Specifications
U.S. Department of Transportation Federal Aviation Administration
LLO VOR
Building Improvements – Siding, Doors, and Paint
Llano, Texas
PREPARED BY: Matthew Felix, AJW-2C15D
DATE: August 18 2021
Table of Contents Table of Contents Summary of Work Scope of Work
SECTION 1 - GENERAL REQUIREMENTS
1.1 VOR temporary shutdown requirements
1.2 Site Location/Access to Work Area
1.3 Contracting Officers Representative (COR)
1.4 Coordination
1.5 Site Inspection
1.6 Sanitary Facilities
1.7 Pre-Construction Meeting
1.8 Field Measurements
1.9 Work Hours
1.10 Project Schedules / Sequence of work
1.11 FAA Holiday Moratorium
1.12 Protection of Existing Property
1.13 Contractor-Furnished Material (CFM)
1.14 Installation
1.15 Asbestos Free Certification / Lead Free Materials
1.16 Cleaning
1.17 Safety – Fall Protection
1.18 Hazardous Material and Safety
1.19 Existing Building Description
1.20 Submittals
SECTION 2 – REQUIREMENTS
2.1 Door Replacement
2.2 Siding Replacement
2.3 Painting …………………………………………………………………………………………………………….19
2.4 Special Contract Requirement: COVID-19 (Construction Only) Appendix A: Photos
The following specifications and advisements constitute the working portion of the contract between the Contractor and the Federal Aviation Administration, an Agency of the Federal Government. The Contracting Officer (CO) assigned to this contract will be the only individual with authority to speak for and contractually bind the FAA. All communications, authorizations, approvals, changes, modifications, etc. involving this contract musr be with and through the CO. Any action not approved by the CO will not bind the FAA.
Summary of Work
1. The demolition of the existing siding for the facility, repairing and replacing any damaged presswood with plywood, install new metal flashing, vapor barrier, ¼” plywood and install new Fiber-cement siding.
2. The demolition of two existing doors and doorframes and installing new lockable doors and door frames per this specification.
3. The complete repainting of all previously painted areas on the inside of the VOR facility, the existing soffit, fascia, bottom of the roof, all roof support beams, and all metal hoods and previously painted equipment mounted on the exterior of the facility with like paint to the satisfaction of the local representative(s).
Scope of Work
The Contractor must provide all labor, materials, and equipment in accordance with the contract provisions, specifications and drawings included herein. The work must include, but not limited to the following:
Door replacement –
1. Remove, cut out and replace (2) deteriorated exterior doors and frames.
2. Notes: Doors and frames must meet or exceed the specifications; general industrial doors are not accepted. The existing doors and frame are not standard size, it is the contractor’s responsibility to obtain and verify the correct dimensions of the new doors prior to ordering and delivering to site.
FAA will NOT be responsible for a wrong door dimensions on project submittals.
3. Paint new doors/frames to match existing and supply new door closures and Best brand 7-pin locksets to match existing.
Siding replacement –
1. Remove existing fiberglass coverage and repair any damaged presswood with ¼” sheets of plywood.
2. Cover exterior walls with a vapor barrier and ¼” marine grade plywood.
3. Inspect wall frame system and repair as needed to match original conditions or better. Contractor to use rust inhibitor on metal frame and replace metal flashing at bottom of exterior walls where plywood is replaced.
4. Sand and grind any exterior roof deck support steel rusted areas and apply rust inhibitor. Paint exterior metal frame where needed to match.
5. Install approved fiber-cement siding system per manufacturer recommendations.
Painting –
i. Scrape and wire brush any loose/peeling/flaking paint for the following areas. Prime and apply two finish coats of approved paint per the requirements.
a. The interior of the entire facility.
b. The soffit, fascia, bottom of the roof, and support beams for the roof.
c. Metal hoods and other previously painted exterior metal surfaces.
SECTION 1 - GENERAL REQUIREMENTS
1.1 VOR temporary shutdown requirements:
A. Completion of the work on this contract will require a temporary shut-down of the facility equipment which must be requested by the FAA 30 days in advance of the planned start of work.
The Contractor must work with the CO & COR as soon as possible after contract award to coordinate a work start date (Notice to Proceed) a minimum of 30 days out to be used for the FAA to request and receive approval of the outage request.
B. When working on site while the VOR is operational, Contractor must abide by operational guidelines as directed by FAA personnel with respect to counterpoise access and vehicle and equipment proximity to the VOR to avoid any potential for signal disruption.
C. Even when sufficient advance notice is received from the Contractor and agreed to at that time, the FAA can make no guarantees for opportunities to proceed with the work. Every effort will be given the contractor to accommodate the work schedule, but some delay could be anticipated.
1.2 Site Location/Access to Work Area
A. Site Location:
The project site is located approximately 9 miles to the Northwest of downtown Llano, TX.
Coordinates (30°47'46.8"N 98°47'14.6"W).
B. Building / Plot Access:
1. The VORTAC building is secured and access inside will only be approved by the facility manager and when escorted by a badged FAA employee.
2. Storage location & parking of contractor materials and vehicles/equipment must be coordinated with the COR during performance of the work in a manner to maintain access to the building by FAA personnel.
3. The FAA reserves the right to stop the work, without any warning, any time if the FAA deems an emergency condition exists.
4. The contractor must keep all vehicles, working equipment and materials within the leased boundaries of the access road and site plot.
5. Security precautions against unauthorized site and building entrance must be maintained.
6. The contractor must confine operations, activities, material storage and employee parking within the facility plot. The Contractor must not deviate from the limits without written permission from the FAA.
1.3 Contracting Officers Representative (COR)
The Contracting Officer (CO) may assign a COR to oversee the work on the project and act as a technical point of contact. A letter dating the COR's responsibilities and authority will be issued when a COR is assigned.
1.4 Coordination
The Contractor, at no expense to the FAA, will procure all construction and working permits required by local and state agencies. Contractor to sequence, coordinate, and integrate installing electrical materials and equipment for efficient flow of work. Coordinate installation and connection of underground and overhead utilities and services, including provisions for electricity-metering components.
A. The Contractor must not take advantage of any apparent error, omission, discrepancy, or ambiguity on the Drawings or Specifications. If any error, omission, discrepancy, or ambiguity is found by the Contractor in the Drawings or Specifications, the Contractor must refer the same to the Contracting Officer (CO) / project engineer prior to beginning work on affected task(s), for interpretation and decision, and such decision must be final.
B. The project engineer and the CO must have the right to correct apparent errors or omissions in the Drawings and Specifications and to make such interpretations, as he / she may deem necessary for the proper fulfillment of the Contract Documents.
C. During the course of the work, should any conflicts, ambiguities, or discrepancies be found that are not addressed or any discrepancies between the Drawings and the Specifications to which the Contractor has failed to call attention before submitting the offer, then the CO will interpret the intent of the Drawings and Specifications and the Contractor hereby agrees to abide by the CO’s interpretation and agrees to carry out the work in accordance with the decision of the CO. In such event, the Contractor will be held to have included in the offer the most proper material and/or method of construction in order to fulfill the intent of the Contract Documents.
1.5 Site Inspection
A. It is recommended that the Contractor perform a field inspection prior to bid submission in order to inform himself/herself of the specific working conditions applicable at the site and to ascertain the correct types/amounts of work to be performed.
B. If the bidder chooses not to visit the site, he will nevertheless be charged with knowledge of conditions that a reasonable inspection would have disclosed.
C. A site visit date will be set up by the Contracting Officer (CO) and the SSC Manager.
Prospective bidders must contact the CO for the date and time.
D. Prior to the start of work, the Contractor must decide to his/her satisfaction that all specifications contained herein are workable and must notify the Contracting Officer of any conflicts.
E. All dimensions and quantities must be determined or verified by the contractor. No claims for extra costs will be allowed because of lack of full knowledge of the existing conditions.
1.6 Sanitary Facilities
Sanitary facilities and water sources are not available at the site. The contractor must provide temporary toilet facilities as required for their workers. Temporary toilet facilities must be of the type approved by the local governing body. The location of the toilet facilities must be as directed by the COR. The unit must be kept clean, stabilized to prevent blow-over, and must be serviced weekly.
1.7 Pre-Construction Meeting
The Contractor must attend a Pre-Construction Meeting prior to starting work at a date and time agreed upon between the contractor and the Contracting Officer (CO).
1.8 Field Measurements
A. The contractor must verify layout information shown on Drawings in relation to actual field conditions and existing structures and utilities.
B. Verify dimensions by field measurements before ordering materials.
1.9 Work Hours
A. Work must be performed during a scheduled workweek of 40 hours, either 4-10s or 5-8s, with exact hours to be agreed upon during the pre-construction meeting.
B. The Contractor must furnish a statement of the number of hours, days, and times to be worked per week along with the number of persons on site.
C. The start and stop times must typically be coordinated with the schedules of the FAA COR or facility personnel providing escort to minimize or prevent the need for overtime work by FAA personnel.
D. Any work outside of this shift will be considered overtime work.
1.10 Project Schedules / Sequence of work
A. The Contractor must prepare a detailed construction schedule for the project. The schedule must be coordinated with the COR and include all milestone activities.
B. Submit the Construction Schedule to the (CO) within ten (10) calendar days after contract award.
1.11 FAA Holiday Moratorium
No work will be scheduled or take place during the week of and the weekend preceding and following the Thanksgiving, Christmas, and New Year’s holidays. Only emergency work to restore critical services to the Facility will be considered and a moratorium waiver must be submitted and approved.
The moratorium period will not be counted against the contract construction duration of the project.
Verify exact dates with CO.
1.12 Protection of Existing Property
A. The Contractor must take all precautions necessary to protect the existing facilities, equipment, buildings, towers, buried and overhead cabling, etc… during the contract.
B. Any areas damaged by the Contractor, his employees, or any subcontractors must be repaired by the Contractor at no additional cost to the Government.
C. Repairs must be approved by the COR and match the original. The Contractor must provide all temporary covers, enclosures, etc..., required to protect the existing facilities.
D. All work must be scheduled and executed without exposing the interior building areas to the effects of inclement weather. The existing building and its contents must be protected against all risks
1.13 Contractor-Furnished Material (CFM)
A. The Contractor must furnish all plant, labor, material and equipment in strict accordance with this specification and the contract drawings. All required materials not specifically listed as Government-Furnished Material (GFM) must be supplied by the Contractor.
B. Contractor must be responsible for verifying the required quantities and comparing this list to the government furnished material.
C. The Contractor must thoroughly review the GFM items noted on the construction drawings to determine what items are supplied as CFM.
D. The use of brand names or approved equal products in this specification does not constitute a requirement that they are the only materials, which meet the specifications in this contract.
They are used as an illustration of known acceptable sources or products. If a brand name product is used in the drawings or Specifications, it should be regarded as a “known acceptable source". The use of the term “known acceptable source” and “brand name or equal” in referencing a specific product or manufacturer is not intended to indicate a preference for the products mentioned, but indicates the quality and characteristics of products that will meet the Government requirements.
E. If the Contractor decides to use a product other than that identified as a “known acceptable source” or “brand name or equal”, the Contractor must provide a submittal for this product.
This does not relieve the Contractor from providing submittals for products or materials required in other sections of this Specification.
1.14 Installation
A. All work and materials must be applied or installed in accordance with the applicable manufacturer’s latest instructions and specifications.
B. Any variations to the instructions or specifications must be called to the COR’s attention prior to application or installation.
1.15 Asbestos Free Certification / Lead Free Materials
A. The Contractor must provide to the Contracting Officer (CO) a signed statement stating that to the best of his/her knowledge; no asbestos-containing building materials were used during the renovation, and modernization of this facility.
B. If the FAA suspects the presence of asbestos, the FAA will sample the suspect material to verify that no asbestos-containing material was utilized. This testing must be performed at the expense of the FAA. If asbestos-containing material is subsequently found during the sampling of the building materials, the Contractor must remove and replace the product or material at his/her expense. In addition, the Contractor must incur the costs of the original testing and/or any re-testing that may be necessary.
C. Lead-free materials will be used in this project. Provide letters of certification for the project at completion, certifying that an only lead-free paint was used.
1.16 Cleaning
A. Working Area: The contractor must keep the working area in a clean and proper condition. All rubbish and waste resulting from the execution of the work must be removed at the end of each day or as directed by the COR.
B. Waste Packing Material: Immediately after unpacking, all packing material, case lumber, excelsior, or other rubbish, flammable or otherwise, must be removed from the building and the premises.
C. Final Clean-Up: Upon completion of work, and before final inspection, the contractor must remove his working tools, equipment, debris, rubbish, and unused materials from the building site.
D. Disposal: Disposal of rubbish, debris, and excess material will be off site at the contractor's expense or as directed by the COR.
1.17 Safety – Fall Protection
Workers working at heights greater than four (4) feet or near an unprotected edge should be protected by a safety net, guardrails, or personal fall arrest / restraint system. The contractor should follow all OSHA regulations and FAA order 3900.63, fall protection program.
1.18 Hazardous Material and Safety
A. The contractor must be responsible for safety on the work site. It is the responsibility of the contractor to eliminate hazards, which may result in tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, etc.
B. The contractor must comply with all safety precautions required by OSHA.
C. The contractor must have two l 5 lb. Class B and C fire extinguishers at the work area through the progress of welding, metal cutting, or any other process involving a spark or fire hazard – see attached EOSH Impacts transmittal for more details.
1.19 Existing Building Description
A. The size of the building is approx. 36’ x 21’ B. The exterior walls were constructed with presswood and covered with vinyl siding.
C. All dimensions listed on this project are approximate and provided to the contractor for estimating purposes only. It is the contractor’s responsibility to verify all dimensions.
1.20 Submittals:
All submittals have to be submitted all together in one package. Submit the following items for approval after contract award:
1. Construction schedule/sequence of work. The schedule must be arranged in a chronological order.
2. Siding replacement plans and specifications.
3. Door manufacturer data including size, rating, and required features
4. Paint manufacturer’s technical data sheet including instructions for its applications and use of the exterior primer, exterior paint, and cone painting materials.
5. Evidence of painter’s qualifications as it is outlined under the painting requirements.
6. Letter of certification to certify that only lead-free paint will be used.
7. Name and number of persons on site must be submitted to the COR/local representative before the starting date.
SECTION 2 – REQUIREMENTS
2.1 Door Replacement
**It is the contractor’s responsibility to take measurements of the doors and make sure the new doors fit, operate, and seal the building**
Exterior doors and frames must have seamless surface and edge finish. Remove and Replace the equipment room and E/G room doors. The following specifications and standards, of the issues currently in force, form a part of this section and are applicable as specified herein:
American Society for Testing and Materials (ASTM) Publication A653:
– General Requirements for Steel Sheet, Zinc-Coated (Galvanized) by the Hot Dip Process
Steel Door Institute (SDI) -100:
- Recommended Specifications Standard Steel Door and Frame
A. Door: New door must be field measured before ordering and custom fabricated if needed to ensure no edge gaps between the door and frame is larger than 1/8” wide installed. The new door must be SDI-100, Grade III, Extra Heavy Duty, 1-3/4”, Model I, Full Flush Design, 16 gage cold rolled steel, galvanized in accordance with ASTM A653. The door must have polyurethane foamed-in-place or laminated core insulation, 20 psi strength, 1.8 pcf density with not more than ½” voids in any direction. The strength of bond between the core and steel face sheet must exceed the strength of the core so that delamination will not occur during operating conditions.
The top edge of the door must be flush and sealed to prevent water from entering inside the core of the door. The interior side of the top edge of the door must be reinforced with additional steel plate welded and ground smooth to the door skin metal as needed to accept mounting hardware and to spread the loads imposed from the safety chain and spring and door holder assemblies referred below. Following fabrication, the doors must receive a baked on rust inhibiting primer applied to all exposed surfaces.
B. Door Quantity: Two doors
C. Door Hardware: The following new hardware must be provided and installed for all new doors.
All metal materials used (including mounting hardware screws/bolts) must be made of stainless steel (SS) if available. If SS is not available for the item and items made of aluminum are to be used, the mounting hardware must be of rust resistant coated carbon steel (or similar aluminum as for the item):
1. Three (3) stainless steel, ball bearing type, tamper proof hinges or a continuous full length hinge of similar construction and features.
2. A stainless steel lockset capable of accepting a FAA Best Lock, 7 pin cylinder core (Best
#83K7A4A-626, or equal). The contractor will not need to supply a lock core but must notify FAA personnel to coordinate core replacement (to be done by FAA personnel) with the door replacement.
3. A safety chain and spring rated at a 200 pound pull installed on the top inside of the door and frame. The chain and spring must be such that when installed, the door will open through an angle of 90 degrees before any stretching or compression of the spring occurs.
4. A door holder/brace must be installed to the inside top of the door. The device must be designed for manual operation (normal position will be defeated – no hold open) and be capable of holding the door in the open position a minimum of 90 degrees in a fifty(50) mph wind with no damage.
5. A fixed, interlocking type exterior weatherseal must be installed along the top of the doors to seal the gap between the door and frame along that edge. This seal must be comprised of a metal piece with a continuous hook and integral seal that is attached to the door and an interlocking angle piece that is attached to the frame. (Zero International Interlocking Watershed, Series #148, Parts #25, #142 and #144, or approved equal).
6. New spring bronze, .009” minimum thickness metal weather-stripping must be installed in the hinge and strike sides of the door frame to seal those gaps. One continuous piece with no joints or gaps must be installed to the frame using countersunk screws. This item may be omitted on the hinge side if a continuous piano type hinge is used for the new doors.
7. Weather-stripping. Install adjustable and spring loaded Zero#870AA or approved equal. This item must be comprised of neoprene and stainless steel (or aluminum if SS not available).
They must be installed in continuous, straight pieces with no joints or gaps along each edge and attached to the inside of the door frame (jamb) at the top and sides and to the interior bottom of the door. They will be adjusted to meet the door such that a nearly airtight seal is formed upon closing and complete strike engagement (the bottom adjusted to close the threshold gap).
8. Sill Protection Sweeps: Install Zero #8197A (Zero International) or approved equal door bottom sill protection sweeps. This item must be comprised of neoprene and stainless steel (or aluminum, if SS not available). It must be installed so that the bottom is 3/8” lower than the top of the entrance threshold, covering that gap.
9. Install new door threshold which matching the existing threshold size.
10. Install a seal (hook strip) on the door bottom that interlocks with the new threshold. The hook strip is similar to the existing hook strip that is installed at the bottom of the existing door.
See Section 9, CRP RTRA door pictures for details.
D. Grounding: Any grounding items that are presently attached to the existing doors and frames must be removed as needed to perform the work of this contract and then reattached in a similar manner as existed (mechanically, exothermically, etc.).
E. Painting: New door paint must match existing door. Painting will include one coat of primer as required to achieve full bonding of the two subsequent coats of exterior latex finish to the substrate. Paint information must be submitted for approval and must stipulate for use on exterior metal surfaces. Painting must be completed and dry before installation of items that attach to the doors and frames.
1. Protection: All adjacent hardware and other items in place and not intended to be painted must be removed, masked, or otherwise protected before painting. Reinstall or remove protection after painting has been completed. Upon completion of painting, the Contractor must remove all paint spots, splatter, and overspray caused by his work and leave the area clean and orderly.
2. Preparation: The door frames/jambs will require all existing items that may be attached removed and then scraped and/or sanded to prepare the surface to be painted. All surfaces to be painted must then be cleaned of dirt, oil, loose rust, and other foreign substances. All signs and placards presently attached to the doors must be replaced after the paint has cured (the COR will coordinate if needed). Anything that has been directly painted or stenciled to the existing door surface must be reapplied, painted, etc. as may be necessary.
3. Application: Paint must be thoroughly stirred, strained and kept at a uniform consistency during application. Prime coat must be applied by brush or spray and subsequent finish coats may be applied by brush, roller, or spray. Paint must be applied uniformly in the proper consistency by skilled painters using appropriate methods as approved by the COR. Where approved by the COR as necessary to suit conditions of surface, temperature, weather, and method of application, the packaged paint may be thinned immediately prior to application in accordance with the manufacturer's directions, but not in excess of one pint of suitable thinner per gallon unless required for adequate spray consistency. Do not exceed manufacturer's recommendations. Paint must not be thinned unless approval for thinning is given by the COR. All coats of paint must be free from sags, wrinkles, runs, holidays, smears, dirt, and color other than those specified. Paint splatter and overspray must be removed before dry.
4. Surfaces that have been sanded, cleaned and/or otherwise prepared for painting must be first given a coat of the approved primer material immediately after such preparation has been completed when practical. Sufficient time must elapse between successive coatings to permit proper drying. This period can be modified as necessary to suit adverse weather conditions.
Follow paint manufacturer's instructions.
5. Reattachment of Grounds: Following curing of the paint and attachment of all other items for the new doors, the Contractor must reattach any grounds that may exist for the doors and frames. The COR or local representative will determine and direct whether or not the type of ground connection used requires the contact surface area to be sanded to bare metal prior to the connection being made.
End of section
2.2 Siding Replacement
2.2.1 SUMMARY
Section includes: Exterior fiber-cement panels
2.2.2 COORDINATION
A. Coordinate siding installation with flashings and other adjoining construction to ensure proper sequencing.
2.2.3 ACTION SUBMITTALS
A. Product Data: For each type of product
B. Shop Drawings:
1. Include details of panel dimensions, profiles, edge conditions, joints, corners, anchorages, attachment assembly, trim, flashings, closures, and accessories; and special details.
a) Accessories: Include details of the flashing, trim, and anchorage, at a scale of not less than 1- 1/2 inches per 12 inches.
C. Samples for Initial Selection: For fiber-cement panels including related accessories.
D. Samples for Verification
1. 6-inch- square Sample of panel.
2.2.4 INFORMATIONAL SUBMITTALS
A. Product Certificates: For each type of fiber-cement panels.
B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for fiber-cement siding.
C. Research/Evaluation Reports: For each type of fiber-cement siding required, from IAMPO or
ICC-ES.
D. Qualification Statements: For manufacturer, Installer, and delegated design engineer.
E. Sample Warranty: For special warranty.
2.2.5 CLOSEOUT SUBMITTALS
A. Maintenance Data: For each type of product, including related accessories, to include in maintenance manuals.
2.2.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Furnish full lengths of fiber-cement panels including related accessories, in a quantity equal to 2 percent of amount installed.
2.2.7 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer: An entity that fabricates fiber-cement panels at a facility located within the United States.
2. Installer: An entity that employs installers and supervisors who are trained and approved by manufacturer.
2.2.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store packaged materials in original containers with labels intact until time of use.
B. Store materials on elevated platforms, under cover, and in a dry location.
2.2.9 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a) Structural failures including cracking and deforming.
b) Deterioration of materials beyond normal weathering.
2. Warranty Period: 5 years from date of Substantial Completion.
2.2.10 MANUFACTURERS
A. James Hardie: HardiePlank
B. Other comparable manufacturers
2.2.11 PERFORMANCE REQUIREMENTS
A. Physical Performance: Provide fiber-cement panels that are tested and labeled in accordance with ASTM C1186, Grade IV, Type A by a qualified testing agency acceptable to authorities having jurisdiction.
1. Wet Flexural Strength: Result: 3190 psi (21,994 kPa); Lower Limit: 2610 psi (48,250 kPa).
2. Water Tightness: No water droplets observed on any specimen.
3. Freeze-Thaw: No damage or defects observed.
4. Warm Water: No evidence of cracking, delamination, swelling, or other defects observed.
5. Heat-Rain: No crazing, cracking, or other deleterious effects, or surface or joint changes observed in any specimen.
B. Structural Performance: Provide composite panel systems capable of withstanding the effects of the following loads, based on testing in accordance with ASTM E330/E330M:
1. Design Wind Loads: Minimum 58 psf (2.78 kPa)
2. Deflection Limits: For wind loads, panel deflection no greater than L/120 of the span.
C. Thermal Expansion: Tested in accordance with ASTM E228.
D. Fire Propagation Characteristics: Composite panel wall assembly complies with NFPA 285.
E. Surface-Burning Characteristics: Provide composite panels that meet the following values when tested in accordance with ASTM E84:
1. Flame-Spread Index: Zero.
2. Smoke-Developed Index: 5.
F. Fire Resistance: Composite panel wall assembly complies with ASTM E119.
G. Ignition Resistance: Composite panel complies with NFPA 268.
2.2.12 ACCESSORIES
A. Water-resistive Barrier: Provide vapor-permeable, UV-resistant, water-resistive barrier in accordance with ICC-ES AC38, ASTM E2178, and manufacturer's written instructions.
1. Basis-of-Design Product: Subject to compliance with requirements, provide American Fiber Cement Corporation; DELTA Fassade S or comparable product by one of the following:
a. Carlisle Coatings and Waterproofing, a CCM Company.
b. VaproShield.
2. UV Resistance: For systems with open joints, provide water-resistive barrier with UV resistance.
B. Metal Subframing and Furring: ASTM C645, cold-formed, metallic-coated steel in accordance with manufacturer's written instructions.
1. Finish: G90 hot-dip galvanized coating, Powder coating.
2. Shape: Hat Channel, Z-Channel.
3. Fasteners: Manufacturer's standard color-matched stainless steel rivets.
4. Concealed Attachment: Manufacturer's standard epoxy adhesive system and accessories.
C. Aluminum Subframing and Furring: Manufacturer's standard to meet Project requirements.
1. Finish: Anodized, Milled.
2. Shape: Hat Channel, Z-Channel.
3. Fasteners: Manufacturer's standard color-matched stainless steel rivets.
4. Concealed Attachment: Manufacturer's standard epoxy adhesive system and accessories.
D. Miscellaneous Wood Subframing and Furring: Pressure-treated wood framing members as required for support and alignment of fiber-cement panel system.
1. Fasteners: Manufacturer's standard color-matched stainless steel screws.
2. Concealed Attachment: Manufacturer's standard epoxy adhesive system and accessories.
E. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of composite panels unless otherwise indicated.
1. Joint Closures: 0.031-inch (0.8-mm), 21-gauge or less, sheet aluminum.
2. Corner Profiles: 0.031- inch (0.8-mm), 21-gauge or less, sheet aluminum.
3. Flashing: Provide aluminum flashing complying with Section 076200 "Sheet Metal Flashing and
Trim" at window and door heads and where indicated.
a) Finish for Aluminum Flashing: Siliconized polyester coating, High-performance organic finish, Factory-prime coating.
2.2.13 EXAMINATION
A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of fiber-cement panels and related accessories.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
2.2.14 PREPARATION
A. Clean substrates of projections and substances detrimental to application.
2.2.15 INSTALLATION
A. General: Comply with manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
1. Do not install damaged components.
2. Install fasteners no more than 24 inches (600 mm) o.c.
B. Install joint sealants as specified in Section 2.2.12 to produce a weathertight installation.
2.2.16 ADJUSTING AND CLEANING
A. Remove damaged, improperly installed, or otherwise defective materials and replace with new materials complying with specified requirements.
B. Clean finished surfaces in accordance with manufacturer's written instructions and maintain in a clean condition during construction.
2.3 Painting
2.3.1 SUMMARY
Section includes: Painting requirements
2.3.2 METAL PREP/PAINTING
Inspect and prep vent hoods, roof support members, and all other previously painted metal surfaces by removing dirt/dust. Remove by wire brushing/scraping any loose, peeling, rusting, or bubbles paint areas. Spot treat all rusted areas with rust inhibitor. Spot prime all exposed metal surfaces with 1 coat Sherwin Williams DTM Wash Primer or approved equal and apply 2 finish coats of Sherwin Williams DTM or approved equal acrylic satin finish (similar color) paint.
2.3.3 MISCELLANEOUS PREP/PAINTING
Scrape and wire brush any loose/peeling/flaking paint. Spot prime any bare wood areas with Sherwin Williams or equal oil-base primer. Apply two finish coats of satin finish (similar color) Sherwin Williams Duration or approved equal paint.
2.3.4 MATERIAL
All of the facility room walls must be painted with one color. All the facility room doors requiring painting may be painted the same color. All paint color will match existing or approved by the SSC.
2.3.5 MANUFACTURERS
A. Sherwin-Williams
B. Pittsburgh Paints
C. Benjamin Moore
2.4 Special Contract Requirement: COVID-19 (Construction Only)
2.4.1 SUMMARY
This supplemental document provides requirements Contractor must take to reduce the spread and/or exposure of COVID –19 on FAA contracts at Federal Aviation Administration (FAA) facilities.
2.4.2 COVID-19 SAFETY PLAN
The COVID-19 Safety Plan (CVSP) must include, but is not limited to, the following:
A. COVID-19 Wellness Self-Check. Contractor should refer to CDC and local guidance for latest symptoms self-check list.
B. Contractor must conduct and complete the Wellness Self-Check form prior to reporting to the FAA facility and/or work site. The Contractor Superintendent/COVID-19 Safety Officer must review each form.
C. The person responsible for administering the Wellness Self-Check must have authority to deny anyone entering the FAA work site who displays any symptoms prior to entering, as well as, authority to remove persons develop symptoms after beginning work at the FAA facility.
D. Wellness Self-Check must be completed immediately prior to accessing the
FAA work site. Contractor must note in their CVSP the physical location of where Wellness Self-check will be completed. Testing site must be outside the FAA property.
E. Contractor must take same precautions for deliveries entering FAA property regardless of driver exiting truck.
F. CVSP must include how Contractor plans to manage the delivery of product samples, batch tickets, and large project/shop drawings to the FAA
1. Face Covering: Contractor must wear a face covering while on the FAA work site and/or within a FAA facility. All face coverings, at a minimum, must adhere to the following:
a) Cover the nose and mouth;
b) Fit snugly, but comfortably, against the side of the face;
c) Be secured with ties or ear loops;
d) Allow breathing without restrictions; and include multiple layers of fabric.
2. Physical Separation (6 foot spacing between workers)/Social Distancing controls will be required at all times.
3. Contractor must identify in their CVSP, when use of physical separation and/or face covering is not practicable due to thermal stress, and/or confined space requirements, or other reasons; and how the Contractor plans to mitigate those circumstances.
4. Personal Hygiene: Contractor must employ good hygiene practices while within the FAA facilities. These practices must include, but not limited to:
a) The use of hand washing and hand sanitizing stations. Hand sanitizer must be FDA approved.
b) Disinfection of frequently used items and surfaces as much as possible. Use EPA N List approved wipes and/or disinfectant supplies.
G. Contractor Communication Plan (if someone tests positive or becomes ill at the work site).
H. Proper disposal of COVID-19 PPE.
I. Include state, county, and local guidelines specific to job location.
2.4.2 ADDITIONAL COVID-19 REQUIREMENTS
A. Prior to departing the FAA work site, the Contractor must wipe and disinfect all high touch point areas with approved wipes and/or disinfectant. High touch point areas include, but not limited to:
1. Doors and door hardware
2. Handrails
3. HVAC components
4. Gates
5. Light controls
6. Desks
7. Telephones
8. Chairs
B. Contractor must provide separate temporary sanitary facilities dedicated to FAA and Contractor use. Contractor is not permitted to use FAA restrooms within a facility. High touch points on/within the temporary sanitary facilities (door handles, toilet seat, etc.) must be wiped and disinfected after each use by the individual using the facility. Contractor must supply the required wipe and/or disinfecting supplies.
2.4.2.1 Remove all trash and accumulated waste daily.
2.4.3 SITE ACCESS/EGRESS
A. The Contractor must meet with the FAA’s Contracting Officer Representative (COR) and local FAA management prior to the start of the project to establish the Contractors’ access, badging, and security requirements.
B. If a Contractor is not feeling well for any reason and COVID-19 symptoms exist, the individual will be denied access to the FAA facility. If a Contractor develops COVID- 19 symptoms while at the FAA facility, the Contractor is required to immediately remove the symptomatic individual from the FAA facility, notify the FAA Contracting Officer (CO) and/or COR and immediately inform the FAA of any concerns regarding the work that was expected to be performed by that Contractor. The Contractor must also provide details on all locations where the symptomatic individual visited within the FAA facility
2.4.3 FAA NOTIFICATIONS
A. Contractor is required to notify the FAA immediately when a suspected or confirmed case of
COVID-19 has visited the FAA facility and/or work site within past 14 days; been in contact with someone that may have visited a FAA facility; and/or had contact with a FAA employee and/or another agency Contractor. Reporting must include the information outlined below to allow the FAA to make a timely and appropriate response. Report any suspect or confirmed cases to 9-AFN- ACQ-EM@faa.gov, with a courtesy copy to the CO and COR. The report must include, for each individual:
1. Date of self-quarantine
2. Whether the case is suspected or confirmed.
3. Where the individual visited (building address) or with whom they met and the date of latest contact.
4. To ensure privacy information is protected, do not include specific information about the individual via e-mail.
5. Once information is received, a FAA official will contact the Contractor directly to obtain additional information regarding the case(s) to coordinate a proper response.
2.4.3.1 Provide medical documentation by an authorized medical professional stating the individual no longer poses a transmission risk and is safe to re-enter the FAA work site. Return to work documentation must be provided to the CO and
COR.
2.4.4 SUBMITTALS
2.4.4.1 The Contractor must provide the following:
mailto:9-AFN-ACQ-EM@faa.gov mailto:9-AFN-ACQ-EM@faa.gov
2.4.4.1.1 COVID-19 Safety Plan
2.4.4.1.2 Washing/Sanitizing Station(s)
2.4.4.1.3 Temporary/Portable Sanitary Facility
2.4.4.1.4 Cleaning/Disinfection supply SDS’s
2.4.4.1.5 Hand Sanitizer SDS’s
2.4.4.1.6 SDSs for all chemicals brought into the FAA facility
2.4.5 EXECUTION
A. Shared use of trailer between FAA and Contractor personnel is not permitted.
B. All meetings must take place virtually where practicable.
C. Contractor must make use of floor plans or other methods to track all the personnel on job site including documenting time entered and exited.
D. FAA is using data from Harvard Dashboard https://globalepidemics.org/key-metrics-for-covid- suppression/ to stay current with the local COVID-19 situation.
If the number of COVID-19 cases increases in the area of work being performed, the CO may issue a Stop Work Notice. FAA highly encourages Contractor to monitor the local COVID-19 statistics via either Harvard dashboard or other official data that is available.
E. Identify all the personnel coming from outside of the State/local commuting area at least one week prior to coming onto the FAA facility
NOTE: Any breach to CVSP or other requirement listed in this document will result in removal of the
Contractor and/or issuing Stop Work Notice by the CO.
https://globalepidemics.org/key-metrics-for-covid-suppression/
Appendix A: Photos Photos are for clarification purposes only; refer to scope of work, specifications, and drawings for detailed work items.
Photo 1 – East facing exterior walls, main entrance to the facility
Photo 2 – North facing exterior walls
Photo 3 – West facing exterior wall
Photo 4 – Bottom side of VOR roof
Photo 5 – Main entrance roof, note the failing paint
Photo 6 – Equipment room ceiling
Photo 7 - Equipment room ceiling continued
Photo 8 – West wall door close up
Photo 9 – chipping paint under roof close up, West side
Photo 10 – North wall mechanical hoods with chipped paint
Photo 11 – North facing wall chipped paint under roof
| Llano, Texas |
| Table of Contents |
| Summary of Work |
| Scope of Work |
| Door replacement – |
| Siding replacement – |
| SECTION 1 - GENERAL REQUIREMENTS |
| 1.1 VOR temporary shutdown requirements: |
| 1.2 Site Location/Access to Work Area |
| 1.3 Contracting Officers Representative (COR) |
| 1.4 Coordination |
| 1.5 Site Inspection |
| 1.6 Sanitary Facilities |
| 1.7 Pre-Construction Meeting |
| 1.8 Field Measurements |
| 1.9 Work Hours |
| 1.10 Project Schedules / Sequence of work |
| 1.11 FAA Holiday Moratorium |
| 1.12 Protection of Existing Property |
| 1.13 Contractor-Furnished Material (CFM) |
| 1.14 Installation |
| 1.15 Asbestos Free Certification / Lead Free Materials |
| 1.16 Cleaning |
| 1.17 Safety – Fall Protection |
| 1.18 Hazardous Material and Safety |
| 1.19 Existing Building Description |
| 1.20 Submittals: |
| SECTION 2 – REQUIREMENTS |
| 2.1 Door Replacement |
| 2.2 Siding Replacement |
| 2.2.2 COORDINATION |
| A. Coordinate siding installation with flashings and other adjoining construction to ensure proper sequencing. |
| 2.2.3 ACTION SUBMITTALS |
| A. Product Data: For each type of product |
| B. Shop Drawings: |
| 1. Include details of panel dimensions, profiles, edge conditions, joints, corners, anchorages, attachment assembly, trim, flashings, closures, and accessories; and special details. |
| a) Accessories: Include details of the flashing, trim, and anchorage, at a scale of not less than 1-1/2 inches per 12 inches. |
| C. Samples for Initial Selection: For fiber-cement panels including related accessories. |
| D. Samples for Verification |
| 1. 6-inch- square Sample of panel. |
| 2.2.4 INFORMATIONAL SUBMITTALS |
| A. Product Certificates: For each type of fiber-cement panels. |
| B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for fiber-cement siding. |
| C. Research/Evaluation Reports: For each type of fiber-cement siding required, from IAMPO or ICC-ES. |
| D. Qualification Statements: For manufacturer, Installer, and delegated design engineer. |
| E. Sample Warranty: For special warranty. |
| 2.2.5 CLOSEOUT SUBMITTALS |
| A. Maintenance Data: For each type of product, including related accessories, to include in maintenance manuals. |
| 2.2.6 MAINTENANCE MATERIAL SUBMITTALS |
| A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. |
| 1. Furnish full lengths of fiber-cement panels including related accessories, in a quantity equal to 2 percent of amount installed. |
| 2.2.7 QUALITY ASSURANCE |
| A. Qualifications: |
| 1. Manufacturer: An entity that fabricates fiber-cement panels at a facility located within the United States. |
| 2. Installer: An entity that employs installers and supervisors who are trained and approved by manufacturer. |
| 2.2.8 DELIVERY, STORAGE, AND HANDLING |
| A. Deliver and store packaged materials in original containers with labels intact until time of use. |
| B. Store materials on elevated platforms, under cover, and in a dry location. |
| 2.2.9 WARRANTY |
| A. Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or workmanship within specified warranty period. |
| 1. Failures include, but are not limited to, the following: |
| a) Structural failures including cracking and deforming. |
| b) Deterioration of materials beyond normal weathering. |
2. Warranty Period: 5 years from date of Substantial Completion.
| 2.2.10 MANUFACTURERS |
| A. James Hardie: HardiePlank |
| B. Other comparable manufacturers |
| 2.2.11 PERFORMANCE REQUIREMENTS |
| A. Physical Performance: Provide fiber-cement panels that are tested and labeled in accordance with ASTM C1186, Grade IV, Type A by a qualified testing agency acceptable to authorities having jurisdiction. |
| 1. Wet Flexural Strength: Result: 3190 psi (21,994 kPa); Lower Limit: 2610 psi (48,250 kPa). |
| 2. Water Tightness: No water droplets observed on any specimen. |
| 3. Freeze-Thaw: No damage or defects observed. |
| 4. Warm Water: No evidence of cracking, delamination, swelling, or other defects observed. |
| 5. Heat-Rain: No crazing, cracking, or other deleterious effects, or surface or joint changes observed in any specimen. |
| B. Structural Performance: Provide composite panel systems capable of withstanding the effects of the following loads, based on testing in accordance with ASTM E330/E330M: |
| 1. Design Wind Loads: Minimum 58 psf (2.78 kPa) |
| 2. Deflection Limits: For wind loads, panel deflection no greater than L/120 of the span. |
| C. Thermal Expansion: Tested in accordance with ASTM E228. |
| D. Fire Propagation Characteristics: Composite panel wall assembly complies with NFPA 285. |
| E. Surface-Burning Characteristics: Provide composite panels that meet the following values when tested in accordance with ASTM E84: |
| 1. Flame-Spread Index: Zero. |
| 2. Smoke-Developed Index: 5. |
| F. Fire Resistance: Composite panel wall assembly complies with ASTM E119. |
| G. Ignition Resistance: Composite panel complies with NFPA 268. |
| 2.2.12 ACCESSORIES |
| A. Water-resistive Barrier: Provide vapor-permeable, UV-resistant, water-resistive barrier in accordance with ICC-ES AC38, ASTM E2178, and manufacturer's written instructions. |
| 1. Basis-of-Design Product: Subject to compliance with requirements, provide American Fiber Cement Corporation; DELTA Fassade S or comparable product by one of the following: |
| a. Carlisle Coatings and Waterproofing, a CCM Company. |
| b. VaproShield. |
2. UV Resistance: For systems with open joints, provide water-resistive barrier with UV resistance.
| B. Metal Subframing and Furring: ASTM C645, cold-formed, metallic-coated steel in accordance with manufacturer's written instructions. |
| 1. Finish: G90 hot-dip galvanized coating, Powder coating. |
| C. Aluminum Subframing and Furring: Manufacturer's standard to meet Project requirements. |
| 1. Finish: Anodized, Milled. |
| D. Miscellaneous Wood Subframing and Furring: Pressure-treated wood framing members as required for support and alignment of fiber-cement panel system. |
| 1. Fasteners: Manufacturer's standard color-matched stainless steel screws. |
| E. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match materia... |
| 2. Corner Profiles: 0.031- inch (0.8-mm), 21-gauge or less, sheet aluminum. |
| 3. Flashing: Provide aluminum flashing complying with Section 076200 "Sheet Metal Flashing and Trim" at window and door heads and where indicated. |
| a) Finish for Aluminum Flashing: Siliconized polyester coating, High-performance organic finish, Factory-prime coating. |
| 2.2.13 EXAMINATION |
| A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of fiber-cement panels and related accessories. |
| B. Proceed with installation only after unsatisfactory conditions have been corrected. |
| 2.2.14 PREPARATION |
| A. Clean substrates of projections and substances detrimental to application. |
| 2.2.15 INSTALLATION |
| A. General: Comply with manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply. |
| 1. Do not install damaged components. |
| 2. Install fasteners no more than 24 inches (600 mm) o.c. |
B. Install joint sealants as specified in Section 2.2.12 to produce a weathertight installation.
| 2.2.16 ADJUSTING AND CLEANING |