Addendum 2 18051 (r).pdf

PDF 80 KB Posted

Attached to
171/18051. TYC; Flint SOB; Parking Ramp Elevator Upgrades
Solicitation number
RFQ 171 190000000439 3
Issued by
Genesee County, Fife Lake Village, Michigan

About this file

This is Addendum Two to a solicitation issued by the State of Michigan Department of Technology, Management & Budget (DTMB) for the Flint State Office Building Parking Garage Elevator Renovation project (File No. 171/18051.TYC, Project #18-309.00). The addendum, dated May 31, 2019, modifies the original drawings and specifications and takes precedence over them. The modifications pertain to Elevator 3 at the base bid phase, requiring contractors to pull the entire piston and cylinder, backfill the casing, and cap it with a welded steel plate. Additionally, contractors must remove and dispose of oil in a legal manner. All incidental items required to provide these modifications are to be included in the bid, even if not specifically described. The addendum was distributed to all bidders receiving plans and specifications, and receipt must be noted on the Proposal Form.

No specifications or drawing modifications are noted as applicable for this addendum. The document was prepared by Hobbs+Black Architecture and issued under the authority of Todd Cordill, DTMB Project Director, with copies distributed to all plan holders via SIGMA, DTMB Facilities Supervisor Mike Noonan, and consulting representatives Jon Filliez, Robin Hyman, and Jacob Sabins.

View the file

Other files

File Type Posted
18051_Drawings 03 ARCH.pdf PDF
18051_Drawings 07 ELEC.pdf PDF
18051_Drawings 02 ARCH.pdf PDF
18051_Drawings 05 MECH.pdf PDF
Advertisemnt 18051 (r).pdf PDF
Addendum 1 18051 (r).pdf PDF
18051_Drawings 06 ELEC.pdf PDF
Specifications 18051 (r).pdf PDF
18051_Drawings 01 STRUC_ARCH.pdf PDF
18051_Drawings 04 ARCH.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

117 E. Al legan Street, Lansing, Michigan 48933 | 517.484.4870

ANN ARBOR | LANSING | PHOENIX | WWW.HOBBS-BLACK.COM

ADDENDUM TWO

DATE: May 31, 2019

PROJECT: Flint State Office Building Parking Garage Elevator Renovation File No.: 171/18051.TYC

PROJECT #: 18-309.00

This Addendum is issued for the purpose of modifying and/or clarifying the original drawings and specifications and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This Addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on Proposal Form in appropriate locations.

GENERAL

1. At base bid Elevator 3: Pull the entire piston and cylinder; and backfill and cap the casing with ¼” thick steel plate cap, welded in place.

2. Remove and dispose of oil in legal manner.

SPECIFICATIONS

1. Not applicable for this addendum.

DRAWINGS

2. Not applicable for this addendum.

END OF ADDENDUM

NCS:ame cc: All Plan Holders, via SIGMA Todd Cordill, DTMB Project Director Mike Noonan, DTMB Facilities Supervisor Jon Filliez, DRA Robin Hyman, CTR Jacob Sabins, CTR

File details come from the government source that posted it. Updated .