Amd 0005 21R0701.pdf

PDF 105 KB Posted

Attached to
DLA Energy Bulk Fuel Additives: Fuel System Icing Inhibitor (FSII) and Diesel Fuel Additive (LIA)
Solicitation number
SPE60221R0701
Issued by

About this file

This amendment modifies a solicitation for bulk fuel additives from the Defense Logistics Agency Energy. The solicitation seeks two additives, fuel system icing inhibitor (FSII) and diesel fuel additive (LIA), with estimated quantities of 4,819,500 US gallons of FSII and 112,500 US gallons of LIA. The ordering period is from date of award through June 30, 2024, and the delivery period is July 1, 2021 through June 30, 2024 with a 30-day carryover for domestic locations and 90 days for overseas locations. Delivery will be via tank truck domestically and ISO containers transported by truck or cargo vessel internationally on an FOB destination basis. The amendment adjusts the ordering and delivery periods and the period of acceptance in the solicitation.

View the file

Other files

File Type Posted
SPE60221R0701_AMD 0012 Conformed Copy.pdf PDF
SPE602210701 AMD 00012.pdf PDF
SPE60221R0701_AMD 0011 Conformed Copy.pdf PDF
SPE60221R0701 AMD 0011.pdf PDF
OSP - Attachment C - AMEND 0011.xlsx XLSX spreadsheet
Amendment_0010_SPE60221R0701.pdf PDF
SPE60221R0701 AMD 0009.pdf PDF
Amendment 0008.pdf PDF
OSP - Attachment C - AMEND 0008.xlsx XLSX spreadsheet
Amendment 0007.pdf PDF
ENERGY QAP C30 SIH FSII (May 2021).pdf PDF
Amendment 0006.pdf PDF
Amd 0004 21R0701.pdf PDF
OSP_21R0701_AMD0004.pdf PDF
Amd 0003 21R0701.pdf PDF
Amd 0002 21R0701.pdf PDF
OSP_21R0701 Amd2 Final.pdf PDF
RFP_21-R-0701 Final - Conformed Copy.pdf PDF
Amendment 0001.pdf PDF
OSP_21R0701 Final.pdf PDF
Attachment 1 - DLA Form 2019 (July 2018).pdf PDF
Attachment 2 - C QAPs and E QAPs.pdf PDF
RFP_21-R-0701 Final.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60221R0701

X

2021 JAN 07

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

BULK PETROLEUM PRODUCT

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

APR 26, 2021

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 2 PAGES

SPE60221R0701 - 0005

The changes set forth herein are incorporated into Solicitation SPE602-21-R-0701.

A.On page three of the solicitation, note 4 is replaced with the following:

Ordering and Delivery Periods: The ordering period is from date of award through June 30, 2024. The delivery period is January 1, 2022 through June 30, 2024, with a 30-day carryover, (90 days for OCONUS locations) unless otherwise designated.

B.On page eighty-one of the solicitation, ADDENDA TO FAR 52.212-1 paragraph (c) is replaced with the following:

(c) Period of Acceptance. Period of Acceptance shall be changed to 270 days.

C.All other terms and conditions of this solicitation remain unchanged.

File details come from the government source that posted it. Updated .