00 22 13.00 20.pdf
PDF 17 KB Posted
- Attached to
- DLA: Roof Repairs Buildings 147 and 148
- Solicitation number
- N400857514700
About this file
This document is a Supplementary Instructions to Offerors for structural repairs and roof replacement at MCAS Cherry Point, N.C. The solicitation includes three Contract Line Items (CLINs): CLIN 0001 (Base Price) covers structural repairs and roof replacement for Buildings DDCN-00147 and DDCN-00148 in Bays A, B, C, and D, including column, beam, and truss assembly replacements, timber structure component repairs, and exterior wall repairs. CLIN 0002 (Option 01) and CLIN 0003 (Option 02) provide optional work for Bay E and Bay F of DDCN-00148, respectively, with similar structural and roof system replacements. The Government reserves the right to award the optional CLINs within 90 calendar days after contract award, with the total contract completion date set at 680 calendar days. Award will be made based on the total sum of all three CLINs, and the Performance Bond must reflect 100 percent of the aggregate amount of all items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDCN B147 AND B148 STRUCTURAL REPAI RS
AND B148 ROOF REPLACEMENT
DOCUMENT 00 22 13. 00 20
SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
02/ 14, CHG 3: 11/ 18
PART 1 GENERAL
1. 1 CONTRACT LI NE I TEMS
The t er ms Of f er or and Bi dder and ver si ons t her eof ( of f er / bi d) have t he same def i ni t i on as used wi t hi n t hi s cont r act .
Pr ovi de t he Cont r act Li ne I t em ( CLI N) l ump sum pr i ce f or t he f ol l owi ng i t ems:
CLI N 0001 - BASE PRI CE
Pr i ce f or t he ent i r e wor k, descr i bed as f ol l ows:
St r uct ur al r el at ed r epai r s f or bui l di ngs DDCN- 00147 and DDCN- 00148 Bays A, B, C and D consi st i ng of Col umn, Beam and Tr uss Assembl y r epl acement , as wel l as Ti mber St r uct ur e Component component r epl acement s and r epai r s; Roof syst em r epl acement and accoi cat ed r epai r s f or bui l di ng DDCN- 00148 on Bays A, B, C and D; and Ext er i or Wal l Repai r s f or bui l di ngs DDCN- 00147 and DDCN- 00148, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0002, and CLI N 0003.
CLI N DESCRI PTI ON TOTAL PRI CE FOR CLI N
0001 St r uct ur al r el at ed r epai r s f or bui l di ngs DDCN- 00147 and DDCN- 00148 Bays A, B, C and D consi st i ng of Col umn, Beam and Tr uss Assembl y r epl acement , as wel l as Ti mber St r uct ur e Component r epl acement s and r epai r s; Roof syst em r epl acement and associ at ed r epai r s f or bui l di ng DDCN- 00148 on Bays A, B, C and D; and Ext er i or Wal l Repai r s f or bui l di ngs DDCN- 00147 and DDCN- 00148.
CLI N 0002 - Opt i on 01
Pr i ce f or ent i r e t he wor k, descr i bed as f ol l ows:
St r uct ur al r el at ed r epai r s f or bui l di ng Bay E of DDCN- 00148 consi st i ng of Col umn and Tr uss Assembl y r epl acement , as wel l as Ti mber St r uct ur e Component component r epl acement s and r epai r s; and Roof syst em r epl acement and accoi cat ed r epai r s f or Bay E of bui l di ng DDCN- 00148, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0001 and CLI N 0003.
00 22 13. 00 20 Page 1 25 August 2025 WO: 7514700 MCAS Cher r y Poi nt , N. C.
CLI N DESCRI PTI ON TOTAL PRI CE FOR CLI N
0002 St r uct ur al r el at ed r epai r s f or bui l di ng Bay E of DDCN- 00148 consi st i ng of Col umn and Tr uss Assembl y r epl acement , as wel l as Ti mber St r uct ur e Component r epl acement s and r epai r s; and Roof syst em r epl acement and associ at ed r epai r s f or Bay E of bui l di ng
DDCN- 00148.
CLI N 0003 - Opt i on 02
Pr i ce f or ent i r e t he wor k, descr i bed as f ol l ows:
St r uct ur al r el at ed r epai r s f or bui l di ng Bay F of DDCN- 00148 consi st i ng of Col umn and Tr uss Assembl y r epl acement , as wel l as Ti mber St r uct ur e Component component r epl acement s and r epai r s; and Roof syst em r epl acement and accoi cat ed r epai r s f or Bay F of bui l di ng DDCN- 00148, but excl udi ng wor k descr i bed i n Cont r act Li ne I t em ( CLI N) 0001 and CLI N 0002.
CLI N DESCRI PTI ON TOTAL PRI CE FOR CLI N
0003 St r uct ur al r el at ed r epai r s f or bui l di ng Bay F of DDCN- 00148 consi st i ng of Col umn and Tr uss Assembl y r epl acement , as wel l as Ti mber St r uct ur e Component r epl acement s and r epai r s; and Roof syst em r epl acement and associ at ed r epai r s f or Bay F of bui l di ng DDCN- 00148
1. 2 GENERAL BI D NOTES
a. Awar d wi l l be made on t he t ot al sum of Cont r act Li ne I t ems 0001, 0002, and 0003.
b. The Gover nment r eser ves t he uni l at er al r i ght t o awar d CLI Ns 0002 and 0003 t o t he Cont r act or at t he pr oposed pr i ce wi t hi n 90 cal endar days af t er t he cont r act awar d. No pr ovi s i on i s made f or economi c pr i ce adj ust ment . I f Opt i ons ar e exer ci sed, t he cont r act compl et i on dat e r emai ns 680 cal endar days af t er awar d of t he cont r act .
c. Eval uat i on of Opt i ons ( JUL 1990) . Except when i t i s det er mi ned i n accor dance wi t h FAR 17. 206( b) Eval uat i on not t o be i n t he Gover nment ' s best i nt er est , t he Gover nment wi l l eval uat e of f er s f or awar d pur poses
00 22 13. 00 20 Page 2 by addi ng t he pr i ce f or t he Opt i ons t o t he t ot al pr i ce f or CLI N 0001.
I n accor dance wi t h FAR 52. 217- 5 Eval uat i on of Opt i ons, eval uat i on of opt i ons wi l l not obl i gat e t he Gover nment t o exer ci se t he Opt i ons.
d. The Gover nment may r ej ect an of f er as nonr esponsi ve i f i t i s mat er i al l y unbal anced as t o pr i ces f or t he basi c r equi r ement and t he opt i on quant i t i es. An of f er i s unbal anced when i t i s based on pr i ces s i gni f i cant l y l ess t han cost f or some wor k and pr i ces whi ch ar e s i gni f i cant l y over st at ed f or ot her wor k.
e. I f CLI N 0002 and 0003 ar e exer ci sed, addi t i onal bondi ng and consent of sur et y i s r equi r ed. Consequent l y, t he Per f or mance Bond must r ef l ect 100 per cent of t he aggr egat e amount of al l I t ems.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Document - -
00 22 13. 00 20 Page 3
File details come from the government source that posted it. Updated .