About this file
This document is a Request for Proposal (RFP) for Contractor-Owned Contractor-Operated (COCO) Fuel Storage Services in Port of Salalah, Oman, solicitation number SPE603-26-R-0503. The Defense Logistics Agency Energy is seeking a contractor to provide comprehensive fuel storage services with specific storage requirements, including the capability to receive, store, protect, and additize fuel via tanker/barge, naval vessels, and tank truck.
The solicitation requires a storage facility with a total fill capacity of 1,644,000 barrels, including 670,000 barrels of JP-5 and 790,000 barrels of F-76 at a single location. The facility must have a minimum of two tanks per fuel grade that are interconnected and isolated from other facilities and products. Key technical specifications include the ability to ship commercial JP-5 and F-76 marine fuels, with tanks meeting specific operational and safety standards. While specific response and award dates were not clearly legible in the provided document, the RFP outlines detailed technical and operational requirements for the fuel storage services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ������������ | ���� |
| ��� | � |
,-./0102034 4/56-, 7342,872 43+ 9+ 8:8,;<-==-720>- ;82-
3,;-, 4/56-, 1?-@%9A'@A,A%)%9
13B070282034 4/56-, 13B070282034 011/-
;82-
;CDEFEGHI
>IJK
L+ 485-
?MCFIN
)$&A$@$AO$9&
P+ 2-B-?Q34- 4/56-, RST
UTVVWXY
XZVV[\
;-7
O+ 3==-, ;82-< B378B 205-
011/-;
6]
73;- 1?-@%9
;B8 -4-,̂ ] 6/B_ ?-2,3B-/5 1-,>07-1 O$') ̀3Q4 _04̂ 584 ,38;
=3,2 6-B>30, >8
/18 abc defg hijkfgfdflm fg /4,-12,072-;
3, 1-2 810;-N n olpq grhss tkgfmugg ektvlmu grhss tkgfmugg
:35-4A3:4-;
158BB
6/104-11
R:316\ -B0̂06B- /4;-, 2Q- :35-4A3:4-;
158BB
6/104-11 ?,3̂ ,85
O R8\
1-,>07-A;0186B-;
>-2-,84A3:4-;
158BB
6/104-11
*(9&(%48071N
10w- 1284;8,;N
;-B0>-,]=3, =36 ;-12048A /4B-11 6B37_ 58,_-;
;0173/42 2-,51
&9L+ 2Q01 7342,872
,82-;
3,;-, /4;-, ;?81 R&) 7=, &9P+ ,8204̂
5-2Q3;
3= 13B070282034 poj fot pox
;-B0>-, 73;- &@+ 8;504012-,-;
73;-
&$L+ 7342,8723,<
3==-,3, =870B02]
73;-dusuxelmu mlc
&OL+
?8]5-42
:0BB
6- 58;-
&$P+ 7Q-7_ 0= ,-5022847- ;0==-,-42 84;
?/2 1/7Q 8;;,-11
3==-, &OP+
1/6502 04>307-1 8;;,-11 1Q3:4 6B37_
&OL
/4B-11 6B37_
6-B3:
7Q-7_-;
02-5 43+
17Q-;/B- 3= 1/??B0-1<1-,>07-1
./84202]
/402
'9+
/402 ?,07-
853/42
1II
1yMIzH{I
|}[W ~W�W�[W Z���T�
�YYZX�
����Y�T�ZV
��WWY[
Z[
SWXW[[Z���
8773/4204̂ 84;
8??,3?,082034 ;828 '@+ 2328B 8:8,;
853/42 |�T� �T�Y� }[W ��V��
'$L+ 13B070282034 0473,?3,82-1 6] ,-=-,-47- =8, )'+'&'A&� )'+'&'A*+ =8, )'+'&'A9 84;
)'+'&'A) 8,- 82287Q-;+
8;;-4;8 8,- 8,- 82287Q-;
'$P+ 7342,872<?/,7Q81- 3,;-, 0473,?3,82-1 6] ,-=-,-47- =8, )'+'&'A*+ =8, )'+'&'A) 82287Q-;+
8;;-4;8 8,- 8,- 82287Q-;
'O+ 7342,8723, ,-./0,-;
10̂4 2Q01 ;37/5-42 84;
,-2/,4 73?0-1 011/04̂ 3==07-+ 7342,8723, 8̂ ,--1
=/,401Q 84;
;-B0>-, 8BB
02-51 1-2 =3,2Q 3, 32Q-,:01- 0;-420=0-;
863>- 84;
84] 8;;020348B 1Q--21 1/6̀-72 2Q- 2-,51 84;
734;020341 1?-70=0-;
8:8,;
3= 7342,872N
3==-, ;82-;
]3/, 3==-, 13B070282034
R6B37_ 047B/;04̂ 84] 8;;020341 3, 7Q84̂ -1 :Q07Q 8,-
1-2 =3,2Q Q-,-04� 877-?2-;
02-51N
9%L+ 10̂482/,- 3= 3==-,3,<7342,8723, 9&L+ /402-;
1282-1 3= 85-,078 |���S��}~� U�S�~�U��S� ����U�~�
9%P+ 485- 84;
202B- 3= 10̂4-, |���W T� ����Y� 9%y+ ;82- 10̂4-; 9&P+ 485- 3= 7342,87204̂ 3==07-, |���W T� ����Y� 9&y+ ;82- 10̂4-;
guu gieu�ksu
=3, 13B070282034 04=3,582034
78BBN
1-- 17Q-;/B-
%'N%% ?5
R,->+ ?�IJy�EPIz P� ̂18 A =8, R*O 7=,\ )9+'&'
8/2Q3,0w-;
=3, B378B ,-?,3;/72034 ?,->03/1 -;02034 /186B-
1-- 8;;-4;/5
-;:316
| ��� | � |
| ���� | ����������� |
| � ������� | �� |
| � | ������ |
,-./0.10�2314�5667�8������9�:��;�<.=>
������������������9�����
�A��
��B����C � ����D���C���� ��
��E���� � ��F����� ����D���C���� ��
��G��
| ������ | �� | ����������� |
| ����D���C���� | �� |
��H���I���������� ����D���C���� ��
| ��������� | ����� �@����� |
| ���� | ����� �J������ |
�K�� L� �����
�M���9���
| � | �� �A���9����� |
| ���� | ����� @:��������� |
���������NOPQRST
| @�B����C | � |
| ����� | �� |
���� C����� �� @�E����
@�E����
U��NVVWXXWYYT @�F��
| ��Z������� | C�������������� |
| ����D���C���� | �� |
@�B����
�N[\]̂SQ\RT
SPE603-26-R-0503
DFSP Port of Salalah, Oman
TABLE OF CONTENTS
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Pricing – Please see ATTACHMENT VI PRICE PROPOSAL FORM Attach
VI
SECTION C - SPECIFICATIONS/STATEMENT OF WORK
PWS PEFORMANCE WORK STATEMENT Attach I
NOTE SECURITY AND FIRE PROTECTION 8
NOTE REMOVAL OF WATER BOTTOMS 8
NOTE SAMPLING AND TESTING OF PETROLEUM PRODUCTS
(STORAGE)
SECTION E - INSPECTION AND ACCEPTANCE
THE QUALITY ASSURANCE PROVISIONS (QAP) LISTED IN THIS SECTION ARE
HEREBY INCORPORATED IN FULL TEXT UNDER ATTACHMENT II OF THIS
SOLICITATION
EQAPS DLA ENERGY QUALITY ASSURANCE PROVISIONS Attach
II
SECTION F- DELIVERIES OR PERFORMANCE
FAR 52.242-15 STOP-WORK ORDER (AUG 1989) 10
NOTE GENERAL RECEIVING AND STORING CONDITIONS 11
NOTE GENERAL SHIPPING CONDITIONS 14
NOTE DETERMINATION OF QUANTIY (STORAGE) 18
NOTE CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) 20
SECTION G - CONTRACT ADMINISTRATION DATA
DFARS 252.232-
ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND
RECEIVING REPORTS (DEC 2018)
DFARS 252.232-
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 23
SECTION H- SPECIAL CONTRACT REQUIREMENTS
NOTE GUARD SERVICE 26
NOTE CONTRACTOR PERSONNEL SECURITY REQUIREMENTS 26
SECTION I - CONTRACT CLAUSES
FAR 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES
OR EQUIPMENT (NOV 2021)
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
Addendum 1 to
FAR 52.212-4
ADDENDUM 1 TO FAR 52.212-4 CONTRACT TERMS AND
CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2023) REFERENCES FAR 52.243-1 CHANGES-
FIXED PRICE (AUG 1987) ALTERNATE I (APR 1984)
Addendum 2 to
FAR 52.212-4
ADDENDUM 2 TO 52.212-4 CONTRACT TERMS AND CONDITIONS-
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV
2023)-REFERENCE 52.215-8 ORDER OF PRECEDENCE-UNIFORM
CONTRACT FORMAT (OCT 1997)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO
IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)
(DEVIATION 2025- O0003)(DEVIATION 2025-O0004)
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) 51
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) 51
FAR 52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND
TRANSLATIONS OF CONTRACT (FEB 2000)
FAR 52.229-6 TAXES – FOREIGN FIXED-PRICE CONTRACTS (FEB 2013) 52
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) 52
FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) 54
DFARS 252.201-
CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991) 54
DFARS 252.203-
REQUIREMENTS RELATING TO COMPENSATION OF FORMER
DOD OFFICIALS (SEP 2011)
DFARS 252.203-
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (DEC 2022)
DFARS 252.203-
AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019) 56
DFARS 252.204-
DISCLOSURE OF INFORMATION (OCT 2016) 56
DFARS 252.
204-7003
CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR
1992)
DFARS 252.204-
LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY
CONTRACTOR REPORTED CYBER INCIDENT INFORMATION (JAN
2023)
DFARS 252.204-
SAFEGUARDING COVERED DEFENSE INFRMATION AND CYBER
INCIDENT REPORTING (MAY 2024)(DEVIATION 2024-O0013
REVISION 1)
DFARS 252.204-
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
DFARS 252.204-
NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) 67
DFARS 252.204-
REPORTING REQUIREMENTS FOR CONTRACTED SERVICES—
BASIC (JUL 2021)
DFARS 252.222-
COMPLIANCE WITH LOCAL LABOR LAWS (OVERSEAS)(JUN 1997) 71
DFARS 252.225-
ANTITERRORISM/FORCE PROTECTION FOR DEFENCE
CONTRACTORS OUTSIDE THE UNISTED STATES (JUN 2015)
DFARS 252.225-
PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE
MADURO REGIME (JAN 2023)
DFARS 252.225-
PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS
OPERATIONS— REPRESENTATION (DEVIATION 2024-O0006,
REVISION 1) (MAR 2024)
DFARS 252.225-
PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS
OPERATIONS (DEVIATION 2024-O0006, REVISION 1)(FEB 2024)
DFARS 252.232-
ASSIGNMENT OF CLAIMS (OVERSEAS)(JUN 1997) 76
DFARS 252.233-
CHOICE OF LAW (OVERSEAS)(JUN 1997) 76
DFARS 252.246- SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT 77
7004 FOR MILITARY OPERATIONS (OCT 2010)
DFARS 252.247-
TRANSPORATION OF SUPPLIES BY SEA (OCT 2024) 78
DLAD
252.233-9001
DISPUTES-AGREEMENT TO USE ALTERNATIVE DISPUTE
RESOLUTION (JUN 2020)
NOTE RESPONSBILITY FOR GOVERNMENT-OWNED PETROLEUM
PRODUCTS
NOTE INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD 83
SECTION J – ATTACHMENTS
PERFORMANCE WORK STATEMENT (PWS) Attach I
DLA ENERGY QUALITY ASSURANCE PROVISIONS (E-QAPS) Attach
II
PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT
FORM
Attach
III
PAST PERFORMANCE QUESTIONNAIRE Attach
IV
PAST PERFORMANCE REFERENCE LIST Attach V
PRICE PROPOSAL FORM Attach
VI
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER
STATEMENTS OF OFFERORS OR RESPONDENTS
FAR 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR
1985)
FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO
INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2024)
FAR 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE
CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR
STATEMENTS – REPRESENTATION (JAN 2017)
FAR 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020) 93
FAR 52.204-24 REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES
OR EQUIPMENT (NOV 2021)
FAR 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-
REPRESENTATION (OCT 2020)
FAR 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS – REPRESENTATION (NOV 2015)
FAR 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (AUG
2020)
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018)
FAR 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING
DELINQUENT TAX LIABILITY OR A FELONY CONVICTION
UNDER ANY FEDERAL LAW (FEB 2016)
FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY
2024) (ALTERNATE I (FEB 2024)
FAR 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS – NOTICE AND
REPRESENTATION (JUN 2020)
DFARS 252.203-
REPRESENTATION RELATING TO COMPENSATION OF FORMER
DOD OFFICIALS (SEP 2022)
DFARS 252.204-
COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE
INFORMATION CONTROLS (OCT 2016)
DFARS 252.204-
COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR
SERVICES—REPRESENTATION (DEC 2019)
DFARS 252.204-
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES—
REPRESENTATION (MAY 2021)
DFARS 252.225-
REPRESENTATION REGARDING BUSINESS OPERATIONS WITH
THE MADURO REGIME (MAY 2022)
DFARS 252.225-
PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE
UNMANNED AIRCRAFT SYSTEMS (AUG 2024) (DEVIATION 2024-
O00014)
DFARS 252.225-
PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE
UNMANNED AIRCRAFT SYSTEMS-REPRESENTATION (AUG 2024)
(DEVIATION 2024-O00014)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (NOV 2024) 134
FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
(AUG 2020)
FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND
COMMERICAL SERVICES (SEP 2023)
Addendum to 52.212-1
ADDENDUM TO 52.212-1 – INSTRUCTIONS TO OFFERORS –
COMMERCIAL PRODUCTS AND COMMERICAL SERVICES (SEP
2023)
FAR 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) 141
FAR 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991) 141
FAR 52.216-1 TYPE OF CONTRACT (APR 1984) 141
FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS
COMPLIANCE PLAN (OCT 2020)
FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) 142
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) 142
DFARS 252.215-
NOTIFICATION TO OFFERORS – POST AWARD DEBRIEFINGS
(DEC 2022)
NOTE DEMURRAGE 147
NOTE ENVIRONMENTAL PROTECTION (STORAGE) 147
NOTE CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI)
IMPLEMENTATION
NOTE AUTHORIZED NEGOTIATOR 148
NOTE PROPOSAL ACCEPTANCE PERIOD 148
NOTE PROTEST TO THE AGENCY 149
NOTE CONTRACTOR TEAM ARRANGEMENTS- SOLICITATION AND
AWARD
NOTE WRITTEN NOTICE OF AWARD 150
SECTION M – EVALUATION FACTORS FOR AWARD
FAR 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2021)
NOTE EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) 155
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
See Section M, FAR 52.212-2, Evaluation of Factors for Award, Price Factor 3 for evaluation methodology concerning all price proposals. Reference Attachment VI for price proposal form.
SECTION C - SPECIFICATIONS/STATEMENT OF WORK/PWS
The Performance Work Statement (PWS) is incorporated by reference as if fully set forth herein.
Refer to Attachment I of this solicitation.
SECURITY AND FIRE PROTECTION
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and firefighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service;
U.S. Marshal's Service; and the Federal Emergency Management Agency.
REMOVAL OF WATER BOTTOMS
Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.)
Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt.
Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
SAMPLING AND TESTING OF PETROLEUM PRODUCTS STORAGE)
(a) SAMPLING. The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge. These on-site resources may be provided by Contractor personnel or by a commercial source acting on behalf of the Contractor. The Quality Representative will not be responsible for taking any samples for the Contractor. All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).
(b) TESTING. The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below):
[ ] The Contractor will perform the tests using its own qualified personnel, facilities, and equipment. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not perform the tests using its own personnel, but will provide on a seven days per week, 24 hours a day basis, it’s own facilities and equipment for testing of product by Government personnel. (All costs for this service are to be included in the monthly service charge.)
[ ] The Contractor will not provide its own personnel, facilities, or equipment.
Instead, the Contractor will, within 24 hours after sampling, transport any sample(s) to a commercial laboratory approved by the Government and arrange for that commercial laboratory to perform all the required tests. The Government, at its own option, may direct that samples be tested at a Government laboratory under contract to the Government. In this case, transport of such samples is still the responsibility of the Contractor. (The Government will reimburse the Contractor for the actual costs of the tests performed by their commercial laboratory. All other associated costs must be included in the monthly service charge.)
All other tests found in the above referenced attachment, which are not part of a higher order analysis, shall be provided in accordance with the CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) contract text.
(c) All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.
SECTION E – INSPECTION AND ACCEPTANCE
DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)
The Quality Assurance Provisions pertaining to the inspection offices, nonconforming supplies and services, and material inspection and receiving reports are incorporated by reference as if fully set forth herein and located in Attachment II of this solicitation.
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause.
Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if –
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(End of clause)
GENERAL RECEIVING AND STORING CONDITIONS
(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.
(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.
(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.
(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.
(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:
I certify that ______________ gallons of _____________________ have been upgraded/downgraded
(quantity) (product) from ___________________ to ____________________. This action was required because (product) (product)
(enter reason for the action)
Signature of Contractor Representative
[ ] I concur with the Contractor’s certification.
[ ] I do not concur with the Contractor’s certification for the following reasons:
Signature of Quality Representative
(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)
(k) The following subparagraphs apply only to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.
(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours notice for barges and the 72 hours notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --
(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.
(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo.
When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.
(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.
(2) INCREASES TO BASIC ALLOWED LAYTIME.
(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.
(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.
(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.
(v) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.
(vi) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
GENERAL SHIPPING CONDITIONS
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE
AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION
OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND
TITLE OF CONTRACTOR'S DESIGNATED REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government.
The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN:
MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.
(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels, jet lubricating oil, and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish, periodically inspect, clean such strainers, and repair same, if necessary, keeping a written record thereof.
(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. The Contractor will furnish such seals. Seal numbers will be indicated on shipping documents.
(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.
(g) FOR TANK CARS ONLY.
(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.
(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.
(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.
(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.
(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information.
The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.
(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.
(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.
(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.
(m) Custody of product delivered to tanker or barge, and risk of loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.
(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(o) The following subparagraphs only apply to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.
(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours’ notice for barges and 72 hours’ notice for tankers will require verbal approval of the Contractor, confirmed in writing.
(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --
(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Lay time shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, lay time will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.
(iii) Lay time shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Lay time, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within lay time determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.
(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.
(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor.
(2) INCREASES TO BASIC ALLOWED LAY TIME.
(i) If, after lay time commences, the conditions or facilities of the barge or tanker to be loaded do not permit loading, basic allowed lay time shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed lay time shall be increased by the duration of the delay.
(iii) After lay time commences, when vessels are required to dock at anchorage due to vessel delays such as vessel inspection and inserting, lay time credit will be allowed for transit time from anchors away at anchorage until first line ashore berthing, not to exceed 2 hours.
(iv) If regulations of the owner or operator of the vessel prohibit loading at any time after lay time has commenced, time so lost shall be added to basic allowed lay time.
(v) If, for any reason, the Contractor is delayed in loading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed lay time shall be increased by the duration of the delay.
(vi) There will be no increase to basic allowed lay time (nor other reductions to any resulting demurrage time) for saved lay time arising out of other loadings/discharges.
(vii) Delays, after commencement of lay time, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed lay time by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of lay time which elapse in excess of the basic allowed lay time for loading provided for by paragraph (1) above, or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
DETERMINATION OF QUANTITY (STORAGE)
The total gallonage received into or shipped from the Contractor's facilities shall be determined as follows:
(a) RECEIPTS OR SHIPMENTS OF CRUDE AND FUELS OTHER THAN RESIDUAL
FUELS (by transport truck of 3500 gallons or less) (truck and trailer combination when delivering same product will be considered as one container or conveyance). On an actual gallonage basis, without temperature correction.
(b) RECEIPTS OR SHIPMENTS OF RESIDUAL FUELS (in excess of 3500 gallons of crude or other fuels by tank car or transport truck). On a gallonage basis corrected to 60oF.
(c) RECEIPTS OR SHIPMENTS BY TANKER OR BARGE OR PIPELINE. On a gallonage basis corrected to 60oF. Quantities shipped or received will be determined on the basis of shore tanks or tender gauges taken by the Contractor and authenticated by the Quality Representative (QR). The ship or carrier's representative may participate in these determinations. During the gauging of shore tanks, the tanker, barge, or carrier's representative may participate in the quantity determinations, and, in the case of tanker/barge shipments or receipts, the Contractor may participate in the operations on board the tanker or barge which are required to determine the quantity of product in the tanker or barge cargo tanks.
(d) In the case of receipts, the Contractor shall sign the bill of lading and other related documents for the actual quantity received as determined above. When requested by the QR, the Contractor shall investigate losses or gains in connection with receipts or shipments to determine if the cause is at the Contractor’s facility.
(e) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. In addition, the following specific standards will be the referee method.
(1) API MPMS Chapter 11.1, Volume Correction Factors (API 2540/ASTM D 1250/IP 200/ISO 91-1). Either the printed version or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine will be the referee method.
(i) For crude oils, JP4 and Jet B, use Volume I, Tables 5A and 6A (or Volume VII Tables 53A and 54A).
(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D (or Volume XIV, Tables
53D and 54D).
(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B (or Volume VIII, Tables 53B and 54B).
(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.
(v) Volume XII, Table 52, shall be used to convert cubic meter at 15 degrees Centigrade to barrels at 60 degrees Fahrenheit. Convert liters at 15 degrees Centigrade to cubic meters at 15 degrees Centigrade by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
(vi) If the original measurement is by weight and quantity is required in U.S. gallons, then--
(A) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit. Convert kilograms to metric tons by dividing by 1,000.
(B) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
(2) API MPMS Chapter 4, Providing Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulations (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent.
(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter.
(f) In addition to gauging of storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories of the purpose of detecting loss of products.
CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)
During the contract period May 10, 2026 through May 09, 2030, the Contractor shall provide petroleum storage facilities and services at the following location:
(Street address)
(City/State/Zip)
SECTION G – CONTRACT ADMINISTRATION DATA
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND
RECEIVING REPORTS (DEC 2018)
(a) Definitions. As used in this clause—
“Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.
(1) Contract financing payments include—
(i) Advance payments;
(ii) Performance-based payments;
(iii) Commercial advance and interim payments;
(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;
(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts;
and
(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.
(2) Contract financing payments do not include—
(i) Invoice payments;
(ii) Payments for partial deliveries; or
(iii) Lease and rental payments.
“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.
“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.
(1) Invoice payments include—
(i) Payments for partial deliveries that have been accepted by the Government;
(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;
(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and
(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.
(2) Invoice payments do not include contract financing payments.
“Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.
“Receiving report” means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.
(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.
(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:
(1) Electronic Data Interchange.
(2) Secure File Transfer Protocol.
(3) Direct input through the WAWF website.
(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when—
(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or
(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.
(e) Information regarding WAWF is available at https://wawf.eb.mil/.
(f) In addition to the requirements of this clause, the Contractor shall meet the https://wawf.eb.mil/ requirements of the appropriate payment clauses in this contract when submitting payment requests.
(End of clause)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN
2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement…