Specifications Vol 1 NOSC NYC WCR.pdf
PDF 27 MB Posted
- Solicitation number
- N4008521R2552
About this file
This solicitation is for design-build renovation and repair work at the Naval Operation Support Center in the Bronx, New York City. The project involves renovating approximately 68,000 square feet of administrative spaces, classrooms, medical spaces, fitness rooms, drill halls, storage rooms, toilet rooms, and vehicle maintenance facilities. Work will be completed in phases to allow partial use of the facility during drill weekends. Temporary administration, classrooms, and toilet/shower facilities will be provided for full-time personnel. The solicitation number is N40085-21-R-2552. The magnitude of construction is estimated between $10 million and $25 million. The NAICS code is 236220 for commercial and institutional building construction, with a small business size standard of $39.5 million. The issuing agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTROLLED
DISTRIBUTION STATEMENT F. Further dissemination only as directed by Portsmouth Naval Shipyard, NAVFAC (December 3, 2018) or higher DoD authority.
NAVFAC MIDLANT, Public Works Department, Maine eProjects Work Order No.: 1145580 WIS/MAXIMO Work Order No.: 4974515
SPECIFICATIONS
WHOLE CENTER REPAIR
At
Navy Operational Support Center (NOSC) New York City, New York
Volume 1 of 2
PREPARED BY:
NAVFAC Midlant PWD ME Building 59
Portsmouth Naval Shipyard Kittery, Maine 03801-2032
REQUEST FOR PROPOSAL PREPARED BY:
Architectural: Scott Donovan, R.A. Mechanical: Christine Lyle, P.E.
Civil: Jacques L. Gagnon, Jr., P.E. Electrical: Ketan Shah, P.E.
Structural: David N. Martin, P.E., S.E. Fire Protection: Laura E. Clebak, P.E.
Geotechnical: N/A Estimating: Oak Point Associates
Submitted By: Peter F. Dunn, P.E. Signature Date: March 10, 2017
Approved By PME: Jeff Hoyt, P.E. Signature Date:
Design Manager: Donald Driver, R.A. Signature Date:
Peter F. Dunn, P.E. Digitally signed by Peter F. Dunn, P.E.
Date: 2020.10.23 13:53:08 -04'00'
DRIVER.DONALD.R.1103234278 Digitally signed by DRIVER.DONALD.R.1103234278 Date: 2020.11.13 10:40:31 -05'00'
HOYT.JEFFREY.F.1248273310 Digitally signed by HOYT.JEFFREY.F.1248273310 Date: 2020.11.13 16:53:52 -05'00'
WHOLE CENTER REPAIR, NOSC NEW YORK CITY, BRONX, NEW YORK 1145580
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 41 00 BID SCHEDULES
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00.00 22 WORK RESTRICTIONS (PWD ME)
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES (PWD ME)
01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 31 23.13 22 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 16.00 22 CONSTRUCTION PROGRESS SCHEDULES (PWD ME)
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 22 GOVERNMENT SAFETY REQUIREMENTS (PWD ME)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL (PWD ME)
01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS (AOR)
01 58 00 PROJECT IDENTIFICATION
01 74 19.00 22 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT (PWD ME)
01 75 00 STARTING AND ADJUSTING
01 78 00.00 22 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 22 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS (PWD
ME AOR)
02 83 13.00 20 LEAD IN CONSTRUCTION (PWD ME AOR)
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 01 32 CONCRETE REHABILITATION FOR CIVIL WORKS
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
05 72 00 DECORATIVE METAL SPECIALTIES
PROJECT TABLE OF CONTENTS Page 1
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) AND QUARTZ AGGLOMERATE
FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 23 00 SPRAYED POLYURETHANE FOAM (SPF) INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS (PATCHING AND
REPAIR)
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING (REPAIR, PATCHING
AND ROOFTOP EQUIPMENT CURBS)
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 55 00 SECURITY WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 23.13 SAFETY FILMS
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPETING
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 11 - EQUIPMENT
PROJECT TABLE OF CONTENTS Page 2
11 66 53 GYMNASIUM DIVIDER CURTAIN
DIVISION 12 - FURNISHINGS
12 66 00 TELESCOPIC CHAIR PLATFORM
DIVISION 14 - CONVEYING EQUIPMENT
14 24 10 VERTICAL WHEELCHAIR LIFTS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 52 46.00 20 LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR
OUTPUT)
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED WATER PIPING SYSTEMS
23 82 00.00 20 TERMINAL HEATING UNITS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 31 00 SOLAR PHOTOVOLTAIC (PV) COMPONENTS [OPTION 1]
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 23 00.00 22 EXCAVATION AND FILL (PWD ME)
31 32 11 SOIL SURFACE EROSION CONTROL
PROJECT TABLE OF CONTENTS Page 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 12 10 BITUMINOUS TACK COATS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 16 13 CONCRETE SIDEWALKS
32 17 23.00 20 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NAVFAC PWD ME
NO. DWG NO. DWG NO. TITLE
G-001 12741286 NF-17-326 VOLUME 1 COVER SHEET AND PROJECT LOCATION
MAPS
G-002 12741287 NF-17-327 LIST OF DRAWINGS
G-003 12741288 NF-17-328 ABBREVIATIONS, GENERAL NOTES, GENERAL
SYMBOLS, AND STANDARD MOUNTING HEIGHTS
G-004 12741289 NF-17-329 PHASING PLANS FIRST AND SECOND FLOOR
G-005 12741290 NF-17-330 PHASING PLAN BASEMENT FLOOR
G-101 12741291 NF-17-331 CODE INFORMATION
G-102 12741292 NF-17-332 BASEMENT FLOOR EGRESS AND FIRE RATING PART
PLANS - AREAS A AND B
G-103 12741293 NF-17-333 BASEMENT FLOOR EGRESS AND FIRE RATING PART
PLAN - AREA C
G-104 12741294 NF-17-334 FIRST FLOOR EGRESS AND FIRE RATING PART
PLAN - AREA B
G-105 12741295 NF-17-335 FIRST FLOOR EGRESS AND FIRE RATING PART
PLANS - AREAS C AND D
G-106 12741296 NF-17-336 FIRST FLOOR EGRESS AND FIRE RATING PART
PLAN - AREA E
G-107 12741297 NF-17-337 SECOND FLOOR EGRESS AND FIRE RATING PART
PLANS - AREAS B AND C
G-108 12741298 NF-17-338 SECOND FLOOR EGRESS AND FIRE RATING PART
PLAN - AREA D
HM101 12741299 NF-17-339 BASEMENT FLOOR HAZARDOUS MATERIALS REMOVALS
PLAN
HM102 12741300 NF-17-340 FIRST FLOOR AND SECOND FLOOR HAZARDOUS
MATERIALS REMOVALS PLANS
C-001 12741301 NF-17-341 CIVIL NOTES, LEGEND AND ABBREVIATIONS
TD101 12741302 NF-17-342 TEMPORARY FACILITIES REMOVALS PLAN
TS101 12741303 NF-17-343 TEMPORARY FACILITIES SITE PLAN
TU101 12741304 NF-17-344 TEMPORARY FACILITIES UTILITY PLAN
TA101 12741305 NF-17-345 TEMPORARY BUILDINGS FLOOR PLANS
DOCUMENT 00 01 15 Page 1
DRAWING NAVFAC PWD ME
NO. DWG NO. DWG NO. TITLE
CD101 12741306 NF-17-346 REMOVALS SITE PLAN
CS101 12741307 NF-17-347 SITE PLAN
CU101 12741308 NF-17-348 UTILITY PLAN
CG101 12741309 NF-17-349 GRADING PLAN
C-301 12741310 NF-17-350 EAST-WEST SECTION THROUGH FIRE PUMP
BUILDING AND EXISTING RETAINING WALL GUARD
RAIL REPAIRS
C-501 12741311 NF-17-351 EROSION AND SEDIMENT CONTROL NOTES AND
DETAILS
C-502 12741312 NF-17-352 SITE DETAILS 1
C-503 12741313 NF-17-353 SITE DETAILS 2
C-504 12741314 NF-17-354 SITE DETAILS 3
C-505 12741315 NF-17-355 SITE DETAILS 4
C-506 12741316 NF-17-356 SITE DETAILS 5
C-507 12741317 NF-17-357 REMOVAL OF PUMP BUILDING AND PARKING LOT
EXPANSION [OPTION 4]
S-001 12741318 NF-17-358 STRUCTURAL NOTES
S-002 12741319 NF-17-359 GENERAL NOTES, DESIGN LOADS AND
ABBREVIATIONS
SD101 12741320 NF-17-360 PARTIAL FOUNDATION AND SECOND FLOOR FRAMING
REMOVALS PLANS AND DETAILS
SB101 12741321 NF-17-361 PARTIAL FOUNDATION PLANS AND DETAILS
SB501 12741322 NF-17-362 FOUNDATION DETAILS
SF101 12741323 NF-17-363 PARTIAL SECOND FLOOR FRAMING PLAN AND
DETAILS
SF102 12741324 NF-17-364 EXISTING ROOF FRAMING PLAN, PARTIAL
FRAMING PLANS AND DETAILS
SF103 12741325 NF-17-365 MECHANICAL EQUIPMENT SUPPORT FRAMING
PLAN AND DETAILS
SF104 12741326 NF-17-366 ROOF REINFORCEMENT PART PLANS
SF105 12741327 NF-17-367 PHOTOVOLTAIC PANEL ARRAY SUPPORT FRAME AND
DETAILS [OPTION 1]
SF501 12741328 NF-17-368 PHOTOVOLTAIC PANEL ARRAY SUPPORT FRAME
DETAILS [OPTION 1] AND CANOPY DETAILS
SF502 12741329 NF-17-369 STRUCTURAL DETAILS
AD101 12741330 NF-17-370 BASEMENT FLOOR REMOVALS PART PLANS - AREAS
A AND B
AD102 12741331 NF-17-371 BASEMENT FLOOR REMOVALS PART PLAN - AREA C
AD103 12741332 NF-17-372 FIRST FLOOR REMOVALS PART PLAN - AREA B
AD104 12741333 NF-17-373 FIRST FLOOR REMOVALS PART PLAN - AREA C
AD105 12741334 NF-17-374 FIRST FLOOR REMOVALS PART PLANS - AREAS D
AND E AND EXTERIOR ELEVATION REMOVALS
AD106 12741335 NF-17-375 SECOND FLOOR REMOVALS PART PLANS - AREAS B
AND C
AD107 12741336 NF-17-376 SECOND FLOOR REMOVALS PART PLAN - AREA D
AD120 12741337 NF-17-377 ROOF REMOVALS PLAN
AD401 12741338 NF-17-378 ENLARGED REMOVALS FLOOR PART PLANS
DOCUMENT 00 01 15 Page 2
NO. DWG NO. DWG NO. TITLE
AD701 12741339 NF-17-379 BASEMENT FLOOR REFLECTED CEILING REMOVALS
PART PLANS - AREAS A AND B
AD702 12741340 NF-17-380 BASEMENT FLOOR REFLECTED CEILING REMOVALS
PART PLAN - AREA C AND FIRST FLOOR
REFLECTED CEILING REMOVALS PART PLAN -
AREA B
AD703 12741341 NF-17-381 FIRST FLOOR REFLECTED CEILING REMOVALS PART
PLAN - AREA C
AD704 12741342 NF-17-382 FIRST FLOOR REFLECTED CEILING REMOVALS PART
PLANS - AREAS D AND E
AD705 12741343 NF-17-383 SECOND FLOOR REFLECTED CEILING REMOVALS
PART PLANS - AREAS B AND C
AD706 12741344 NF-17-384 SECOND FLOOR REFLECTED CEILING REMOVALS
PART PLAN - AREA D
AD901 12741345 NF-17-385 PUMP BUILDING REMOVALS [OPTION 4]
AE001 12741346 NF-17-386 WALL TYPES
AE002 12741347 NF-17-387 WALL AND FIRESTOPPING DETAILS
AE101 12741348 NF-17-388 BASEMENT FLOOR PART PLANS - AREAS A AND B
AE102 12741349 NF-17-389 BASEMENT FLOOR PART PLAN - AREA C
AE103 12741350 NF-17-390 FIRST FLOOR PART PLAN - AREA B
AE104 12741351 NF-17-391 FIRST FLOOR PART PLAN - AREA C
AE105 12741352 NF-17-392 FIRST FLOOR PART PLANS - AREAS D AND E
AE106 12741353 NF-17-393 SECOND FLOOR PART PLANS - AREAS B AND C
AE107 12741354 NF-17-394 SECOND FLOOR PART PLAN - AREA D
AE120 12741355 NF-17-395 ROOF PLAN
AE121 12741356 NF-17-396 ROOF DETAILS
AE301 12741357 NF-17-397 PARTIAL BUILDING SECTION AND DETAILS
AE401 12741358 NF-17-398 ENLARGED AUDITORIUM FLOOR PLAN
AE402 12741359 NF-17-399 ENLARGED FIRST FLOOR PART PLAN AND INTERIOR
ELEVATIONS
AE403 12741360 NF-17-400 ENLARGED PLATFORM LIFT FLOOR PLANS,
SECTION AND DETAILS
AE404 12741361 NF-17-401 ENLARGED EXTERIOR STAIR AND ROOF CANOPY
PLANS AND DETAILS
AE405 12741362 NF-17-402 ROOF CANOPY DETAILS
AE406 12741363 NF-17-403 ENLARGED TOILET ROOM FLOOR PLANS, INTERIOR
ELEVATIONS AND TOILET ACCESSORY SCHEDULE
AE407 12741364 NF-17-404 ENLARGED TOILET ROOM FLOOR PLANS, INTERIOR
ELEVATIONS, AND STANDARD MOUNTING HEIGHTS
AE408 12741365 NF-17-405 ENLARGED TOILET ROOM FLOOR PLANS AND
INTERIOR ELEVATIONS - 1
AE409 12741366 NF-17-406 ENLARGED TOILET ROOM FLOOR PLANS AND
INTERIOR ELEVATIONS - 2
AE501 12741367 NF-17-407 PLAN DETAILS - 1
AE502 12741368 NF-17-408 PLAN DETAILS - 2
AE510 12741369 NF-17-409 STAIR PLANS
AE511 12741370 NF-17-410 GUARDRAIL AND HANDRAIL DETAILS
AE580 12741371 NF-17-411 CASEWORK DETAILS 1
AE581 12741372 NF-17-412 CASEWORK DETAILS 2
DOCUMENT 00 01 15 Page 3
NO. DWG NO. DWG NO. TITLE
AE601 12741373 NF-17-413 DOOR SCHEDULE
AE602 12741374 NF-17-414 DOOR DETAILS
AE640 12741375 NF-17-415 ROOM FINISH SCHEDULE
AE641 12741376 NF-17-416 COLOR KEY/MANUFACTURER GUIDE AND DETAILS
AE642 12741377 NF-17-417 FLOOR PATTERNS AND DETAILS
AE701 12741378 NF-17-418 BASEMENT FLOOR REFLECTED CEILING PART
PLANS - AREAS A AND B
AE702 12741379 NF-17-419 BASEMENT FLOOR REFLECTED CEILING PART PLAN
- AREA C AND FIRST FLOOR REFLECTED CEILING
PART PLAN - AREA B
AE703 12741380 NF-17-420 FIRST FLOOR REFLECTED CEILING PART PLAN -
AREA C
AE704 12741381 NF-17-421 FIRST FLOOR REFLECTED CEILING PART PLANS -
AREAS D AND E
AE705 12741382 NF-17-422 SECOND FLOOR REFLECTED CEILING PART PLANS -
AREAS B AND C
AE706 12741383 NF-17-423 SECOND FLOOR REFLECTED CEILING PART PLAN -
AREA D
AE801 12741384 NF-17-424 SIGNAGE SCHEDULE AND DETAILS
G001A 12741385 NF-17-425 VOLUME 2 COVER SHEET AND PROJECT LOCATION
MAPS
G002A 12741386 NF-17-426 VOLUME 2 LIST OF DRAWINGS
P-001 12741387 NF-17-427 PLUMBING LEGENDS, ABBREVIATIONS AND
GENERAL NOTES
PD101 12741388 NF-17-428 BASEMENT FLOOR PLUMBING REMOVALS PART PLAN
- AREA A
PD102 12741389 NF-17-429 BASEMENT FLOOR PLUMBING REMOVALS PART PLANS
- AREAS B AND C
PD103 12741390 NF-17-430 FIRST FLOOR PLUMBING REMOVALS PART PLAN -
AREA C
PD104 12741391 NF-17-431 SECOND FLOOR PLUMBING REMOVALS PART PLAN -
AREA C
PD401 12741392 NF-17-432 MECHANICAL ROOM G1 PLUMBING REMOVALS PART
PLAN - AREA C
PD402 12741393 NF-17-433 ENLARGED FIRST AND SECOND FLOOR PLUMBING
REMOVALS PART PLAN
P-401 12741394 NF-17-434 ENLARGED PLUMBING PART PLANS 1
P-402 12741395 NF-17-435 ENLARGED PLUMBING PART PLANS 2
P-403 12741396 NF-17-436 ENLARGED PLUMBING PART PLANS 3
P-404 12741397 NF-17-437 BASEMENT PLUMBING PART PLANS - AREA C
P-405 12741398 NF-17-438 ENLARGED FIRST FLOOR PLUMBING PART PLANS
P-406 12741399 NF-17-439 ENLARGED UNDERSLAB/BASEMENT AND SECOND
FLOOR PLUMBING PART PLANS
P-407 12741400 NF-17-440 ENLARGED PLUMBING PART PLANS AND PARTIAL
RISER DIAGRAMS - CENTER
P-501 12741401 NF-17-441 PLUMBING DETAILS
P-601 12741402 NF-17-442 PLUMBING SCHEDULES
DOCUMENT 00 01 15 Page 4
NO. DWG NO. DWG NO. TITLE
P-701 12741403 NF-17-443 PLUMBING PARTIAL RISER DIAGRAMS - WEST
P-702 12741404 NF-17-444 SANITARY WASTE AND VENT PIPING PARTIAL
RISER DIAGRAM - EAST
P-703 12741405 NF-17-445 DOMESTIC WATER SUPPLY PIPING PARTIAL RISER
DIAGRAM - EAST
M-001 12741406 NF-17-446 MECHANICAL LEGENDS AND ABBREVIATIONS
MD101 12741407 NF-17-447 BASEMENT FLOOR MECHANICAL REMOVALS PART
PLANS - AREAS A AND B
MD102 12741408 NF-17-448 BASEMENT FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - AREA C
MD103 12741409 NF-17-449 FIRST FLOOR MECHANICAL PIPING REMOVALS PART
PLAN - AREA C
MD104 12741410 NF-17-450 FIRST FLOOR MECHANICAL PIPING REMOVALS PART
PLANS - AREAS D AND E
MD105 12741411 NF-17-451 SECOND FLOOR MECHANICAL PIPING REMOVALS
PART PLAN - AREA C
MD106 12741412 NF-17-452 BASEMENT FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLAN - AREA C
MD107 12741413 NF-17-453 FIRST FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLANS - AREAS C AND E
MD108 12741414 NF-17-454 FIRST FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLANS - AREAS B AND D
MD109 12741415 NF-17-455 SECOND FLOOR MECHANICAL DUCTWORK REMOVALS
PART PLANS - AREAS B AND C
MD110 12741416 NF-17-456 ROOF MECHANICAL REMOVALS PART PLAN - AREA C
MD401 12741417 NF-17-457 MECHANICAL ROOM G1 CHILLED WATER PIPING
REMOVALS PART PLAN - AREA C
MD402 12741418 NF-17-458 MECHANICAL ROOM G1 HEATING WATER PIPING
REMOVALS PART PLAN - AREA C
MH101 12741419 NF-17-459 BASEMENT FLOOR MECHANICAL DUCTWORK PART
PLANS - AREAS A, B AND C
MH102 12741420 NF-17-460 FIRST FLOOR MECHANICAL DUCTWORK PART PLANS
- AREAS B AND D
MH103 12741421 NF-17-461 FIRST FLOOR MECHANICAL DUCTWORK PART PLAN
- AREA C
MH104 12741422 NF-17-462 FIRST FLOOR MECHANICAL DUCTWORK PART PLAN
AND SECTION - AREA E
MH105 12741423 NF-17-463 SECOND FLOOR MECHANICAL DUCTWORK PART PLANS
- AREAS B AND D
MH106 12741424 NF-17-464 SECOND FLOOR MECHANICAL DUCTWORK PART PLAN
- AREA C
MH110 12741425 NF-17-465 ROOF MECHANICAL PART PLANS - AREAS B AND D
MH111 12741426 NF-17-466 ROOF MECHANICAL PART PLAN - AREA C
MP101 12741427 NF-17-467 BASEMENT FLOOR MECHANICAL PIPING PART PLANS
- AREAS A AND B
MP102 12741428 NF-17-468 BASEMENT FLOOR MECHANICAL PIPING PART PLAN
- AREA C
DOCUMENT 00 01 15 Page 5
NO. DWG NO. DWG NO. TITLE
MP103 12741429 NF-17-469 FIRST FLOOR MECHANICAL PIPING PART PLANS -
AREA C
MP104 12741430 NF-17-470 BASEMENT AND FIRST FLOOR MECHANICAL PIPING
PART PLANS - AREA D
MP105 12741431 NF-17-471 SECOND FLOOR MECHANICAL PIPING PART PLANS -
AREAS B AND D
MP106 12741432 NF-17-472 SECOND FLOOR MECHANICAL PIPING PART PLAN -
AREA C
M-401 12741433 NF-17-473 MECHANICAL ROOM G1 CHILLED WATER PIPING
PART PLAN - AREA C
M-402 12741434 NF-17-474 MECHANICAL ROOM G1 HEATING WATER PIPING
PART PLAN - AREA C
M-501 12741435 NF-17-475 MECHANICAL DETAILS 1
M-502 12741436 NF-17-476 MECHANICAL DETAILS 2
M-503 12741437 NF-17-477 MECHANICAL DETAILS 3
M-504 12741438 NF-17-478 MECHANICAL DETAILS 4
M-601 12741439 NF-17-479 MECHANICAL SCHEDULES 1
M-602 12741440 NF-17-480 MECHANICAL SCHEDULES 2
M-603 12741441 NF-17-481 MECHANICAL SCHEDULES 3
M-604 12741442 NF-17-482 MECHANICAL VENTILATION SCHEDULES
M-701 12741443 NF-17-483 CONTROL SYSTEM ARCHITECTURE AND SCHEDULES
M-702 12741444 NF-17-484 MECHANICAL CONTROL DIAGRAMS 1
M-703 12741445 NF-17-485 MECHANICAL CONTROL DIAGRAMS 2
M-704 12741446 NF-17-486 MECHANICAL CONTROL DIAGRAMS 3
M-705 12741447 NF-17-487 MECHANICAL CONTROL DIAGRAMS 4
M-706 12741448 NF-17-488 MECHANICAL CONTROL DIAGRAMS 5
M-707 12741449 NF-17-489 MECHANICAL CONTROL DIAGRAMS 6
M-801 12741450 NF-17-490 BASEMENT FLOOR RECOMMISSIONING PART PLANS -
AREAS A AND B [OPTION 3]
M-802 12741451 NF-17-491 BASEMENT FLOOR RECOMMISSIONING PART PLAN -
AREA C [OPTION 3]
M-803 12741452 NF-17-492 FIRST FLOOR RECOMMISSIONING PART PLANS -
AREAS B AND D [OPTION 3]
M-804 12741453 NF-17-493 FIRST FLOOR RECOMMISSIONING PART PLANS -
AREAS C AND E [OPTION 3]
M-805 12741454 NF-17-494 SECOND FLOOR RECOMMISSIONING PART PLANS -
AREAS B AND D [OPTION 3]
M-806 12741455 NF-17-495 SECOND FLOOR RECOMMISSIONING PART PLAN -
AREA C [OPTION 3]
FX001 12741456 NF-17-496 FIRE SUPPRESSION LEGENDS, NOTES AND
ABBREVIATIONS
FD101 12741457 NF-17-497 BASEMENT FLOOR FIRE SUPPRESSION REMOVALS
PART PLANS - AREAS A AND B
FD102 12741458 NF-17-498 BASEMENT FLOOR FIRE SUPPRESSION REMOVALS
PART PLAN - AREA C
FD103 12741459 NF-17-499 FIRST FLOOR FIRE SUPPRESSION REMOVALS PART
PLAN - AREA B
FD104 12741460 NF-17-500 FIRST FLOOR FIRE SUPPRESSION REMOVALS PART
PLAN - AREA C
DOCUMENT 00 01 15 Page 6
NO. DWG NO. DWG NO. TITLE
FD105 12741461 NF-17-501 FIRST FLOOR FIRE SUPPRESSION REMOVALS PART
PLANS - AREAS D AND E
FD106 12741462 NF-17-502 SECOND FLOOR FIRE SUPPRESSION REMOVALS PART
PLAN - AREA B
FD107 12741463 NF-17-503 SECOND FLOOR FIRE SUPPRESSION REMOVALS PART
PLANS - AREAS C AND D
FX101 12741464 NF-17-504 BASEMENT FLOOR FIRE SUPPRESSION PART PLANS
- AREAS A AND B
FX102 12741465 NF-17-505 BASEMENT FLOOR FIRE SUPPRESSION PART PLAN -
AREA C
FX103 12741466 NF-17-506 FIRST FLOOR FIRE SUPPRESSION PART PLAN -
AREA B
FX104 12741467 NF-17-507 FIRST FLOOR FIRE SUPPRESSION PART PLAN -
AREA C
FX105 12741468 NF-17-508 FIRST FLOOR FIRE SUPPRESSION PART PLANS -
AREAS D AND E
FX106 12741469 NF-17-509 SECOND FLOOR FIRE SUPPRESSION PART PLAN -
AREA B
FX107 12741470 NF-17-510 SECOND FLOOR FIRE SUPPRESSION PART PLANS -
AREAS C AND D
FX401 12741471 NF-17-511 FIRE PUMP AND ENCLOSURE PLAN, ELEVATION
AND SCHEDULE
FA101 12741472 NF-17-512 BASEMENT FLOOR FIRE ALARM PART PLANS -
AREAS A AND B
FA102 12741473 NF-17-513 BASEMENT FLOOR FIRE ALARM PART PLAN - AREA
C
FA103 12741474 NF-17-514 FIRST FLOOR FIRE ALARM PART PLAN - AREA B
FA104 12741475 NF-17-515 FIRST FLOOR FIRE ALARM PART PLAN - AREA C
FA105 12741476 NF-17-516 FIRST FLOOR FIRE ALARM PART PLANS - AREAS D
AND E
FA106 12741477 NF-17-517 SECOND FLOOR FIRE ALARM PART PLAN - AREA B
FA107 12741478 NF-17-518 SECOND FLOOR FIRE ALARM PART PLANS - AREAS
C AND D
FA401 12741479 NF-17-519 FIRE PUMP ENCLOSURE FIRE ALARM PLAN, RISER
DIAGRAM AND MATRIX
FA501 12741480 NF-17-520 FIRE ALARM RISER DIAGRAM AND MATRIX
E-001 12741481 NF-17-521 ELECTRICAL SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
ES101 12741482 NF-17-522 ELECTRICAL SITE PLAN
ED101 12741483 NF-17-523 BASEMENT FLOOR ELECTRICAL REMOVALS PART
PLANS - AREAS A AND B
ED102 12741484 NF-17-524 BASEMENT FLOOR ELECTRICAL REMOVALS PART
PLAN - AREA C
ED103 12741485 NF-17-525 FIRST FLOOR ELECTRICAL REMOVALS PART
PLANS - AREAS B AND D
ED104 12741486 NF-17-526 FIRST FLOOR ELECTRICAL REMOVALS PART PLAN -
AREA C
DOCUMENT 00 01 15 Page 7
NO. DWG NO. DWG NO. TITLE
ED105 12741487 NF-17-527 FIRST FLOOR ELECTRICAL REMOVALS PART PLAN -
AREA E
ED106 12741488 NF-17-528 SECOND FLOOR ELECTRICAL REMOVALS PART PLANS
- AREAS B AND C
ED107 12741489 NF-17-529 SECOND FLOOR ELECTRICAL REMOVALS PART PLAN
- AREA D
ED108 12741490 NF-17-530 ELECTRICAL REMOVALS ROOF PLAN
EP101 12741491 NF-17-531 BASEMENT FLOOR POWER PART PLANS - AREAS A
AND B
EP102 12741492 NF-17-532 BASEMENT FLOOR POWER PART PLAN - AREA C
EP103 12741493 NF-17-533 FIRST FLOOR POWER PART PLANS - AREAS B
AND D
EP104 12741494 NF-17-534 FIRST FLOOR POWER PART PLAN - AREA C
EP105 12741495 NF-17-535 FIRST FLOOR POWER PART PLAN - AREA E
EP106 12741496 NF-17-536 SECOND FLOOR POWER PART PLANS - AREAS B
AND C
EP107 12741497 NF-17-537 SECOND FLOOR POWER PART PLAN - AREA D
EP108 12741498 NF-17-538 ELECTRICAL ROOF PLAN
EP501 12741499 NF-17-539 ELECTRICAL ONE-LINE DIAGRAM
EP601 12741500 NF-17-540 PANELBOARD SCHEDULES 1
EP602 12741501 NF-17-541 PANELBOARD SCHEDULES 2
EP603 12741502 NF-17-542 PANELBOARD SCHEDULES 3
EP604 12741503 NF-17-543 PANELBOARD SCHEDULES 4
EP605 12741504 NF-17-544 PANELBOARD SCHEDULES 5
EP606 12741505 NF-17-545 PANELBOARD SCHEDULES 6
EP607 12741506 NF-17-546 PANELBOARD SCHEDULES 7
EL101 12741507 NF-17-547 BASEMENT FLOOR LIGHTING PART PLAN - AREA A
EL102 12741508 NF-17-548 BASEMENT FLOOR LIGHTING PART PLAN - AREA C
EL103 12741509 NF-17-549 FIRST FLOOR LIGHTING PART PLANS - AREAS
B AND D
EL104 12741510 NF-17-550 FIRST FLOOR LIGHTING PART PLAN - AREA C
EL105 12741511 NF-17-551 FIRST FLOOR LIGHTING PART PLAN - AREA E
EL106 12741512 NF-17-552 SECOND FLOOR LIGHTING PART PLANS - AREAS B
AND C
EL107 12741513 NF-17-553 SECOND FLOOR LIGHTING PART PLAN - AREA D
EL701 12741514 NF-17-554 LIGHTING FIXTURE SCHEDULE AND DETAILS
EL702 12741515 NF-17-555 LIGHTING FIXTURE DETAILS
ET101 12741516 NF-17-556 BASEMENT FLOOR TECHNOLOGY PART PLANS -
AREAS A AND B
ET102 12741517 NF-17-557 BASEMENT FLOOR TECHNOLOGY PART PLAN -
AREA C
ET103 12741518 NF-17-558 FIRST FLOOR TECHNOLOGY PART PLANS -
AREAS B AND D
ET104 12741519 NF-17-559 FIRST FLOOR TECHNOLOGY PART PLAN - AREA C
ET105 12741520 NF-17-560 FIRST FLOOR TECHNOLOGY PART PLAN - AREA E
ET106 12741521 NF-17-561 SECOND FLOOR TECHNOLOGY PART PLANS - AREAS
B AND C
ET107 12741522 NF-17-562 SECOND FLOOR TECHNOLOGY PART PLAN - AREA D
ET501 12741523 NF-17-563 TELECOM ONE-LINE DIAGRAMS AND DETAILS
-- End of Document --
DOCUMENT 00 01 15 Page 8
DOCUMENT 00 41 00
BID SCHEDULES
01/07
PART 1 GENERAL
1.1 BASIS OF BIDS
1.1.1 Options and Unit Prices
This contract will be awarded with options and unit prices required for specifically selected work. A description of the options and schedule of the unit price work is contained in Standard Form 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys."
DOCUMENT 00 41 00 Page 1
Options and Unit Prices Form
N40085-13-R-XXXX
(i) Item 0001: Base Amount
Basis of Bid for Item 0001 shall be the Total Amount for Item 0001, but not including the work indicated or specified to be provided under any Option Item.
Item Description Estimated Unit Unit Price Amount Quantity
0001a All work complete in 1 Job LS XXX $_______ accordance with the drawings and specifications but not including the work indicated or specified under 0001b.
0001b Remove existing 150 LF $_______ $_______ damaged pipe insulation and provide pipe insulation.
0001c Asbestos containing 150 SF $_______ $_______ boiler insulation.
0001d PCB ballasts. 592 EA $_______ $_______
0001e PCB caulking. 30 LF $_______ $_______
0001f Mercury lamps. 300 EA $_______ $_______
0001g Mercury thermostats. 12 EA $_______ $_______
Total Amount for Item 0001: $_______
In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
DOCUMENT 00 41 00 Page 2
N40085-13-R-XXXX
(ii) Item 0002: Option 1
Option may be exercised at the time of award or within 60 calendar days after award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment. Method for evaluation of bids for award purposes is specified below.
Basis of Bid for Item 0002 shall be the addition of the following work complete:
Provision of all work for a rooftop photovoltaic system.
Item 0002: $_______
If Option is exercised, the contract completion date remains the same.
(iii) Item 0003: Option 2
Option may be exercised at the time of award or within 60 calendar days after award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment. Method for evaluation of bids for award purposes is specified below.
Basis of Bid for Item 0003 shall be the addition of the following work complete:
Replacement of the medical suite electric hot water heater.
Item 0003: $_______
If Option is exercised, the contract completion date remains the same.
(iv) Item 0004: Option 3
Option may be exercised at the time of award or within 60 calendar days after award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment. Method for evaluation of bids for award purposes is specified below.
Basis of Bid for Item 0004 shall be the addition of the following work complete:
Re-commissioning of the existing building HVAC equipment.
Item 0004: $_______
If Option is exercised, the contract completion date remains the same.
DOCUMENT 00 41 00 Page 3
N40085-13-R-XXXX
(v) Item 0005: Option 4
Option may be exercised at the time of award or within 60 calendar days after award by the Contracting Officer. A firm fixed bid price is required for the option. No provision is made for economic price adjustment. Method for evaluation of bids for award purposes is specified below.
Basis of Bid for Item 0005 shall be the addition of the following work complete:
Removal of pump building and parking lot expansion.
Item 0005: $_______
If Option is exercised, the contract completion date remains the same.
The low bidder for purposes of award will be determined as in Clause "FAR 52.217-5, Evaluation of Options," of Section 00200, "Instructions to Bidders."
NOTE: The minimum bid guarantee shall be 100 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005.
NOTE: If the option under Items 0002, 0003, 0004, and 0005 are exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005. Payment Bonds shall reflect 50 percent of the aggregate amount of Items 0001, 0002, 0003, 0004, and 0005. See attached Consent of Surety Form.
-- End of Document --
DOCUMENT 00 41 00 Page 4
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E2114 and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Work Sequencing and Preparation Plan; G
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
The base bid work includes the Whole Center Repair of the Navy Operational Support Center (NOSC) New York City including; the removal of exterior
SECTION 01 11 00 Page 1 concrete stairs and handrails, selective interior partitions, door frames, doors and hardware, ceiling systems, interior finishes, HVAC and electrical equipment; demolition of the one room paint shop adjacent to the vehicle maintenance facility; removal of existing underground fire protection water line; provision of the renovation and modification of the existing quarterdeck, crew lounge, officer heads and other male and female heads; the provision of the renovation and addition of a more formal exterior entranceway on the east façade including reinforced concrete stairs and metal handrails, and an entrance canopy; the provision of relocation of an exterior double door; provision of underground fire protection water line and diesel fire pump and enclosure; provision of roof repairs; provision of the repair and replacement of deteriorated HVAC and electrical equipment; provision of a complete building mechanical ventilation system; provision of the replacement of the existing cast-iron, natural gas-fired boiler and associated heating hot water pumps with two gas-fired boilers each sized for 60 percent of the existing boiler load, heating hot water distribution pumps with variable frequency drives and replacement of hydronic accessories; provision of air conditioning for the drill hall; provision of modifications and additions to the public address systems; provision of removal and replacement of the existing fire alarm system with a fire alarm and mass notification system;
provision of removal and replacement of the existing sprinkler system;
provision of replacement of deteriorated interior finishes, floor finishes, wall painting, and door frame painting throughout the facility;
the provision of an accessible vertical platform lift; the provision of auditorium telescoping seating system and retractable curtain in the drill hall; provision of repair of life safety and egress components throughout the building; the provision of audio-visual equipment; and incidental related work.
Option 1 work at the Navy Operational Support Center (NOSC) New York City includes the provision of a complete and functional rooftop photovoltaic array including; photovoltaic panels, supporting structure, modifications to the existing structural systems, roof penetrations and repairs, electrical equipment, and incidental related work.
Option 2 work at the Navy Operational Support Center (NOSC) New York City includes the provision of the replacement of the existing electric hot water heater serving the Medical Suite with a water heater of the same size and type provided with a thermostatic mixing valve and expansion tank, and connection to the building DDC control system for equipment scheduling for energy savings, and incidental related work.
Option 3 work at the Navy Operational Support Center (NOSC) New York City includes the provision of recommissioning of existing building HVAC equipment not otherwise affected by the work of this project.
Recommissioning shall consist of the Commissioning Agent exercising each piece of equipment - fan coil units, exhaust fans, etc - and documenting that fans operate, valves open and close, dampers operate, current setpoints, etc. The Commissioning Agent shall create a record document of findings highlighting inoperable items, corrective measures taken (i.e.
re-calibration of room temperature sensor), or other findings that building maintenance personnel can use as a basis for maintenance measures, and incidental related work.
Option 4 work at the Navy Operational Support Center (NOSC) New York City includes the provision of removal of the pump building and parking lot expansion and incidental related work.
SECTION 01 11 00 Page 2
1.4.2 Location
The work shall be located at the NOSC New York City, Bronx, NY, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.5 PROJECT SEQUENCING REQUIREMENTS
Provide Work Sequencing and Preparation Plan indicating how the work is to be accomplished and incorporating Government directives. The intent of this Plan is for the Contractor to show the Government that a complete understanding of the project requirements are understood by the Contractor and his/her subcontractors. The Plan shall be carefully prepared and shall include every aspect of the project and how it is to be accomplished with an absolute minimum of disruption to Government operations on the Activity. No work may begin on the project until this plan is reviewed and approved by the Government.
1.6 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
h. Protect nearby waterway (East River) from construction operations.
1.7 OCCUPANCY OF PREMISES
Adjacent buildings and areas in the NOSC building adjacent to the work will be occupied by Government personnel during the performance of the work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of
SECTION 01 11 00 Page 3 procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. While the building(s) is occupied, life safety measures and access to egress components must be maintained.
1.8 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.9 LOCATION OF UNDERGROUND UTILITIES
Verify the location of underground utilities in accordance with Section
01 35 26.00 22 GOVERNMENT SAFETY REQUIREMENTS (PWD ME).
Obtain digging permits prior to start of excavation by contacting the Contracting Officer 15 calendar days in advance. Scan the construction site and floor and roof structures with Ground Penetrating Radar and electromagnetic or sonic equipment, and mark the surface of the ground, paved surface and floor and roof structures where existing underground utilities or utilities encased in floor and roof structures are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated to be removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.9.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.10 GOVERNMENT-COORDINATED WORK
Coordinate the salvage, relocation and storage on site, and reinstallation of display materials in the quarterdeck with the Contracting Officer.
Items shall include, but are not limited to, wall-hung and floor-mounted static displays, wall hung pictures, and moveable display cases and their contents. Coordinate the locations and organization of items with the Contracting Officer or appointed NOSC representative prior to reinstallation.
1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.11.1 NMCI Contractor Access
The NMCI Contractor must be allowed access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place)
SECTION 01 11 00 Page 4 to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NMCI contractor to facilitate joint use of building spaces during the final phases of construction.
After the Contracting Officer has facilitated coordination meetings between the two contractors, the construction contractor must, within one week, incorporate the effort of additional contractor coordination into construction schedule to demonstrate plan for maintaining the contract duration.
1.12 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the storage area located within 1 mile of the construction site.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 5
SECTION 01 14 00.00 22
WORK RESTRICTIONS (PWD ME)
03/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2019) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
Vehicle List; G
1.3 SPECIAL SCHEDULING REQUIREMENTS (AOR)
a. The facility will remain in operation during the entire construction period. The Contractor shall conduct his/her operations so as to cause the least possible interference with normal operations of the Activity.
b. Permission to interrupt any Activity roads, railroads, and/or utility services shall be submitted to the Contracting Officer in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. Coordinate the work with the project sequencing/phasing requirements outlined in Section 01 11 00 SUMMARY OF WORK.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES (AOR)
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations. Keep within the limits of the work and avenues of ingress and egress. Do not enter restricted areas unless required to do so and until cleared for such entry.
SECTION 01 14 00.00 22 Page 1
All Contractors' equipment shall be conspicuously marked for identification.
1.4.1 Subcontractors and Personnel Contacts
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.2 Vehicle List
Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:
a. Make
b. Year
c. Model
d. License number
e. Registered owner
f. Current Base pass expiration date.
1.4.3 Identification Badges and Installation Access
a. Application for and use of badges will be as directed. Obtain access to the installation by submitting the SECNAV 5512/1 form (Attachment A) a minimum of 7 working days in advance for vetting and approval, or by obtaining passes each day from the Station's Pass and Identification/Security Office.
One-day passes, issued through the Station's Pass and Identification Office, will be furnished without charge. Report any instances of lost or stolen badges to the Contracting Officer immediately.
b. All Contractors who possess a Navy Commercial Access Control (NCAC) System Card are required to present a second form of valid ID to the Gate Sentry, if requested, upon arrival at the Installation's Entrance Gate.
All Contractor personnel without CAC cards will need two forms of approved identification for access to the Installation.
See Attachment A for the list of acceptable identification documents.
c. One-Day Passes: Participation in the vetting process is not mandatory, and if the Contractor chooses to not participate in the vetting process, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the vetting process.
SECTION 01 14 00.00 22 Page 2
1.4.4 Identification Badges and Installation Access (NOSC)
Application form and use of badges for access to the NOSC will be as directed by the Contracting Officer.
Furnish a completed EMPLOYMENT ELIGABILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscia.gov/portal/site/uscis by searching or selecting Emplotment Verification Form I-9. Report any instances of lost or stolen badges to the Contracting Officer immediately.
1.5 STATION REGULATIONS
1.5.1 Radiological
1.5.1.1 Radioactive Sources (AOR)
All contracts involving radiation generating devices shall conform to the requirements listed in Section 01 35 26.00 22 GOVERNMENT SAFETY REQUIREMENTS (PWD ME) and U.S. Army Corps of Engineers Safety Manual EM 385-1-1. All requirements are to be submitted to the Contracting Officer at least 14 days prior to commencement of operations involving radiation generating devices. A requirements checklist will be provided by NAVFAC (COTs) Contractor Oversight Technician and also available on PWD Maine website:
https://www.navfac.navy.mil/navfac_worldwide/atlantic/fecs/ mid-atlantic/pwd_maine/about_us/construction.html.
1.5.2 Laser Control
Contractor shall comply with laser safety requirements under 21 CFR 1040 and ANSI 2136.1-1986 for any work under this contract utilizing lasers.
1.5.3 Energy Conservation
In cooperation with Government representatives, the Contractor shall participate in an active program directed toward the efficient use of energy. Government furnished utilities will not be provided for air conditioning of Contractor trailers or office areas.
1.5.4 Fire Prevention (AOR)
Contractor shall familiarize and require all their employees to become familiar with fire prevention regulations within the Station to include the proper method of turning in a fire alarm, storage of flammable and combustible materials and control of combustible waste and trash. Any HOT WORK (welding, burning, grinding, cutting, etc.) requires a HOT WORK PERMIT prior to commencing such work. This permit is obtained from the Station's Fire Department via the Contracting Officer.
1.5.5 Pesticide and Herbicide Control
Contractor shall not apply pesticides nor herbicides unless specifically required by this contract. Where application of pesticides or herbicides is required, provide the submittals required by the specification and obtain written approval prior to any application. Contracting Officer will require review and approval of pesticides or herbicides submittals.
SECTION 01 14 00.00 22 Page 3
1.5.6 Smoking Policy
In accordance with NAVFAC policy, smoking is prohibited inside all buildings and other facilities except those areas specifically identified as smoking areas (e.g., smoking shelters). Smoking is not permitted within 20 feet of air intakes, doorways or windows.
1.6 WORKING HOURS (AOR)
Regular working hours shall consist of a period established by the Contracting Officer between 7 AM and 3:30 PM, Monday through Friday, excluding Government holidays. The regular working hours shall be confirmed with the Contracting Officer.
Work will not be allowed at the Naval Reserve (NOSC's) facilities on "Drill" weekends. The Contractor shall contact the Contracting Officer for specific dates.
1.6.1 Work Outside Regular Hours (AOR)
Work outside regular working hours requires Contracting Officer approval.
Provide written requests fifteen (15) Calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer.
1.7 WORK IN OCCUPIED BUILDING(S)
Work under this contract may be located in an occupied building. Move unfixed furniture away from Contractor's working area as required to perform the work; protect; and replace in original locations upon completion of the work. Leave fixed equipment in place and protect against damage or temporarily disconnect, relocate, protect, and reinstall at completion of work. If determined necessary by the Contracting Officer, the Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work. Allow 15 calendar days after written notification from the Contractor for the Government to relocate Government property.
1.8 UTILITY CUTOVERS AND INTERRUPTIONS
Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays as approved by the Contracting Officer. Conform to procedures required in the paragraph "Work Outside Regular Hours." Anticipated costs shall be included in the bid.
Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
Interruption to Water, Sanitary Sewer, Storm Sewer, Telephone Service, Electric Service, Air Conditioning, Heating, Fire Alarm, Compressed Air, and other utilities shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." This time limit includes time for deactivation and reactivation.
Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the Station's utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the
SECTION 01 14 00.00 22 Page 4 work. The Contractor shall notify the Contracting Officer in writing within 15 calendar days when such operation is required.
1.9 WORK ADJACENT TO AN OVERHEAD CRANE
Provide a minimum vertical clearance of three (3) inches between the highest point of the crane and the lowest overhead obstruction. For buildings where truss sag becomes a factor, increase the clearance as necessary to maintain the minimum required clearance.
The horizontal clearance between the end of the crane and the building columns, knee…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .