FINAL_SLIDES_Pre-Proposal_Conference.pptx
PPTX presentation 5 MB Posted
- Attached to
- Rocky Mountain/West Coast Solicitation
- Solicitation number
- SPE600-17-R-0709
- Issued by
-
Defense Logistics Agency Energy
About this file
2017 Rocky Mountain/West Coast/Offshore Pre-proposal Conference Slides
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DLA Energy Rocky Mountain/West Coast/Offshore
SPE600-17-R-0709
Preproposal Conference
February 2, 2017
DEFENSE LOGISTICS AGENCY ENERGY
AMERICA’S COMBAT FUEL SUPPORT LOGISTICS AGENCY
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
DEFENSE LOGISTICS AGENCY
AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Overview of Agenda Opening & Welcoming Remarks U.S. Department of the Navy U.S. Department of Agriculture Rocky Mountain Solicitation Overview
LUNCH
“Break Out” Sessions for Questions & Answers Closing Remarks
Deliver the right solution on time, every time
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Welcome / Introductions DLA Energy Points of Contact:
| Division Chief: | Chris Boeding 703-767-9651 |
| Contracting Officer: | Lorena Montenegro 703-767-9496 |
| Lead Contract Specialists: | Michelle Sands 703-767-1764 |
Justin Wingo 703-767-3134 Vendor Introductions
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
DEPARTMENT OF THE NAVY
Farm to Fleet Overview Chris Tindal Director for Operational Energy Office of the Deputy Assistant Secretary of the Navy for Energy
Farm to Fleet Biofuels Initiative DLA Energy bulk fuels contracting continues to solicit for large-scale, domestic drop-in synthetic fuel blend purchases for regular operational use
USDA CCC funds can be used to help defray feedstock costs
Increase the amount of energy coming from alternative sources in order to diversify our supply
Farm to Fleet Biofuels Initiative 10% blend minimum, 1 year contract CCC funding will go up as blend amounts increase from 10% to 30% JP-5 jet fuel and F-76 marine diesel fuel – any approved pathways F-76: Fischer-Tropsch (F-T), Hydroprocessed Esters and Fatty Acids (HEFA) JP-5: F-T, HEFA, and Synthesized Iso-Paraffins (10%) CCC Eligibility Must be USDA-approved feedstock Must be domestically produced and refined Must deliver!
GHG emissions EISA 526 dictates same or better GHG emissions DLA Quality Technical Support will verify
THANK YOU
2 x F/A-18E, USS Nimitz (CVN-68)
Harry S. Baumes, Ph. D.
Director Office of Energy Policy and New Uses
Defense Logistics Agency – Energy Hilton Springfield Hotel, Virginia February 2, 2017
Pre-Proposal Conference for Rocky Mountain/West Coast/Offshore
USDA Role
Office of the Chief Economist
Feedstock Production
Logistics
Fuel Conversion
Conversion Scale- up/Integration Fuel Testing/Approval Fuel Performance Environment Assmt
End User/ Buyer
Enable Production
Development Supply Chain Approach for Alternative Jet Fuels Feedstock Development & Production Research and Education Feedstock pathways – Integration - Scale Up Commercial Production End –Use Alternative Fuels
USDA Partnerships with U.S. Navy
Farm-to-Fleet Program
Defense Production Act
Farm-to-Fleet
Agriculture, Navy Promote U.S. Military Energy Independence with 'Farm-to-Fleet‘
WASHINGTON, Dec. 11, 2013 – U.S. Departments of Agriculture (USDA) and Navy's joint "Farm-to-Fleet" venture will now make biofuel blends part of regular, operational fuel purchase and use by the military. The announcement incorporates the acquisition of biofuel blends into regular Department of Defense (DOD) domestic solicitations for jet engine and marine diesel fuels. The Navy will seek to purchase JP-5 and F-76 advanced drop-in biofuels blended from 10 to 50 percent with conventional fuels. Funds from USDA's Commodity Credit Corporation (CCC) will assist the effort.
Farm-to-Fleet builds on the USDA / U.S. Navy partnership. The partnership’s aim is to investigate how to speed the development of domestic, competitively-priced "drop-in" diesel and jet fuel substitutes.
Illustration of the Use of CCC funds Dollars Per Gallon
Biofuel JP-5 / F-76 4.0999999999999996 Fossil Fuel JP-5 / F-76 4 The BPI Notice of Funding Availability (NOFA) published in the Federal Register, December 29, 2016.
$50 million is available through FY 2018
The NOFA can be viewed at: www.fsa.usda.gov/energy Farm-to-Fleet Feedstock Program Biofuel Production Incentive (BPI)
| For every 1% biofuel content above 10%, the BPI payment rate will increase 0.8335 cents, up to a maximum payment rate of 25 cents, per gallon: | ||
| If the blended rate is: | Then the BPI payment rate, per gallon, will be: | |
| 10 % | 8.3350 cents | |
| 11 % | 9.1685 cents | |
| 15 % | 12.5025 cents | |
| 20 % | 16.6700 cents | |
| 25 % | 20.8375 cents | |
| 30 % and up to a maximum as permitted by the MILSPEC | 25.0000 cents |
Farm-to-Fleet Feedstock Program BPI Payment Scale
FEEDSTOCKS
Feedstocks can be divided into 4 categories
Generate a RIN, not eligible for CCC funding support
Do not generate a RIN, eligible for CCC funding support
Generate a RIN, eligible for CCC funding support
Do not generate a RIN, not eligible for CCC funding support
Acceptable Feedstocks Annual cover crops and oil produced from these cover crops (these will likely need to be approved by Environmental Protection Agency on case by case basis)
Slash, pre-commercial thinnings, tree residue and forest residue
Wood mill residue / waste
Camelina / camelina oil
Non-food grade corn oil
Canola / Rapeseed oil (Industrial grade)
Algae / Algal Oil
Cellulosic biomass from crop residues, i.e., stover, wheat straw, rice straw
Switchgrass
Miscanthus
Jatropha
Energy cane
Fats, oils and greases derived in the initial processing phase but not otherwise used by a consumer
Hybrid Poplars
Shrub Willows
Sorghum / sorghum oil (non-food grade)
Sorghum, Biomass and Energy
Sunflower Oil
Safflower Oil
Pennycress
Eucalyptus
Agricultural residues such as rice hulls and nut shells
Animal wastes and by-products of animal wastes including fats, oils, and greases (not recycled)
Other agricultural products approved by the Commodity Credit Corporation
Unacceptable Feedstocks Food waste
Yard waste
Municipal solid waste
THANK YOU
Kelly Novak USDA, Farm Service Agency Phone 202.720.4053; email kelly.novak@wdc.usda.gov
Procurement Process
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
ISSUE RFP
CLOSE RFP/
INITIAL OFFER SUBMISSIONS
INITIAL EVALUATIONS
CLOSE NEGOTIATIONS
FINAL PROPOSAL REVISIONS
FINAL EVALUATIONS
AWARDS
OPEN NEGOTIATIONS
PREPROPOSAL CONFERENCE
PRE-SOLICITATION
REVERSE AUCTION
SMALL BUSINESS SET-ASIDE NEGOTIATIONS
Demand Planning Richard Jaekel Chief, Mobility Fuels Planning Division 703-767-3146 Richard.Jaekel@dla.mil
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
JP8/JA1 DPA
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Lag 1 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.51680000000000004 0.4733 0.50749999999999995 0.95430000000000004 0.90429999999999999 0.89229999999999998 0.70720000000000005 0.9587 0.70009999999999994 0.99450000000000005 0.65159999999999996 0.81940000000000002 Lag 4 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.53932351391252609 0.59805342688437035 0.51987726868547546 0.75134004977316093 0.71943272579928774 0.74892844277748183 0.88670740507701551 0.89172508665647199 0.9344058417394433 0.89643513456818413 0.54587028025040063 0.92155199298056445 Lag 12 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.56131745551184631 0.77333461670383097 0.84489538168406331 0.46651649610993662 0.45603277742492548 0.49936883356602768 0.45146158122728203 0.87698785884939712 0.86366160141436144 0.91305168904848311 0.77579423022477645 0.5110950567704251
JP8/JA1 Enriched Forecast 12 Month Enriched Forecast Oct 2017 – Sep 2018 64,750,308 USG or 1,541,674 BBLS
Aggregated DPAs Lag 1 75.67% Lag 4 74.61% Lag 12 66.61%
Previous 12 Months Final Demand History (FDH) 64,750,313 USG or 1,541,674 BBLS
Total Variance Previous 12 Months FDH 2,248,797 USG or 53,543 BBLS
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
JAA DPA
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Lag 1 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.81789999999999996 0.84389999999999998 0.90369999999999995 0.84130000000000005 0.96230000000000004 0.88300000000000001 0.878 0.98499999999999999 0.91859999999999997 0.98529999999999995 0.99399999999999999 0.84509999999999996 Lag 4 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.83797013284424227 0.90963636965326788 0.80294777729705435 0.86323130663751357 0.88225795842065213 0.96894362958920122 0.95139681175044677 0.82038985258456065 0.74628584912900642 0.96838574789882992 0.90153997096965133 0.94258614991539991 Lag 12 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.86664837035198183 0.8367724106088017 0.66567990941123756 0.69828674757600673 0.71532200817165048 0.76737192352154981 0.84518363868338142 0.73631336627034383 0.70303074630009599 0.81996789237563705 0.73455786658256983 0.90521715234352007
JAA Enriched Forecast
537,295,579 USG or 12,792,752 BBLS
Aggregated DPAs Lag 1 90.48% Lag 4 92.72% Lag 12 77.45%
Previous 12 Months Final Demand History (FDH) 503,126,074 USG or 11,979,192 BBLS
639,998 USG or 15,238 BBLS
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
RMWC JP5 DPA
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Lag 1 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.72340000000000004 0.68830000000000002 0.87919999999999998 0.8246 0.89700000000000002 0.96930000000000005 0.79649999999999999 0.82340000000000002 0.85409999999999997 0.9819 0.72599999999999998 0.94099999999999995 Lag 4 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.73250657782969397 0.79056909722869595 0.89511113445438539 0.82260215240558665 0.80161679131174945 0.92854147369696205 0.86373573186597408 0.81353423533699731 0.87356172934426723 0.98309326241077311 0.75311822822210361 0.9045952709934999 Lag 12 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.7518586853324194 0.77516926946847131 0.97329567862017707 0.72976411412033637 0.8996172346246778 0.96596542997071333 0.81136094550319415 0.82939431686859744 0.9154731837609088 0.99374216832110529 0.77239852973484424 0.98173661318733729
RMWC JP5 Enriched Forecast
90,475,176 USG or 2,154,171 BBLS
Aggregated DPAs Lag 1 84.21% Lag 4 84.69% Lag 12 86.66%
Previous 12 Months Final Demand History (FDH) 88,394,595 USG or 2,104,633 BBLS
3,104,417 USG or 73,915 BBLS
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
World Wide JP5 DPA
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
LAG 1 42339 42385 42416 42445 42476 42506 42537 42567 42598 42629 42659 42690 0.80220000000000002 0.7762 0.91690000000000005 0.82979999999999998 0.9294 0.88009999999999999 0.8427 0.96360000000000001 0.90159999999999996 0.86350000000000005 0.91020000000000001 0.99409999999999998 LAG 4 42339 42385 42416 42445 42476 42506 42537 42567 42598 42629 42659 42690 0.81569999999999998 0.85960000000000003 0.96850000000000003 0.82079999999999997 0.98309999999999997 0.97770000000000001 0.90210000000000001 0.99890000000000001 0.81410000000000005 0.9526 0.86019999999999996 0.99270000000000003 LAG 12 42339 42385 42416 42445 42476 42506 42537 42567 42598 42629 42659 42690 0.7288 0.85440000000000005 0.89200000000000002 0.93989999999999996 0.97199999999999998 0.8992 0.82930000000000004 0.95399999999999996 0.81 0.97950000000000004 0.83540000000000003 0.93359999999999999
World Wide JP5 Enriched Forecast 12 Month Enriched Forecast Feb 2017 – Jan 2018 427,492,543 usg or 10,178,394 BBL
Aggregated DPAs Lag 1 88.42% Lag 4 91.22% Lag 12 88.57%
Previous 12 Months Final Demand History (FDH) 415,048,529 USG or 9,882,108 BBL
Total Variance -2,008,921 USG or 47,831 BBLS
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
RMWC F76 DPA
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Lag 1 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.70950000000000002 0.77990000000000004 0.80869999999999997 0.2928 0.3145 0.92249999999999999 0.85019999999999996 0.2034 0.29310000000000003 0.749 0.24030000000000001 0.58509999999999995 Lag 4 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.71705540148554325 0.37980622789604068 0.95010717422413848 0.30804281341715384 0.29800451933994676 0.98997798134332426 0.70737376086894022 0.2087406399832171 0.28326980244133587 0.68618431265860336 0.25363158433101657 0.56254854744046667 Lag 12 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.5992108981921106 0.60224777041041655 0.89618007024452218 0.30591973231601416 0.42398188662167519 0.69359857344112374 0.5145640532424528 0.29361440662437432 0.50505143282307763 0.9778552782196257 0.18113781682818983 0.90507082710082654
RMWC F76 Enriched Forecast
26,067,420 USG or 620,653 BBLS
Aggregated DPAs Lag 1 56.24% Lag 4 52.87% Lag 12 57.49%
Previous 12 Months Final Demand History (FDH) 35,331,095 USG or 841,217 BBLS
-437,063 USG or -11,263 BBLS
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
World Wide F76 DPA
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Lag 1 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.82030000000000003 0.8044 0.87739999999999996 0.8982 0.9698 0.84470000000000001 0.92069999999999996 0.74390000000000001 0.95189999999999997 0.95620000000000005 0.66080000000000005 0.96699999999999997 Lag 4 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.77876105418596298 0.77266703887315602 0.93136807243148001 0.83312977552334255 0.94475069327585859 0.88280419251302489 0.99726000657600233 0.79723089450345364 0.92669916117843321 0.87877750390452891 0.60007997656158718 0.9822659047231006 Lag 12 42339 42370 42401 42430 42461 42491 42522 42552 42583 42614 42644 42675 0.47373851502984105 0.73815639126765342 0.73131188364665356 0.88427147302791165 0.93825003675602114 0.84731536707161892 0.95890246723036188 0.78312681335249512 0.93107066785389725 0.96826224434474006 0.59819663566956094 0.91294570904200278
World Wide F76 Enriched Forecast 12 Month Enriched Forecast Feb 2017 – Jan 2018 584,511,720 usg or 13,916,946 BBL
Aggregated DPAs Lag 1 86.79% Lag 4 86.05% Lag 12 81.38%
Previous 12 Months Final Demand History (FDH) 561,395,881 USG or 13,366,569 BBL
Total Variance -36,186,128 USG or -861,574 BBLS
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Program Description Statement of Need: The acquisition of the estimated annual bulk fuel requirements for the Rocky Mountain/West Coast/ Offshore Program
Requirements:
Turbine Fuel, Aviation (JP8) 9130-01-031-5816, PP 2.2b: 2,510,000 USG Turbine Fuel, Aviation (JP5) 9130-00-273-2379, PP 2.2d: 136,920,000 USG Turbine Fuel, Aviation (JAA) 9130-00-359-2026, PP 2.2b: 586,925,000 USG Turbine Fuel, Aviation (JA1) 9130-00-753-5026, PP 2.2b: 42,200,000 USG Fuel, Naval Distillate (F76) 9140-00-273-2377, PP 2.5b: 124,000,000 USG
Delivery Period:
October 1, 2017 through September 30, 2018 plus 30-day carry over period
I209.09 EXTENSION PROVISIONS (DLA ENERGY JAN 2012)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Solicitation Overview Solicitation Sections Section B, Supplies or Services and Prices/Costs Section C, Descriptions/Specifications/Statement of Work Section D, Packaging and Marking Section E, Inspection and Acceptance Section F, Deliveries or Performance Section G, Contract Administration Data Section H, Special Contract Requirement Section I, Contract Clauses Section J, List of Documents, Exhibits and Other Attachments Section K, Representations, Certifications, and other Statements of Offerors or Respondents Section L, Instructions, Conditions, and Notices to Offerors or Respondents Section M, Evaluation Factors for Award
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Solicitation Overview Contract Type:
Indefinite Delivery, Indefinite Quantity (IDIQ) contracts with 75% minimum guarantee Fixed-Price with Economic Price Adjustment (EPA) Multiple awards
Competition:
Full and open w/ partial small business set-asides (48.59%)
Solicitation:
Negotiated Request for Proposal (RFP) Intend to award with discussions System for Award Management (SAM) registration required at https://www.sam.gov/portal/public/SAM
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Solicitation Overview What To Submit:
SF-1449
Offeror Submission Package(OSP) Applicable fill-in clauses/provisions Quality Control Plan (or outline) Representations and Certifications (Section K)
If applicable, Small Business Subcontracting Plan(Large Business Only) F-76 Traceability Page Supply Commitment Letter
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Offer Entry Tool (OET) An electronic tool for submissions of offers under DLA Energy Bulk Petroleum Solicitations Mandatory for submission of offers under this Solicitation.
BULK OET and DIRECT DELIVERY OET ARE DIFFERENT Bulk OET accounts are linked to your Commercial And Government Entity (CAGE) Code Only one offer per CAGE Code can be submitted A separate OET account is required for each CAGE code Multiple users per CAGE code allowed:
Users may work on offer simultaneously Cannot submit offer if more than one user is logged in
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Obtaining an OET Account Three Steps to obtaining an OET account:
Establish a CAGE Code for your company CAGE code is assigned when registration in System of Award Management (SAM) is complete Link to SAM: https://www.sam.gov/ Create an account in the Account Management and Provisioning System (AMPS):
- Link to AMPS: https://amps.dla.mil/oim Log into AMPS and apply of the Vendor Offer Submission Role:
BULK OET – 105
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Minimum Offer Requirements The following information is the minimum that must be included to successfully submit an offer in OET:
At least one shipping point must be identified in the Shipping Point Physical Abilities Table At least one FOB Origin or FOB Destination Bid Must Include shipping point, product, max quantity, mode, product price, and additive costs (if any) Electronically sign SF 1449 Complete Offer Submission Package (OSP) and attach
Rocky Mountain West Solicitation
- RMW 17R0709 OET R1
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
FOB Origin vs FOB Destination Free On Board (FOB) Origin and Destination offers allowed Solicitation requirements identify allowed type for each location Origin and Destination offers evaluated differently in the BEM
FOB Origin:
Custody Transfer point at vendor shipping point BEM evaluates each bid line to ALL possible requirement locations Evaluates up to five intermediate points between shipping point to requirement location Transportation rates not included in offer price Will only be evaluated to locations with offered additive match
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
FOB Origin Offer Each FOB Origin bid line is evaluated to all requirements that can be reached.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
FOB Destination FOB Destination to Requirement locations Custody transfer point is at the requirement location Transportation cost included in offered price BEM will only evaluate to the offered requirement location Offered additives must match the requirement location additives
FOB Destination to DFSP Custody Transfer Point at the specified DFSP Transportation cost to the custody transfer point included in offer price BEM evaluates each bid line from DFSP to all possible requirement locations Will evaluate up to four intermediate points between the DFSP and requirement locations Will only evaluate to locations with correct additive match
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
FOB Destination Offer
Each FOB Destination bid line is evaluated only to the specific location.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
FOB Destination to DFSP Offer
Each FOB Destination bid line is evaluated to all requirements that can be reached from the DFSP that is the FOB point.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
OET Rounds (Example)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
INITIAL OFFERS /
OET ROUND 1
INTERIM OFFERS /
OET ROUND 2
FINAL OFFERS /
OET ROUND 3
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Evaluation Overview Offer Evaluation Method:
Lowest Price, Technically Acceptable(LPTA)
52.212-2 EVALUATION -- COMMERCIAL ITEMS (OCT 2014)
Factor 1: Technical Acceptability Subfactor 1: Supplies or Services and Prices/Cost, Section B Subfactor 2: Description/Specifications/Statement of Work, Section C Subfactor 3: Inspection and Acceptance, Section E Subfactor 4: Deliveries or Performance, Section F
Factor 2: Price: Bid Evaluation Model (BEM)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Market Research Jesse Hall Industry Economist 703-767-8254 Jesse.Hall@dla.mil
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pricing Economic Price Adjustment Clause 52.216-9069 Economic Price Adjustment – Published Market Price – Domestic Bulk (NOV 2011) – DLAD Default or Recommended Escalators Published price we believe most accurately reflects price movements for that product in the specified location Base Reference Date – November 15, 2016 Prior Week Average Pricing Average of daily midpoint prices from 11/7/16 – 11/11/16 Uncommon Escalators Escalators proposed by offerors that differ from DLA default escalator
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pricing Base Reference Price – Default Escalators West Coast Jet: Platts Jet Fuel LA, San Francisco, and Seattle average West Coast F76: Platts ULSD LA, San Francisco, and Seattle average Rocky Mountain Jet: Platts Jet54 USGC Pipe Alaska JP4 or Jet B: 70% OPIS Anchorage conv. clear reg unl rack average prior week average + 30% OPIS Anchorage commercial jet fuel delivered spot prior Thursday Price Escalation Offer price - Base reference price = Margin Invoice price = Reference price + Margin
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pricing Adjustment factors
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pricing Adjustment factors – Calculation
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pricing Adjustment factors – Why?
Evaluate offers based on the relationship of the uncommon escalator and the default escalator for a 12 month period
Looking at full 12 month average for the comparison allows us to see the "normal" relationship between the two escalators
May be a market abnormality on the base reference date
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Quality Technical Philip Chang Chemist 703-767-9654 Philip.Chang@dla.mil Margaret Weddell Chemist 703-767-9531 Margaret.Weddell@dla.mil
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Specifications & Quality Assurance Provisions (QAP) JP-8 (MIL-DTL-83133J dated Dec 16, 2015) and QAP C16.64-1 JP-5 (MIL-DTL-5624W dated March 28, 2016) and QAP C16.01 JP5 Table I Limit Changes Viscosity at -20°C decreased to 7.0 mm2/s [D445] Smoke Point increased to 25 mm [D1322] FSII concentration decreased to 0.08-0.11 volume percent [D5006] JP5 Table III Additions (for fuel containing synthesized hydrocarbons) Derived cetane number, min: 40 [D6890, D7170] Viscosity at -40°C: 12 mm2/s [D445] JP5 Table IV Incidental Contaminants Particulate matter Filtration Time Particle Counting FAME content (Max at 50ppm) Flash point of 62.5C is required at the custody transfer for delivery in Ca, Or and Wa.
20ml of each batch sample need to be delivered to NRL.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Specifications & Quality Assurance Provisions (QAP) JAA and JA1 (ASTM D1655-16c) and QAP C16.08-1 for JAA and QAP C16.09 for JA1 Tube deposit ratings using ETR (D3241 Annex A3) or ITR (D3241 Annex A2) have been added and are now the referee method.
Clarification: If available the ETR results are referee and take precedence over ITR. ITR is only considered referee if ETR is not available.
F-76 (MIL-DTL-16884N dated Apr 22, 2014) and QAP C16.23 Ultra low sulfur limit 15ppm maximum Traceability Signature Page Reference to MIL-PRF-32490, Feb 3, 2014, ADDITIVE, LUBRICITY IMPROVER, DIESEL, and QPL-32490 http://quicksearch.dla.mil Flash point of 62.5C is required at the government acceptance at origin and subsequently deliver through a multiproduct pipeline.
Storage Stability modification to the spec limits.
Total insoluble shall be less than 2.0mg/100ml when D5304 is used, and 1.0mg/100ml when D2274 is used.
20ml of each batch sample need to be delivered to NRL.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
JP-5 Synthetic Fuel Requirements Section 3.1 of MIL-DTL-5624W Required to provide full CoAs for any JP-5 containing a synthetic fuel blend
| Max Blend Ratio | Synthetic Component Requirement | |
| Fischer Tropsch (FT) | 50% | ASTM D7566, Annex A1 |
| Hydroprocessed Esters and Fatty Acids (HEFA) | 50% | ASTM D7566, Annex A2 |
| Synthesized Iso-Paraffins (SIP) | 10% | ASTM D7566, Annex A3 |
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
JP-8: Section 3.1.1 of MIL-DTL-83133J allows up to 50% blend of either FT or HEFA
F-76: Section 3.2.1 of MIL-DTL-16884N allows up to 50% blend of either FT or HRD
JP-8 and F-76 Renewable Fuels
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pre-Award Requirements for Renewable Fuels
| For the Synthetic Portion, full CoAs of: | ||
| Fuel | Tables | Specification |
| F-76 | A-I and A-II | MIL-DTL-16884N |
| JP-8 | A-I and A-II | MIL-DTL-83133J |
| JP-5 | ||
| - FT | A1.1 and A1.2 | ASTM D7566 |
| - HEFA | A2.1 and A2.2 | ASTM D7566 |
| - SIP | A3.1 and A3.2 | ASTM D7566 |
Include in the OSP:
Include the blend percentage of synthetic For the finished fuel, full specification testing
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Renewable Commercial Fuels Jet A may contain approved synthetic fuels per ASTM D7566
Any offer including a synthetic portion must also include full CoA to the relevant annex of D7566, tables 1 & 2 and a full CoA to ASTM D1655
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Quality Assurance Glenn Rowinski Quality Assurance Specialist 703-767-8395 Glenn.Rowinski@dla.mil
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
E Quality Assurance Provisions (QAPs)
CONTRACTOR INSPECTION RESPONSIBILITIES:
The QAP used depends on product type and mode of transport:
E1.21 applies for commercial fungible Jet A/A-1 with & without additives. Modes: P/L, TT, and TC. E1 applies to all others, including Jet A/A-1by marine vessel.
E1: QCP acceptable to Gov’t., Cover all phases: Rec, Storage, Sample, Test/Calibrate, Load, Documentation, Off-spec.
E1.21 Company Plan – but must address those points cited under E1.21: COQ, additive injection procedures (homogeneity), inspect TC, provide test reports to P/L Company (must meet their spec), documentation (COQ & BOL) to QAR, P/L, and/or truck driver. Annotate additive concentrations on COQ or BOL.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
E Quality Assurance Provisions (QAPs) Other “E” QAPs:
E12 Point of Acceptance – defines where Acceptance takes place.
E22.01 Point of Inspection – where Gov’t inspection takes place. Normally inspection occurs at Origin.
E22 Inspection Offices – Which Region covers which states. For RMWC - Americas West.
E35 – Non Conforming Supplies – Request goes to Contracting.
E40.01 MIRR in WAWF/iRAPT – Marine, P/L, TT.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Supply Planning / Technical Evaluation
Bruce DeSoto Chief, Supply Planning Branch 703-767-9322 Bruce.DeSoto@dla.mil
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Technical Evaluation Lowest Price, Technically Acceptable (LPTA) -- Source Selection Evaluation Board (SSEB) --- Supply Planning, Tankers, Transportation, Quality Assurance, and Product Technology & Standards
-- Board reviews Offer Submission Package (OSP) and/or Offer Evaluation Tool (OET) Submittal
-- Cannot over-emphasize the need to ensure the OSP or OET is fully completed. Missing details might result in sections being rated unacceptable from the
SSEB.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Technical Evaluation (Con’t) Evaluation Factors – Section M of Solicitation:
-- Section B, Supplies or Services
-- Section C, Description/Specs/Statement of Work
-- Section E, Inspection and Acceptance
-- Section F, Deliveries or Performance
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Technical Evaluation (Con’t) Examples of missing data include:
-- Mode, Min/Max Quantities, Shipping Point
-- Min/Max Parcel Size, Lift Interval, Max Monthly Qty
-- Delivery Exceptions/Waivers (if applicable)
-- Quality Control Plan
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Technical Evaluation (Con’t) Examples of missing data include:
-- Tanker/Port Details
-- Shipping Rate in BBL/HR
-- Refinery Shutdown/Turnaround
-- Truck Loading Rack Details
-- Free Time/Detention Rate
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Bid Evaluation Model (BEM) Awards are made based on the lowest overall cost to the Government taking into account offer pricing, transportation to requirement location and other cost factors Model calculates costs of all possible ways to connect an offer to a requirement:
All offer lines considered individually All possible transportation modes considered Applicable node/arc combinations up to six iterations to connect offers and requirements All offer conditions (i.e. “either/or,” offer maximums/minimums) and additive possibilities Each “leg” of a route is monetized and added to the offer (six legs) Includes intermediate throughput costs and adjustment factors Lowest overall cost across all requirements is awarded
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Offer Evaluations Offer Conditions OET provides you with the opportunity to define your offer in great detail by defining the conditions applicable to you offer You do NOT have to use any conditional statements You CAN use more than one conditional statement Conflicting Conditions:
Ensure your conditional statements do not conflict with each other (i.e.: Stating your minimum award by Tanker is 5 million and stating your overall maximum award is 3 million).
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
BEM Evaluation Report
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Evaluation Example Offers A: 6,000,000 USG by TT @ $2.95/gallon B: 6,000,000 USG by PL @ $3.00/gallon C: 1,000,000 USG by PL @ $2.99gallon Requirements Base 1: 3,000,000 gallons received by TT Base 2: 3,000 ,000 gallons received by TT Base 3: 1,000 .000 gallons received by TT Intermediate Depot Support Available Into X by PL, out by TT to all Requirements Into Y by PL, out by TT to all Requirements Transportation Rates A to 1 (TT): .28/gallon A to 2 (TT): .20/gallon A to 3 (TT): .23/gallon B to X (PL): .02/gallon B to Y (PL): .02/gallon C to X (PL): .01/gallon C to Y (PL): .04/gallon X to 1 (TT): .05/gallon X to 2 (TT): .02/gallon X to 3 (TT): .05/gallon Y to 1 (TT): .04/gallon Y to 2 (TT): .06/gallon Y to 3 (TT): .02/gallon PL = Pipeline; TT = Tank Truck Offer A
6,000,000 USG @$2.95
Offer C
1,000,000 USG @$2.98
Offer B
6,000,000 USG @$3.00
DFSP X
DFSP Y
Base 3
1,000,000 USG
Base 2
3,000,000 USG
Base 1
3,000,000 USG
.28 .02 .05 .01 .02 .05 .02 .04 .02 .04 .20 .23 .06 Req 1 – Offer A (total cost $3.23/gal) Req 2 – Offer A (total cost $3.15/gal) Req 3 – Offer C (total cost $3.04/gal) Total cost: $22,180,000 Req 1 – Offer B (total cost $3.06/gal) Req 2 – Offer C (total cost $3.01/gal) Req 2 – Offer B (total cost $3.04/gal) Req 3 – Offer B(total cost $3.04/gal) Total cost: $21,310,000 $860K Savings Distribution Plan Generated Evaluated on Offered Price Only:
Evaluated on Laid-Down Cost:
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
BEM Runs
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
INITIAL OFFERS /
OET ROUND 1
INTERIM OFFERS /
OET ROUND 2
IPR BEM RUN - MCBEW
FPR BEM RUN – MCBEW & LCR
FINAL OFFERS /
OET ROUND 3
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Reverse Auction (RA) Submitted through OET No changes except for a reduction in price No attachments permitted BEM Evaluation Reports provided:
| - Minimum Cost Bid Evaluation Sheet (MCBEW) |
| - Laid Down Cost Report (LCR) provided |
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Laid Down Cost Report (LCR)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Post Reverse Auction
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
BEM BASE RUN
8(a) RUN
SB SET-ASIDE RUN
HUBZONE RUN
ADDITIONAL RA ROUNDS
SB NEGOTIATIONS
FINAL FORCED RUN
Responsibility Responsibility Determinations (FAR Part 9) In order to be eligible for an award, the Contracting Officer must be able to determine the contractor responsible as defined at FAR 9.104– General Standards.
L2.07- Determination of Responsibility
(1) The volumes to be supplied;
(2) The specification(s) of product(s) to be supplied;
(3) The points of delivery and period of contract performance;
(4) The escalation provision(s) applicable to products to be supplied; and
(5) The supplier's delivery and inspection terms and conditions.
Eligibility review
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Pre-Award Surveys Preaward Surveys (Financial/Technical Capability) A preaward survey is normally required only when the information on hand or readily available to the contracting officer, including information from commercial sources, is not sufficient to make a determination regarding responsibility. See FAR 9.106-1 – Conditions for Preaward Surveys.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Awards/Post Award Awards:
Process awards in EBS Notification via email Approximately 60-days prior to start of Delivery Period (October 1, 2017)
Notice of Unsuccessful Offerors
Post Award:
Post final BEM’s to FBO.gov Process contract modifications Orders (Ordering period: Date of award through September 30, 2018)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Questions / Answers
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
Break-Out Sessions for Q&A Tables with Subject Matter Experts are located in the main conference room and “Break-Out” Room 1
Questions and answers that are not vendor specific regarding their offer will be recorded, compiled and posted on FBO.gov on the FAQ memo.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
DEFENSE LOGISTICS AGENCY
AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE image12.jpeg image13.png image14.png image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpg image11.jpeg image16.jpeg image17.jpeg image18.png image19.png image20.png image21.png image22.jpeg image23.jpeg image24.jpeg image25.png image26.jpeg image27.png image28.png
Microsoft_Excel_Worksheet.xlsx Sheet1
Biofuel Fossil Fuel
JP-5 / F-76 4.1 4
To resize chart data range, drag lower right corner of range.
Microsoft_Excel_Worksheet1.xlsx
JP8 PPN
Product Number Type Location Product Short Description Location description SNP Planner Processing indicator System Max Capacity Purchase Program
002568613 @A8\QProduction Plant@ EBFA TURBINE FUEL,AVIATI BRYANT AAF E1Y Not processed PPN2.2B
002568613 @A8\QProduction Plant@ EEEA TURBINE FUEL,AVIATI EIELSON AFB E1Y Not processed 39396 PPN2.2B
002568613 @A8\QProduction Plant@ EF3A TURBINE FUEL,AVIATI FORT WAINWRIGHT E1Y Not processed 75264 PPN2.2B
002568613 @A8\QProduction Plant@ ELEA TURBINE FUEL,AVIATI Elmendorf AFB E1N Not processed PPN2.2B
002568613 @A8\QProduction Plant@ ESFA TURBINE FUEL,AVIATI FORT GREELY E1Y Not processed 36372 PPN2.2B
003592026 @A0\QCustomer@ 8060000015 TURBINE FUEL,AVIATION CRAIG E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000068 TURBINE FUEL,AVIATION COLD BAY E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000070 TURBINE FUEL,AVIATION MCGRATH E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000071 TURBINE FUEL,AVIATION SAINT PAUL ISLAND E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000073 TURBINE FUEL,AVIATION FAIRBANKS E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000081 TURBINE FUEL,AVIATION JUNEAU E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000112 TURBINE FUEL,AVIATION BETHEL E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000113 TURBINE FUEL,AVIATION KING SALMON E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000114 TURBINE FUEL,AVIATION SEWARD E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000116 TURBINE FUEL,AVIATION GALENA E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000277 TURBINE FUEL,AVIATION BETTLES E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000278 TURBINE FUEL,AVIATION GULKANA E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060000380 TURBINE FUEL,AVIATION FAIRBANKS E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060001020 TURBINE FUEL,AVIATION FAIRCHILD AFB E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060002774 TURBINE FUEL,AVIATION SPOKANE E1N Not processed PPN2.2B
003592026 @A0\QCustomer@ 8060044612 TURBINE FUEL,AVIATION MT ARNG AASF 1 E1N Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EAAN TURBINE FUEL,AVIATION DFSP Alamogordo E1Y Not processed 5132904 PPN2.2B
003592026 @A8\QProduction Plant@ EACC TURBINE FUEL,AVIATION ACU-5 E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EAMA TURBINE FUEL,AVIATION AASF2 Marana E1Y Not processed 83832 PPN2.2B
003592026 @A8\QProduction Plant@ EAMC TURBINE FUEL,AVIATION AASF Mather E1Y Not processed 11886 PPN2.2B
003592026 @A8\QProduction Plant@ EAPA TURBINE FUEL,AVIATION AASF 1 Phoenix E1Y Not processed 29568 PPN2.2B
003592026 @A8\QProduction Plant@ EAPC TURBINE FUEL,AVIATION Plant 42 E1Y Not processed 98868 PPN2.2B
003592026 @A8\QProduction Plant@ EAPO TURBINE FUEL,AVIATION AASF2, Pendleton E1Y Not processed 21336 PPN2.2B
003592026 @A8\QProduction Plant@ EASO TURBINE FUEL,AVIATION AASF 1, Salem E1Y Not processed 48174 PPN2.2B
003592026 @A8\QProduction Plant@ EAWU TURBINE FUEL,AVIATION AASF West Jordan E1Y Not processed 55860 PPN2.2B
003592026 @A8\QProduction Plant@ EB1T TURBINE FUEL,AVIATION Fort Bliss TT E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EB2C TURBINE FUEL,AVIATION MCLB BARSTOW E1N Not processed 10374 PPN2.2B
003592026 @A8\QProduction Plant@ EBAC TURBINE FUEL,AVIATION Buckley ANG Base E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EBBC TURBINE FUEL,AVIATION Buckley AFB E1Y Not processed 390768 PPN2.2B
003592026 @A8\QProduction Plant@ EBET TURBINE FUEL,AVIATION Fort Bliss E1Y Not processed 523488 PPN2.2B
003592026 @A8\QProduction Plant@ EBFA TURBINE FUEL,AVIATION BRYANT AAF E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EC1C TURBINE FUEL,AVIATION Carson Terminal E1Y Not processed 14196000 PPN2.2B
003592026 @A8\QProduction Plant@ EC1N TURBINE FUEL,AVIATION Cannon AFB E1Y Not processed 1645056 PPN2.2B
003592026 @A8\QProduction Plant@ EC3C TURBINE FUEL,AVIATION KMEP CALNEV-EDWARDS E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EC4O TURBINE FUEL,AVIATION Camp Withycombe E1Y Not processed 10920 PPN2.2B
003592026 @A8\QProduction Plant@ ECCC TURBINE FUEL,AVIATION China Lake E1Y Not processed 419160 PPN2.2B
003592026 @A8\QProduction Plant@ ECCN TURBINE FUEL,AVIATION DFSP SELBY E1Y Not processed 22747998 PPN2.2B
003592026 @A8\QProduction Plant@ ECCW TURBINE FUEL,AVIATION Cheyenne APRT ANG E1Y Not processed 201138 PPN2.2B
003592026 @A8\QProduction Plant@ ECFA TURBINE FUEL,AVIATION Camp Navajo E1Y Not processed 14784 PPN2.2B
003592026 @A8\QProduction Plant@ ECFC TURBINE FUEL,AVIATION Ft Carson SuperStation E1Y Not processed 281064 PPN2.2B
003592026 @A8\QProduction Plant@ ECGW TURBINE FUEL,AVIATION Camp Guernsey E1Y Not processed 32046 PPN2.2B
003592026 @A8\QProduction Plant@ ECIN TURBINE FUEL,AVIATION Creech AFB E1Y Not processed 119490 PPN2.2B
003592026 @A8\QProduction Plant@ ECPC TURBINE FUEL,AVIATION Channel Islands ANG E1Y Not processed 405804 PPN2.2B
003592026 @A8\QProduction Plant@ ECSC TURBINE FUEL,AVIATION CAMP ROBERTS E1Y Not processed 58800 PPN2.2B
003592026 @A8\QProduction Plant@ ECTC TURBINE FUEL,AVIATION KM Bulk Storage Travis E1Y Not processed 20304900 PPN2.2B
003592026 @A8\QProduction Plant@ ECWO TURBINE FUEL,AVIATION Camp Rilea E1Y Not processed 12012 PPN2.2B
003592026 @A8\QProduction Plant@ EDDA TURBINE FUEL,AVIATION Davis Monthan AFB E1Y Not processed 6030822 PPN2.2B
003592026 @A8\QProduction Plant@ EDDU TURBINE FUEL,AVIATION DUGWAY PROVING GROUND E1Y Not processed 49560 PPN2.2B
003592026 @A8\QProduction Plant@ EE1C TURBINE FUEL,AVIATION Edwards AFB E1Y Not processed 2086560 PPN2.2B
003592026 @A8\QProduction Plant@ EEEC TURBINE FUEL,AVIATION NAS El Centro E1Y Not processed 1675044 PPN2.2B
003592026 @A8\QProduction Plant@ EF1C TURBINE FUEL,AVIATION FORT CARSON E1Y Not processed 72072 PPN2.2B
003592026 @A8\QProduction Plant@ EF1W TURBINE FUEL,AVIATION Fairchild AFB E1Y Not processed 4572372 PPN2.2B
003592026 @A8\QProduction Plant@ EF2C TURBINE FUEL,AVIATION Fort Irwin E1Y Not processed 331128 PPN2.2B
003592026 @A8\QProduction Plant@ EFCS TURBINE FUEL,AVIATION Ft Bliss Superstation E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EFFA TURBINE FUEL,AVIATION Fort Huachuca E1Y Not processed 186060 PPN2.2B
003592026 @A8\QProduction Plant@ EFFC TURBINE FUEL,AVIATION Fresno ANG E1Y Not processed 150570 PPN2.2B
003592026 @A8\QProduction Plant@ EFFW TURBINE FUEL,AVIATION FE Warren AFB E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EFJC TURBINE FUEL,AVIATION Fort Hunter-Liggett E1Y Not processed 45024 PPN2.2B
003592026 @A8\QProduction Plant@ EFNN TURBINE FUEL,AVIATION Naval Air Station Fallon E1Y Not processed 2969778 PPN2.2B
003592026 @A8\QProduction Plant@ EG2M TURBINE FUEL,AVIATION Great Falls E1Y Not processed 143262 PPN2.2B
003592026 @A8\QProduction Plant@ EGBI TURBINE FUEL,AVIATION Gowen Field ANG E1Y Not processed 772632 PPN2.2B
003592026 @A8\QProduction Plant@ EH2H TURBINE FUEL,AVIATION HICKAM ANG E1Y Not processed 65982 PPN2.2B
003592026 @A8\QProduction Plant@ EHHN TURBINE FUEL,AVIATION Holloman AFB E1Y Not processed 1531068 PPN2.2B
003592026 @A8\QProduction Plant@ EHHO TURBINE FUEL,AVIATION Umatilla E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EHHU TURBINE FUEL,AVIATION HILL AFB E1Y Not processed 8316546 PPN2.2B
003592026 @A8\QProduction Plant@ EHKH TURBINE FUEL,AVIATION MCAS KANEOHE BAY E1Y Not processed 1353954 PPN2.2B
003592026 @A8\QProduction Plant@ EHMI TURBINE FUEL,AVIATION Holy Corp E1Y Not processed 4659984 PPN2.2B
003592026 @A8\QProduction Plant@ EKBI TURBINE FUEL,AVIATION KINLEY CORP E1Y Not processed 1014678 PPN2.2B
003592026 @A8\QProduction Plant@ EKCC TURBINE FUEL,AVIATION KINDER MORGAN COLTON E1Y Not processed 1082298 PPN2.2B
003592026 @A8\QProduction Plant@ EKIC TURBINE FUEL,AVIATION KINDER MORGAN IMPERIAL E1Y Not processed 2007390 PPN2.2B
003592026 @A8\QProduction Plant@ EKKN TURBINE FUEL,AVIATION Kirtland AFB E1Y Not processed 3481632 PPN2.2B
003592026 @A8\QProduction Plant@ EKKO TURBINE FUEL,AVIATION Kingsley Field E1Y Not processed 696696 PPN2.2B
003592026 @A8\QProduction Plant@ EKPA TURBINE FUEL,AVIATION KINDER MORGAN PHOENIX E1Y Not processed 4578000 PPN2.2B
003592026 @A8\QProduction Plant@ EKS1 TURBINE FUEL,AVIATION KM NORTH LINE SPARKS E1Y Not processed 3585582 PPN2.2B
003592026 @A8\QProduction Plant@ EKSC TURBINE FUEL,AVIATION KINDER MORGAN Miramar Station E1N Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EKTA TURBINE FUEL,AVIATION KINDER MORGAN TUCSON E1Y Not processed 1866102 PPN2.2B
003592026 @A8\QProduction Plant@ EKYA TURBINE FUEL,AVIATION KINDER MORGAN YUMA E1Y Not processed 4311090 PPN2.2B
003592026 @A8\QProduction Plant@ EL1A TURBINE FUEL,AVIATION Luke AFB E1Y Not processed 2243976 PPN2.2B
003592026 @A8\QProduction Plant@ EL1C TURBINE FUEL,AVIATION Los Alamitos E1Y Not processed 190008 PPN2.2B
003592026 @A8\QProduction Plant@ ELFW TURBINE FUEL,AVIATION Fort Lewis, Doss Aviation Inc E1Y Not processed 334320 PPN2.2B
003592026 @A8\QProduction Plant@ EM1C TURBINE FUEL,AVIATION March ARB E1Y Not processed 7115178 PPN2.2B
003592026 @A8\QProduction Plant@ EM1M TURBINE FUEL,AVIATION Malmstrom AFB E1Y Not processed 393498 PPN2.2B
003592026 @A8\QProduction Plant@ EM2C TURBINE FUEL,AVIATION Moffett Field ANG E1Y Not processed 9996 PPN2.2B
003592026 @A8\QProduction Plant@ EMMC TURBINE FUEL,AVIATION Moffett Federal Airfield E1Y Not processed 126210 PPN2.2B
003592026 @A8\QProduction Plant@ EMMI TURBINE FUEL,AVIATION Mountain Home AFB E1Y Not processed 4527474 PPN2.2B
003592026 @A8\QProduction Plant@ EMMW TURBINE FUEL,AVIATION McChord AFB E1Y Not processed 6063750 PPN2.2B
003592026 @A8\QProduction Plant@ EN1N TURBINE FUEL,AVIATION Nellis AFB E1Y Not processed 2829498 PPN2.2B
003592026 @A8\QProduction Plant@ EP2C TURBINE FUEL,AVIATION Peterson AFB E1Y Not processed 359982 PPN2.2B
003592026 @A8\QProduction Plant@ EP3C TURBINE FUEL,AVIATION DFSP 29 Palms E1Y Not processed 54054 PPN2.2B
003592026 @A8\QProduction Plant@ EP4C TURBINE FUEL,AVIATION Camp Pendleton E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EP5C TURBINE FUEL,AVIATION MCB 29 Palms E1Y Not processed 392322 PPN2.2B
003592026 @A8\QProduction Plant@ EPMW TURBINE FUEL,AVIATION Puget Sound, Manchester E1Y Not processed 19589808 PPN2.2B
003592026 @A8\QProduction Plant@ EPP1 TURBINE FUEL,AVIATION Camp Pendleton E1Y Not processed PPN2.2B
003592026 @A8\QProduction Plant@ EPPC TURBINE FUEL,AVIATION DFSP Pasco E1Y Not processed 1236732 PPN2.2B
003592026 @A8\QProduction Plant@ EPPH TURBINE FUEL,AVIATION DFSP PEARL HARBOR E1Y Not processed 54783918 PPN2.2B
003592026 @A8\QProduction Plant@ EPPO TURBINE FUEL,AVIATION Portland IAP ANG E1Y Not processed 625548 PPN2.2B
003592026 @A8\QProduction Plant@ ERRN TURBINE FUEL,AVIATION Reno ANG E1Y Not processed 148554 PPN2.2B
003592026 @A8\QProduction Plant@ ES2U TURBINE FUEL,AVIATION Salt Lake City ANG E1Y Not processed 423150 PPN2.2B
003592026 @A8\QProduction Plant@ ES3C TURBINE FUEL,AVIATION San Luis Obispo E1Y Not processed 19488 PPN2.2B
003592026 @A8\QProduction Plant@ ESBC TURBINE FUEL,AVIATION MWTC Bridgeport E1Y Not processed 11424 PPN2.2B
003592026 @A8\QProduction Plant@ ESCW TURBINE FUEL,AVIATION Cusik Survival School E1Y Not processed 9282 PPN2.2B
003592026 @A8\QProduction Plant@ ESPA TURBINE FUEL,AVIATION Sky Harbor IAP ANG E1Y Not processed 449736 PPN2.2B
003592026 @A8\QProduction Plant@ ESSH TURBINE FUEL,AVIATION DFSP SCHOFIELD E1Y Not processed 36120 PPN2.2B
003592026 @A8\QProduction Plant@ ETTA TURBINE FUEL,AVIATION Tucson IAP E1Y Not processed 463344 PPN2.2B
003592026 @A8\QProduction Plant@ ETTC TURBINE FUEL,AVIATION Travis AFB E1Y Not processed 10715628 PPN2.2B
003592026 @A8\QProduction Plant@ ETTN TURBINE FUEL,AVIATION Tonapah ANG E1Y Not processed 1861356 PPN2.2B
003592026 @A8\QProduction Plant@ EUUC TURBINE FUEL,AVIATION USAF Academy E1Y Not…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .