Plans-006775A-_signed.pdf
PDF 32 MB Posted
- Attached to
- FY 2025 - Pavement Preservation - Package 4
- Solicitation number
- 25-0669-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The document is a detailed engineering plan set for the Pinellas County, Florida FY2025 Countywide Pavement Preservation Program, specifically Local Group 210. The project involves comprehensive roadway resurfacing and milling across multiple streets including 40th Avenue N, 41st Avenue N, 42nd Avenue N, 25th Street N, 47th Avenue N, 48th Avenue N, 49th Avenue N, 46th Avenue N, 46th Terrace N, 50th Avenue N, 26th Street N, Xenia Street N, and 24th Street N. The project encompasses milling existing asphalt pavement to a depth of 1.5 inches and resurfacing with Type SP 12.5 Structural Course (Traffic C) across approximately 34.98 lane miles, with a 2% (maximum 4%) grade variation as directed by the project engineer.
The engineering plans, prepared by Professional Engineer Jeffrey S. Thompson, consist of 22 detailed sheets including general notes, typical sections, roadway plans, and specific road section details. The project is part of Pinellas County's commitment to maintaining traffic safety and roadway efficiency, with the pavement preservation work structured as Package 4 of the FY2025 program. The document provides comprehensive technical specifications for milling and resurfacing, indicating a structured approach to infrastructure maintenance with precise engineering standards and methodical road improvement strategies.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0669-006775A
FY2025 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
LOCAL GROUP 210
FINANCIAL PID 004192A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORIDA
93254
40TH AVE N
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5)
41ST AVE N
TYPICAL SECTION
TYPICAL SECTION
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5)
42ND AVE N, 25TH ST N, 47TH AVE N, 48TH AVE N, 49TH AVE N,
TYPICAL SECTION
46TH AVE N, 46TH TERR N,
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
TYPICAL SECTION
50TH AVE N, 26TH ST N, 46TH AVE N
(STA. 108+08.57 - STA. 114+46.89), 25TH ST N, XENIA ST N & 24TH ST N
Feet 60300 15
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES-(2) |
| 3 TYPICAL SECTION_1-(3) |
| 4 ROADWAY PLAN (04) |
| 5 ROADWAY PLAN (05_) |
| 6 ROADWAY PLAN (6_) |
| 7 ROADWAY PLAN (7_) |
| 8 ROADWAY PLAN (8_) |
| 9 ROADWAY PLAN (9_) |
| 10 ROADWAY PLAN (10_) |
| 11 ROADWAY PLAN (11_) |
| 12 ROADWAY PLAN (12_) |
| 13 ROADWAY PLAN (13_) |
| 14 ROADWAY PLAN (14_) |
| 15 ROADWAY PLAN (15_) |
| 16 ROADWAY PLAN (16_) |
| 17 ROADWAY PLAN (17_) |
| 18 ROADWAY PLAN (18_) |
| 19 ROADWAY PLAN (19_) |
| 20 Typical Sections A_B-SHEET-(40) |
| 21 Typical Section C-SHEET-(41) |
| 22 LOOP DETAIL-(42) |
| 2025-05-19T14:26:17-0400 | |
| Jeffrey S Thompson |
File details come from the government source that posted it. Updated .