
A N D
F R A M t e r i n i s h C o l e a i n l e s s s t e
S E C T I O N
C O I L I N G
C O U N T E R
D O O
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i c a t i t e r i n i n u f a c t u r n u f a c t u r e r
C o l m e N
S I G N E R
N O T E
U s e f o r o p e n i n g o f m m f e e t h i g h o r l e s s a m m f e e t w i d e o r l e s
S E C T I O N
D o o r s
A C C O R D I A N
F O L D I N G
D O O c a t i m p o n e n i n u f a c t u r n u f a c t u r e r
C o l m e N
S E C T I O N
A L U M I N U M F R A M E D
E N T R A N C E S
A N D
S T O R E F R O N t e r i n i n u f a c t u r n u f a c t u r e r
C o l m e N u m i n a
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
S E C T I O N
B U I L D E R S
H A R D W A t e r i n i
H n g o r
C l o s e o o r
C l o s e o o r
P i v o t
S e o s e r
H o l d o o r
S t o o r
H o l d e c k
L a t c h
K y
C a b i n e m o r
P l a t t a s t c k
M o p
P l a t t a s t o r
E d g i x i t
D e v i u s h
B o l o r
P u l s h
P l a t m b i n a t i o n
P u s h
P u l l
P l a o r d i n a t o g h t
P r o o f
S e a a t h e r
S t r r e s h o
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
S E C T I O N
G L A Z I a z i n g
T y n u f a c t u r g
C o l o r
N a m e N
V I S I O N
F I N I S H
S E C T I O N
I N T I
M P I
G l o s s a n d
S h e e n
S t a n d a r o s s e e n o s s
L e v e r a d i t i o n a l m a t t e f i n i s h f l x u n i t s a x u n i o s s
L e v e i g h s i d e s h e e n f l a t a v e l v e t l i k x u n i t s a n i u n i o s s
L e v e r a d i t i o n a l e g g s h e l l l i k e f i n i u n i t s a u n i o s s
L e v e s a t i n l i k e f i n i u n i t s a n u n i o s s
L e v e r a d i t i o n a l s e m i g l o u n i
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i o s s
L e v e l a t r a d i t i o n a l g l o u n i o s s l e v e i g h g l o s s m o r e t h a n u n i
P a i n t c o o n u f a c t u r g
C o l o r
N a m e N
S t a i n
C o d e o s s a n d
T r a n s p a r e n n u f a c t u r g
C o l o r
N a m e N
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i a q
C l e a r c o a t i n d e C o n u f a c t u r g
C o l o r
N a m e N
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i
S E C T I O N
W A
D
D O O R
P R O T E C T I t e r i n u f a c t u r g
C o l o r
N a m e N r n e r
G u a r l l
G u a r d s a n d
H a n d r a l l
G u a o r
F r a m e
P r o t e c t i
N I S H
S C H E D U L E
M I S C E L L A N E O U S
A B B R E V I A T I O b b r e v i a t i c e s s
F l o o r i c o r d i o n
F o l d i r t i t i o u s t i c a l
C e i l i o u s t i c a l
C e i l i n e c i a l
F a c
S o u s t i c a l
M e t a l
P i l i o u s t i c a l
W a l l
P a n o u s t i c a l
W a e a t m e o u s t i c a l
W a l l c o v e r i o d i z e d
A l u m i n l o r o d i z e d
A l u m i n t u r a l
F i n i k e d
O n
E n a m i c k
F a i c k
F l o o r i i c k
P a v i r p r p e t
A t h l e t o o r i r p e t
M o d u l e
T i r a m i c
G l a z e d
F a c i i k r a m i c
M o s a i c
T i n c r e n c r e t e
M a s o n r y
U n
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i v i d e r
S t r i p s
M a r b o x y
C o a t i o x y
R e s i n
F l o o r i i s t i p o s e d
D i v i d e r
S t r i
X t e r i t e r i o r
F i n i s h
S y s t t e r i o r
P a i
T t e r i o r
S t a
T b r i c
W a l l c o v e r i c i n g
T i a t u r e
S t r i o o r
M a t s
F r a m o o r
T i l e
M o s a u o r o c a r b l d i n g
P a n e l
P a r t i t i o t
G r i l a s s
M a s o n r y
U n a z e d
F a c e
C a z e d
S t r u c t u r c i n g
T i a n i p s u m
W a l l b o a g h
G l a z e d
C o a t i t e x
M a s t i c
F l o o r i n e a r
M e t a l
C e i l i n e a r
W o o d
C e i l i r b t e r i r t l t i C o l o r
C o a t i t u r a l
F i n i i v e r
T i r f o r a t e d
M e t a l
F a c i i l e o r
P a n e l a s t a s t e r
H i g h
S t r e n g a s t e r
K e e n e
C e m e a s t i c
L a m i n a l y p r o p y l e n e
F a b r l l c o v e r i r c e l a i n
P a v e r
T i
Q a r r y
T i
Q d i a n t
C e i l i n g
P a n s t s i l i e n t
S t a i r
T r e b b e r
B a b b e r
T i l e
F l o o r i a n d r e l
G l a a o n e
F l o o r i
M C
T a m p a
U p g r a d e
F a c i l i t y
P h y s i c a l
S e c u r i t y
P r o j e c t
N o
T M M m p a
V A M C
T a m p a
F l o r i r u c t u r a l
C l s p e n s i o n
D e c o r a t i v i i r r a z z o
P o r t l a m e r r a z z o
T i r r a z z o
T h i n
S x t u r e d
G y p s u m
C e i l i n x t u r e d
M e t a l
C e i l i n i n s e t
T e r r a z z n e e r
P l a s t n y l
B a n y l
C o a t e d
F a b r l l c o v e r i n y l
C o m p o s i t i o n
T i n y l
S h e e t
F l o o r i n y l
S h e e t
F l o o r i e l d e d
S e a m l l
B o r d
F I N I S H
S C H E D U L E
S Y M B O m b o l
D e f i n i t i m e f i n i s h a s a d j o i n i n g w a l c o l o r r e q u i r i s t i m a t c h e x i s t i i s t i n g f i n i s h t o r e m a m o v
R O O M
F I N I S H
S C H E D U
M a t c h a d j o i n i n g o r e x i s t i n g s i m i l a r s u r f a c e s c o l o r s t e x t u r e s o r p a t t e r n s w h e r e d i s t u r b e d o r d a m a g b a l t e r a t i o n s o r n e w w o r k w h e n n o t s c h e d u l e
E
N
D
Tampa VAMC, Tampa, Florida 06-18
09 22 16 - 1
SECTION 09 22 16
NON-STRUCTURAL METAL FRAMING
This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories for the screw attachment of gypsum board, plaster bases or other building boards.
1.2 RELATED WORK
A. Load bearing framing: Section 05 40 00, COLD-FORMED METAL FRAMING.
B. Support for wall mounted items: Section 05 50 00, METAL FABRICATIONS.
C. Pull down tabs in steel decking: Section 05 36 00, COMPOSITE METAL
DECKING.
D. Ceiling suspension systems for acoustical tile or panels and lay in gypsum board panels: Section 09 51 00, ACOUSTICAL CEILINGS// Section 09
29 00, GYPSUM BOARD.
1.3 TERMINOLOGY
A. Description of terms shall be in accordance with ASTM C754, ASTM C11, ASTM C841 and as specified.
B. Underside of Structure Overhead: In spaces where steel trusses or bar joists are shown, the underside of structure overhead shall be the underside of the floor or roof construction supported by beams, trusses, or bar joists. In interstitial spaces with walk-on floors the underside of the walk-on floor is the underside of structure overhead.
C. Thickness of steel specified is the minimum bare (uncoated) steel thickness.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Studs, runners and accessories.
2. Hanger inserts.
3. Channels (Rolled steel).
4. Furring channels.
5. Screws, clips and other fasteners.
C. Shop Drawings:
1. Typical ceiling suspension system.
09 22 16 - 2
2. Typical metal stud and furring construction system including details around openings and corner details.
3. Typical shaft wall assembly
4. Typical fire rated assembly and column fireproofing showing details of construction same as that used in fire rating test.
D. Test Results: Fire rating test designation, each fire rating required for each assembly.
1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE
In accordance with the requirements of ASTM C754.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society For Testing And Materials (ASTM)
A641-19.................Zinc-Coated (Galvanized) Carbon Steel Wire
A653/653M-23............Specification for Steel Sheet, Zinc Coated
(Galvanized) or Zinc-Iron Alloy-Coated
(Galvannealed) by Hot-Dip Process.
C11-23..................Terminology Relating to Gypsum and Related
Building Materials and Systems
C635-22.................Manufacture, Performance, and Testing of Metal
Suspension System for Acoustical Tile and
Lay-in Panel Ceilings
C636-19.................Installation of Metal Ceiling Suspension
Systems for Acoustical Tile and Lay-in Panels
C645-18.................Non-Structural Steel Framing Members
C754-20.................Installation of Steel Framing Members to
Receive Screw-Attached Gypsum Panel Products
C841-23.................Installation of Interior Lathing and Furring
C954-22.................Steel Drill Screws for the Application of
Gypsum Panel Products or Metal Plaster Bases to
Steel Studs from 0.033 in. (0.84 mm) to 0.112
1n. (2.84 mm) in Thickness
E580-22.................Application of Ceiling Suspension Systems for
Acoustical Tile and Lay-in Panels in Areas
Requiring Moderate Seismic Restraint.
PART 2 - PRODUCTS
09 22 16 - 3
2.1 PROTECTIVE COATING
Galvanize steel studs, runners (track), rigid (hat section) furring channels, "Z" shaped furring channels, and resilient furring channels, with coating designation of G40 or equivalent.
2.2 STEEL STUDS AND RUNNERS (TRACK)
A. ASTM C645, modified for thickness specified and sizes as shown.
1. Use C 645 steel, 0.75 mm (0.0296-inch) minimum base-metal (30 mil).
2. Runners same thickness as studs.
3. Exception: Members that can show certified third party testing with gypsum board in accordance with ICC ES AC86 (Approved May 2012) need not meet the minimum thickness limitation or minimum section properties set forth in ASTM C 645. The submission of an evaluation report is acceptable to show conformance to this requirement. Use C
645 steel, 0.48mm (0.019 inch) minimum base-metal (19 mil).
B. Provide not less than two cutouts in web of each stud, approximately
300 mm (12 inches) from each end, and intermediate cutouts on approximately 600 mm (24-inch) centers.
C. Doubled studs for openings and studs for supporting concrete backer-board.
D. Studs 3600 mm (12 feet) or less in length shall be in one piece.
E. Shaft Wall Framing:
1. Conform to rated wall construction.
2. C-H Studs or C-T Studs.
3. E Studs.
4. J Runners.
5. Steel Jamb-Strut.
2.3 FURRING CHANNELS
A. Rigid furring channels (hat shape): ASTM C645.
B. Resilient furring channels:
1. Not less than 0.45 mm (0.0179-inch) thick bare metal.
2. Semi-hat shape, only one flange for anchorage with channel web leg slotted on anchorage side, channel web leg on other side stiffens fastener surface but shall not contact anchorage surface other channel leg is attached to.
C. "Z" Furring Channels:
1. Not less than 0.45 mm (0.0179-inch)-thick base metal, with 32 mm
(1-1/4 inch) and 19 mm (3/4-inch) flanges.
2. Web furring depth to suit thickness of insulation.
09 22 16 - 4
D. Rolled Steel Channels: ASTM C754, cold rolled; or, ASTM C841, cold rolled.
2.4 FASTENERS, CLIPS, AND OTHER METAL ACCESSORIES
A. ASTM C754, except as otherwise specified.
B. For fire rated construction: Type and size same as used in fire rating test.
C. Fasteners for steel studs thicker than 0.84 mm (0.033-inch) thick. Use
ASTM C954 steel drill screws of size and type recommended by the manufacturer of the material being fastened.
D. Clips: ASTM C841 (paragraph 6.11), manufacturer’s standard items.
Clips used in lieu of tie wire shall have holding power equivalent to that provided by the tie wire for the specific application.
E. Concrete ceiling hanger inserts (anchorage for hanger wire and hanger straps): Steel, zinc-coated (galvanized), manufacturers standard items, designed to support twice the hanger loads imposed and the type of hanger used.
F. Tie Wire and Hanger Wire:
1. ASTM A641, soft temper, Class 1 coating.
2. Gage (diameter) as specified in ASTM C754 or ASTM C841.
G. Attachments for Wall Furring:
1. Manufacturers standard items fabricated from zinc-coated
(galvanized) steel sheet.
2. For concrete or masonry walls: Metal slots with adjustable inserts or adjustable wall furring brackets. Spacers may be fabricated from
1 mm (0.0396-inch) thick galvanized steel with corrugated edges.
H. Power Actuated Fasteners: Type and size as recommended by the manufacturer of the material being fastened.
2.5 SUSPENDED CEILING SYSTEM FOR GYPSUM BOARD (OPTION)
A. Conform to ASTM C635, heavy duty, with not less than 35 mm (1-3/8 inch) wide knurled capped flange face designed for screw attachment of gypsum board.
B. Wall track channel with 35 mm (1-3/8 inch) wide flange.
PART 3 - EXECUTION
3.1 INSTALLATION CRITERIA
A. Where fire rated construction is required for walls, partitions, columns, beams and floor-ceiling assemblies, the construction shall be same as that used in fire rating test.
B. Construction requirements for fire rated assemblies and materials shall be as shown and specified, the provisions of the Scope paragraph (1.2)
09 22 16 - 5 of ASTM C754 and ASTM C841 regarding details of construction shall not apply.
3.2 INSTALLING STUDS
A. Install studs in accordance with ASTM C754, except as otherwise shown or specified.
B. Space studs not more than 610 mm (24 inches) on center.
C. Cut studs 6 mm to 9 mm (1/4 to 3/8-inch) less than floor to underside of structure overhead when extended to underside of structure overhead.
D. Where studs are shown to terminate above suspended ceilings, provide bracing as shown or extend studs to underside of structure overhead.
E. Extend studs to underside of structure overhead for fire, rated partitions, smoke partitions, shafts, and sound rated partitions and insulated exterior wall furring.
G. Openings:
1. Frame jambs of openings in stud partitions and furring with two studs placed back to back or as shown.
2. Fasten back to back studs together with 9 mm (3/8-inch) long Type S pan head screws at not less than 600 mm (two feet) on center, staggered along webs.
3. Studs fastened flange to flange shall have splice plates on both sides approximately 50 X 75 mm (2 by 3 inches) screwed to each stud with two screws in each stud. Locate splice plates at 600 mm (24 inches) on center between runner tracks.
H. Fastening Studs:
1. Fasten studs located adjacent to partition intersections, corners and studs at jambs of openings to flange of runner tracks with two screws through each end of each stud and flange of runner.
2. Do not fasten studs to top runner track when studs extend to underside of structure overhead.
I. Chase Wall Partitions:
1. Locate cross braces for chase wall partitions to permit the installation of pipes, conduits, carriers and similar items.
2. Use studs or runners as cross bracing not less than 63 mm (2-1/2 inches wide).
J. Form building seismic or expansion joints with double studs back to back spaced 75 mm (three inches) apart plus the width of the seismic or expansion joint.
K. Form control joint, with double studs spaced 13 mm (1/2-inch) apart.
09 22 16 - 6
3.3 INSTALLING WALL FURRING FOR FINISH APPLIED TO ONE SIDE ONLY
A. In accordance with ASTM C754, or ASTM C841 except as otherwise specified or shown.
B. Wall furring-Stud System:
1. Framed with 63 mm (2-1/2 inch) or narrower studs, 600 mm (24 inches) on center.
2. Brace as specified in ASTM C754 for Wall Furring-Stud System or brace with sections or runners or studs placed horizontally at not less than three foot vertical intervals on side without finish.
3. Securely fasten braces to each stud with two Type S pan head screws at each bearing.
C. Direct attachment to masonry or concrete; rigid channels or "Z" channels:
1. Install rigid (hat section) furring channels at 600 mm (24 inches) on center, horizontally or vertically.
2. Install "Z" furring channels vertically spaced not more than 600 mm
(24 inches) on center.
3. At corners where rigid furring channels are positioned horizontally, provide mitered joints in furring channels.
4. Ends of spliced furring channels shall be nested not less than
200 mm (8 inches).
5. Fasten furring channels to walls with power-actuated drive pins or hardened steel concrete nails. Where channels are spliced, provide two fasteners in each flange.
6. Locate furring channels at interior and exterior corners in accordance with wall finish material manufacturers printed erection instructions. Locate "Z" channels within 100 mm (4 inches) of corner.
D. Installing Wall Furring-Bracket System: Space furring channels not more than 400 mm (16 inches) on center.
3.4 INSTALLING SUPPORTS REQUIRED BY OTHER TRADES
A. Provide for attachment and support of electrical outlets, plumbing, laboratory or heating fixtures, recessed type plumbing fixture accessories, access panel frames, wall bumpers, wood seats, toilet stall partitions, dressing booth partitions, urinal screens, chalkboards, tackboards, wall-hung casework, handrail brackets, recessed fire extinguisher cabinets and other items like auto door buttons and auto door operators supported by stud construction.
09 22 16 - 7
B. Provide additional studs where required. Install metal backing plates, or special metal shapes as required, securely fastened to metal studs.
3.5 INSTALLING SHAFT WALL SYSTEM
A. Conform to UL Design No. U438 for two-hour fire rating. Provide one hour fire rating Shaft wall if indicated on the drawings.
B. Position J runners at floor and ceiling with the short leg toward finish side of wall. Securely attach runners to structural supports with power driven fasteners at both ends and 600 mm (24 inches) on center.
C. After liner panels have been erected, cut C-H studs and E studs, from 9 mm (3/8-inch) to not more than 13 mm (1/2-inch) less than floor-to-ceiling height. Install C-H studs between liner panels with liner panels inserted in the groove.
D. Install full-length steel E studs over shaft wall line at intersections, corners, hinged door jambs, columns, and both sides of closure panels.
E. Suitably frame all openings to maintain structural support for wall:
1. Provide necessary liner fillers and shims to conform to label frame requirements.
2. Frame openings cut within a liner panel with E studs around perimeter.
3. Frame openings with vertical E studs at jambs, horizontal J runner at head and sill.
F. Elevator Shafts:
1. Frame elevator door frames with 0.87 mm (0.0341-inch) thick J strut or J stud jambs having 75 mm (three-inch) long legs on the shaft side.
2. Protrusions including fasteners other than flange of shaft wall framing system or offsets from vertical alignments more than 3 mm
(1/8-inch) are not permitted unless shown.
3. Align shaft walls for plumb vertical flush alignment from top to bottom of shaft.
3.6 INSTALLING FURRED AND SUSPENDED CEILINGS OR SOFFITS
A. Install furred and suspended ceilings or soffits in accordance with
ASTM C754 or ASTM C841 except as otherwise specified or shown for screw attached gypsum board ceilings and for plaster ceilings or soffits.
1. Space framing at 400 mm (16-inch) centers for metal lath anchorage.
2. Space framing at 600 mm (24-inch) centers for gypsum board anchorage.
09 22 16 - 8
B. New exposed concrete slabs:
1. Use metal inserts required for attachment and support of hangers or hanger wires with tied wire loops for embedding in concrete.
2. Furnish for installation under Division 3, CONCRETE.
3. Suspended ceilings under concrete rib construction shall have runner channels at right angles to ribs and be supported from ribs with hangers at ends and at 1200 mm (48-inch) maximum intervals along channels. Stagger hangers at alternate channels.
C. Concrete slabs on steel decking composite construction:
1. Use pull down tabs when available.
2. Use power activated fasteners when direct attachment to structural framing can not be accomplished.
D. Where bar joists or beams are more than 1200 mm (48 inches) apart, provide intermediate hangers so that spacing between supports does not exceed 1200 mm (48 inches). Use clips, bolts, or wire ties for direct attachment to steel framing.
E. Existing concrete construction exposed or concrete on steel decking:
1. Use power actuated fasteners either eye pin, threaded studs or drive pins for type of hanger attachment required.
2. Install fasteners at approximate mid height of concrete beams or joists. Do not install in bottom of beams or joists.
F. Steel decking without concrete topping:
1. Do not fasten…