Special Provisions1.docx
DOCX document 679 KB Posted
- Attached to
- IDOT Continuous Count Sites in D1
- Solicitation number
- 26-494DOT-FINAD-B-50847
- Issued by
- Illinois
About this file
This document contains Special Provisions for an Illinois Department of Transportation (IDOT) contract to provide electrical maintenance and repair services for approximately 50 Continuous Count Sites (CCS) in District 1, which encompasses Cook, Lake, McHenry, Kane, DuPage, and Will counties. The contractor must provide a designated service representative available during normal business hours to respond to service calls, with response times defined by priority level: Level 1 (Priority Service) requires response within 24 hours and completion within 5 days; Level 2 (Routine Work) requires completion within 20 days; and Level 3 (Annual Maintenance/New Installation) requires completion within 90 days. The contractor must maintain an office located no more than three-hour drive time from work sites and employ International Brotherhood of Electrical Workers journeymen or department-approved equivalents. Work includes installation and maintenance of traffic counting equipment, detector loops, piezo axle sensors, controller cabinets, solar power systems, and video traffic counters at specified locations. The contractor is responsible for furnishing all labor, tools, equipment, materials under $25 per unit, cellular phones, electronic mail capabilities, and test equipment, with no reimbursement allowed for travel or communication expenses.
Payment is calculated on hourly rates for journeyman electricians, laborers, and equipment usage (pickup trucks, bucket trucks, arrow boards, and attenuators), measured to the nearest 0.25-hour increments. Parts and materials over $25 per unit are reimbursed at actual cost plus markup (15% for invoices up to $2,500, 10% for $2,500-$5,000, and 5% for amounts exceeding $5,000), with supplier invoices required as documentation. Monetary deductions apply for failure to meet response times: $100 per day for Level 1, $75 per day for Level 2, and $50 per day for Level 3 (Monday-Friday, excluding holidays). The contractor assumes all liability for damage to existing structures or right-of-way resulting from operations and must restore damage at their own expense. The contract requires compliance with traffic control standards, work zone protection, and supervision of workforce to ensure efficient material and worker utilization. All work must be performed during state-designated hours without interference to state operations, and the contractor is solely responsible for any damage to underground electrical facilities, with replacement required from handhole to controller rather than splicing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB vendor-instructions-and-requirements B50847~1.docx | DOCX document | |
| blank vendor-disclosure-formerly-forms-A.docx | DOCX document | |
| IFB offer-to-the-state-of-illinois B50847.pdf | ||
| blank IPG-active-registered-vendor-disclosure-formerly-forms B.docx | DOCX document | |
| contract IDOT Continuous Count Sites~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
LOCATION OF PROJECT
This project is located in Cook, Lake, McHenry, Kane, DuPage, and Will counties in their entirety.
ASSIGNMENT OF WORK
Nothing in this contract shall be construed to provide the Contractor the exclusive right to service the Department’s electrical facilities in District 1. The Department reserves the right to perform any and all work on these CCS locations with its own forces to work within District 1.
CONTRACTOR’S REPRESENTATIVE
The Contractor shall designate a service representative to serve as the key contact person for the Department in the execution of this contract. The service representative shall monitor the daily activities of the contract and be available to discuss and respond to any problems that may arise. The services of this person shall be included in the contract, and no additional compensation shall be allowed.
CONTRACTOR REQUIREMENTS
The Contractor shall be available to respond to calls for service during normal business hours to correct any malfunction of equipment or address any repairs to damaged equipment resulting from any cause. The Contractor shall designate at least two responsible representatives of its organization of whom the Department may issue work orders and instructions. The Contractor shall provide the necessary information (names and telephone numbers) of these representatives. One of these representatives shall always be available during normal business hours.
The Contractor must occupy an office and be engaged primarily in the provision of electrical services as it pertains to Traffic Count site maintenance and installation. The business or employees of this business should be located no more than a three-hour drive time from the site where services are to be rendered. Response time begins with the receipt of the call / email from the Department. When the Contractor dispatches only one person to perform the work, that person will be an International Brotherhood of Electrical Workers journeyman, tradesman, or approved by the department equivalent. When the job requires more than one person, an apprentice or aid may accompany the journeyman.
The Contractor shall report the existence of any defective equipment, controls, and/or accessories which may require replacement or repairing. This information shall be given to the Department representative via phone call or email and shall include the list of the defective item/items, photos of pavement sensors, photos of cabinets and solar infrastructure.
The Contractor will be required to perform the specified work with his/her own workforce.
CONTRACTOR RESPONSIBILITY
The Contractor shall be solely responsible for any damage to existing structures or to the right of-way resulting from the operation of their equipment or employees while making repairs. The Contractor shall, at his/her own expense, restore any damage to a condition equal to that existing before the damage was done as directed by the Department.
CONTROL OF WORK
The Department will conduct frequent inspections of the respective systems and installations to determine if the servicing is being performed by the Contractor promptly, satisfactorily, and in the manner specified in the contract.
ELECTRONIC MAIL
The Contractor shall have electronic mail receiving and sending capabilities available. The Department will utilize these communication media to reduce errors in communications; to send/receive work orders, photos, site visit forms, various drawings, and estimate sheets as needed. This requirement shall be included in the contract, and no additional compensation shall be allowed.
EXPENSES
Unless otherwise agreed upon and stated herein, this Contract does not allow for reimbursement of any expense incurred by Contractor including, but not limited to, telephone or other communications device, postage, copying, travel, transportation, lodging, food, and per diem.
JOURNEYMAN ELECTRICIAN
This work shall consist of a journeyman electrician’s labor, tools, equipment, and other incidentals necessary or convenient to the successful completion of work orders and the carrying out of all duties and obligations imposed by the contract. Also, the journeyman electrician shall be required to carry a cellular telephone to facilitate communications with work crews and to verify operation conditions of CCS facilities. The Department reserves the rights to use the cellular telephone to contact the journeyman electrician for his or her location and to request a report on the status of a work order.
This work will be measured to the nearest 0.25 hour for each journeyman electrician approved for use on the applicable work order. Labor rates for journeyman electrician shall be inclusive of (but not limited to) all regular and premium time, insurance, benefits, overheard, and profit.
This work will be paid for at the contract unit price per HOUR for JOURNEYMAN ELECTRICIAN.
LABOR
This unit shall be eligible for payment only when labor is performed onsite at appropriate work locations. Labor will be measured to the nearest 0.25 hour for each person other than journeyman electrician or apprentice electrician (normally a laborer) approved for use on the applicable work order on items other than routine work items. Labor rates shall be inclusive of (but not limited to) all regular and premium time, insurance, benefits, overhead, and profit.
The laborer shall furnish all labor, tools, equipment, and other incidentals necessary or convenient to the successful completion of work orders and the carrying out of all duties and obligations imposed by the contract.
This work will be paid for at the contract unit price per HOUR for LABOR.
LABOR, TOOLS, AND EQUIPMENT
The Contractor shall furnish all labor, tools, equipment, and other incidentals necessary or convenient to successfully complete the work orders and carry out all duties and obligations imposed by the contract.
All Contractor work crews shall be equipped with a cellular telephone to facilitate communications with work crews and to verify operating conditions of CCS facilities. Only the crew leader will be required to be equipped with a cellular telephone. The Contractor shall provide the Department with the telephone number being used in the execution of each work order. The Department reserves the rights to use the cellular telephone to contact a Contractor’s work crew for their location and to request a report on the status of a work order. No additional compensation for cellular telephone expenses will be allowed.
Only labor onsite at work locations shall be eligible for payment. The Department will specify if the journeyman electrician and/or apprentice electrician pay items will be utilized on each individual work order. Overtime work during nights, weekends, and holidays will be performed by the Contractor only at the direction of the Department.
The time allowed for the truck pay items included in this contract shall be the actual time the truck is onsite at the work location (while work is underway). Truck rates include (but not limited to) the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs, overhaul and maintenance of any kind, depreciation, storage, overhead, profits, insurance, and all incidentals.
Arrow board (trailer mounted) shall meet the requirements of Articles 701.15(i) and 1106.02. The time allowed for arrow board (trailer mounted) shall be the actual time the arrow board is in use at the work location.
Attenuator, crash (truck mounted) shall meet the requirements of Articles 701.15(h) and 1106.02.
The time allowed for the attenuator, crash (trailer mounted) shall be the actual time the attenuator is in use at the work location.
Individual pieces of equipment not listed in the “Equipment Watch Rental Rate Blue Book” and having a replacement value of $2500.00 or less shall be considered to be tools or small equipment, and no payment will be made for their use on this contract. The Contractor should utilize the appropriate equipment to complete the repair as authorized by the Department. If the Contractor chooses to use equipment that in the opinion of the Department is above and beyond what is required, the Contractor shall be compensated at the appropriate amount as determined by the Department of what was necessary to complete the work order.
Method of Measurement: Truck usage will be measured to the nearest 0.25 hour for each pickup truck, bucket truck (length less than 35 feet), or bucket truck (length 35 feet to 65 feet) approved for use on the applicable work order.
Arrow board usage will be measured to the nearest 0.25 hour for each arrow board (trailer mounted) approved for use on the applicable work order.
Truck mounted attenuator usage will be measured to the nearest 0.25 hour for each attenuator, crash (truck mounted) approved for use on the applicable work order.
Basis of Payment: Truck usage will be paid for at the contract unit price per HOUR for PICK-UP TRUCK, BUCKET TRUCK (LENGTH LESS THAN 35 FEET), or BUCKET TRUCK (LENGTH 35
FEET TO 65 FEET).
Arrow board usage will be paid for at the contract unit price per HOUR for ARROWBOARD
(TRAILER MOUNTED).
Truck mounted attenuator usage will be paid for at the contract unit price per HOUR for ATTENUATOR, CRASH (TRUCK MOUNTED) and shall include the cost of the truck driver.
PARTS AND MATERIALS
Parts and materials supplied by the Contractor, which have a retail value under $25.00 per unit, shall be considered included in the contract, and no additional compensation is allowed.
If parts and materials are required to complete a work order and are not already considered included within an existing contract pay item, then the Contractor shall receive the actual cost for parts and materials supplied (including transportation charges paid by the Contractor). To this actual cost, a maximum of 15% will be added for invoice amounts up to $2,500, 10% for invoice amounts from $2,500 to $5,000 and 5% for invoice amounts greater than $5,000. The cost of all parts and materials shall be itemized on the invoice for each work order. The actual billing invoices from the suppliers of items greater than $25.00 for any single unit must be submitted as documentation of parts and materials costs.
When such parts and materials are furnished by the Contractor, the material shall be of the best grade of its respective kind for the intended purpose. The Contractor is expected to make a good faith effort to purchase the parts and materials supplied by them at the lowest possible price. The transportation of the parts and materials to the location on the work order by the Contractor shall be considered included with the contract, and no additional compensation shall be paid (except for when a special piece of equipment is required to properly transport the items). All materials provided by the Contractor shall be new, unless otherwise stipulated, and in accordance with the standards specified.
The Department may request to the Contractor in writing to order parts and materials not to be installed by the Contractor. These parts and materials will be used by the Department in the repair and/or maintenance completed by the Department work force.
RESPONSE TIMES
The Department will define the expected response times at the time of issuing the work order based on the following:
LEVEL 1 – Priority Service Calls – Respond within 24 hours of issuance, and complete work within five days.
LEVEL 2 – Routine Work Items – Complete work within 20 days of the date that the work order was issued.
LEVEL 3 – Annual maintenance / New site installation – Complete work within 90 days of the date that the order was issued.
It shall be the Contractor’s responsibility to promptly notify the Department, if for any reason, the Contractor cannot meet either the response time established at the issuance of the work order or the response times established herein. If the response time exceeds the time allowed, the Department has the option of contacting another contractor.
RESPONSE TIME, FAILURE TO MEET
Should the Contractor fail to respond and/or complete a work order on time, or such extended time as may have been allowed by the Department, a monetary deduction will be applied to monies due or that may become due to the Contractor. The value of the monetary deduction will be as follows:
For LEVEL 1 - $100 per day (Monday-Friday Excluding holidays) per work order.
For LEVEL 2 - $75.00 per day (Monday-Friday Excluding holidays) per work order.
For LEVEL 3 - $50.00 per day (Monday-Friday Excluding holidays) per work order.
For the purpose of calculating the LEVEL 1 and LEVEL 2 monetary deductions, a day shall be any (or portion of) excluding the following:
(a) When adverse weather at the field jobsite prevents work on the controlling item of a work order.
(b) When job conditions at the field jobsite due to recent weather conditions prevent work on the controlling item of a work order.
(c) When work on the controlling item has been suspended by an act or omission by the Department or Engineer.
SCHEDULE OF WORK
Any work performed on state premises shall be done during the hours designated by the State and performed in a manner that does not interfere with the State and its personnel.
SUPERVISION OF WORK FORCE
The Contractor shall provide adequate supervision to their work force to ensure that workers and materials are utilized in an efficient manner. This is to include, but not limited to, ensuring knowledgeable and experienced workers are matched to related servicing tasks, the proper type of service vehicle is sent for each work order, and service vehicles are equipped with the parts, materials, and equipment required to complete the work order. No additional allowance will be made for general superintendence of the work force used on this contract.
TEST EQUIPMENT
The Contractor shall provide all its own testing instruments, as required, to service the CCS facilities of the Department. The Contractor shall use the established procedures as defined by the manufacturer, Department Special provisions or standard practice to determine the integrity of the equipment. The Department shall be provided with the testing procedures used upon request. All required test equipment shall be included in the contract, and no additional compensation will be allowed.
TRAVEL EXPENSE
The Contractor shall not be reimbursed for travel expenses, including "port to port" charges, incurred in fulfilling obligations under this contract. All such charges are to be included and paid for as part of the unit costs contained herein.
UNDERGROUND FACILITIES
The Contractor's attention is directed to the possible presence of state-owned underground electrical cable within the limits of the proposed work order.
The Illinois Department of Transportation IS NOT a member of the Joint Utility Locating Information for Excavators (JULIE) System. Any damage to the underground facilities, caused by the Contractor shall be repaired to the satisfaction of the Department at the Contractor's expense, including temporary repairs which may be required to keep the facility operational while material is being obtained to make permanent repairs. Splicing of electric cable will not be allowed. Electric cable shall be replaced from handhole to controller.
WORK DURING PEAK HOURS
Contractor will be permitted to work on any day from dawn to dusk unless work requires a lane restriction in a high-volume area in which work may be restricted to non-rush hours.
The Contractor shall have all lanes of traffic open during peak hours in the appropriate direction.
The Contractor will not be allowed to conduct any type of operation in the open lanes or any type of operation that would impede the flow of traffic during peak hours.
WORK ORDERS
No work of any kind is to be performed by the Contractor unless a work order authorizing the work has been issued by the Department. The work order shall show the date and time issuance, type of facility, location, a description of the service required, the problem reported, and/or pay items. The work order will indicate a contact and telephone number for the Contractor to contact with any questions regarding the work order.
If at the time of service being performed, additional work of a minor nature (not to exceed $500) appears to be needed, the Contractor shall proceed with that work. If it appears that the additional work could result in a substantial addition or change to the current work order, the Contractor shall contact the Department’s Data Management Lab contact before proceeding with the additional work.
The date and time that the Contractor’s work crew arrives at the location on the work order and the date and time the requested work is completed shall be noted on the Contractor’s billing invoice submitted to the Department for payment. If the work is not completed on the first trip, the Contractor shall record on the invoice the arrival and departure dates and times for all subsequent work crews until the work order is completed.
The Contractor shall advise the Department’s Data Management Lab contact upon arrival and departure of the site of all service calls and provide the status of work.
TRAFFIC CONTROL PLAN
Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these special provisions, and any special details and Highway Standards contained herein and in the plans.
Conformance to these traffic control and protection standards and this special provision will not be paid for separately but rather the cost shall be considered included in the various contract items.
It is the intention of the Department that the various routes be kept open to traffic at all times during the construction of this contract. The Contractor shall utilize the proper traffic control and protection procedures required by the applicable highway standards, listed above, to properly protect its workmen and the motoring public when work is being performed on or near the roadway.
The traffic control standard recommended is based on the Department’s estimate of the nature of work, duration, and equipment required to perform the repairs.
Any deviation must remain in compliance to the Standard Specifications for Road and Bridge Construction, Standard Specifications for Traffic Control Items, and the Manual of Uniform Traffic Control Devices according to the most recent edition of each and prior approval by the Department is required.
DOCUMENTATION
A Work order form will be sent to the contractor for each job. The contractor must fill out the work order form in its entirety and return it to the Department after the job is completed.
TRAFFIC SPOTTERS (BDE)
Effective: January 1, 2019 Revise Article 701.13 of the Standard Specifications to read:
“ 701.13 Flaggers and Spotters. Flaggers shall be certified by an agency approved by the Department. While on the job site, each flagger shall have in his/her possession a current driver’s license and a current flagger certification I.D. card. For non-drivers, the Illinois Identification Card issued by the Secretary of State will meet the requirement for a current driver’s license. This certification requirement may be waived by the Engineer for emergency situations that arise due to actions beyond the Contractor's control where flagging is needed to maintain safe traffic control on a temporary basis. Spotters are defined as certified flaggers that provide support to workers by monitoring traffic.
Flaggers and spotters shall be stationed to the satisfaction of the Engineer and be equipped with a fluorescent orange, fluorescent yellow/green, or a combination of fluorescent orange and fluorescent yellow/green vest meeting the requirements of ANSI/ISEA 107-2004 or ANSI/ISEA 107-2010 for Conspicuity Class 2 garments. Flaggers shall be equipped with a stop/slow traffic control sign. Spotters shall be equipped with a loud warning device. The warning sound shall be identifiable by workers so they can take evasive action when necessary. Other types of garments may be substituted for the vest as long as the garments have a manufacturer’s tag identifying them as meeting the ANSI Class 2 requirement. The longitudinal placement of the flagger may be increased up to 100 ft (30 m) from that shown on the plans to improve the visibility of the flagger. Flaggers shall not encroach on the open lane of traffic unless traffic has been stopped.
Spotters shall not encroach on the open lane of traffic, nor interact with or control the flow of traffic.
For nighttime flagging, flaggers shall be illuminated by an overhead light source providing a minimum vertical illuminance of 10 fc (108 lux) measured 1 ft (300 mm) out from the flagger’s chest. The bottom of any luminaire shall be a minimum of 10 ft (3 m) above the pavement.
Luminaire(s) shall be shielded to minimize glare to approaching traffic and trespass light to adjoining properties. Nighttime flaggers shall be equipped with fluorescent orange or fluorescent orange and fluorescent yellow/green apparel meeting the requirements of ANSI/ISEA 107-2004 or ANSI/ISEA 107-2010 for Conspicuity Class 3 garments.
Flaggers and spotters shall be provided per the traffic control plan and as follows.
(a) Two-Lane Highways. Two flaggers will be required for each separate operation where two-way traffic is maintained over one lane of pavement. Work operations controlled by flaggers shall be no more than 1 mile (1600 m) in length. Flaggers shall be in sight of each other or in direct communication at all times. Direct communication shall be obtained by using portable two-way radios or walkie-talkies.
The Engineer will determine when a side road or entrance shall be closed to traffic. A flagger will be required at each side road or entrance remaining open to traffic within the operation where two-way traffic is maintained on one lane of pavement. The flagger shall be positioned as shown on the plans or as directed by the Engineer.
(b) Multi-Lane Highways. At all times where traffic is restricted to less than the normal number of lanes on a multilane pavement with a posted speed limit greater than 40 mph and the workers are present, but not separated from the traffic by physical barriers, a flagger or spotter shall be furnished as shown on the plans. Flaggers shall warn and direct traffic.
Spotters shall monitor traffic conditions and warn workers of errant approaching vehicles or other hazardous conditions as they occur. One flagger will be required for each separate activity of an operation that requires frequent encroachment in a lane open to traffic. One spotter will be required for each separate activity with workers near the edge of the open lane or with their backs facing traffic.
Flaggers will not be required when no work is being performed, unless there is a lane closure on two-lane, two-way pavement.”
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
Effective: November 1, 2021 Revised: November 1, 2022 Add the following paragraph after the first paragraph of Article 701.08 of the Standard Specifications:
“The Contractor shall equip all vehicles and equipment with high-intensity oscillating, rotating, or flashing, amber or amber-and-white, warning lights which are visible from all directions. In accordance with 625 ILCS 5/12-215, the lights may only be in operation while the vehicle or equipment is engaged in construction operations.”
CONCRETE FOUNDATION, TYPE-D
DESCRIPTION
This item shall consists of constructing a Type-D foundation for the installation of a Type-III ground cabinet housing continuous traffic count equipment, anchor bolts and ground rod in accordance with the following requirements and conforming in all respects to the lines, grades and dimensions shown on the plans or as directed by the Engineer and in applicable portions of Section 878 of the Standard Specifications.
MATERIALS
The materials shall conform to the specifications for Class SI concrete Reinforcement Bars in the Standard Specifications. The conduit and fittings within the limits of the foundation shall conform to the same requirements as specified for the conduit outside these limits. Anchor bolts shall meet the requirements of Section 505 and Article 1006.09 of the Standard Specifications.
A ground rod shall be installed in each foundation and shall conform to Article 1087.01. Unless otherwise indicated, ground rods shall be one piece copper-clad steel rods ¾” x 10 feet. After installation, and before acceptance of the ATR, the earth ground shall be tested in the presence of the Engineer utilizing an appropriate earth-ground test set.
CONSTRUCTION
The Class SI Type-D foundations shall be at the locations specified in the plans. The top of the foundations shall be finished level. Shimming will not be permitted. All edges along the top of the foundation shall have a 1-inch bevel. A form extending a minimum of 9 inches below the top surface of the foundation is required. The form shall be set level and means shall be provided for holding same rigidly in place while the concrete is being deposited. If the excavation is irregular, a form shall be used to provide the proper dimensions of the entire foundation below the grade surface. Where a concrete foundation is contiguous to a sidewalk, preformed joint filler of 1 inch thickness shall be placed between the foundation and the sidewalk.
All conduit in the foundation shall be installed rigidly in place before concrete is deposited in the form. Insulated bushings shall be provided at the ends of conduit.
Anchor bolts shall be set in place before the concrete is deposited by means of a template constructed to place the anchor bolts in accordance with the pattern of the bolt holes in the base. After installation of cables, all conduit openings in the foundations shall be sealed with an approved mastic. The required number and size of galvanized steel conduit shall be installed in every concrete foundation as shown in the plans. An excess of galvanized steel conduit shall be installed in every concrete foundation. These excess stubs shall be 2 inches in length. Placement and Quantity shall be determined by the Engineer and the ends of the stubs shall be capped.
Incidental to the cost of each Type-D foundation, the contractor shall construct a 5-inch PCC sidewalk of rectangular area 3 foot x 4 foot immediately adjacent to the cabinet door, with the 4 foot dimension of the rectangle parallel to the cabinet door when closed. The only situation where this is not applicable is when the foundation is immediately adjacent to or within a paved sidewalk or shoulder area where no further surfacing area is required. The Engineer shall be the sole judge of proper action if this situation should arise.
BASIS FOR PAYMENT
This work shall be paid for at the contract unit price per foot of depth of CONCRETE FOUNDATION, TYPE D, which price shall be payment in full for all necessary excavating, backfilling, disposal of surplus material, form work, and furnishing all materials, anchor bolts, stubs, and ground rods within the limits of the foundation.
CONTROLLER CABINET TYPE III
This item shall consist of furnishing and installing Type-3 ground-mounted cabinets of the size specified in place including anchor bolts, bases, cable harnesses, ground rods, terminal boards, shelves, mounting hardware, and all miscellaneous items at locations as directed by the Engineer.
MATERIALS
Cabinets shall be of fabricated aluminum supplied in the sizes with minimum inside dimensions as listed below.
| Type |
| Height |
| Width |
| Depth |
| Thickness |
| Opening |
| E.S.P. 3 |
| 49.5 In |
| 30 In |
| 17 In |
| .185 In |
| 38 In X 27.5 In |
A heavy-duty gasket shall be installed around the cabinet door opening to provide a weather-tight seal for the protection of the enclosed equipment.
The Type-3 ground mounted cabinet shall be caulked along the entire perimeter of the base with a waterproof, non-hardening compound prior to setting the cabinet on the foundation to ensure a water, dust and insect-proof seal.
The cabinet shall be provided with a screened vent under the roof overhang, but a thermostatically controlled fan is not required. No louvers or filtered air intake in the door shall be required.
The cabinet exterior surface shall be smooth, free of marks and scratches and provide an unpainted brushed aluminum finish.
The cabinet door shall be capable of being opened to various angles by a stop and catch mechanism.
The cabinet door shall be equipped with Type-2 Corbin brass locks.
The cabinet shall not be equipped with a police door.
The cabinet shall have two (2) shelves for setting counter/classifiers and other equipment. The shelves’ vertical position shall be adjustable.
Materials shall conform to applicable portions of controller cabinets as listed in the Standard Specifications Section 1074.03
INSTALLATION DETAILS
Installation shall conform to applicable portions of Section 863 of the Standard Specifications.
The detector loop leads shall be equipped with lightning protection. Any lightning protection for the axle sensors shall be as recommended by the manufacturer. Lightning arrestors for the detector loop leads shall be EDCO SRA6LCBLL, manufactured by EDCO Inc. of Belleview, FL. or equivalent. The type of high-quality lightning arrestors for the axle sensor lead-in shall be as recommended by the equipment manufacturers. The terminal board wiring and all other wiring and connections shall be as indicated in the wiring diagram. Open-end spade connectors shall be used and shall be of sufficient length to allow moving the I.R.D. Automatic Traffic Recorder or equal counter/classifier at least 2 feet outside the cabinet door opening without disconnecting any cables.
No holes shall be drilled through the cabinet exterior for internal equipment mounting.
Each wire entering a cabinet shall be trained in a workmanlike manner and lugged at each terminal strip. If more than one wire has a common terminal on a terminal strip, the adjacent strip shall be used and an appropriate jumped connection shall be made.
All cables and wiring entering a cabinet shall be dressed, harnessed, tied, laced, and clamped to produce a workmanlike wiring installation.
All cables, loop wires, power, shall be labeled with a Panduit type cable tag. The tag will identify the type of cable and the cable destination.
The Piezo Electric Axle Sensor Transmission Cable shall be terminated in the cabinet with a male BNC connector of a commercial grade or better and a colored strain-relief sleeve. Assembly shall be performed using proper methods and tooling. Twist-on connectors shall not be used.
The Piezo Electric Axle Sensor Transmission Cable color code shall be as follows:
| LANE #1 |
| RED |
| LANE #2 |
| WHITE |
| LANE #3 |
| GREEN |
| LANE #4 |
| BLUE |
| LANE #5 |
| ORANGE |
| LANE # 6 |
| VIOLET |
A copper grounding bus shall be mounted on the rear wall of the cabinets connecting all components to earth ground. Each cabinet shall contain a wiring diagram of the installation in addition to the diagrams which are to be submitted to the Engineer.
The cabinet shall be wired in accordance with the plans provided. Any deviation from the plans shall be submitted and approved in advance.
The Contractor shall furnish three (3) diagrams of the internal and external connections of the equipment in each cabinet. He shall also furnish the operating and maintenance instructions for all equipment supplied. One copy of the wiring diagrams for each cabinet shall be retained in each field cabinet. Wiring diagram shall be contained in a plastic pouch that shall be permanently mounted to the door of each cabinet. Contractor shall permanently mark the cabinet for each terminal connection as to function and destination.
Incidental to the cost of each cabinet, the Contractor shall construct a 5-inch PCC sidewalk of a rectangular area 3 feet by 4 feet immediately adjacent to the cabinet foundation on the same side of the foundation as the cabinet door, with the 4-foot dimension of the rectangle parallel to the cabinet door when closed. If the width of the required cabinet foundation is greater than the 3-foot width of the standard Type D concrete foundation, the 4-foot dimension of the sidewalk area shall be increased to equal the width of the foundation plus 1 foot, the area to extend 6 inches beyond each side of the foundation. This paragraph shall be applicable at all cabinet locations included in this Section. The only situations where this paragraph shall not apply are as follows: When the foundation is immediately adjacent to or within a paved sidewalk or shoulder area and no further surfacing is required. The Engineer shall be the sole judge as to the applicability of this paragraph in all questions arising there from.
No conduit shall be allowed to enter cabinet through the sides, top or back walls.
Terminal blocks provided in field cabinets shall be the heavy-duty barrier type. The terminal block shall be a minimum of 2 inch wide and 1.2 inch deep. Center to center of the terminal screws or studs shall be a minimum of 0.63 inch with barriers in-between. Terminal blocks shall be rated at 45 amps 600 volts breakdown RMS line to line 11,000 V. and breakdown RMS line to ground 13,800 V. A marking strip shall be provided with each terminal block.
METHOD OF MEASUREMENT
Each cabinet installed complete and in place on a Type D concrete foundation will be counted as a single unit.
BASIS FOR PAYMENT
This work will be paid for at the contract unit price each for CONTROLLER CABINET, TYPE-III which price shall be paid in full for furnishing, wiring and installing the new cabinet, anchor bolts and terminal facilities complete.
DETECTOR LOOP LEAD-IN CABLE IN CONDUIT, CONOGA-30003
DESCRIPTION
This work consists of furnishing and installing loop detector lead-in cables or interconnect cables of the number of pairs specified in the conduit in accordance with the requirements of the Standard Specifications, Section 886 and the following exceptions or additions:
MATERIALS
The Traffic Count Detector Loop Lead-in Cable shall be Canoga 30003 or equivalent.
INSTALLATION
Each end of the cable shall be identified with wire markers as directed by the Engineer.
The drain wire of each pair shall be grounded to chassis ground in the cabinet only for interference suppression.
The electrical values of the cable shall be metered by the Contractor, in the presence of the Engineer, after they are spliced to the detector loop. Acceptance of the cable as metered shall be determined by the Engineer.
This work shall be paid for at the contract unit price per lineal foot for ELECTRIC CABLE IN CONDUIT, CONOGA-30003.
DETECTOR LOOP, TYPE I
This item shall consist of furnishing, installing and testing 6' X 8' rectangular detector loops at the locations shown on the plans. The detector loops shall be installed in accordance with all details shown on the plans and applicable portions of Section 886 of the Standard Specifications. All sawcutting, detector loop installation, joint sealing, lead-ins, and testing necessary to complete the installation shall conform to the following requirements:
MATERIALS
The cable used for detector loop shall be #14-7 strand XHHW XLP-600V, encased in orange Detecta-duct tubing as manufactured by Kris-Tech Wire Company, Inc or equivalent. All loop wire shall be UL listed. Lead-ins shall be Conoga-30003 cable or equivalent from the handhole to the cabinet. The jacket shall be made of high-density polyethylene.
At ambient air temperatures above 50 degrees F, joint sealer having a minimum tensile strength of 100 P.I.E. when tested by ASTM Method D638-58T shall be used. The sealer shall have sufficient strength and resiliency to withstand stresses caused by vibrations, and pavement expansion and contraction due to temperature changes. Adhesion of the sealer to Portland cement concrete shall be at least equal to the tensile strength of the concrete. The joint sealer shall have a maximum cure time of 30 minutes. Curing shall be defined as the capability of with standing normal traffic loads without degradation. The sealer shall meet or exceed the specifications of OZ GEDNEY DOZSeal 230 filling compound.
If the ambient air temperature is below 50 degrees F, a hard asphalt-base filling and insulating compound having a high softening point and a high pouring temperature shall be used. The filling compound shall have a softening point of not less than 235 degrees F, a summer pouring temperature of 375 degrees F, and a winter pouring temperature of 425 degrees F.
INSTALLATION DETAILS
The Engineer shall be contacted regarding proposed changes in loop locations necessitated by badly deteriorated pavement. The Engineer may relocate such loops. Detector loops may not be installed before permanent striping is completed on a newly resurfaced section of road.
Slots in the pavement shall be cut with a concrete sawing machine in accordance with the applicable portions of Section 420.05 of the Standard Specifications. The slot must be clean, dry, and oil-free. Wire shall be inserted in the pavement slot with a blunt tool which will not damage the insulation. Loops shall not be dry cut. Loops shall not be installed at an outside temperature below 50° F unless directed by Engineer.
All excess joint sealer shall be removed so that the level of the sealer in the sawcut is at the same level as the adjoining pavement.
Plastic sleeving shall be used to insulate the wire where loop wire crosses cracks and joints in the pavement. The sleeving shall be properly sealed with electrical tape to prevent joint sealer from entering sleeves. Sleeving shall extend a minimum of 8 inches each side of joint.
Detector loops shall be centered in all traffic lanes unless designated otherwise on the plans or by the Engineer. Traffic lanes shall be referred to by number, and loop wire shall be color-coded and labeled accordingly. Lane #1 shall be the southbound (westernmost) or westbound (northernmost) outside lane. Subsequent lanes are to be coded sequentially towards the opposite outside shoulder. A chart which shows the coding for each installation shall be included in each cabinet. Core holes will not be allowed at corners of loops. Sawcuts for all detector loops and lead-ins shall not be greater than 2 3/4 inches in depth.
All detector loops shall contain four (4) turns of #14 wire. Detector loops shall not be connected in series with other loops. Each detector loop shall have its own lead-in cable to the cabinet when said detector loop is over 150 feet from the cabinet. The loop lead-in shall be a Canoga 30003 cable or equivalent. Loop and lead-in wires shall be free from kinks or any insulation abrasions. Lead-ins shall be twisted in such a manner so as to prevent mechanical movement between the individual cables. Lead-in cable shall be brought into a cabinet or handhole at the time the detector loop is placed in the pavement.
Where lead-in runs are less than 150 feet, the loop wire shall be utilized as lead-in to the point of termination without splices, being twisted 5 turns per foot. The loop wire will be paid for as lead-in from the handhole to the point of termination in the cabinet.
Loop lead-ins placed in handholes shall be coiled, taped and secured to the upper portion of the handhole to protect against water damage. The excess coiled wire should not exceed 6' in length. Any other method of installation will require prior written approval of the Engineer. Each loop lead-in shall be color coded and tagged at each angled drilled hole, handhole, and junction box through which it passes and at the termination point in the cabinet.
An angled hole shall be drilled at least 12 inches in from the edge of pavement through which the 1 1/4 inch PVC conduit containing the loop lead-in cable shall be installed (see plan detail).
The loop shall be spliced to the lead-in wire with a barrel sleeve, crimped and soldered. Adhesive-lined heat shrink tubing shall be used to provide waterproof protection for the splice. The soldered connection shall be made with a soldering iron or soldering gun. No other method will be acceptable, i.e. the use of a torch to solder will not be acceptable. The heat shrink tubing shall be shrunk with a heat gun. No other method will be acceptable, i.e. the use of a torch will not be acceptable. No burrs shall be left on the wire when soldering is finished. Cold solder joints will not be acceptable.
The Traffic Count Detector Loop color code shall be as follows:
| LOOP #1 | GRAY |
| LOOP #2 | ORANGE |
| LOOP #3 | PURPLE |
| LOOP #4 | BLUE |
| LOOP #5 | GREEN |
| LOOP #6 | YELLOW |
| LOOP #7 | BROWN |
| LOOP #8 | WHITE |
At locations where there are more than eight loops, loops number nine through number sixteen shall repeat the same color code, but all loops shall additionally be marked to identify the lane.
In addition to color codes each loop shall be identified with a written label attached to the loop wire, or lead-in wire. The tags shall be Panduit #MP250W175-C or equivalent. All wires and cables shall be identified in each handhole or cabinet the cable passes through, or terminates in. The labels shall be attached to the cable by use of two cable ties.
PROTECTION OF WORK
Electrical work, equipment and appurtenances shall be protected from damage during construction until final acceptance. Electrical duct openings shall be capped or sealed to prevent the entrance of water and dirt. Wiring shall be protected from mechanical injury.
STANDARDS OF INSTALLATION
Electrical work shall be completed in a neat and workmanlike manner in accordance with the best practices of the trade. Unless otherwise indicated, materials and equipment shall be new and installed in accordance with the manufacturer's recommendations.
Except as specified elsewhere herein, materials and equipment shall be in conformance with the requirements of Section 106 of the Standard Specifications.
TESTING
Detector loops shall be tested immediately upon installation at each automated traffic recording station and again at the time of Final Acceptance Inspection in the presence of the Engineer. Items which fail to test satisfactorily shall be repaired or replaced before final acceptance.
An electronic test instrument capable of measuring large values of electrical resistance, such as a megger, shall be used to measure the resistance of the detector loop and its lead-in. The resistance of the loop and its lead-in shall be a minimum of 100 megohms above ground under any conditions of weather or moisture. The resistance tests and all electronic tests shall be performed in the presence of the Engineer any number of times as specified by the Engineer. The loop and loop lead-in shall have an inductance between 100 microhenries and 350 microhenries. The continuity test of the loop and loop lead-in shall not indicate a resistance greater than two (2) ohms. The Contractor shall conduct all testing in the presence of the Engineer and all readings will be recorded by the Engineer. Testing shall be done with an approved loop tester.
METHOD OF MEASUREMENT
The detector loop measurement shall be the length of sawcut in the pavement which contains loop wire. The actual length of wire used in the sawcut shall not be considered in any measurement.
This item will be paid at the contract unit price per lineal foot for DETECTOR LOOP, TYPE I.
Loop Splicing Requirements 4-C No. 18 Twisted Shielded Cable Twist Black /White together Twist Red / Green together Canoga - 30003 wire or Equivalent.
WCSMW 30/100 Heat Shrink Tube Barrel sleeve, crimped & soldered Bare Wire Nylon covering scraped off only insulation and wire to remain No. 14 Wire with insulation PVC & Shielded cable to form water tight seal.
Minimum 25 mm (1") Heat Shrink Tube overlap on wire.
25 mm (1") min.
25 mm (1") min.
REVISIONS
Name Date 25 mm (1") min.
25 mm (1") min.
Illinois Department of Transportation Office of Planning and Programming 1-1-25 Date:
Checked By:
R Marx.
Drawn By:
R. Marx
NONE
Not to Scale Scale:
Note:
WCS 200/750 Heat Shrink Tube Traffic Detector Loop
PIEZO AXLE SENSORS, CLASS-II
DESCRIPTION
This item consists of installing one Class II Piezo Axle Sensor (AMP Model No. 4-1004673-0 BLC Sensor Class II 11’ with 300’ led or equivalent), in each lane indicated on the plans.
The use of Global Resin Epoxy or equivalent is necessary for proper bonding. A minimum of thirty (30) days cure time for new asphalt is required before the epoxy is used for bonding.
Piezo axle sensors may not be installed before permanent striping is completed on a newly resurfaced section of road. Installation of an automated traffic recorder must be completed no later than sixty (60) days after installation is begun.
Personnel from the Illinois Department of Transportation Data Management Lab or approved personnel must be present to supervise installation of the axle sensors
MATERIAL
The Class II axle sensors, necessary RG58C/U transmission cable and Global Epoxy or equivalent for encapsulating sensors shall be furnished by the Contractor. ROADTRAX BLC Traffic Sensors manufactured by AMP Incorporated or equivalent shall be installed at this location. The axle sensor shall be flexible along its longitudinal axis to allow the sensor to easily conform to the profile of the lane in which it is being installed. Class II axle sensors shall be manufactured with suitable lengths of RG58C/U transmission cable for continuous run from axle sensor through the handhole to the cabinet. Splicing of transmission cable to axle sensor shall not be permitted unless approved in advance and supervised by Mr. Ramon Taylor of the Illinois Department of Transportation.
INSTALLATION
Installation shall be in accordance with the attached instructions. The Engineer should be advised at least three days prior to installation. Contact Mr. Rich Marx of the Illinois Department of Transportation, telephone (217) 782-2065, to arrange a time and date for the installation. Personnel from the Illinois Department of Transportation Data Management Lab or approved personnel must be present to supervise installation of the axle sensors.
Heated loop sealers shall not be used to seal the RG58C/U transmission cable in the pavement sawcut. Sealex or equivalent loop sealant shall be used.
TESTING
Piezo axle sensors shall be tested immediately upon installation and again at the time of Final Acceptance Inspection in the presence of the Engineer. The tests shall be performed utilizing an oscilloscope to ensure acceptable, clean signals of proper amplitude and polarity. Sensors that fail to test satisfactorily shall be repaired or replaced before final acceptance.
This work shall be paid for at the contract unit price per linear foot for PIEZO AXLE SENSOR, CLASS II, measured along the sawcut in the pavement containing the axle sensor. The lead-in measured from the end of the axle sensor to the dive hole shall be paid for at the contract unit price per linear foot for detector loop type I. The lead-in from the dive hole to the cabinet shall be considered incidental since it is provided with the sensor.
HANDHOLE
This work shall consist of furnishing the materials and installing a precast composite concrete handhole, heavy-duty handhole, or double handhole in accordance with Sections 814 and 1088.05 of the Standard Specifications for Road and Bridge Construction and the following additions or exceptions.
The frame and cover shall be constructed of a polymer concrete and reinforced with a heavy-weave fiberglass cloth. The material shall be in accordance with Section 1088.05 of the Standard Specifications for Road and Bridge Construction. The nominal dimensions of the handhole shall be a minimum 17”(W) x 30”(L) x 36”(D) and the nominal dimensions of the double handhole shall be a minimum 30”(W) x 48”(L) x 36”(D).
The cover shall contain the legend “TRAFFIC SIGNALS” and shall be held down by two stainless steel hex head bolts. The cover shall contain 2 recessed lift pins. The cover for a double handhole shall be a split lid, 2-piece cover.
Basis of Payment: This work will be paid for at the contract unit price each for HANDHOLE; HEAVY-DUTY HANDHOLE; or DOUBLE HANDHOLE.
SOLAR POWER SYSTEM
DESCRIPTION
The solar power system shall consist of the (100W or higher) solar panel (collector) all necessary mounting hardware, post, Victron Energy SmartSolar MPPT 75/15 solar charge controller, and Relion RB100 Cold Weather Lithium Iron Phosphate Battery or equivalent with bolt terminals. It shall have a completely sealed, valve regulated construction. The systems must be of the following capacity: All continuous vehicle ATRs shall be equipped with 100 watt solar panel or larger. The system’s capacity should enable it to operate the equipment for thirty (30) consecutive days of heavily overcast weather without the power level of the battery dropping to a point at which it would no longer power or operate the equipment.
MATERIAL
The solar panel and all necessary mounting hardware shall be constructed of maintenance free materials which will not require painting. The solar panel surface shall be mounted at an angle of 65o referenced to the south horizon for maximum efficiency in this geographic region. Mounting height shall be a minimum of 9 feet above ground on a pressure-treated 4-inch x 6-inch post. Mounting in any other fashion will be as specified by the Engineer. A pullbox shall be installed in the conduit on the wood post approximately 3 feet above grade level to facilitate splicing the power wires to the solar panel.
BASIS FOR PAYMENT
This work will be paid for at the contract unit price each for SOLAR EQUIPMENT mounted on a new post which shall be payment in full for furnishing the post, the charge controller, the battery and the conduit with electric cable attached to the post.
TRENCH AND BACKFILL FOR ELECTRICAL WORK
Description This work shall consist of constructing and backfilling a trench for the accommodation of raceways, unit duct, and cables.
Materials Materials shall be according to the following.
Item Article/Section
(a) Fine…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .