Plans-006777A-signed.pdf
PDF 31 MB Posted
- Attached to
- FY 2025 - Pavement Preservation - Package 4
- Solicitation number
- 25-0669-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The document is a detailed engineering plan set for the Pinellas County Fiscal Year 2025 Countywide Pavement Preservation Program, specifically focusing on 49th Street North from 5th Avenue North to 38th Avenue North in Florida. The project involves comprehensive pavement rehabilitation, including milling existing asphalt pavement to a depth of 2 inches and resurfacing with Type SP 12.5 Structural Course (Traffic C) across multiple station segments. The project covers approximately 60,300 linear feet, with detailed engineering sheets ranging from station 20+87.72 to 127+10.15, and includes 19 distinct engineering plan sheets documenting the roadway improvements.
The project is part of Pinellas County's broader pavement preservation initiative, which aims to enhance traffic safety and roadway efficiency. This specific package (Package 4) is one of four paving locations within the county, comprising two arterial roads and two local neighborhood projects totaling approximately 34.98 lane miles. The engineering plans, certified by Professional Engineer Jeffrey S. Thompson, outline precise specifications for road surface treatment, including consistent 2% grade modifications as determined by the project engineer. The document indicates a systematic approach to road maintenance, focusing on structural improvements and surface restoration to extend the lifecycle of the county's transportation infrastructure.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0669-006777A
FY2025 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
49TH ST N (5TH AVE N - 38TH AVE N)
FINANCIAL PID 004192A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORIDA
93254
49TH ST N (5TH AVE N - 38TH AVE N)
STA. 20+87.72 TO STA. 72+01.34
TYPICAL SECTION
* 2% (OR AS DIRECTED BY THE ENGINEER) * 2% (OR AS DETERMINED BY THE ENGINEER)
* 2% (OR AS DETERMINED BY THE ENGINEER)
49TH ST N (5TH AVE N - 38TH AVE N)
STA. 74+01.60 TO STA. 101+48.38
TYPICAL SECTION
49TH ST N (5TH AVE N - 38TH AVE N)
STA. 103+54.47 TO STA. 127+10.15
TYPICAL SECTION
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (2")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
Feet
60300 15
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES-(2) |
| 3 ROAD TYPICAL SECTION |
| 4 SH (20+00.00-29+40.00) |
| 5 SH (29+40.00-38+80.00) |
| 6 SH (38+80.00-48+20.00) |
| 7 SH (48+20.00-57+60.00) |
| 8 SH (57+60.00-67+00.00) |
| 9 SH (67+00.00-76+40.00) |
| 10 SH (76+40.00-85+80.00) |
| 11 SH (85+80.00-95+20.00) |
| 12 SH (95+20.00-104+60.00) |
| 13 SH (104+60.00-114+00.00) |
| 14 SH (114+00.00-123+40.00) |
| 15 SH (123+40.00-129+00.00) |
| 16 SH (130+00.00-139+40.07) |
| 17 Typical Sections A_B-SHEET-(40) |
| 18 Typical Section C-SHEET-(41) |
| 19 LOOP DETAIL-(42) |
| 2025-05-19T14:33:55-0400 | |
| Jeffrey S Thompson |
File details come from the government source that posted it. Updated .