Specifications-5-20-25.pdf

PDF 187 KB Posted

Attached to
FY 2025 - Pavement Preservation - Package 4
Solicitation number
25-0669-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is a set of specifications for road and street construction in Pinellas County, Florida, developed by the Pinellas County Utilities Department and aligning with Florida Department of Transportation standards for Fiscal Year 2025 Pavement Preservation Package 4. The project encompasses four specific roadway locations: two arterial roads (Belcher Road from Nebraska Avenue to Klosterman Road, and 49th Street N from 5th Avenue N to 38th Avenue N) and two local group projects (Eagle Lane & Birdie Lane and Local Group 210), totaling approximately 34.98 lane miles. The contract involves superpave asphalt concrete construction, milling of existing asphalt pavement, and utility adjustments such as valve box and manhole rim/cover modifications.

The specifications detail precise technical requirements for asphalt concrete, including restrictions on recycled asphalt pavement (limited to 25%), and establish payment terms for various construction activities measured per ton or per each unit. The contract specifies that fuel price adjustments are not applicable, and no extra payments will be made for various roadway configurations like intersections, cul-de-sacs, driveways, and medians. The work will be paid based on constructed and accepted quantities, with specific pay items for different road types and thickness levels, emphasizing a comprehensive approach to pavement preservation and infrastructure maintenance.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS ROAD AND

STREET CONSTRUCTION

CONTRACT No. 25-0669

FY 2025 - Pavement Preservation Package 4

In Pinellas County

TO ACCOMPANY PINELLAS COUNTY STANDARD SUPPLEMENTAL SPECIFICATIONS FOR

ROADWAY AND GENERAL CONSTRUCTION (APRIL 2022), PINELLAS COUNTY UTILITIES

DEPARTMENT STANDARD TECHNICAL SPECIFICATIONS FOR UTILITIES AND RELATED

CONSTRUCTION (June 2018), AND FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION DIVISIONS II AND III ONLY (FY 2023- 2024):

SPECIAL PROVISIONS

Pinellas County Supplemental Specifications for Roadway and General Construction, April 2022

General Notes to Pay Items Numbers

Letters “A, B, C, and D” have been added to each pay item number specifying its correlation to the sub PIDs. These letters do not change the specifications associated with the original Pay Item Numbers indicated in Pinellas County Supplemental Specifications for Roadway and General Construction, April 2022 and Special Provisions.

Section 334 of the Pinellas County Roadway Std. Tech. Specs. – Superpave Asphalt Concrete

The specification for Superpave Asphalt Concrete shall be amended to include:

PAY ITEM NO. 334-xxxx-xxx – SUPERPAVE ASPHALT CONCRETE The allowance for bituminous asphalt liquid can be found in the Pinellas County Standard Technical Specifications for Roadway and Related Construction, latest edition. Fuel price adjustments are not applicable in this contract.

Recycled Asphalt Pavement – The County confirms that the recycled asphalt pavement (RAP) is restricted to 25%. The percentage of RAP allowed is found in the Pinellas County Specifications for Hot Bituminous Mixtures, Plant Methods, Equipment, and Construction Methods – latest edition.

Shall be used for all type roadways (arterials, collectors, and local roadways) and include intersections, cul-de-sacs, driveways, medians, turn lanes, and any other configurations not mentioned. There will be no extra payment for the conditions noted above. The Superpave Asphalt mix will be as shown on the plans, or as directed by the Engineer.

PAY ITEM NO. 334-2095-460 SUPERPAVE ASPHALT CONCRETE, Leveling, Type SP 9.5 or SP 12.5, Fine, Traffic Level C, Variable Thickness https://pinellas.gov/wp-content/uploads/2022/10/supplemental-specifications-roadway-construction-apr-2022.pdf

• The work shall consist of all labor and material required to construct superpave asphalt concrete for roadway as shown on the plans and listed in the specifications.

PAY ITEM NO. 334-2095-460 SUPERPAVE ASPHALT CONCRETE, Leveling, Type SP 9.5 or SP 12.5, Fine, Traffic Level C, Variable Thickness the work specified under this Section must be paid for per Ton (TN), as shown on Plans, constructed, and accepted.

PAY ITEM NO. 334-3125-000 SUPERPAVE ASPHALT CONCRETE, Type SP 12.5, Fine, Traffic Level C, Variable Thickness, Arterials/Collectors

• The work shall consist of all labor and material required to construct superpave asphalt concrete for roadway as shown on the plans and listed in the specifications.

Arterials/Collectors include:

• Project A - PID 006194A Belcher Rd. - Nebraska Ave. to Klosterman Rd.

• Project B - PID 006777A 49th Street N. (5th Ave. N. to 38th Ave. N.)

PAY ITEM NO. 334-3125-000 SUPERPAVE ASPHALT CONCRETE, Type SP 12.5, Fine, Traffic Level C, Variable Thickness, Arterials/Collectors Thickness the work specified under this Section must be paid for per Ton (TN), as shown on Plans, constructed, and accepted.

PAY ITEM NO. 334-3125-001 SUPERPAVE ASPHALT CONCRETE, Type SP 12.5, Fine, Traffic Level C, Variable Thickness, Local Groups

• The work shall consist of all labor and material required to construct superpave asphalt concrete for roadway as shown on the plans and listed in the specifications.

Local Groups include:

• Project C - PID 005657A Eagle Lane & Birdie Lane

• Project D - PID 006775A Local Group 210

PAY ITEM NO. 334-3125-001 SUPERPAVE ASPHALT CONCRETE, Type SP 12.5, Fine, Traffic Level C, Variable Thickness, Local Groups the work specified under this Section must be paid for per Ton (TN), as shown on Plans, constructed, and accepted.

Section 380 of the Pinellas County Roadway Std. Tech. Specs. – Milling of Existing Asphaltic Concrete Pavements and Roadway Base

PAY ITEM NO. 380-3490 - MILLING EXISTING ASPHALT PAVEMENT - 2" Thickness or Less, Full Width

Shall be used for all type roadways (arterials, collectors, and local roadways) and include intersections, cul-de-sacs, driveways, medians, turn lanes, and any other configurations not mentioned. There will be no extra payment for the conditions noted above.

Milling material may consist of asphalt millings and sub-base. There will be no extra payment for disposal of asphalt millings or sub-base material.

UTILITIES

ITEM NO. PW-331101-309-9001 Adjust Valve Box to Finished Grade (In Pavement)

ITEM NO. RW-333501-310-9001 Adjust Valve Box to Finished Grade (In Pavement)

Description: The work consists of furnishing all labor, equipment, customer coordination, and materials for the vertical adjustment of an existing valve box and cover to match proposed finish grade. The unit price shall include placement of the valve cover to finish grade as shown on plans or directed by the Engineer.

Authorized materials listing can be retrieved from:

Technical Specifications for Utilities and Related Construction Jun 2018 - Pinellas County

Measurement: The measurement for these units shall be each, measured in place, on grade, inspected, and accepted.

Payment shall be made under:

Item No. PW-331101-309-9001 Adjust Valve Box to Finished Grade (In Pavement) Per Each

Item No. RW-333501-310-9001 Adjust Valve Box to Finished Grade (In Pavement) Per Each

ITEM NO. SS-333900-302-KXXX Adjust Manhole Rim & Cover

Description: This item provides all labor, equipment and materials for adjusting existing manhole riser, C.I.

frame, and cover. Adjustment includes removal of existing ring and cover and removal or placement of up to 6 courses of brick and reinstalling the existing ring and cover. The work does not include excavation, surface restoration, sheeting or well point dewatering which, if required, will be paid for, or is part of the work, under other Contract Pay Items.

Measurement: The quantities of manhole rim and cover adjustments to be paid under this item shall be each measured in place, on grade, inspected, and accepted.

Payment shall be made under:

Item No. SS-333900-302-K001 Adjust Manhole Rim & Cover to Finished Grade (In Pavement)

Item No. SS-333900-302-K002 Adjust Manhole Rim & Cover to Finished Grade (Outside Pavement)

ITEM NO. UT-999-0000 UNSPECIFIED WORK (Utilities)

Description: All work shall be done in accordance with Section 999-000 of the Pinellas County Standard Technical Specifications for Roadway and General Construction.

Measurement and Payment: The work specified in this section shall be paid for the contract unit price per each (EA), actually constructed and accepted.

https://pinellas.gov/technical-specifications-for-utilities-and-related-construction-jun-2018/

SPECIAL PROVISIONS