This document is Amendment 4 for Solicitation SPE605-24-R-0204, detailing Base Reference Prices for various fuel types as of 1/20/2025. The amendment provides a comprehensive table listing specific fuel products including Fuel Oil (Burner FJ1 and FJ3), Kerosene (KJ1), MUR, MUP, and JA1, with their corresponding Platts codes, publication sources, and base reference prices ranging from $2.117381 to $2.348524 per US gallon.

The key pricing mechanism involves escalation/de-escalation of contract prices on the 1st and 3rd Monday using the Previous 5-day Average of the PLATTS escalator referenced for each fuel type. Offerors are required to use the specified publication for each line item as the escalation reference, and after award, DLA Energy will provide daily updated contract prices on their homepage. The escalator identified for each line item is the only one accepted for pricing evaluation, with no alternate escalators permitted.

View the file

Other files

File Type Posted
Attachment J_ SCHEDULE_25MAR 25.pdf PDF
ATTACHMENT L_ PRICE DATA SHEET.pdf PDF
SF30_SPE60524R02040007.PDF PDF
SF30_SPE60524R02040007.PDF PDF
Attachment F_Offeror Submission Package_Mar 2025.pdf PDF
Attachment J_ SCHEDULE_25MAR 25.pdf PDF
ATTACHMENT K_ PRICE DATA SHEET.pdf PDF
Attachment J_ SCHEDULE_11MAR25.pdf PDF
SF30_SPE60524R02040006.pdf PDF
SF30_SPE60524R02040005.PDF PDF
Attachment K_Escalators for Amendment 5.pdf PDF
Attachment L_QAP C16.09 Turbine Fuel Aviation (Jet A1) (JAN 2025).pdf PDF
Attachment J_ SCHEDULE.pdf PDF
SF30_SPE60524R02040004.PDF PDF
Final_Solicitation SPE605-24-R-0204_Updated Amend 4.pdf PDF
SF30_SPE60524R02040003.PDF PDF
Attachment A__SCHEDULE for SPE60524R0204_12 March 2024.pdf PDF
SF30_SPE60524R02040002.pdf PDF
SF30_SPE60524R02040001.PDF PDF
Attachment I_Price Data Sheet.pdf PDF
Attachment A__SCHEDULE for SPE60524R0204_March 5 2024.pdf PDF
Attachment B_ Escalators.pdf PDF
Attachment A__SCHEDULE for SPE60524R0204.pdf PDF
Attachment G Section C Fuel Specs.pdf PDF
Attachment H_Section E Contract Texts.pdf PDF
Attachment C_ AMPS Role Guide.pdf PDF
Final_Solicitation SPE605-24-R-0204.pdf PDF
Attachment F_Offeror Submission Package.pdf PDF
Attachment D _ Requesting the OET Vendor Role in AMPS Guide.pdf PDF
Attachment E _ PCS OET Vendor Guide.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 4

SPE605-24-R-0204

Base Reference Prices 1/20/2025 and Platts Codes by Fuel Type

Product

Publication

Platts

Codes

EBS Codes

(for DLA

Energy Use

Only)

Base Reference

Date

Base Reference

Price

(US $ per

USG)

FUEL OIL,

BURNER (FJ1)

PLATTS

SPORE(JPN)

GASOIL

1ST & 3RD MON

AAOVC00

#AAOVC00 PPWSPG113M 1/20/2025 $2.348524

FUEL OIL,

BURNER (FJ3)

PLATTS JAPAN

JET 1ST AND

3RD MON

#PJAAN00 PPWJPJK13 1/20/2025 $2.338714

KEROSENE

(KJ1)

PLATTS JAPAN

JET 1ST and

3RD MON

#PJAAN00 PPWJPJK13 1/20/2025 $2.338714

MUR

PLATTS

GASOLINE UNL

91-92 C+F

JAPAN CARGO

1ST and 3RD

MONDAY

#PGACW00 PPWJPU13M 1/20/2025 $2.117381

MUP

PLATTS JAPAN

UNL

1ST and 3RD

MONDAY

#PGACW00 PPWJPU13M 1/20/2025

$2.117381

JA1 PLATTS JAPAN

JET 1ST and

3RD MON

#PJAAN00 PPWJPJK13 1/20/2025

$2.338714

NOTES:

The base reference date is 20 January 2025. Offerors MUST use the publication listed for each line-item in schedule as the escalation reference for their offer prices. After award, the contract price for all Line Items will escalate/de-escalate on the 1st and 3rd Monday using the Previous 5-day Average of the PLATTS escalator referenced by fuel type in Attachment B: Escalator Spreadsheet. Price changes are not based on product cost or vendor profit margin. After award DLA Energy will provide updated contract prices daily under “Vendor Resources/Price Adjustments” on the DLA Energy homepage at www.energy.dla.mil

ESCALATORS: The escalator identified on each line item within the schedule (also listed in the above table by fuel type in the table above shall be the only escalator accepted for pricing evaluation. Any proposal for an alternate escalator shall not be accepted.

File details come from the government source that posted it. Updated .