ATTACHMENT II EQAPs.pdf
PDF 11 MB Posted
- Attached to
- Storage Services in the Port of Mesaieed, Qatar
- Solicitation number
- SPE603-20-R-0506
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
REVISIONS
REV DESCRIPTION DATE APPROVED
ENERGY QAP El September 2013
El CONTRACTOR INSPECTION RESPONSIBILITIES
(a) This contract provision applies to:
(I) All aviation fuel, lubricating oil, and additive shipments.
(2) All Bulk and Posts, Camps, and Stations non-aviation fuel shipments via pipeline or waterborne transport.
(b) QUALITY CONTROL PLAN.
(I) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan
(QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. Ifthc Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative
(QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or se1vices. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the
Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.
(2) The Contractor shall require subcontractors to provide and maintain inspection systems adhere to all the requirements in this contract provision.
(3) The QCP shall include the identification of key operational positions, a schematic diagram of plant facilities peliinent to the inspection system, indicating all inspection points, and a description of the following operations related to the supplies or services to be furnished under the contract:
(i) RECEIVING, BLENDING AND COMPOUNDING. Procedures used to ensure the quality of additives blended into product supplied under this contract. Procedures to identify and ensure the quality of component base stocks used to produce finished product.
Procedures to be used for adding, prior to batching, all required additives at all locations. When procedures for in-line blending of non-aviation products in accordance with the IN-LINE BLENDING OF NON-AVIATION PETROLEUM PRODUCTS contract provision are used, the QCP will provide for establishing blend ratios, and identify the responsible personnel within the Contractor's organization authorized to establish the blend ratios. When line injection of additives is required by the contract, the QCP will provide procedures for prop01tionately injecting additives throughout the entire loading process to ensure the additive is homogeneously blended into the product, as well as procedures for maintaining records evidencing the homogeneous blending of all line injected additives. In addition to the testing in (iii) below, a laborat01y hand blend of jet fuel with all additives required by the contract shall be tested, prior to shipment, to verify compliance with the specification;
(ii) SAMPLING. Procedures for sampling additives, blend tanks, shipping tanks, lines, and conveyances/containers in accordance with API Manual of Petroleum Measurement Standards (MPMS), Chapter 8, Section I, (ASTM D 4057) Manual Sampling of
Petroleum and Petroleum Products, and/or Section 2, (ASTM D 4177) Automatic Sampling of Liquid Petroleum and Petroleum Products.
Procedures include sample location, frequency, quantity, and retention. For all tanker, barge, and pipeline shipments, a flow-prop01tional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS ChapJer 8, Section I are acceptable provided that they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table ll of this contract provision. See Table I, Minimum Sampling and Testing Requirements, and Table II, Sample Retention;
(iii) TESTING. Types oftest series and individual test methods/procedures to be performed on samples taken from each location identified in (ii) above. See Table I, Minimum Sampling and Testing Requirements, and Table ill, Definitions of Test Series;
(iv) CALIBRATION. Program for testing and measuring equipment in accordance with ISO I 0012, Measurement Manage
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
DISTRIBUTION
STATEMENT -A
APPROVED FOR
PUBLIC RELEASE
DISTRIBUTION IS
"UNLIMITED"
DATE
04/14/2014
DATE
DATE
05/05/2014
ITEM
DEFENSE LOGISTICS AGENCY ENERGY
8725 JOHN J. KINGMAN RD
FORT BELVOIR, VIRGINIA 22060-6222
ENERGY QAP El
NSN CODE ID NO.
MULTIPLE 52838
SIZE SCALE DRAWING NUMBER
A 1)
DLA FORM 1889, OCT 2011 PREVIOUS EDITION IS USABLE Add Continuation Page SHEET 1 OF 11 PDF (DLA)
ATTACHMENT II EQAPs
SPE603-20-R-0506
PORT OF MESAIEED, QATAR
ATTACHMENT II EQAPs
File details come from the government source that posted it. Updated .