This document is a Statement of Work (SOW) for the James A. Haley VA Hospital Upgrade Security Phase II Project (No. 673-18-617). The project involves installing and integrating a new Personal Identity Verification (PIV) and Physical Access Control System (PACS) in Building 1, including replacement of selected doors and equipment. The scope includes professional services, equipment, labor, and specialty services to upgrade the facility's security infrastructure, with a performance period of 365 days.

The project is a pre-solicitation set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with a project magnitude between $1,000,000 and $2,000,000. Specific technical requirements include installing Software House CCure 9000 version 3.0, Wavelynx PIV card readers, supervised door contacts, and 15-second delayed egress systems. Contractors must comply with VA security, safety, and records management regulations, possess OSHA training, and follow strict infection control and asbestos handling protocols. The anticipated solicitation posting date is March 27, 2025, with the contract to be awarded through the Department of Veterans Affairs, Network Contracting Office 08.

View the file

Other files

File Type Posted
36C24825R0066 0001.pdf PDF
Davis Bacon Wage Determination FL20250208 dtd 14 Mar 2025.txt TXT text file
DIVISIONAL BREAKDOWN SHEET.docx DOCX document
EMR.docx DOCX document
36C24825R0066_15_Apr_2025.pdf PDF
RFP Attachment Past Performance Questionaire.doc DOC document
852.222-71, Compliance with Executive Order 13899. DEVIATION APR 2025 - 1 Page.docx DOCX document
NARA RM Contract Language Clause.docx DOCX document
Instruction to Offerors.docx DOCX document
PIV Reader Spec.pdf PDF
36C24825R0066 Pre Sol Posted 10 Mar 2025.docx DOCX document
Specifications Vol 1 Physical Security phase II.pdf PDF
Specifications Vol 2 Physical Security phase II.pdf PDF
36C24825R0066.docx DOCX document
Drawings.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

James A. Haley VA Hospital

Upgrade Security Phase II

Project No. 673-18-617

STATEMENT OF WORK

PROJECT # 673-18-617

I. SCOPE OF WORK:

A. Furnish all necessary professional services, equipment, labor materials, supervision, tools, testing, and specialty services (i.e. Industrial

Hygienist, Asbestos Contractor, etc.) to perform the NRM Project #673-

18-617, " Upgrade Security Phase II " at the James A. Haley VA Hospital, located at 13000 Bruce B. Downs Boulevard, Tampa, Florida, 33612. The work includes, but is not limited to site investigation, review and adherence to the design and specification, and the installation and integration of a new Personal Identity Verification (PIV) and Physical

Access Control System(PACS) on selected doors in BLDG 1 as described and identified in the project description in this SOW and project documentation. The Contractor Team is to include subcontractors performing professional services under this contract, shall perform its services consistent with the professional skill and care ordinarily provided by architects/engineers practicing in the same or similar locality under the same or similar circumstances. The Contractor Team shall perform its services as expeditiously as is consistent with such professional skill and care and the orderly progress of the project. The

Period of performance is 365 days.

B. Project Description: Provide contract services to install and integrate a new Personal Identity Verification (PIV), Physical Access Control System

(PACS), and replacement of selected doors and equipment as required by the project design documents. The basis of design utilized the latest version of the Physical Security and Resiliency Design Manual. Elements of the project are:

• Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.

• The Contractor is required to review and adhere to all specifications in volume 1 and 2 and is responsible for developing the scope of installation to be executed in a manner that is in-line with the project documents.

• The Contractor shall review all aspects of the design drawings and adhere to all notes, drawings, and component schedules. All activities related to a certain space has been assigned a task number, if in multiple parts, in the task number alpha suffix. These task numbers have been placed on floorplans and in the Door, Frame and Hardware schedule and in the project task summary. The designer used the task numbers as the unifying identifier for project work.

• The Contractor Team should be prepared to create a work plan for each door task to allow the VA to understand the contractors’ requirements to complete the installation. An ILSM, PCRA and ICRA will be created from this information.

• The Contractor Team installation to include the following security equipment: Software House CCure series; iStar Ultra line controllers.

• The controllers will be housed in new NEMA 4 boxes matching the existing camera installation.

• Contractor is required to install power requirements as per drawings provided and all cable pathways will be in conduit w/security fittings.

• The Contractor Team shall utilize Software House CCure 9000 version

3.0.

• The Contractor Team shall furnish and install the model type:

Wavelynx ET20-3PS non keypad or Wavelynx ET25-3PS Keypad 200-bit

PIV class readers as appropriate at the designated card reader locations. This information may conflict with design notes. All PIV locations shall be field verified with the COR.

• The Contractor Team shall evaluate the task areas prior to construction to determine if utilities or any other objects will need to be relocated or addressed in the design. The Contractor

Team shall also review the as–Built drawings and the site drawings for the areas affected.

• The Contractor Team shall show a detailed containment plan for infection control for this design. This plan shall be detailed showing locations and what infection control requirements are to be used for each area. The HPMs for Safety and Infection Control will be provided to the D/B Team for their use. Construction barriers will be required for the duration of the construction to isolate patients and staff from dust, debris and construction hazards as determined by the Safety Officer and Infection Control representatives. The D/B Team will also have to indicate these construction barriers on their drawings.

• The Contractor Team shall provide isolated UL listed power supplies that meet or exceed the rated loads for the locking hardware as

• required. The load should not exceed 80% of the circuit. The

Contract team shall submit a shop drawing for review.

• The Contractor shall be prepared to provide necessary composite cable from the head end to the PIV readers with enough conductors to support the use of two readers at one door opening.

• The Contract Team shall install supervised door contacts and 15 second delayed egress at the affected doors. Components should be similar in functionality as the model IEXDA12/24 manufactured by

ASSA ABLOY.

• The Contractor Team must be prepared to supply manpower in which the workers have completed an OSHA-approved asbestos training program, which covers topics such as asbestos hazards, safety procedures, and personal protective equipment (PPE). Workers must wear a respirator with a High Efficiency Particulate Air (HEPA) filter, which is designed to capture 99.97% of particles as small as 0.3 microns.

• Workers must wear disposable, asbestos-resistant clothing, including coveralls, gloves, head covering, goggles or face shield to protect from asbestos fibers.

• The work area must be sealed off from the surrounding environment using plastic sheeting and tape to prevent asbestos fibers from spreading. Negative Air Pressure: A negative air pressure system must be used to prevent asbestos fibers from escaping the containment area.

• The Contractor Team will be required to schedule and lead weekly progress meetings with the VA staff.

E. COMPLIANCE

• The contractor shall be fully responsible for compliance with all

VA, local, state, and Federal occupational safety laws, rules, and regulations.

• The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients.

• The contractor is responsible for meeting all applicable OSHA and

VA guidelines for safe working procedures.

• All work for the duration of the contract shall be performed by certified trained technicians.

F.CONTRACTOR EMPLOYEES

Contractor personnel shall present a neat appearance and be easily recognized as contract employees. Example: wearing steel toe boots and safety glasses ID badges and or name tags.

G.CONTRACTOR EMPLOYEE IDENTIFICATION

All contractor employees must be clearly identified as contractors (not

VA employees) when performing services under this contract. This includes visual (appearance), verbal (phone), and electronic (email). The contractor must provide all employees with a contractor identification

(ID) badge at the contractor’s expense prior to performing work under this contract. Contractor employees are always required to display this badge when performing services under this contract.

Employees released from service by the contractor must have their badge collected by the contractor. All badges must contain an expiration date and photograph of the employee.

All contractor employees must also be required to wear VA issued badges and must always display these badges while in the performance of this contract and/or as instructed by the COR.

The contractor supervisor must ensure that all contractor employees display their VA issued badges.

The contractor supervisor must be responsible for managing all VA issued badges provided to contractor employees and immediately collect these badges from employees no longer working on the contract.

H.CONTRACTOR EMPLOYEE CONDUCT

• The contractor is completely responsible for all actions and conduct of their employees. Contractor employees must be well-groomed and neat in appearance.

• Contract employees must be professional in attire and must not wear any offensive clothing.

• Contractor employees must conduct themselves in a socially acceptable manner appropriate for an office work environment; Loudness, vulgarity, rudeness, smoking, or other similar offensive conduct by a contractor employee may be grounds for denying the employee further access to VA premises.

• Contractor employees must not consume alcohol or illegal drugs during working hours or at any other time the employees are performing work under this contract.

I.CONTRACTOR RESPONSIBILITY

• The contractor shall obtain all necessary licenses and/or permits as required to perform this work.

• He/she shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.

• He/she shall be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees’ fault or negligence, and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of Florida.

• Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there from.

K.CONTRACT AWARD MEETING:

• The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a Kickoff Meeting or advised the contractor that a kickoff meeting is waived.

L.PERIOD OF PERFORMANCE:

• This shall be a firm-fixed price contract. The Period of performance is

365 days. Warranty period for the installation and repair will be provided as part of the original contract documents for the project.

M. CHANGES TO THE Statement of Work

• Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder with all other products of the project. Costs incurred by the contractor through the actions of parties other than CO shall be borne by the contractor.

N. Performance Requirements:

• Contractor shall provide the necessary personnel and equipment to meet or exceed required service. Contractor shall have the following responsibilities:

• Provide licensed and trained personnel to perform the project in the

State of Florida.

• Provide all supervision, labor and materials to complete all requirements described in this SOW.

• Contractor shall obtain all necessary licenses and permits required to perform this work required by this SOW, with each having completed the

Occupational Safety & Health Administration (OSHA) approved 10-hour

Construction Outreach Training or General Industry Outreach Training.

• Contractor shall take all precautions necessary to protect persons and property from injury and/or damage during performance of this contract.

• Contractor shall be responsible for any injury to their employees as well as for any damages to personnel or Government property that occurs during the performance of this contract that is caused by the

Contractor’s fault or negligence.

• Contractor shall insure that all areas where equipment is serviced under this contract are left in a clean, neat and orderly condition.

• Contractors shall have technical training and evident track records of working experience in Nurse Call and related components in healthcare, industrial, educational, or commercial facilities for a minimum of five

(5) years.

• Contractors shall possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work safely, effectively, and timely. Tools, equipment, and PPE shall comply with

OSHA Standard 29 CFR 1910, (Subpart I), and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable

• Arrange and pay for all proper disposal of waste and debris.

• Maintain project schedule agreed upon in the purchase order documents.

• Provide all OSHA site safety for each employee during work.

• Contractor employees shall have background checks completed.

O.DELIVERABLES

• The Contractor shall perform the services necessary to complete the tasks in accordance with the procedures described in a timely and professional manner, consistent with industry standards, at the location, place and time that the VA has set aside, and all in accordance with the SOW and RFP documents.

• Contactor shall provide a copy of the inspection document used (field report) on the day of each performed inspection.

R.ROLES AND RESPONSIBILITIES:

• Contracting Officer (CO) - A person duly appointed with the authority to enter, administer and terminate contracts on behalf of the Government. The CO is the only person who can legally commit the

Government and only the CO, as the Government's agent, can modify the contract/order. The CO is the final authority for determining the adequacy of the Contractor's performance. CO decisions arising under or relating to the contact are final.

• Contracting Officer's Representative (COR) — An individual designated in writing by the CO to perform specific technical and administrative functions within the scope and limitations of their written appointment (e.g., surveillance of Contractor's performance, accept services). The COR is not empowered to make any contractual commitments or authorize any changes to the order/contract or in any way obligate additional funds by the Government; such authority' rests solely with the CO. The COR’s primary duty is to monitor the

Contractor's performance by physically checking to see that tasks are completed, reports are submitted, and desired outcomes are achieved. When a surveillance observation results in an unacceptable evaluation, the COR will report the unacceptable performance to the

COR. The COR is not authorized to direct work, offer advice on how the work should be performed, change the contract, or in any way obligate payment of funds by the Government.

U. SECURITY CLAUSES:

With No Sensitive Data but Requires Training

VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE

VA INFORMATION CUSTODIAL LANGUAGE:

a. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

b. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation

(FAR) part 12.

c. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.

d. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and

Preparedness is responsible for these policies and procedures.

SECURITY INCIDENT INVESTIGATION:

a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the

COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.

b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident

(including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.

c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.

d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.

LIQUIDATED DAMAGES FOR DATA BREACH:

a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.

However, it is the policy of VA to forgo collection of liquidated damages in the event the contractor provides payment of actual damages in an amount determined to be adequate by the agency.

b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident

Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.

SECURITY CONTROLS COMPLIANCE TESTING:

On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all of the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working-days’ notice, at the request of the government, the contractor must fully cooperate and assist in a government-sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector

General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by

VA in the event of a security incident or at any other time.

TRAINING:

a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete VA

Privacy and Information Security Awareness and Rules of Behavior

Training before being granted access to VA information and its systems.

i. Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Rules of Behavior before being granted access to VA information and its systems.

b. The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required.

c. Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.

The Certification and Accreditation (C&A) requirements do not apply and a Security Accreditation Package is not required for this SOW.

All Contractor, Pharmaceutical Company Representative (PCR), and

Healthcare Industry Representatives (HIR) will coordinate with

Contracting Officer Representative for instructions so they are in compliance with James A. Haley Veterans’ Hospital policies listed on the JAHMC Document Management Center share point site:

HPM NO. 90-25; HEALTHCARE VENDOR ACCESS AND COMPETENCY

HPM NO. 132-04; SECURITY MANAGEMENT PROGRAM

HPM NO. 132-05; HOSPITAL IDENTIFICATION PROGRAM

HPM NO. 11-91; PHARMACEUTICAL COMPANY REPRESENTATIVES

HIR are required to report to MSDU (Room GC-003), immediately after entering the facility. HIR will be required to sign into the monitoring system and print a badge for proper identification. . The Healthcare

Industry Representatives for Nutrition and Food Services, Office of

Information and Technology, and Social Work Services are in included in this policy; vendors (HIR) for Pharmacy Services are to follow (HPM 11-

91) policy. HIR must be sponsored by a physician, a Service Chief, or their designee, for a specified date and a specified case. HIR are not permitted in patient care areas or clinics unless a prior appointment has been made.

Pharmaceutical Company Representative (PCR) refers to anyone acting on behalf of a pharmaceutical company or its business partners for the purpose of promoting the use of items managed under the VA formulary process. These items primarily include drugs, but to a lesser extent also include any medical supplies, nutritional supplements, and similar commodities managed under the VA formulary process.

a. Sign-In: PCRs may visit VA Medical care facilities no earlier than 8:00 a.m. and stay no later than 3:30 p.m., Monday through Friday, unless they receive prior approval from both the Chief of the

Service that they will be visiting and the Chief of Pharmacy.

Representatives visiting the JAHVH must sign in at the Pharmacy

Administrative Office (Located in Trailer 78) and wear a visitor’s badge as well as their company’s personal name badge while in the hospital.

Vendors: Reference Hospital Memorandum Policy Number 90-25 Healthcare

Vendor Access and Competency.

Contractors and/or project managers: Will be issued a PIV/ID badge in accordance with the facility PIV Policy. Contactors will contact their assigned VA Contracting Officer Representative (COR) for coordination.

Contract Personnel/Sub-Contractors: Contractors are responsible for the daily accountability and identification of all personnel assigned to their respective contract including sub-contractors. Contractors will identify personnel using the following procedures as appropriate.

Construction Project contract personnel will report to the contractor for issuance of a temporary self-adhesive identification badge. This badge will be issued on a daily basis and must include the following information: Company name, project number, date and name of individual. Contractor will maintain a daily log of all personnel.

Contract personnel not involved in an actual construction project will report to police dispatch for issuance of a numbered badge. A driver’s license or photo ID will be required each day upon entering the facility, in exchange for the badge, and will be given back once the badge is returned to police dispatch. The contractor will provide

Police Service with a list of names for all sub-contract personnel requiring access to the facility. It is the responsibility of the contractor to update the list as necessary.

NPR OPC; CBOCs and Off-site Lease facilities with VA Police staffing:

As above with check-in with VA Police.

Off-site Lease facilities w/o VA Police staffing: Coordinate with COR, Administrative Officer, or Service Point of Contact.

NARA Records Management

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records

Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy

Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the

Government are Federal records subject to the provisions of 44

U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act

(FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5

U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with

Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. James A Haley Veterans’ Hospital and Clinics and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of James A. Haley

Veterans’ Hospital and Clinics or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

a. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to

James A. Haley Veterans’ Hospital and Clinics. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting

Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the

[contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the

Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to James A. Haley Veterans’ Hospital and Clinics control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph

(4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and James A. Haley Veterans’

Hospital and Clinics guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with James A. Haley Veterans’ Hospital and Clinics policy.

8. The Contractor shall not create or maintain any records containing any non-public James A. Haley Veterans’ Hospital and Clinics information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy

Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The James A. Haley Veterans’ Hospital and Clinics owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S.

Government for which James A Haley Veterans’ Hospital and Clinics shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take

VHA-provided records management training, Talent Management System

(TMS) Item #4192704, Records Management for Everyone. The

Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]

D. Flowdown of requirements to Subcontractors

The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

-END-