SPE60220R0720 Amendment 0003.pdf

PDF 17 KB Posted

Attached to
DLA ENERGY BULK PETROLEUM PRODUCTS - JPTS - SPE60220R0720
Solicitation number
SPE60220R0720
Issued by

View the file

Other files

File Type Posted
SPE602-20-R-0720 Q_A 2.pdf PDF
SPE602-20-R-0720 QA Set 1.pdf PDF
Amendment 0002.pdf PDF
OSP.docx DOCX document
SPE60220R0720 Amendment 0001.pdf PDF
OSP.pdf PDF
Attachment 5 - Fillable Clauses.pdf PDF
Attachment 1 - ENERGY QAP C16.08-13 (JPTS) (DLA-E Mar 2019).pdf PDF
SPE60220R0720.pdf PDF
DLA Energy Form 2019 (Small Business Subcontracting Plan).pdf PDF
Attachment 3 - E QAPs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60220R0720

X

2020 NOV 06

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

BULK PETROLEUM PRODUCT

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

12/04/2020

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 2 PAGES

SPE60220R0720 - 0003

A.The purpose of this amendment is to:

a.Add a solicitation note for payment terms.

b.Delete the entirety of provision F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT TRUCKS, TRUCKS AND TRAILERS, TANK WAGONS, PIPELINE, AND LIGHTERS (DLA ENERGY JAN 2012) from Section F; and c.Revise Section I. to update I86.12 DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT (BULK) (DLA ENERGY NOV 2011).

The solicitation is amended as follows:

B.Solicitation Note 25 is added as follows:

25. PAYMENT TERMS: Unless an exception is granted, payment terms are NET 30.

C.F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT TRUCKS, TRUCKS AND TRAILERS, TANK WAGONS, PIPELINE, AND LIGHTERS (DLA ENERGY JAN 2012) is deleted in its entirety from Section F

D.Section I is revised to updated I86.12 as follows (changes in bold):

I86.12 DELIVERY-ORDER LIMITATIONS – SCOPE OF CONTRACT (BULK) (DLA ENERGY NOV 2011)

(a) The Government agrees to purchase, during the period of this contract and in accordance with the terms of this contract, at least a quantity (or quantities) of product that, under the contract terms, will be not less than 60 percent of the total original estimated contract volume. The Government may satisfy this obligation by purchasing against any or all of the contract line items.

(b) Except as authorized by paragraphs (c) through (e) below, the maximum quantity the Government is allowed to purchase and the Contractor is authorized to furnish will not exceed the total quantity of each grade of fuel specified in Schedule B of the contract.

(c) If, under a single solicitation, contract line items are not all awarded at the same time, then, for purposes of this contract text, the above mentioned total original estimated contract volume shall be that of the contract after award has been made of all items.

(d) Notwithstanding the wording of the INDEFINITE QUANTITY contract text--

(1) On the final order placed for each product from each refinery source calling for delivery into or by means of tanker or barge, the Government shall be entitled to order, and if ordered, the Contractor shall be required to furnish the ordered quantity, which may be over what the Government would otherwise be entitled to order and is considered sufficient to fill out the vessel. On the final ordered placed by means of pipeline, the Government shall be entitled to order, and if ordered, the Contractor shall be required to furnish quantity sufficient to fulfill the maximum parcel size set by the applicable carrier or International agreement. However, in no event shall this additional quantity for tanker, barge or pipeline exceed their respective monthly quantities as defined in the contract unless agreed upon by the Contractor.

(2) The Contractor may, at its option, make deliveries subsequent to 30 days after the expiration of the ordering period, if requested by the Government.

(e) The scope of this contract does not include--

(1) Alteration to the specification that would require significant reconfigurement of refinery design, or significant modification of current and planned refinery operations;

(2) Alteration in method of shipment that would result in significant disruption of current and planned refinery operations; and

(3) Alteration of the place of delivery, under f.o.b. origin contracts, that would require delivery from a refinery other than the one(s) specified in the Contractor's offer.

END OF AMENDMENT