This document is a comprehensive asbestos survey report for multiple buildings at Marine Corps Air Station Cherry Point in North Carolina. The survey, conducted by OLM Environmental, LLC in January 2023, assessed six Defense Logistics Agency (DLA) Distribution buildings (DDCN-00147, DDCN-00148, DDCN-00150, DDCN-00154 Bay C, DDCN-00159, and DDCN-04246) for potential asbestos-containing materials (ACM) prior to planned structural, fire suppression, and fire alarm system repairs. Laboratory analysis by AmeriSci Richmond found no asbestos detected in most sampled materials, though the report identified approximately 70 linear feet of presumed asbestos-containing pipe insulation in DDCN-00150 and exposed suspected asbestos-containing floor tiles in the same building. The report recommends following EPA and OSHA regulations if any identified asbestos-containing materials will be disturbed during renovation work, including proper removal, notification, and worker protection procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023 CONFIRMATION SURVEYS AND VISUAL
ASSESSMENTS TO IDENTIFY ASBESTOS HAZARDS
FOR PLANNED RENOVATIONS AND REPAIRS
DEFENSE LOGISTICS AGENCY DISTRIBUTION
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
FOR:
ATLAS ENGINEERING, INC.
551-A PYLON DRIVE
RALEIGH, NORTH CAROLINA 27606
ATLAS JOB NO. J2690
BY:
OLM ENVIRONMENTAL, LLC
2317 LOCKWOOD FOLLY LANE
RALEIGH, NORTH CAROLINA 27610
PHONE: 919-212-3019
CELL: 919-931-0629
OLM Environmental, LLC PHONE: (919) 212-3019
2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629
February 15, 2023
Atlas Engineering, Inc.
551-A Pylon Drive Raleigh, North Carolina 27606
Attention: Mike Riccitiello, PE, PMP President
Subject: 2023 Confirmation Surveys and Visual Assessments to Identify Asbestos Hazards for Planned Renovations and Repairs Defense Logistics Agency (DLA) Distribution Buildings DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN- 00159 and DDCN-04246 Structural, Fire Suppression and Fire Alarm/MNS-Related Repairs Marine Corp Air Station Cherry Point (MCAS Cherry Point) Contract No: FA8903-15-D-0016; Task Order: FA8903-20-F-0030 OLME Project No.: OLME-2022-38
Dear Mr. Riccitiello:
OLM Environmental, LLC (OLME) is pleased to present this report of our “confirmation” surveys and visual assessments to identify asbestos hazards from accessible areas throughout the above-mentioned facilities which are planned for various types of renovations and repairs. We understood, based on the information detailed in the provided “Statement of Work”, the following details the planned scope of work:
Facility Number
DDCN-
00147
DDCN-
00148
DDCN-
DDCN-00154,
Bay “C”
DDCN-
DDCN-
04246
Facility Description General Purpose
Warehouse
General Purpose
Warehouse
General Purpose
Warehouse
STG AIR/GRD
ORG UTS
MARCOR
General Purpose
Warehouse
General Purpose
Warehouse
Structural-Related Repairs
Yes Yes Yes Yes No No
Fire Suppression-Related Repairs
No No Yes Yes No Yes
Fire Alarm/MNS-Related Repairs
No No Yes Yes Yes Yes
Original Construction Date
1943 1942 1943 1943 1954 1987
Gross Square Footage 153,200 135,800 116,200 117,700 160,223 20,083
2023 Confirmation Surveys and Visual Assessments to Identify Asbestos Hazards February 15, 2023 for Planned Renovations and Repairs Page 2 Defense Logistics Agency (DLA) Distribution Buildings DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN-00159 and DDCN-04246 Structural, Fire Suppression and Fire Alarm/MNS-Related Repairs Marine Corp Air Station Cherry Point (MCAS Cherry Point) Contract No: FA8903-15-D-0016; Task Order: FA8903-20-F-0030 OLME Project No.: OLME-2022-38
Atlas Engineering (Atlas) located in Raleigh, North Carolina was contracted by APTIM Corporation
(APTIM) to provide and coordinate the design services, including hazardous materials related services, for the planned work. Atlas subcontracted OLME to provide asbestos-related consulting services to the project.
Atlas and APTIM representatives provided our inspectors information for the project, including the report entitled, “Report of Targeted Hazardous Materials Survey” dated 14 January 2019; AFCEC Contract:
FA8903-15-D-0002, Task Order 0441”. Wood Environment & Infrastructure Solutions, Inc. (Wood) located in Atlanta, Georgia performed the previous survey and assessment. We reviewed the information and results contained in the previous report. The scope of the previous survey did not fully cover the scope for this project. Facilities included in the 2019 included the following:
DDCN-00148 DDCN-00150
DDCN-00159 DDCN-04246
We reviewed and incorporated their findings for each facility into this report. Their bulk sampling analysis results indicated that, when observed and sampled throughout each facility, asbestos was “None Detected” in the following type materials:
Various Types of 2-foot by 2-foot Ceiling Tile
(Lay-in)
“New” and “Old” Wallboard and Associated
Joint Compound
Various Types, Sizes and Colors of Covebase and
Associated Mastic
Various Colors of Firestop
Plaster Felt Paper Various Types of 1-foot by
1-foot Ceiling Tile (Mechanically Applied)
Various Colors of Mastic
Spray-Applied Fireproofing
Various Types of 2-foot by 4-foot Ceiling Tile (Lay-in)
Stucco Material Various Colors of
Tile Grout
Concrete Various Colors of Caulking
(Wall Penetration)
We have attached the bulk sampling summary and sampling location drawing from Wood’s report in the sections entitled, “2019 Report of Targeted Hazardous Materials Survey Bulk Sampling Summary and
Sampling Locations Drawings”.
for Planned Renovations and Repairs Page 3 Defense Logistics Agency (DLA) Distribution Buildings DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN-00159 and DDCN-04246 Structural, Fire Suppression and Fire Alarm/MNS-Related Repairs Marine Corp Air Station Cherry Point (MCAS Cherry Point) Contract No: FA8903-15-D-0016; Task Order: FA8903-20-F-0030 OLME Project No.: OLME-2022-38
Although not sampled, their assessment and findings did identify approximately 70 linear feet of
“presumed” asbestos-containing pipe insulation (labeled as ACM) remaining in DDCN-00150. We did confirm the presence of the material and determined that additional labeled ACM remained throughout the facility and could be impacted by the planned work. The locations of our finding and observations of the additional remaining ACM are detailed in the section entitled, “Photographs”. This report also presents our overall review of information provided; recent site visit walkthrough and assessment observations; bulk sampling procedures; bulk sampling analysis results and recommendations.
PROJECT INFORMATION
Atlas representatives, Mike Riccitiello and Tim Ford, provided our inspectors with the project information, site access and drawings detailing the project. Mr. Ford also assisted our inspector during our walkthrough and bulk sampling. APTIM site representatives, Peyton Park and Donald Ball, provided our inspectors with site access and information and scope details during our site walkthrough, performed on January 9-10, 2023.
SURVEY PROCEDURES
With all authorized parties present, a walkthrough and visual assessment was conducted in each impacted area of each facility based on the scope of work planned. Our inspector assessed each area for the presence of any suspected Asbestos hazard(s) to determine if bulk samples of any suspect materials were required. We also confirmed the locations of the 2019 previous bulk sampling to determine if additional suspect materials remained and required sampling. Both friable and nonfriable suspect ACMs were considered during the course of the surveys. Friable materials are those materials that can be pulverized or reduced to powder by hand pressure.
At the completion of our walkthroughs and assessments, if necessary, a sampling strategy was determined;
and bulk samples were obtained. Suspect materials were grouped based on material homogeneity. A homogeneous area is an area that contains materials that seem by texture, color and wear to be uniform and applied during the same general time period. Based on observations made during our recent walkthrough of for Planned Renovations and Repairs Page 4 Defense Logistics Agency (DLA) Distribution Buildings DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN-00159 and DDCN-04246 Structural, Fire Suppression and Fire Alarm/MNS-Related Repairs Marine Corp Air Station Cherry Point (MCAS Cherry Point) Contract No: FA8903-15-D-0016; Task Order: FA8903-20-F-0030 OLME Project No.: OLME-2022-38 each facility, only DDCN-00148 and DDCN-00154 required collection and analysis of bulk samples of
“suspect” materials.
ANALYSIS PROCEDURES
For the bulk samples collected during our recent walkthroughs, each bulk sample obtained was analyzed using Polarized Light Microscopy (PLM), coupled with Dispersion Staining as outlined in the
Environmental Protection Agency's (EPA) accredited test method EPA 600/M4-82-020 that incorporates method EPA-600/R-93/116 where applicable as per 40 CFR 763. Summaries of the bulk samples are attached in the following section, “Summary of Analytical Results”. Our collected bulk samples were placed in sealed containers and shipped to AmeriSci Richmond laboratory (AmeriSci) located in
Midlothian, Virginia for analysis. AmeriSci is accredited under the National Voluntary Laboratory
Accreditation Program (NVLAP). Their NVLAP Laboratory Code is 101904-0.
SUMMARY OF ANALYTICAL RESULTS
Although not sampled for analysis, the following details the identified “presumed” ACM with estimated quantities remaining in-place which may be impacted by the work planned in DDCN-00150:
TYPE OF MATERIAL
GENERAL
LOCATION*
TYPE OF
ASBESTOS AND
PERCENTAGE
ESTIMATED
QUANTITY
Thermal System Insulation on Pipelines and Elbow Fitting
Bays “A”, “B”, “E” and “F”
“Presumed” and “Labeled” as ACM
500-700 linear feet
9-inch by 9-inch and 12-inch by 12-inch Floor Tile and Associated Black Mastic (Exposed and Under Carpet)
Bay “A” – Former Sales/Adjacent
Offices
Tile and Mastic:
Presumed as ACM
1,000-1500 sq. ft.
* It would be reasonable to assume that ACMs are present in these locations.
The following is a summary of the bulk sampling obtained and analyzed:
DDCN-00148: Asbestos was not detected in bulk samples of various types of 2-foot by 2-foot and 2-foot by
4-foot composite ceiling panels and gypsum wallboard and associated joint compound.
for Planned Renovations and Repairs Page 5 Defense Logistics Agency (DLA) Distribution Buildings DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN-00159 and DDCN-04246 Structural, Fire Suppression and Fire Alarm/MNS-Related Repairs Marine Corp Air Station Cherry Point (MCAS Cherry Point) Contract No: FA8903-15-D-0016; Task Order: FA8903-20-F-0030 OLME Project No.: OLME-2022-38
DDCN-00154: Asbestos was not detected in bulk samples of various types of 2-foot by 4-foot composite ceiling panels and gypsum wallboards.
A complete summary of the bulk sampling performed is attached in the Section entitled, “Asbestos Bulk
Sampling Record”. We have also attached a copy of each PLM laboratory report in Section entitled, “AmeriSci Richmond - PLM Bulk Asbestos Reports”. Finally, drawings detailing the recent bulk sampling locations and general location of the remaining identified ACMs in the section entitled, “Drawings of the Recent Bulk Sampling and General Locations of Presumed and/or Labeled ACMs”.
RECOMMENDATIONS
We understand that APTIM intends to perform the planned renovations and repairs in 2023. If the planned renovations and repairs have the potential or may include disturbing the “presumed and/or labeled” ACMs in order to complete the work, then these materials and surfaces must be addressed in accordance with applicable Federal, State, and local regulations. The EPA’s NESHAP asbestos regulation (40 CFR 61, Subpart M, Section 61.145) requires that regulated friable ACMs and regulated nonfriable ACMs that may become friable be properly removed prior to any planned renovation and/or demolition activities. The
North Carolina regulations (G.S. 130A-444 through 451) also require accreditation of personnel from inspector, designer, contractor supervisors and workers and air monitors in the asbestos field and notification and removal permit fees for such asbestos removal projects. These will be required if abatement is planned or required for the identified ACM.
The OSHA asbestos standards (29 CFR 1910 and 1926) address general industry and construction industry employee asbestos exposure. These standards set asbestos exposure limits that, if exceeded, require medical surveillance and training programs for the employees. Engineering controls, such as proper work practices, respiratory protection and protective clothing are also outlined to achieve compliance with exposure limits.
These standards also require the posting of warning signs in regulated areas and attaching warning labels on products containing asbestos and to waste containers. Asbestos remaining in the building in the non-public for Planned Renovations and Repairs Page 6 Defense Logistics Agency (DLA) Distribution Buildings DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN-00159 and DDCN-04246 Structural, Fire Suppression and Fire Alarm/MNS-Related Repairs Marine Corp Air Station Cherry Point (MCAS Cherry Point) Contract No: FA8903-15-D-0016; Task Order: FA8903-20-F-0030 OLME Project No.: OLME-2022-38 areas must be labeled to warn maintenance personnel about the presence of Asbestos. All employees who have the potential to come into contact with the “presumed and/or labeled” ACM must be trained for 2-hour awareness training as required by OSHA.
QUALIFICATIONS
This report summarizes OLME’s evaluation of the conditions observed at the DLA Distribution Buildings
DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, Bay C; DDCN-00159 and DDCN-04246 during the course of our surveys and assessments. Our findings are based upon our observations obtained at each facility and the analyses of the bulk samples obtained at the time of our survey. Any conditions discovered which deviate from the data contained in this report should be presented to us for our evaluation. OLME appreciates the opportunity to have provided these services. We would be glad to discuss any of the results contained in this report, at your convenience. If there are any questions concerning this report or results, please contact us at (919) 931-0629.
Sincerely, OLM Environmental, LLC
Oral L. McGirt Project Manager
Attachments: 2019 Report of Targeted Hazardous Materials Survey Bulk Sampling Summary and Sampling Locations Drawings Photographs Asbestos Bulk Sampling Record AmeriSci Richmond - PLM Bulk Asbestos Reports Drawings of the Recent Bulk Sampling and General Locations of Presumed and/or Labeled ACMs
2019 REPORT OF TARGETED HAZARDOUS MATERIALS SURVEY BULK
SAMPLING SUMMARY AND SAMPLING LOCATIONS DRAWINGS
DEFENSE LOGISTICS AGENCY (DLA) DISTRIBUTION
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTOGRAPHS
DEFENSE LOGISTICS AGENCY (DLA) DISTRIBUTION
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
BUILDING DDCN-00147
PHOTOGRAPHS – BUILDING DDCN-000147
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 1 View of Men’s and Women’s Restrooms Located in Bay
“A” Displaying Non-Asbestos Gypsum Wallboard
PHOTO No. 2 Interior View of Men’s and Women’s Restrooms Located in
Bay “A” Displaying Non-Asbestos Gypsum Wallboard and 2-foot by 2-foot Suspended Ceiling Panels (SCP)
PHOTO No. 3 View of Employees Offices Located in Bay “A” Displaying
Non-Asbestos, Painted CMU Block Exterior
PHOTO No. 4 Interior View of Employees Offices Located in Bay “A”
Displaying Non-Asbestos, 2-foot by 2-foot SCP Observed Throughout
PHOTOGRAPHS – BUILDING DDCN-000147
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 5 View of Another Employees Offices Located in Bay “A” Displaying Non-Asbestos, Painted CMU Block Exterior
PHOTO No. 6 Interior View of the Employees Offices Located in Bay “A” Displaying Non-Asbestos, 2-foot by 4-foot SCP Observed
Throughout
Notes:
Bay “A” Displayed Suspect Floor Tile and Mastic in the Offices and Restrooms Bays “B”, “C”, “D” and “E” Displayed No Suspect Materials other than Paints
BUILDING DDCN-00148
PHOTOGRAPHS – BUILDING DDCN-000148
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 7 View Inside Bay “E” Front Office Near Column (B, 5)
Displaying Non-Asbestos 2-foot by 2-foot SCP and Gypsum Wallboard with Joint Seam Compound Sampled
PHOTO No. 8 Another View Inside Bay “E” Front Office Near Column (B,5) Displaying Sampled Non-Asbestos 2-foot by 2-foot SCP and
Gypsum Wallboard with Joint Seam Compound Sampled
PHOTO No. 9 View Inside Bay “F” Large Office Near Column (D,3)
Displaying Non-Asbestos Gypsum Wallboard Perimeter
PHOTO No. 10 Interior View Inside Bay “F” Large Office Near Column (D,3) Displaying Non-Asbestos 2-foot by 4-foot SCP Sampled and
Non-Asbestos Gypsum Wallboard
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 11 Closer View of the Non-Asbestos 2-foot by 4-foot SCP Identified in Bay “F” Large Office Near Column (D,3)
PHOTO No. 12 View of Bay “F” Offices with Copy Room Near Column (D,2)
PHOTO No. 13 View Inside Copy Room Near Column (D,2) Displaying Non-Asbestos 2-foot by 4-foot SCP Sampled and Non-
Asbestos Gypsum Wallboard
PHOTO No. 14 Closer View of the Non-Asbestos 2-foot by 4-foot SCP Identified in Bay “F” Copy Room Near Column (D,2)
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 15 View of Bay “F” Offices with Breakroom Near Column
(H,2)
PHOTO No. 16 View Inside Breakroom Near Column (H,2) Displaying Non- Asbestos 2-foot by 4-foot SCP Sampled and Non-Asbestos
Gypsum Wallboard
PHOTO No. 17 Closer View of the Non-Asbestos 2-foot by 4-foot SCP Identified in Bay “F” Breakroom Near Column (H,2)
PHOTO No. 18 View of Bay “F” Men and Women’s Restroom Located
Between Column (L,1) and Column (N,1)
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 19 View Inside “Older” Men’s Restroom Displaying Painted
Non-Asbestos Plaster Ceiling Remaining
PHOTO No. 20 View of the Sampling Location for Sample 148-F-4 of Non-
Asbestos Gypsum Wallboard Obtained Near Women’s Room Entrance Near Column (L,1)
PHOTO No. 21 View of the Sampling Location for Sample 148-F-5 of Non-Asbestos Gypsum Wallboard Obtained Near Men’s Room Entrance
Near Column (N,1)
Note: Pipe Insulation (When Present) was Observed as Fiberglass Insulation Throughout the Facility
BUILDING DDCN-00150
PHOTOGRAPHS – BUILDING DDCN-000150
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 22 View Inside Bay “A” Sales North Side Perimeter Wall
Displaying Location Above SCP Where Asbestos- Containing Pipeline and Elbow Fittings TSI Remains
PHOTO No. 23 View Inside Bay “A” Sales of Exposed and Damaged 9-inch by
9-inch and 12-inch by 12-inch Floor Tile and Black Mastic Remains Concealed Under Carpet
PHOTO No. 24 Closer View Inside Bay “A” Sales of Exposed and
Damaged 9-inch by 9-inch and 12-inch by 12-inch Floor Tile and Black Mastic Remains Concealed Under Carpet
PHOTO No. 25 Another View Inside Bay “A” Sales Storage North Side Perimeter
Wall Displaying Asbestos-Containing Pipeline and Elbow Fittings TSI Extending Over SCP in Sales
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 26 Closer View of Exposed and Damaged Asbestos-
Containing Pipeline Insulation Observed
PHOTO No. 27 View Inside Bay “A” Sales Storage North Side Perimeter Wall
Displaying Where Asbestos-Containing Pipeline and Elbow Fittings TSI Remains
PHOTO No. 28 Another View Inside Bay “A” Sales Storage North Side Perimeter Wall Displaying Where Asbestos-Containing
Pipeline and Elbow Fittings TSI Remains
PHOTO No. 29 Closer View of the Asbestos Warning Label Applied on the
Asbestos-Containing Pipeline and Elbow Fitting TSI Identified in Sales Storage
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 30 View of Asbestos-Containing Insulation on Pipeline
Extending North-to-South in Sales Storage
PHOTO No. 31 Final View of Asbestos-Containing Insulation Observed on
Pipelines and Elbow Fitting Insulation Outside the South Side Perimeter Wall of Sales Storage
PHOTO No. 32 View Inside Bay “A” Near East Side Roll-up Gate
Displaying the Location of Asbestos-Containing Pipelines and Elbow Fitting Insulation Observed
PHOTO No. 33 Closer View Inside Bay “A” Near East Side Roll-up Gate
Displaying the Location of Asbestos-Containing Pipelines and Elbow Fitting Insulation Observed
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 34 Closer View of Exposed Asbestos-Containing Pipelines Insulation Observed Inside Bay “A” Near East Roll-up
Gate
PHOTO No. 35 View of Asbestos-Containing Pipeline Insulation Observed in
Bay “B” West Side Near Roll-Up Gate
PHOTO No. 36 Another View of Asbestos-Containing Pipeline Insulation
Observed in Bay “B” West Side
PHOTO No. 37 Closer View of the Asbestos Warning Label Observed Applied on the Asbestos-Containing Insulation in Bay “B” West Side
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 38 View of Asbestos-Containing Pipeline Insulation Observed
Labeled in the Mezzanine Level in Bay “E” East Side
PHOTO No. 39 Closer View of the Asbestos Warning Label Observed Applied on the Asbestos-Containing Insulation Observed Labeled in the Mezzanine Level in Bay “E” East Side
PHOTO No. 40 Another View of Asbestos-Containing Pipeline Insulation Observed Labeled in the Mezzanine Level in Bay “E” East
Side Near Bay “F” Side
PHOTO No. 41 View of Asbestos-Containing Pipeline Insulation Observed
Labeled in the Men’s Restroom in Bay “F” East Side Near Large Practice Room Under Mezzanine
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 42 Another View of Asbestos-Containing Pipeline Insulation Observed Labeled in the Men’s Restroom in Bay “F” East
Side Near Large Practice Room Under Mezzanine
PHOTO No. 43 Final View of Asbestos-Containing Pipeline Insulation Observed Labeled in the Men’s Restroom in Bay “F” East Side Near Large
Practice Room Under Mezzanine
PHOTO No. 44 View of Asbestos-Containing Pipeline Insulation Observed
Labeled in the Men’s Restroom in Bay “F” Southeast Corner
PHOTO No. 45 Another View of Asbestos-Containing Pipeline Insulation
Observed Labeled in the Men’s Restroom in Bay “F” Southeast Corner
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 46 View of Asbestos-Containing Pipeline Insulation Observed
Remaining Along Column Row 20 in Bay “F” - Central
PHOTO No. 47 Another View of Asbestos-Containing Pipeline Insulation
Observed Remaining Along Column Row 20 in Bay “F” - Central
PHOTO No. 48 View Exposed End of the Asbestos-Containing Pipeline Insulation Observed Remaining
Along Column Row 20 in Bay “F” - Central
Note: Labeled and Unlabeled Non-Asbestos (Fiberglass) Insulation was Observed Throughout the Building
BUILDING DDCN-00154; BAY “C” ONLY
PHOTOGRAPHS – BUILDING DDCN-000154; BAY “C” ONLY
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 49 View Inside Bay “C” Displaying the Wood Column, Existing Fire Suppression System Pipelines and Roof
Decking Observed Throughout
PHOTO No. 50 Another View Inside Bay “C” Displaying the Wood Column, Existing Fire Suppression System Pipelines and Roof Decking
Observed Throughout
PHOTO No. 51 Closer View of the Existing Fire Suppression System and
Metal Supports Observed Attached to the Wood Roof Deck Throughout
PHOTO No. 52 Additional View Inside Bay “C” Displaying the Wood Column, Existing Fire Suppression System Pipelines and Roof Decking
Observed Throughout
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 53 Final View Inside Bay “C” Displaying the Wood Column, Existing Fire Suppression System Pipelines and Roof Decking Observed Throughout
PHOTO No. 54 View of East Side Manufactured Office Where Bulk Sampling was Obtained
PHOTO No. 55 View Inside of the East Side Manufactured Office Displaying the Non-Asbestos 2-foot by 4-foot SCP
Observed and Sampled
PHOTO No. 56 Closer View of the Non-Asbestos 2-foot by 4-foot SCP
Observed and Sampled
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 57 View Above the SCP in the East Side Manufactured Office Displaying the General Location Where the Non-Asbestos
Gypsum Wallboard Sampling was Obtained
PHOTO No. 58 Closer View Above the SCP in the East Side Manufactured
Office Displaying the General Location Where the Non- Asbestos Gypsum Wallboard Sampling was Obtained
BUILDING DDCN-00159
PHOTOGRAPHS – BUILDING DDCN-000159
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 59 View Inside Bay “A” Displaying Existing Fire Suppression
System Piping and Fiberglass Insulation Pipelines and Fittings on Domestic Water Pipes
PHOTO No. 60 Another View Inside Bay “A” Displaying Existing Fire
Suppression System Piping and Fiberglass Insulation Pipelines and Fittings on Domestic Water Pipes
PHOTO No. 61 View Inside Bay “C” Displaying Exposed Structural
Support Members Observed Coated with Non-Asbestos Fireproofing (Previous Sampled)
PHOTO No. 62 Closer View Inside Bay “C” Displaying Exposed Structural
Support Members Observed Coated with Non-Asbestos Fireproofing (Previous Sampled)
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 63 View From the Second Floor Cubical Office Space
Displaying “Suspect” Asbestos-Containing Floor Tile and Underlying Mastic Observed Exposed and Under Carpet
PHOTO No. 64 Another View from the Second Floor Cubical Office Space Displaying “Suspect” Asbestos-Containing Floor Tile and Underlying Mastic Observed Exposed and Under Carpet
PHOTO No. 65 View of the Various Types of Non-Asbestos 2-foot by 2-foot and 2-foot by 4-foot SCP Observed Throughout the
Second Floor
PHOTO No. 66 Another View of the Various Types of Non-Asbestos 2-foot by
2-foot and 2-foot by 4-foot SCP Observed Throughout the Second Floor
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 67 Typical View of the Staging of the Fire Suppression Station
Observed Throughout the Second Floor
PHOTO No. 68 Another Typical View of the Staging of the Fire Suppression
Station Observed Throughout the Second Floor
BUILDING DDCN-04246
PHOTOGRAPHS – BUILDING DDCN-004246
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 59 View of the Exterior of Building DDCN-04246 Displaying
Metal Siding Applied Throughout
PHOTO No. 60 View of the Exterior Portion of the Building Where Work is
Planned and No Suspect Materials were Observed
PHOTO No. 61 View Inside of the Building Displaying the Existing Fire
Suppression System, Steel Framing and Fiberglass Batting Insulation Applied Throughout
PHOTO No. 62 Another View Inside of the Building Displaying the Existing
Fire Suppression System, Steel Framing and Fiberglass Batting Insulation Applied Throughout
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 63 View of the Building Roof Deck Displaying the Existing Fire Suppression System, Steel Framing and Fiberglass
Batting Insulation Applied Throughout
PHOTO No. 64 Another View of the Building Roof Deck Displaying the
Existing Fire Suppression System, Steel Framing and Fiberglass Batting Insulation Applied Throughout
PHOTO No. 65 View of the Manufactured Office Located
Near the Roll-up Gate
PHOTO No. 66 View of the Manufactured Office Located Near the Roll-up Gate
Displaying Non-Asbestos 2-foot by 4-foot SCP with Attached Sprinkler Heads and Gypsum Wallboard Walls
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
PHOTO No. 67 Another View of the Manufactured Office Located Near the Roll-up Gate Displaying Non-Asbestos 2-foot by 4-foot SCP with
Attached Sprinkler Heads and Gypsum Wallboard Walls
ASBESTOS BULK SAMPLING RECORD
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
SAMPLING DATES: JANUARY 9-10, 2023
INSPECTOR: ORAL L. MCGIRT
ASSISTED BY: TIM FORD (ATLAS)
SAMPLE
NUMBER
SAMPLE LOCATION TYPE OF MATERIAL
TYPE OF ASBESTOS AND
PERCENTAGE
BUILDING DDCN-00148 – BAY “E”
148-E-1 Front Office Near
Column (B, 5) 2-foot by 2-foot Suspended Ceiling
Panel with Splines and Pinholes None Detected
148-E-2 Front Office Near
Column (B, 6) 2-foot by 2-foot Suspended Ceiling
Panel with Splines and Pinholes None Detected
148-E-3 Front Office Near
Column (B, 5) Gypsum Wallboard with Joint Seam
Compound Wallboard and Compound:
None Detected
148-E-4 Front Office Near
Column (B, 6) Gypsum Wallboard with Joint Seam
Compound Wallboard and Compound:
None Detected
BUILDING DDCN-00148 – BAY “F”
148-F-1 Large Office Near
Column (D,3) 2-foot by 4-foot Suspended Ceiling Panels with Splines and Pinholes
None Detected
148-F-2 Copy Room Near
Column (D, 2) 2-foot by 4-foot Suspended Ceiling Panels with Splines and Pinholes
None Detected
148-F-3 Breakroom Near
Column (H,2) 2-foot by 4-foot Suspended Ceiling Panels with Splines and Pinholes
None Detected
148-F-4 Women’s Room
Entrance Near Column (L, 1)
Gypsum Wallboard with Joint Seam Compound
Wallboard and Compound:
None Detected
148-F-5 Men’s Room Entrance
Near Column (N-1) Gypsum Wallboard with Joint Seam
Compound Wallboard and Compound:
None Detected
BUILDING DDCN-00154
154-C-1 Manufactured Office -
Central 2-foot by 4-foot Suspended Ceiling Panels with Splines and Pinholes
None Detected
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
CONTRACT NO: FA8903-15-D-0016; TASK ORDER: FA8903-20-F-0030
OLME PROJECT NO.: OLME-2022-38
SAMPLING DATES: JANUARY 9-10, 2023
INSPECTOR: ORAL L. MCGIRT
ASSISTED BY: TIM FORD (ATLAS)
SAMPLE
NUMBER
SAMPLE LOCATION TYPE OF MATERIAL
TYPE OF ASBESTOS AND
PERCENTAGE
BUILDING DDCN-00154 (Cont.)
154-C-2 Manufactured Office –
Near Entrance 2-foot by 4-foot Suspended Ceiling Panels with Splines and Pinholes
None Detected
154-C-3 Manufactured Office
South Side Gypsum Wallboard with Joint Seam
Compound Wallboard: None Detected*
154-C-4 Manufactured Office
South Side Gypsum Wallboard with Joint Seam
Compound Wallboard: None Detected*
AMERISCI LABORATORY - RICHMOND VIRGINIA
NVLAP LAB CODE 101904-0
ORAL L. MCGIRT
NORTH CAROLINA INSPECTOR NO. 10755
* Insufficient Joint Compound for Analysis (Not Present)
AMERISCI RICHMOND
PLM BULK ASBESTOS REPORTS
DEFENSE LOGISTICS AGENCY (DLA) DISTRIBUTION
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
BUILDING DDCN-00148
January 21, 2023
Dear Oral McGirt:
OLM Environmental, LLC Attn: Oral McGirt 2317 Lockwood Folly Lane Raleigh, NC 27610
RE: OLM Environmental, LLC Job Number 123011690
P.O. #OLME-2022-38
OLME-2022-38; Building DDCN-00148; Building 148 - Interior Repair Proj
AmeriSci Richmond
13635 GENITO ROAD
MIDLOTHIAN, VIRGINIA 23112
TEL: 8047631200 FAX: 8047631800
Enclosed are the results for PLM asbestos analysis of the following OLM Environmental, LLC samples received at AmeriSci on Friday, January 20, 2023, for a 24 hour turnaround:
148-E-1, 148-E-2, 148-E-3, 148-E-4, 148-F-1, 148-F-2, 148-F-3, 148-F-4, 148-F-5
The 9 samples contained in zip lock bag were shipped to AmeriSci via Fed Ex 8147 2830 2137 B 940. These samples were prepared and analyzed according to EPA PLM Method (EPA 600/R-93/116 Section 2.2). The required analytical information, analysis results, analyst signature and laboratory identification are contained in the PLM Bulk Asbestos Report. If TEM analysis was requested for selected samples the gravimetric reduction data (by Sec 2.3) and TEM Asbestos % (by Sec 2.5) are included in Table 1 along with a summary of Asbestos % by PLM for all samples analyzed.
This report relates ONLY to the sample analysis expressed as % asbestos. AmeriSci assumes no responsibility for customer supplied data such as “sample type”, "location", or “area sampled”. This report must not be used to claim product endorsement by AmeriSci, NVLAP or any agency of the U. S. Government. The National Institute of Standards and Technology accreditation requirements mandate that this report must not be reproduced, except in full, without the written approval of the laboratory.
This report may contain specific data not covered by NVLAP or ELAP accreditations, if so identified in relevant footnotes.
Glenn F. Massey
Sincerely, QA Manager | Authorized Signatory
AmeriSci appreciates this opportunity to serve your organization. Please contact us for any further assistance or with any questions.
Boston - Los Angeles - New York - Richmond
AmeriSci Richmond
13635 GENITO ROAD
MIDLOTHIAN, VIRGINIA 23112
TEL: (804) 763-1200 • FAX: (804) 763-1800
01/20/23 AmeriSci Job # 123011690 01/20/23
1 3 OLME-2022-38; Building DDCN-00148; Building 148 - Interior Repair Proj
PLM Bulk Asbestos Report Date Received Date Examined
RE:
ofPage
P.O. # OLM Environmental, LLC
2317 Lockwood Folly Lane
Raleigh, NC 27610
Attn: Oral McGirt
Asbestos Present Total % AsbestosClient No. / HGA Lab No.
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-E-1 123011690-01 NAD Front Office Near Column (B,5); Bay "E"; 2-Foot By 2-Foot Suspended Ceiling Panel With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Texture
Cellulose 35%, Fibrous glass 15%, Non-fibrous 50%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-E-2 123011690-02 NAD Front Office Near Column (B,6); Bay "E"; 2-Foot By 2-Foot Suspended Ceiling Panel With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Tile
Cellulose 35%, Fibrous glass 15%, Non-fibrous 50%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-E-3 123011690-03.1 NAD Front Office Near Column (B,5); Bay "E"; Gypsum Wallboard With Joint Seam Compound
Gray, Homogeneous, Fibrous, Gypsum Board
Cellulose 2.0%, Non-fibrous 98%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-E-3 123011690-03.2 NAD Front Office Near Column (B,5); Bay "E"; Gypsum Wallboard With Joint Seam Compound
White, Homogeneous, Non-Fibrous, Joint Compound
Non-fibrous 100%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-E-4 123011690-04.1 NAD Front Office Near Column (B,6); Bay "E"; Gypsum Wallboard With Joint Seam Compound
Gray, Homogeneous, Fibrous, Gypsum Board
Cellulose 2.0%, Non-fibrous 98%
(by CVES) by Tou Si Anothay on 01/20/23
See Reporting notes on last page
AmeriSci Job #: 123011690 Page 2 of 3
OLME-2022-38; Building DDCN-00148; Building 148 - Interior Repair Proj
PLM Bulk Asbestos Report Client Name: OLM Environmental, LLC
Asbestos Present Total % AsbestosClient No. / HGA Lab No.
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-E-4 123011690-04.2 NAD Front Office Near Column (B,6); Bay "E"; Gypsum Wallboard With Joint Seam Compound
White, Homogeneous, Non-Fibrous, Joint Compound
Non-fibrous 100%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-F-1 123011690-05 NAD Large Office Near Column (D,3); Bay "F"; 2-Foot By 4-Foot Suspended Ceiling Panles With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Tile
Cellulose 35%, Fibrous glass 15%, Non-fibrous 50%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-F-2 123011690-06 NAD Copy Room Near Column (D,2); Bay "F"; 2-Foot By 4-Foot Suspended Ceiling Panles With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Tile
Cellulose 35%, Fibrous glass 15%, Non-fibrous 50%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-F-3 123011690-07 NAD Breakroom Near Column (H,2)Bay "F"; 2-Foot By 4-Foot Suspended Ceiling Panles With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Tile
Cellulose 35%, Fibrous glass 15%, Non-fibrous 50%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-F-4 123011690-08 NAD Women's Room Entrance Near Column (L,1); Bay "F"; 2-Foot By 4-Foot Suspended Ceiling Panles With Splines And Pinholes
Brown, Homogeneous, Fibrous, Gypsum Board
Cellulose 2.0%, Non-fibrous 98%
(by CVES) by Tou Si Anothay on 01/20/23
Comment: Insufficient joint Compound, Gypsum broad only.
AmeriSci Job #: 123011690 Page 3 of 3
OLME-2022-38; Building DDCN-00148; Building 148 - Interior Repair Proj
PLM Bulk Asbestos Report Client Name: OLM Environmental, LLC
Asbestos Present Total % AsbestosClient No. / HGA Lab No.
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-F-5 123011690-09.1 NAD Men's Room Entrance Near Column (N,1); Bay "F"; 2-Foot By 4-Foot Suspended Ceiling Panles With Splines And Pinholes
Brown, Homogeneous, Fibrous, Gypsum Board
Cellulose 2.0%, Non-fibrous 98%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No148-F-5 123011690-09.2 NAD Men's Room Entrance Near Column (N,1); Bay "F"; 2-Foot By 4-Foot Suspended Ceiling Panles With Splines And Pinholes
White, Homogeneous, Non-Fibrous, Joint Compound
Non-fibrous 100%
(by CVES) by Tou Si Anothay on 01/20/23
Reporting Notes:
*NAD = no asbestos detected, Detection Limit <1%, Reporting Limits: CVES = 1%, 400 Pt Ct = 0.25%, 1000 Pt Ct = 0.1%; "Present" or NVA = "No Visible Asbestos" are observations made during a qualitative analysis; NA = not analyzed; NA/PS = not analyzed / positive stop; PLM Bulk Asbestos Analysis using Meiji, Model MT 6120 microscope, Serial #2200363, by EPA 600/R-93/116 per 40 CFR 763 (NVLAP Lab Code 101904-0) and ELAP PLM Analysis Protocol 198.1 for New York friable samples which includes quantitation of any vermiculite observed (198.6 for NOB samples) or EPA 400 pt ct by EPA 600/M4-82-020 (NYSDOH ELAP Lab # 10984); CA ELAP Lab # 2508; Note: PLM is not consistently reliable in detecting asbestos in floor coverings and similar NOB materials. NAD or Trace results by PLM are inconclusive, TEM is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos-containing in New York State (also see EPA Advisory for floor tile, FR 59, 146, 38970, 8/1/94). NIST Accreditation requirements mandate that this report must not be reproduced except in full without the approval of the laboratory. This PLM report relates ONLY to the items tested.
Analyzed by: Tou Si Anothay Date: 1/20/2023
Reviewed by: Glenn F. Massey
BUILDING DDCN-00154
January 21, 2023
Dear Oral McGirt:
OLM Environmental, LLC Attn: Oral McGirt 2317 Lockwood Folly Lane Raleigh, NC 27610
RE: OLM Environmental, LLC Job Number 123011689
P.O. #OLME-2022-38
OLME-2022-38; Building DDCN-00154; Building 154 - Interior Repair Proj
AmeriSci Richmond
13635 GENITO ROAD
MIDLOTHIAN, VIRGINIA 23112
TEL: 8047631200 FAX: 8047631800
Enclosed are the results for PLM asbestos analysis of the following OLM Environmental, LLC samples received at AmeriSci on Friday, January 20, 2023, for a 24 hour turnaround:
154-C-1, 154-C-2, 154-C-3, 154-C-4
The 4 samples contained in zip lock bag were shipped to AmeriSci via Fed Ex 8147 2830 2137 B 940. These samples were prepared and analyzed according to EPA PLM Method (EPA 600/R-93/116 Section 2.2). The required analytical information, analysis results, analyst signature and laboratory identification are contained in the PLM Bulk Asbestos Report. If TEM analysis was requested for selected samples the gravimetric reduction data (by Sec 2.3) and TEM Asbestos % (by Sec 2.5) are included in Table 1 along with a summary of Asbestos % by PLM for all samples analyzed.
This report relates ONLY to the sample analysis expressed as % asbestos. AmeriSci assumes no responsibility for customer supplied data such as “sample type”, "location", or “area sampled”. This report must not be used to claim product endorsement by AmeriSci, NVLAP or any agency of the U. S. Government. The National Institute of Standards and Technology accreditation requirements mandate that this report must not be reproduced, except in full, without the written approval of the laboratory.
This report may contain specific data not covered by NVLAP or ELAP accreditations, if so identified in relevant footnotes.
Glenn F. Massey
Sincerely, QA Manager | Authorized Signatory
AmeriSci appreciates this opportunity to serve your organization. Please contact us for any further assistance or with any questions.
Boston - Los Angeles - New York - Richmond
AmeriSci Richmond
13635 GENITO ROAD
MIDLOTHIAN, VIRGINIA 23112
TEL: (804) 763-1200 • FAX: (804) 763-1800
01/20/23 AmeriSci Job # 123011689 01/20/23
1 2 OLME-2022-38; Building DDCN-00154; Building 154 - Interior Repair Proj
PLM Bulk Asbestos Report Date Received Date Examined
RE:
ofPage
P.O. # OLM Environmental, LLC
2317 Lockwood Folly Lane
Raleigh, NC 27610
Attn: Oral McGirt
Asbestos Present Total % AsbestosClient No. / HGA Lab No.
Location:
Analyst Description:
Asbestos Types:
Other Material:
No154-C-1 123011689-01 NAD Manufactured Office - Central; 2-Foot By 4-Foot Suspended Ceiling Panels With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Panel
Cellulose 25%, Fibrous glass 5.0%, Non-fibrous 70%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No154-C-2 123011689-02 NAD Manufactured Office - Near Entrance; 2-Foot By 4-Foot Suspended Ceiling Panels With Splines And Pinholes
Gray, Homogeneous, Fibrous, Ceiling Panel
Cellulose 25%, Fibrous glass 5.0%, Non-fibrous 70%
(by CVES) by Tou Si Anothay on 01/20/23
Location:
Analyst Description:
Asbestos Types:
Other Material:
No154-C-3 123011689-03 NAD Manufactured Office North Side; Gypsum Wallboard With Joint Compound2
Gray, Homogeneous, Fibrous, Gypsum Board
Cellulose 2.0%, Non-fibrous 98%
(by CVES) by Tou Si Anothay on 01/20/23
Comment: insufficient Joint compound, gypsum broad only.
Location:
Analyst Description:
Asbestos Types:
Other Material:
No154-C-4 123011689-04 NAD Manufactured Office South Side; Gypsum Wallboard With Joint Compound2
Gray, Homogeneous, Fibrous, Gypsum Board
Cellulose 2.0%, Non-fibrous 98%
(by CVES) by Tou Si Anothay on 01/20/23
Comment: Insufficient Joint Compound, Gypsum broad only.
AmeriSci Job #: 123011689 Page 2 of 2
OLME-2022-38; Building DDCN-00154; Building 154 - Interior Repair Proj
PLM Bulk Asbestos Report Client Name: OLM Environmental, LLC
Reporting Notes:
*NAD = no asbestos detected, Detection Limit <1%, Reporting Limits: CVES = 1%, 400 Pt Ct = 0.25%, 1000 Pt Ct = 0.1%; "Present" or NVA = "No Visible Asbestos" are observations made during a qualitative analysis; NA = not analyzed; NA/PS = not analyzed / positive stop; PLM Bulk Asbestos Analysis using Meiji, Model MT 6120 microscope, Serial #2200363, by EPA 600/R-93/116 per 40 CFR 763 (NVLAP Lab Code 101904-0) and ELAP PLM Analysis Protocol 198.1 for New York friable samples which includes quantitation of any vermiculite observed (198.6 for NOB samples) or EPA 400 pt ct by EPA 600/M4-82-020 (NYSDOH ELAP Lab # 10984); CA ELAP Lab # 2508; Note: PLM is not consistently reliable in detecting asbestos in floor coverings and similar NOB materials. NAD or Trace results by PLM are inconclusive, TEM is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos-containing in New York State (also see EPA Advisory for floor tile, FR 59, 146, 38970, 8/1/94). NIST Accreditation requirements mandate that this report must not be reproduced except in full without the approval of the laboratory. This PLM report relates ONLY to the items tested.
Analyzed by: Tou Si Anothay Date: 1/20/2023
Reviewed by: Glenn F. Massey
DRAWINGS OF THE RECENT BULK SAMPLING AND GENERAL
LOCATIONS OF PRESUMED AND/OR LABELED ACMS
DEFENSE LOGISTICS AGENCY (DLA) DISTRIBUTION
BUILDINGS DDCN-00147; DDCN-00148; DDCN-00150; DDCN-00154, BAY C;
DDCN-00159 AND DDCN-04246
STRUCTURAL, FIRE SUPPRESSION AND FIRE ALARM/MNS-RELATED REPAIRS
MARINE CORP AIR STATION CHERRY POINT (MCAS CHERRY POINT)
BAY A BAY B BAY C BAY D BAY E
SUPPORT
A
B
C
D
F
G
H
I
J
K
E
34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 123456789101112
S A
M P
LE
L
O C
A
TI
O N
P
LA
N B
U
IL
D
IN
G D
D C
N -0
M A R
IN
E C O
R
PS
A
IR
S
TA
TI
O
N C
H
ER
R Y
PO
IN
T H
A V
EL
O C K
N C
EN
G
IN
EE
R
IN
G , I
N C.
DDCN-00147 FLOOR PLAN - LEVEL 1
NOTE: NO SAMPLES OF SUSPECTED ACM WERE TAKEN AT BUILDING DDCN-00147
DURING THIS ASSESSMENT. APTIM DOES NOT FORESEE THEIR ANTICIPATED SCOPE OF
WORK TO DISTURB POTENTIAL ACM AT BUILDING DDCN-00147. PLEASE NOTIFY ATLAS
ENGINEERING AND OLM ENVIRONMENTAL OF ANY CHANGES IN SCOPE OF WORK THAT
MAY POTENTIALLY DISTURB ANY SUSPECTED ACM.
BAY A BAY B BAY C BAY D BAY F
TE
M
PO
R
AR
Y
ST
O
R
AG
E
TE
M
PO
R
AR
Y
ST
O
R
AG
E
BAY E
A
B
C
D
E
F
G
H
J
K
L
M
N
P
19 18 17 16 15 14 13 13 11 10 9 8 7 6 5 4 3 2 1
148-E-2 148-E-4 148-E-1 148-E-3 148-F-1 148-F-2
148-F-5148-F-4148-F-3
S A
M P
LE
L
O C
A
TI
O N
P
LA
N B
U
IL
D
IN
G D
D C
N -0
M A R
IN
E C O
R
PS
A
IR
S
TA
TI
O
N C
H
ER
R Y
PO
IN
T H
A V
EL
O C K
N C
EN
G
IN
EE
R
IN
G , I
N C.
SAMPLE FIELD ID
NUMBER
148-E-1 BAY E, FRONT OFFICE NEAR COLUMN (B,5)
SAMPLE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .