Specifications 18051 (r).pdf
PDF 3 MB Posted
- Solicitation number
- RFQ 171 190000000439 3
- Issued by
- Genesee County, Fife Lake Village, Michigan
About this file
This is a Project Manual and Specifications document for the Flint State Office Building Parking Garage Elevator Improvements project, issued by the State of Michigan Department of Technology, Management and Budget (DTMB) and the University of Michigan Flint Campus. The project involves complete replacement of two selective collective hydraulic passenger elevators with dual jack rope systems at the Harrison Street Parking Ramp in Flint, Michigan (Agency No. 171, File No. 171/18051.TYC). The work includes installation of new rails, cabs, cab lighting, hoistway entrances, hallway lanterns, call buttons, replacement of mechanical systems in elevator machine rooms, power connections, lighting circuits, and revision of fire alarm smoke detection systems, along with concrete work for sump installation in the elevator pit. One existing elevator shaft will be abandoned in place with rated drywall and concrete masonry separation from the modernized elevators. The project includes three alternates: elevator #3 modernization, wrapping all hoistway entries, and replacing the abandoned elevator #3 first floor hoistway entrance with a fire-rated door. Bids were due electronically through the SIGMA VSS website on June 5, 2019, at 2:00 p.m. local time, with a mandatory pre-bid conference scheduled for May 21, 2019, at 10:30 a.m. and site tour immediately following at approximately 11:00 a.m. The contract time for substantial completion is 60 calendar weeks from the date of the Agreement or Notice to Proceed, with final completion within 60 calendar days of substantial completion, subject to liquidated damages of $750.00 per calendar day for delays.
Bid security of five percent of the Base Bid is required, with performance and payment bonds mandated for all bids exceeding $50,000. The project includes a contingency allowance of $65,000 for use according to the Owner's written instructions and authorization, with overhead and profit not permitted for contingency items; any unused portion shall be returned to the Owner at project completion. The Contract documents specify compliance with prevailing wage requirements for federally-funded projects under the Davis-Bacon Act, Michigan prevailing wage standards, and the State Construction Code. Bidders must submit a bid breakdown, questionnaire detailing organization and experience, list of proposed subcontractors with licensing information, and a schedule of named materials and equipment. The project is subject to Michigan Occupational Safety and Health Administration (MIOSHA) requirements, Michigan Right-to-Know Law compliance, nondiscrimination covenants, and Michigan residency requirements for 50 percent of on-site employees. Specific sections address asbestos abatement procedures, lead abatement protocols, hazardous materials handling, demolition and waste management with recycling requirements, and soil erosion and sedimentation control in compliance with 1994 PA 451, Part 91.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18051_Drawings 03 ARCH.pdf | ||
| Addendum 2 18051 (r).pdf | ||
| 18051_Drawings 07 ELEC.pdf | ||
| 18051_Drawings 02 ARCH.pdf | ||
| 18051_Drawings 05 MECH.pdf | ||
| Advertisemnt 18051 (r).pdf | ||
| Addendum 1 18051 (r).pdf | ||
| 18051_Drawings 06 ELEC.pdf | ||
| 18051_Drawings 01 STRUC_ARCH.pdf | ||
| 18051_Drawings 04 ARCH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
117 E. Allegan Street Lansing, Michigan 48933
P.517.484.4870 F.517.484.1369
H+B Project No. 18-309.00
Project Manual for
Flint State Office Building Parking Garage
Elevator Improvements Harrison Street Flint, MI 48502
DEPARTMENT OF TECHNOLOGY
MANAGEMENT AND BUDGET
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
and
UNIVERSITY OF MICHIGAN
FLINT, MI CAMPUS
File No. 171/18051.TYC Index No. 171CODTMB7188
MAY 10, 2019
SOM – DTMB
FLINT STATE OFFICE BUILDING PARKING RAMP – ELEVATOR IMPROVEMENTS
FLINT, MICHIGAN
FILE NO. 171/18051.TYC
H+B PROJECT: 18309
TABLE OF CONTENTS - 1
TABLE OF CONTENTS
DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS
State of Michigan Table of Contents
State of Michigan MICHSPEC
DIVISION 1 GENERAL REQUIREMENTS
Section 01 2100 Allowances
Section 01 2300 Alternates
Section 01 2500 Substitution Procedures
Section 01 2500A Substitution Request Form
Section 01 3100 Project Management and Coordination
Section 01 3233 Photographic Documentation
Section 01 3300 Submittal Procedures
Section 01 4000 Quality Requirements
Section 01 4200 References
Section 01 5000 Temporary Facilities and Controls
Section 01 6000 Product Requirements
Section 01 7300 Execution
Section 01 7329 Cutting and Patching
Section 01 7419 Construction Waste Management and Disposal
Section 01 7700 Closeout Procedures
Section 01 7700E Punch List
Section 01 7823 Operation and Maintenance
Section 01 7839 Project Record Documentation
Section 01 7900 Demonstration and Training
DIVISION 2 EXISTING CONDITIONS
Section 02 4119 Selective Demolition
DIVISION 3 CONCRETE
Section 03 3053 Miscellaneous Cast-In-Place Concrete
DIVISION 4 MASONRY
Section 04 2200 Concrete Unit Masonry
DIVISION 5 METALS
Section 05 5000 Metal Fabrications
DIVISION 7 THERMAL AND MOISTURE PROTECTION
Section 07 1619 Metal Oxide Waterproofing
Section 07 8413 Penetration Firestopping
DIVISION 8 OPENINGS
Section 08 3113 Access Doors and Frames
DIVISION 9 FINISHES
Section 09 2900 Gypsum Board
Section 09 9913 Exterior Painting
SOM – DTMB
FLINT STATE OFFICE BUILDING PARKING RAMP – ELEVATOR IMPROVEMENTS
FLINT, MICHIGAN
FILE NO. 171/18051.TYC
H+B PROJECT: 18309
TABLE OF CONTENTS - 2
DIVISION 14 CONVEYING EQUIPMENT
Section 14 2400 Hydraulic Passenger Elevators - Base Bid
Section 14 2400A Hydraulic Passenger Elevators - Alternate
DIVISION 22 PLUMBING
Section 22 0500 Common Work Results for Plumbing
Section 22 0553 Identification for Plumbing Piping and Equipment
Section 22 0719 Plumbing Piping Insulation
Section 22 1005 Plumbing Piping
Section 22 1006 Plumbing Piping Specialties
Section 22 3000 Plumbing Equipment
DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING
Section 23 0500 Common Work Results for HVAC
Section 23 0553 Identification for HVAC Piping and Equipment
Section 23 0719 HVAC Piping Insulation
Section 23 0913 Instrumentation and Control Devices for HVAC
Section 23 2113 Hydronic Piping
Section 23 2300 Refrigerant Piping
Section 23 8127 Small Split-System Heating and Cooling
DIVISION 26 ELECTRICAL
Section 26 0505 Selective Demolition for Electrical
Section 26 0519 Low-Voltage Electrical Power Conductors and Cables
Section 26 0526 Grounding and Bonding for Electrical Systems
Section 26 0529 Hangers and Supports for Electrical Systems
Section 26 0533.13 Conduit for Electrical Systems
Section 26 0533.16 Boxes for Electrical Systems
Section 26 0553 Identification for Electrical Systems
Section 26 2726 Wiring Devices
Section 26 2813 Fuses
Section 26 2816.16 Enclosed Switches
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
Section 28 3100 Fire Detection and Alarm
DIVISION 32 EXTERIOR IMPROVEMENTS
Section 32 3113 Chain Link Fences and Gates
This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0 Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0
Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR
STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
MICHSPEC No. 97.0820 −−−− 00020 THROUGH 97.0820 −−−− 00440
RELEASED ON NOVEMBER 1, 1997;
Developed from Contract Forms and Conditions of the Contract
FORMSPEC Michigan Model and suggested for use with Bidding Requirements
1997 Edition/Rev 11/2018 Version
STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS
MICHSPEC DTMB 00010 − 1 (Rev. 11/2018)
SECTION 00010 TABLE OF CONTENTS
SECTION/PAGE NO.
SUBJECT INDEX
SECTION 00020 GLOSSARY ............................................................................................................................................ 00020 - 1
SECTION 00030 ADVERTISEMENT ................................................................................................................................. 00030 - 1
SECTION 00100 INSTRUCTIONS TO BIDDERS .............................................................................................................. 00100 - 1
ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS ................................................................................................. 00100 - 1
ARTICLE 2 QUALIFICATIONS OF BIDDERS .................................................................................................................... 00100 - 1
ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ...................................... 00100 - 2
ARTICLE 4 INTERPRETATIONS; ADDENDA ................................................................................................................... 00100 - 3
ARTICLE 5 BID SECURITY ............................................................................................................................................... 00100 - 3
ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................. 00100 - 4
ARTICLE 7 MATERIALS AND EQUIPMENT ..................................................................................................................... 00100 - 4
ARTICLE 8 SUBCONTRACTORS ..................................................................................................................................... 00100 - 5
ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................ 00100 - 5
ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS................................................................................................ 00100 - 6
ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ...................................................................................................... 00100 - 6
ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD .............................................................................................. 00100 - 7
ARTICLE 13 BIDS TO REMAIN OPEN ................................................................................................................................ 00100 - 7
ARTICLE 14 AWARD OF THE CONTRACT ........................................................................................................................ 00100 - 7
ARTICLE 15 EXECUTION OF THE AGREEMENT .............................................................................................................. 00100 - 9
ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................ 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE ................................. 00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST....................................................................................... 00110 - 1
SECTION 00120 SUPPLEMENTARY INSTRUCTIONS .................................................................................................... 00120 - 1
SECTION 00210 INFORMATION FOR BIDDERS ............................................................................................................. 00210 - 1
SECTION 00300 BID SUMMARY ..................................................................................................................... 00300 - SUMMARY
SECTION 00300 BID FORM .............................................................................................................................................. 00300 - 1
ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................ 00300 - 1
ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................. 00300 - 1
ARTICLE 3 TIME OF COMPLETION ................................................................................................................................... 00300 - 2
ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................. 00300 - 2
ARTICLE 5 DEFINED TERMS ............................................................................................................................................. 00300 - 2
ARTICLE 6 BID SCHEDULE ................................................................................................................................................ 00300 - 3
ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES .................................................................................................... 00300 - 5
ARTICLE 8 BID SUBMITTED ON ....................................................................................................................................... 00300 - 6
SECTION 00310 BID BOND .............................................................................................................................................. 00310 - 1
SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................... 00320 - 1
SECTION 00410 BID BREAKDOWN ................................................................................................................................ 00410 - 1
SECTION 00420 QUESTIONNAIRE .................................................................................................................................. 00420 - 1
ARTICLE 1 ORGANIZATION .............................................................................................................................................. 00420 - 1
ARTICLE 2 SPECIALTY CONTRACTOR LICENSES ......................................................................................................... 00420 - 1
ARTICLE 3 EXPERIENCE .................................................................................................................................................. 00420 - 1
ARTICLE 4 ADDITIONAL QUALIFICATIONS ..................................................................................................................... 00420 - 2
ARTICLE 5 REFERENCES ................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ........................................................................................................................ 00420 - 3
SECTION 00430 LIST OF SUBCONTRACTORS .............................................................................................................. 00430 - 1
SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT ................................................................................. 00440 - 1
ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS .......................................... 00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS ................................................................... 00440 - 3
SECTION 00500 AGREEMENT ......................................................................................................................................... 00500 - 1
ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK ............................................................................................. 00500 - 1
ARTICLE 2 CONTRACT DOCUMENTS ............................................................................................................................. 00500 - 1
ARTICLE 3 CONTRACT PRICE .......................................................................................................................................... 00500 - 2
ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00500 - 2
ARTICLE 5 PAYMENTS TO CONTRACTOR ..................................................................................................................... 00500 - 3
MICHSPEC DTMB 00010 − 2 (Rev. 11/2018)
ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ........................................................................................ 00500 - 3 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS ......................................................................................................... 00500 - 3
ARTICLE 8 MISCELLANEOUS ........................................................................................................................................... 00500 - 3
ARTICLE 9 NOTICE AND SERVICE ................................................................................................................................... 00500 - 4
SECTION 00520 ATTACHMENT “A” TO AGREEMENT .................................................................................................. 00520 - 1
SECTION 00610 PERFORMANCE BOND ....................................................................................................................... 00610 - 1
SECTION 00620 PAYMENT BOND .................................................................................................................................. 00620 - 1
SECTION 00700 GENERAL CONDITIONS ....................................................................................................................... 00700 - 1
ARTICLE 1 INTERPRETATIONS .......................................................................................................................................... 00700 - 1
1.1 Section 00020 Glossary:.............................................................................................................................................. 00700 - 1
1.2 Intent of the Contract Documents: ............................................................................................................................... 00700 - 1
1.3 Priority of the Contract Documents: ............................................................................................................................. 00700 - 2
1.4 Interpretation of Indemnification Provisions: ................................................................................................................ 00700 - 2
1.5 Additional Interpretations: ............................................................................................................................................ 00700 - 2
1.6 Ownership and Use of the Contract Documents: ......................................................................................................... 00700 - 3
1.7 Copies of the Contract Documents: .............................................................................................................................. 00700 - 3
ARTICLE 2 THE OWNER−GENERAL PROVISIONS ......................................................................................................... 00700 - 3
2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................ 00700 - 3
2.2 Reference Points; Base Lines and Benchmarks: ......................................................................................................... 00700 - 3
2.3 Stop Work Order: ......................................................................................................................................................... 00700 - 3
2.4 Limitations on the Owner’s Responsibilities: ............................................................................................................... 00700 - 4
2.5 Additional General Provisions: ..................................................................................................................................... 00700 - 4
2.6 Partnering Charter: ...................................................................................................................................................... 00700 - 4
ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS ......................................................................................... 00700 - 4
3.1 Owner’s Representative: ............................................................................................................................................ 00700 - 4
3.2 Clarifications and Interpretations: ................................................................................................................................ 00700 - 4
3.3 Minor Variations and No-Cost Changes; Minor Delays:............................................................................................... 00700 - 5
3.4 Determinations by the Professional: .......................................................................................................................... 00700 - 5
3.5 Limitations on the Professional’s Responsibilities: ...................................................................................................... 00700 - 5
ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS .......................................................................................... 00700 - 5
4.1 Review of the Contract Documents: ............................................................................................................................ 00700 - 5
4.2 Management, Supervision, and Personnel: ................................................................................................................. 00700 - 5
4.3 Materials and Equipment: ............................................................................................................................................ 00700 - 6
4.4 Concerning Control of Work: ....................................................................................................................................... 00700 - 6
4.5 Patent Fees and Royalties: .......................................................................................................................................... 00700 - 7
4.6 Use of Premises: ......................................................................................................................................................... 00700 - 7
4.7 Record Documents: ..................................................................................................................................................... 00700 - 7
4.8 Emergencies: ............................................................................................................................................................... 00700 - 8
4.9 Indemnification: ........................................................................................................................................................... 00700 - 8
ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS ......................................................................................................... 00700 - 8
5.1 Employment of Subcontractors: ................................................................................................................................... 00700 - 8
5.2 "Or Equal" and Substitute Materials and Equipment:................................................................................................... 00700 - 9
5.3 The Contractor’s Continuing Responsibilities: ........................................................................................................... 00700 - 9
ARTICLE 6 SUBMITTALS ................................................................................................................................................... 00700 - 9
6.1 Shop Drawing, Sample and Other Technical Submittals: ............................................................................................ 00700 - 9
6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 10
6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 10
6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 10
6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 10
ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 11
7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 11
7.2 Sales and Use Tax and Other Similar Taxes: ............................................................................................................. 00700 - 12
7.3 Safety and Protection: ................................................................................................................................................ 00700 - 12
7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 12
7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 12
7.6 The Owner’s Liability Insurance: ................................................................................................................................ 00700 - 13
7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 13
7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 13
7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 13
MICHSPEC DTMB 00010 − 3 (Rev. 11/2018)
7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 13
7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 13
7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 14
7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 14
ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 15
8.1 Starting the Work: ....................................................................................................................................................... 00700 - 15
8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 15
8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 15
8.4 Substantial Completion: .............................................................................................................................................. 00700 - 15
8.5 Partial Use: ................................................................................................................................................................. 00700 - 16
8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 16
8.7 Suspension of Work: .................................................................................................................................................. 00700 - 16
8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 16
ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND
APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 17
9.1 Warranty: ................................................................................................................................................................... 00700 - 17
9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 17
9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 17
9.4 Correction of Work: .................................................................................................................................................... 00700 - 17
9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 18
9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 18
ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 19
10.1 Changes in the Work: ................................................................................................................................................ 00700 - 19
10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 19
10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 20
10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 20
10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 20
10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 21
10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 21
10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 21
ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN
CONTRACT TIME ......................................................................................................................................... 00700 - 22
11.1 General Provisions: ................................................................................................................................................... 00700 - 22
11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 22
11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 22
11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 23
11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 23
11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 23
11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 24
11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 24
11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 24
11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ....................... 00700 - 24
11.11 Limits on the Fee for the Work Involved: ................................................................................................................... 00700 - 25
11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................ 00700 - 25
11.13 Changes in Contract Time for Early Completion: ....................................................................................................... 00700 - 25
11.14 Access to Records: .................................................................................................................................................... 00700 - 26
11.15 Price Reduction for Defective Cost and Pricing Data: ............................................................................................... 00700 - 26
ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 26
12.1. Schedule of Values: ................................................................................................................................................... 00700 - 26
12.2 Requests for Payment: .............................................................................................................................................. 00700 - 27
12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 27
12.4 Refusal to Make or to Recommend Payment: ........................................................................................................... 00700 - 27
12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 27
12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 28
12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 28
12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 28
ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 28
13.1 Related Work at Site: ................................................................................................................................................. 00700 - 28
13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 29
13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 29
MICHSPEC DTMB 00010 − 4 (Rev. 11/2018)
ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 29
14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 29
14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 30
14.3 Surety Default: ........................................................................................................................................................... 00700 - 31
14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 31
14.5 The Contractor May Suspend Work: ....................................................................................................................... 00700 – 31
ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 31
15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 31
15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 32
15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 32
15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 32
15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 33
15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 33
15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 33
SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1
DIVISION 01 GENERAL REQUIREMENTS BY PSC
SECTION 01310 PROGRESS SCHEDULE ...................................................................................................................... 01310 - 1
SCHEDULES - BOUND HEREIN
DRAWINGS - BOUND SEPARATELY
ARCHITECTURAL
A-000 – Title Sheet
A-001 – Code Compliance Sheet
S-100 – Foundation Plan
S-100A – Foundation Plan Alternate
A-100 – Composite Floor Plan
A-101 – Enlarged Floor Plans
A-101A – Enlarged Floor Plans Alternate
A-102 – Enlarged Floor Plans
A-102A – Enlarged Floor Plans Alternate
A-103 – Enlarged Floor plans
A-103A – Enlarged Floor plans Alternate
A-110 – Details
A-200 – Elevator Lobbies and Cab Details
A-200A – Elevator Lobbies and Cab Details Alternate
MECHANICAL
P-001 – Plumbing Title Sheet
P-101 – Bottom Level Plumbing Plan
P-101A – Bottom Level Plumbing Plan - Alternate
M-001 – Mechanical Title Sheet
M-101 – Bottom Level Mechanical Plan
M-101A – Bottom Level Mechanical Plan - Alternate
ELECTRICAL
E-001 – Electrical Symbols Sheet
ED-101 – 1
St
Level – Electrical Demolition
ED-101A – 1
St
Level – Electrical Demolition Alternate
E-101 – 1 St and 2 nd
Level – Electrical
E-101A – 1 St and 2 nd
Level – Electrical Alternate
E-102 – 3 Rd
Level – Electrical
E-102A – 3 Rd
Level – Electrical Alternate
MICHSPEC DTMB 00010 − 5 (Rev. 11/2018)
E-103 – 4 Th and 5 Th
Level – Electrical
E-103A – 4 Th and 5 Th
Level – Electrical Alternate
E-104 – 6 Th
Level – Electrical
E-104A – 6 Th
Level – Electrical Alternate
E-701 – Electrical Schedules
STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY
MICHSPEC DTMB 00020 - 1 (Rev. 11/2018)
SECTION 00020 GLOSSARY
1.1 Defined Terms:
1.1.1. The following terms or relative pronouns used in
Division 0 of the Specifications have these intent and meanings:
Activity−An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.
Addenda−Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who actually submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.
Agreement−The written agreement between the Owner and Contractor covering the Work to be furnished and performed.
Alternate−Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.
Apparent Low Bidder: Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.
Archaeological Feature−Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.
As-Planned Schedule−Is the Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.
Authorized Technical Data−Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.
Bar Chart Schedule−Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model
Bid−Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates. The term Bid includes a Rebid.
Bidder−The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.
Bidding Documents−The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.
Bid Price−The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.
Bid Security−Security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.
Bidding Requirements−The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.
*AD Board−The Administrative Board of the State of Michigan.
Bonds−Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.
Business Day−Any Day except Saturdays, Sundays and holidays observed by the Owner.
Bulletin−A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.
Calendar Day−Every day shown on the calendar, Saturdays, Sundays and holidays included.
Cash Allowance−An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or
MICHSPEC DTMB 00020 - 2 (Rev. 11/2018) other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.
Change Authorization−A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.
Change Order−A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.
Contact Person−Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.
Contract−Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.
Contract Award−The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.
Contract Documents−Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.
Contract Float−Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.
Contract Price−The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).
Contract Times−The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work.
The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.
Contractor−Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.
Correction Period−Period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.
Cost of the Work Involved−The sum of all costs that would be, or actually were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.
CPM Schedule−Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.
Critical Path Method (CPM)−The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.
Date of Commencement of the Contract Time−The date when the Contract Time starts to run.
Defective−An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.
Defective Work/Non Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non compliant conditions requiring response and remedy by the Contractor.
Delay−Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.
*Department (DTMB)−Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.
Director-SFA is the Director of DTMB State Facilities Administration.
Director-DCD is the Director of DTMB State Facilities Administration, Design and Construction Division
MICHSPEC DTMB 00020 - 3 (Rev. 11/2018)
Division−Each of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.
Drawings−Part of the Contract Documents showing the Work. Drawings shall neither serve nor be used as Shop Drawings.
Early (Late) Dates−Early (late) times of performance for the Activities.
Emergency−A condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.
Fee for the Work Involved (Fee)−A negotiated, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and
(b) negotiated, reasonable profit on the Cost of the Work Involved.
General Requirements−Division 1 of the Specifications.
Hazardous Material−Asbestos, ACBMs, PCBs, petroleum products, such construction materials as paint thinners, solvents, gasoline, oil, etc., and any other like material the manufacture, use, treatment, storage, transportation or disposal of which is regulated by federal, State or local Laws governing the protection of public health, natural resources or the environment.
State Facilities Administration - Entity in the Department of Technology, Management and Budget responsible for design, construction, and operations and maintenance of facilities and capital renewal.
State Facilities Administration Representative - Designated DTMB-SFA Design and Construction Division Project Director (a) Responsible for directing and supervising the Professional’s services during the period allowed for completion of the Work; and/or (b) Acting as representative for the Owner and for the enforcement of the Contract Documents, approving payment to the Contractor and coordinating the activities of the State, Owner, Professional and Contractor.
Law(s)−Means federal, State and local statutes, ordinances, orders, rules and/or regulations.
MCL−The Michigan Compiled Laws of the State of Michigan.
Means and Methods−Includes means, methods, techniques,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .