Attachment V - Argonne Requirements and Schedule - A0003.pdf
PDF 863 KB Posted
- Attached to
- PJM 2024 - Electricity - A0006 Federal contract opportunity
- Solicitation number
- SPE60424R0408-Solicitation
- Issued by
- Defense Logistics Agency Energy
About this file
This document appears to be an Argonne National Laboratory pricing sheet related to a federal contract opportunity for the supply of electricity and ancillary services to various military and federal civilian installations located in the PJM Regional Transmission Organization's market area.
The solicitation, numbered SPE60424R0408, is for a one-year contract term beginning in December 2024 with no option periods. The Government is seeking retail electricity offers with a total estimated annual quantity of 2,665,887,871 kWh. Pricing is based on Locational Marginal Pricing and must include all PJM ancillary services and ISO related costs. The contract will be a Firm Fixed Price Requirements Type and Fixed-Price Requirements Type. The solicitation is a Request for Proposal (RFP), and all responsible sources are encouraged to submit a responsive and complete proposal. No award will be made to an offeror on the Specially Designated Nationals List or other exclusion lists. Questions are due by September 15, 2024.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARGONNE NATIONAL LABORATORY
PRICING SHEET
August 21, 2024
Local Distribution Company: Commonwealth Edison Company (“ComEd”)
Contract Term: Argonne is in ComEd meter group 20 and the December 2024 meter read date is on or about December 29, 2024.
Historical Annual Usage
Capacity PLC Start Date End Date 43,280.05 6/1/2024 5/31/2025
Network Service PLC Start Date End Date
46,927.45 1/1/2024 12/31/2024
Peak and off-peak hours are based on ComEd’s definition of Retail Peak Period and Retail Off-Peak Period in its terms and conditions. The Retail Peak Period is 6 AM to 10 PM, Monday through Friday, excluding holidays.
Contract Projected Usage
Argonne's computer demand may be as high as 57,000 KW and the additional load is expected to be about 375 Million KWH per year.
The following table is a summary of the estimated load. Note that baseline usage is Argonne’s internal number representing annual usage before any deviations, such as weather or the new computer.
ARGONNE NATIONAL LABORATORY ESTIMATED LOAD FOR APS SHUTDOWN AND NEW COMPUTER
PRELIMINARY ESTIMATES
Contract Start: December 2024 (with Dec-24 Meter Read)
All energy shall be based on the requirements of section B802 of this solicitation and the transaction fee must include ALL PJM ancillary services and ISO related costs not identified in the pass-through components.
Defined peak and off-peak hours are based on ComEd’s definition of Retail Peak Period and Retail Off-Peak Period in its terms and conditions. Retail Peak Period is defined as 6AM to 10PM, Monday through Friday, except on days designated as holidays by the NERC. Retail Off-Peak Period is defined as all hours other than those included in the Retail Peak Period. These definitions will remain in effect during the term of this contract.
APPENDIX I
EXPECTED INVOICE COMPONENTS AND FORMAT
kWh $ per kWh Total $ ComEd Metered kWh xxx,xxx,xxx (a)
Contract Peak Energy Charge $x.xxxx $xxx,xxx.xx (b) Contract Off-Peak Energy Charge $x.xxxx $xxx,xxx.xx (c) Total Contract Energy Charge $xxx,xxx.xx (d = b+c)
Line Losses @ x.xx% xx,xxx $xx,xxx.xx (e=average commodity cost * a * x.xx%)
Transmission Charge $xxx,xxx.xx (f = per Contract formula) Argonne Network PLC x Annual NITS / 366 Days x Days in Period
Capacity Charge $xxx,xxx.xx (g = per Contract formula) Argonne Capacity PLC x Zonal Adj. x Scaling Adj. x Capacity Price x Days in Period
Reliability Must Run Charge $xx,xxx.xx (h)
Total Invoice $x, xxx,xxx.xx (sum a through h)
| August 21, 2024 |
| Historical Annual Usage |
| Contract Projected Usage |
| Pass-Through Components |
| 4. Direct Pass-Through Reliability Must Run: |
| APPENDIX I |
File details come from the government source that posted it. Updated .