This document contains the specific terms and conditions for an Invitation to Bid (ITB) issued by the Alabama Department of Transportation (ALDOT) for HVAC maintenance and repair services at the Grove Hill Area 8 facility. The solicitation seeks qualified contractors to provide HVAC maintenance and minor repairs to specified equipment, with minor repairs including component replacement, thermostat wire and capacitor repairs, drain line clearing, duct work repairs, belt replacement, and small refrigerant leak repairs. The scope explicitly excludes new HVAC unit installation, complete system replacement, and any work requiring structural modifications such as sheetrock removal or concrete breaking. The deadline for questions is July 1, 2026, by 5:00 pm. The resulting contract will be established for an initial 12-month period with options to extend for up to four additional consecutive 12-month periods at the same pricing, terms, and conditions, provided both parties agree in writing no later than 30 days prior to expiration of each period.

Award will be made to the lowest responsible bidder meeting all specifications, as determined by an award matrix revealed at bid opening. Bidders must submit HVAC repair parts pricing as a markup percentage entered in the unit price section of the item grid. Contractors must provide proof of certification from the Alabama State Board of Heating, Air Conditioning, and Refrigeration Contractors and carry a minimum of $1,000,000 liability insurance coverage with $500,000 per occurrence, with the State of Alabama named as certificate holder. Workers' compensation insurance is also required. All materials must comply with trade practice standards and local codes, and contractors must submit a complete materials list to the area maintenance engineer prior to job site delivery. Price escalations may be considered if justified by documentation and do not exceed industry-specific price index or CPI increases; any price de-escalations must be passed to the state immediately. Vendors have five days to respond to any information requests, and failure to comply may result in bid rejection.

View the file

Other files

File Type Posted
ITB Standard Boilerplate.pdf PDF
ALDOT_Area_8_Speccs_HVAC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALDOT Area 8 Grove Hill HVAC Services (ITB) Terms and Conditions

The purpose of this solicitation and resulting contract is to provide HVAC maintenance and minor repairs to all equipment listed in the agency specifications. Minor repairs may include changing out bad parts, fixing connections such as thermostat wires and capacitors, clearing clogged drain lines, repairing existing duct work, replacing belts, repairing small refrigerant leaks, etc. At no point shall new HVAC units be installed or entire systems be replaced using this contract. Also, any work that would include taking down sheetrock, breaking up concrete, or any change in the design of the current equipment, must not be done through this contract.

Award:

Award will be made per grouping to the lowest responsible bidder meeting all specifications. The lowest bidder will be determined by an award matrix revealed at the bid opening.

Bid Submission Instructions:

Beginning on the Alabama buys supplier portal page, select the desired sourcing project. Once project is opened, make sure the left panel is expanded. If not, click on small double arrows to expand. Be sure to review each tab for necessary information and enter bid amounts on item grid as needed. After you have checked and completed each tab, you can validate and submit your bid.

****Note:

• HVAC Repair Parts line: Bidders are to enter a mark-up percentage in the Unit Price section of the item grid. Example: If you are bidding a 15% markup on repair parts, you will enter 15.00 in the unit price section.

• Suppliers may enter “NA” in the Supplier Part Number section of the item grid.

Contractor's Qualifications and Requirements:

Each bidder shall provide proof of certification by the State of Alabama Board of Heating, Air Conditioning, and Refrigeration Contractors. Failure to provide said documentation may result in the rejection of your bid.

Liability Insurance:

Supplier must have a minimum of $1,000,000.00 liability coverage with $500,000.00 per occurrence and must be in effect for the contract period. Insurance certificate, or letter of intent to provide the amount of coverage from the insurance company must be submitted with the bid, or the bid may be rejected. Supplier is responsible for all losses/damages caused by its employees. Insurance certificate, when issued, must show the State of Alabama as the certificate holder. Suppliers are required to hold Workman’s Compensation Insurance to satisfy local, state, and federal regulations.

Requested information:

Any information requested from a vendor must be furnished within five (5) days from receipt of request. Failure to provide the information with the time frame above may result in the rejection of your bid.

Applicable Laws:

The supplier will comply with all applicable Federal and State of Alabama laws and all municipal ordinances that apply to these services.

Liability of Supplier:

The supplier will be responsible for the damage to the State of Alabama property/building when the damage is caused by supplier/employees while executing services.

Assignment of contract:

To assign, sublet, sub-contract, or transfer any contract resulting from this solicitation, the supplier's written request must be approved by the Chief Procurement Officer.

Contract Period:

Establish a 12-month contract with an option to extend for a second, third, fourth, and fifth 12-month period with the same pricing, terms and conditions. The second, third, fourth, or fifth 12-month period, if agreed by both parties, would begin the day after the first, second, third, or fourth 12-month period expires. Any successive extension must have written approval of both the state and vendor no later than 30 days prior to expiration of the previous 12-month period.

Quality of materials and labor:

Materials used that are not otherwise specified shall be the kind and quality consistent with the trade practice for such work and shall comply with all local codes. All labor shall be well experienced in this type of work, and it shall be completed in a professional manner. Prior to delivery of materials to the job site, the contractor shall submit to the area maintenance engineer a complete list of all materials proposed to be furnished and installed.

Price Escalation:

If, during the performance of this contract, the cost of material, labor, or any other contract component significantly increases through no fault of the supplier, a price increase may be considered. Supplier should provide justification of any price increase for materials, labor, or any other contract component, including documentation from the manufacturer where applicable. Any proposed increases in labor and/or materials should not exceed increases during the same time period in industry specific price index or in CPI (Consumer Price Index) if no industry index is available. All price increases must be approved by both the state and the supplier in writing. Any de-escalation in price shall be passed onto the state immediately while still meeting all specifications, terms, and conditions of the contract.

Default:

When a supplier defaults on a contract and/or purchase order, the State may procure the goods or services under the contract from other sources and the defaulting supplier shall be responsible for any additional costs incurred by the State for the procurement from other sources. The defaulting supplier may also be subject to suspension and/or debarment in accordance with the Code of Alabama or the State of Alabama Department of Finance Administrative Code.

Deadline for Questions: July 1, 2026, by 5:00 pm.