SF 30 Amendment 4 with answers to questions received by the Government.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE J
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
July 26, 2017
4. REQUISITION/PURCHASE REQ. NO.
64597582
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
SPE600 7. ADMINISTERED BY (If other than Item 6) CODE SPE600 DLA Energy - FESAC
8725 JOHN J. KINGMAN RD., SUITE 2945
FT. BELVOIR, VA 22060-6222
BUYER/SYMBOL – Jeremy Baxter/DLA Energy-FESAC Email –Jeremy.Baxter@dla.mil
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
X
9a. AMENDMENT OF SOLICITATION NO.
SPE600-17-R-0504
9b. DATED (SEE ITEM 11)
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: I2.06 CHANGES-FIXED PRlCE(ALT II,) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [X ] is required to sign this document and return ___1____ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Modification/Amendment is issued to provide answers to the questions that were received by the Government by the due date of 3:00 pm Ft Belvoir Time/June 23, 2017 IAW page 4 Attachment II OSP. The WD CBA for Malmstrom AFB, MT has been updated and is posted. Changes to the Solicitation and AF Appendices are reflected in the posted answers. These changes are forthcoming in a future Modification/Amendment to the Solicitation and AF Appendices documents.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER (Type or print)
15B. NAME OF CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C.DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
NOTE: Unless otherwise indicated, each question is intended to request information for both locations.
1. Which is correct for the Technical Proposal Submission? Original and two copies or one hard copy and one PDF electronic copy?
ANSWER: One hard copy and one PDF reference: SPE600-17-R-0504 SF 1449 page 3 paragraph D
2. Section L.1.b states type font shall be 12 point Times New Roman in the Technical Proposal. Will the Government consider 8 point to 10 point font size for charts and tables?
ANSWER: Charts and tables may be 8 or 10 font as long as they are fully legible.
3. Based upon our attendance at the site visits for F.E. Warren AFM and Malmstrom AFB and our familiarity with the missions at both installations it would seem that PWS paragraph C-5.2.7 Cryogenics Maintenance would not apply. However, the footnotes in Appendix AF indicate cryogenics is a contractor responsibility. But, the installation specific information is either N/A (F.E. Warren) or missing (Malmstrom). Is cryogenics maintenance and operation a requirement of the contract at either location?
ANSWER: Cryogenics servicing and maintenance is not required at FE Warren AFB or Malmstrom AFB.
4. Ref. Instructions to Offerors, Volume 1, Technical Proposal: Does the government want offerors to address each of the sub-factors from an overall perspective in regards to providing the required services at both sites? Or does the government want offerors to also submit an appendix addressing specifics of each site separately? Please clarify.
ANSWER: It is the offerors responsibility to determine the substance and format of the technical proposal. It is encouraged for the offerors to follow the format of the PWS to address each major subsection/subfactor from a generic perspective applicable to fuels management operations with appendices identifying base specific details or deviations from the generic information.
5. Is the TM allowed to have additional duties?
ANSWER: IAW PWS Appendix D, the TM “cannot be a collateral duty job, but this does not prevent the TS/TM from infrequent performance of routine PWS tasks to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as TS/TM duties, segregation of duties, and overall performance management is not affected.”
6. Can duties of the Accountant, FDSO, Dispatcher and Lab guy be collateral duties?
ANSWER: IAW PWS Appendix D, the accountant “cannot be a collateral duty job, but this does not prevent the Accountant from infrequent performance of routine PWS tasks (such as a FDSO or Dispatcher) to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as specific accounting duties and segregation of duties are not affected.” IAW PWS Appendix D, the laboratory technician “cannot be a collateral duty job, but this does not prevent the Laboratory technician from infrequent performance of routine PWS tasks (such as a FDSO or Refueling Unit Operator) to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as specific quality surveillance and control sampling and testing duties are not affected.”
7. Will a waiver or exemption be given for DLA P-10?
ANSWER: No waiver or exemption is anticipated.
8. Does the Government perform PM actions at both locations, leaving the Contractor responsible for Operator Maintenance of monthly and below?
ANSWER: IAW PWS para C-5.3.2 and Appendix AF, I, Preventive Maintenance at both locations is the responsibility of the government. The offeror is responsible for compliance with maintenance tasks as indicated in PWS para C-5.3 and para C-5.3.6, as para C-5.3 7 Cryogenics Maintenance is not required.
9. At both locations, the current contractor is working on average 4 nights a week after the published duty hours to continue to catch helicopters, many times for 2-3 hour after the shift. What are the additional overtime hours the incumbent incurred for the last year to catch aircraft that have arrived after hours?
ANSWER: N/A due to increase in duty hours per Question 10.
10. The existing PWS hours at both locations are inconsistent with the current and future workload. Would the Government consider adjusting the hours for the contractor to and addition 2-3 hours after the current published times, so that that PWS more accurately reflects the work load that is actually being experienced at the site?
ANSWER: Normal Operations/Distribution Hours at FE Warren AFB and Malmstrom AFB in Appendix AF will be increased to reflect 0200 end of day.
11. C-5.2.1 states the FSC will be staffed on all shifts, however, APPENDIX AF has that the FSC will only be manned from 0700 to 1600 which requirement will be required?
ANSWER: See Question 10 for revised hours. PWS para C-5.2.1 requires the FSC to be “staffed sufficiently on all shifts…” However, as the requirements for after FSC normal hours are small, the FSC tasks for those hours generally can be met by on-shift Operations/Distribution personnel through maintaining communication with the customer.
12. C-5.2.5.1 requires the contractor to provide and maintain manual gauging equipment/supplies (Tape & Bobs', fuel & water finding paste) How many tapes and bobs', and fuel and water finding paste are consumed & or replaced annually?
ANSWER: Quantities and durations are estimates only: Tape and bobs are not consumable and are used until damaged and no longer able to be re-certified. One container of water and fuel finding paste has been used per year.
13. C-5.2.6 states the contractor will provide at their expense all necessary laboratory supplies and replacement equipment. Does this require replacement items such as CU meters, Inline Samplers, etc or equipment like Glassware and consumable supplies like either, cans, alcohol, and filters?
ANSWER: The contractor is required to provide any and all items necessary to perform applicable sampling and testing responsibilities unless indicated as GFE in Appendix AF.
14. C-5.3 the contractor shall provide parts, supplies, and materials needed to perform maintenance. What is meant or implied as required items to meet this requirement?
ANSWER: The contractor is required to provide any and all items necessary to perform applicable maintenance responsibilities unless indicated as GFE in Appendix AF.
However, keep in mind at these locations, IAW Appendix AF and C-5.3.2, Preventive Maintenance is the responsibility of the government.
15. Assistant Terminal Superintendent/Manager (ATS/ATM) (3) this may be a collateral duty job except for the Accountant position. Will a waiver or exemption be authorized?
ANSWER: No. Due to segregation of duty concerns, the TM/ATM cannot perform the accountant role.
16. As the contractor will be required to purchase the fuel for all Contractor supplied vehicles as well as the refueling units. Is DLA going to assign the Contractor a T
DODAAC?
ANSWER: Upon award, the contractor will need to apply for the proper DoDAAC to enable purchase of DWCF fuel.
17. At Malmstrom it was stated that the contractor would be responsible to provide office furniture as part of the contract cost.
a. Of the existing office furniture in the building, what will be left for contract turnover as Government Provided?
ANSWER: No office furniture will remain unless listed in Appendix AF.
b. Will the contractor be required to provide the furniture at F.E. Warren as well?
ANSWER: No office furniture will remain unless listed in Appendix AF.
18. At this time the current contractor is using Government provided lab consumables (i.e. ether) to perform testing of DLA fuel at the missile sites. In this PWS, the contractor is required to provide all lab consumables. Will DLA reimburse the contractor if our consumable supplies that we use in testing fuel samples from the missile sites?
ANSWER: No. Testing fuel samples is a PWS requirement, so consumable supplies used for this task are the contractor’s responsibility.
19. Reference RFP, Section L - Instructions To Offers 3.iv Past Performance Questionnaire: As there are several Fuels Management Services contracts currently being procured by DLA-E, will it be acceptable to the Government to use questionnaires that DLA-E has already received for other recent proposals? This will cut down the amount of paperwork that customers will be required to complete.
ANSWER: Yes, to the extent the questionnaires comply with the requirements of the solicitation regarding past performance
20. Reference RFP, Section L – Instructions To Offers, Proposal Organization, 1.ii, and Appendix D: The paragraph in Section L states that resumes for Key personnel are required to be submitted with the proposal, however Appendix D states that they are to be submitted after contract award. Please clarify.
ANSWER: Resumes for Key personnel are due 30 days after contract award.
21. Reference PWS Appendix D: Please confirm that an on-site TS/TM is required on the new contract for EACH of the AF base locations.
ANSWER: A separate on-site Terminal Manager (TM) is required at FE Warren AFB and at Malmstrom AFB.
22. Reference PWS Appendix AF, FE Warren AFB: The appendix lists the FSC hours of operation from 0700-1800 M-F. Please confirm that Offerors are required to have someone present during all hours of operation in the FSC to be considered compliant with PWS requirements.
ANSWER: The FSC hours of operation are 0700-0200; yes, someone must be present during all hours of operation
23. Reference PWS Appendix AF, FE Warren AFB: The appendix lists the service hours for all functions as 0700-1800 M-F. Is this service hours window the same as what is currently in place at FE Warren?
ANSWER: The FSC hours of operation are 0700-0200; yes someone must be present during all hours of operation.
24. Reference PWS Appendix AF, FE Warren AFB and OSP: The third paragraph of the base specific requirements states that requests for overtime are to be coordinated with the COR or Contracting Officer. Please confirm requests outside normal duty hours are considered as reimbursable as there are no provisions in the OSP for OT reimbursement.
ANSWER: Overtime is a contractor responsibility and not reimbursable. Offerors should factor in any requirements for staffing support outside normal duty hours in their firm fixed price offer
25. Reference PWS Appendix AF, FE Warren AFB: The fifth paragraph references a NAC as the requirement for access to MAF restricted areas. This is in conflict with the last sentence of the Appendix which references a requirement of a current security clearance. Please clarify.
ANSWER: Secret security clearance is needed along with NAC for access to MAF restricted areas.
26. Reference PWS Appendix AF, FE Warren AFB: The appendix states that tank truck receipts require Contractor escort. What is the distance from the entry gate to the tank farm?
ANSWER: Approximately 2 miles.
27. Reference PWS Appendix AF, Malmstrom AFB: The appendix lists the FSC hours of operation from 0700-1600 M-F. Please confirm that Offerors are required to have someone present during all hours of operation in the FSC to be considered compliant with PWS requirements during this period.
ANSWER: The FSC hours of operation are 0700-0200; yes, someone must be present during all hours of operation.
28. Reference PWS Appendix AF, Malmstrom AFB: The appendix, for all functions, has weekends, holidays, and after hours left blank. Please clarify if there are any response requirements beyond the normal duty windows defined.
ANSWER: See Question 10 and 11. For both locations, IAW PWS para C-5.1, “If requirements necessitate Contractor personnel return to conduct operations outside normal hours, the Contractor shall respond and provide required support within 1 hour of notification. The Contractor shall maintain a recall roster of personnel and will provide standby personnel contact information to applicable base points of contact for potential after hours or emergency support.” IAW Appendix AF, “Fuels Operations and FSC shall operate during these observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOCC and Security Forces and be available to respond within 1 hr.”
29. Reference PWS Appendix AF, Malmstrom AFB: The appendix lists 6 tank trucks at
8000 USG as the average number of receipts per period. What is the period referenced?
ANSWER: Per month.
30. Reference PWS Appendix AF, Malmstrom AFB: The appendix states that tank truck receipts require Contractor escort. What is the distance from the entry gate to the tank farm?
ANSWER: 1.5 miles
31. Reference Malmstrom AFB Collective Bargaining Agreement: Appendix A of the agreement lists a “Fuels Manager” hourly category. Please confirm the Government is aware of the potential that the Terminal Manager may be a union member.
ANSWER: Wage Determination CBA-2017-10176 is included for purposes of offerors’ compliance with the requirements of Solicitation Provision 52.222-41(f) and the CBA is attached for offeror’s reference. Determination of assigned duties is the responsibility of the offeror.
32. Please provide additional data for both locations regarding mobile C-300/1 ground product issues to include:
a. Average number of servicing operations performed (by grade of product) per month.
ANSWER: Quantities and durations are estimates only;
Malmstrom: GUR: 1; DS1: 2 FE Warren: GUR 1-2; DS1: 3-4
b. Number of ground product vehicles (C-300/1) normally operated simultaneously per shift.
Malmstrom: 2
FE Warren: 1
c. Average number of C300/1 fills (at the fillstand) per month (by grade of product).
Malmstrom: GUR: 2 per year; DS1: 1 per month
FE Warren: GUR: 1 per month; DS1: 1 per month
33. Are there any requirements to deliver ground fuel to any off-station locations? If yes, please provide locations, distance from main base, grade of product, consumption history and delivery frequency.
ANSWER:
Malmstrom: Yes, in emergency situations, none historically has occurred for ground products.
FE Warren: Yes, Papa 7 and Papa 10 Rd. 40 miles distance, Diesel product issued. 6 times annually, 50 gallons average per year.
34. Please provide historical data that shows how often aviation fuel is delivered to the MAF–R tanks at both bases.
ANSWER: Quantities and durations are estimates only; Depends on consumption by helicopter squadron, average current number of aviation fuel deliveries is 1-2 per month.
35. We understand the MAF-R tanks have a capacity of 1,000 gallons. What is the inventory level at which resupply of the tanks is needed?
ANSWER: Max resupply of each tank limited to 900.
36. How do the documents reflecting the issues from the MAF-R to helicopters get from the missile sites to the Fuels accounting office?
ANSWER: Facility Managers at each site normally deliver accounting documents to the fuels office. Documents may also be collected during monthly inspections of the MAF- R.
37. Appendix AF states the contractor shall provide laboratory testing of facility manager provided samples IAW applicable regulations as for any aviation issue tank to ensure fuel quality is maintained. Based on this, are you stating that the facility managers pull (obtain) the samples and provide them to the contractor to be analyzed?
ANSWER: Per Appendix AF, the contractor is responsible for pulling the samples and performing analysis. However, for Malmstrom AFB, Montana Air National Guard fuels specialists currently obtain and provide the fuel samples for the Malmstrom AFB contractor to analyze.
38. Since the MAF-R tanks are non-capitalized tanks that are not operated/controlled by the contractor, how is off-spec fuel handled? If fuel samples fail, who is responsible to Caution Tag/Lock the tank and associated fuel pumping system?
ANSWER: Per Appendix AF, removal of off-specification or dormant stock is the responsibility of the Facility Manager. The contractor is responsible to Caution Tag/Lock the tank and associated fuel pumping system.
39. When maintenance is performed on the MAF-R downstream from the filter separator or when a new hose is installed on the MAF-R fuel systems, whose responsibility is it to ensure the fuel is sampled prior to issuing product?
ANSWER: The contractor.
40. Are MAF-R systems considered organizational tanks IAW AFI 23-204? If yes, PWS Appendix AF states a monthly “supervisory” tank inspection will be performed by the contractor to ensure the tanks are properly maintained and in good working order. Do these inspections qualify as the bi-annual organizational tank inspections required IAW
AFI 23-204?
ANSWER: Yes
41. Other than the MAF-R tanks, are there other organizational tanks located at the missile sites that fall under the contractor’s responsibility under AFI 23-204? If yes, please provide numbers and locations.
ANSWER: Organizational tank information is provided in Appendix AF.
42. Please provide historical data showing how often the contractor has had to respond to emergency fueling requests outside of normal duty hours.
ANSWER: Two times during contract period for both sites; also see Question 10 and 11.
43. Are there any confined spaces the contractor will be required to access?
ANSWER: No
44. How is waste water (obtained from draining R-11 sumps and filter separators or product recovery) disposed of?
ANSWER: Malmstrom: Satellite accumulation point
FE Warren: Off-specification bowser disposed of through the unit environmental coordinator.
45. Based on the very small operation, is the contractor required to employee an alternate TM who has attended the DLA RO/TM course?
ANSWER: Yes.
46. During the site visit, Mr. Butler advised the contractor would be required to pay for all fuel used in government provided vehicles, including R-11s, C-300/301. Please confirm this is correct, and if so, please provide historical records for fuel consumption by product grade and vehicle type.
ANSWER: The contractor will be responsible for all fuel used to operate the refueling units. Previous year consumption data is:
a. FE Warren: 1100 gallons
b. Malmstrom: R11: 52 gallons per month / C300/301: 16 gallons per month.
47. Who provides fuel for emergency generators? If contractor is provided, please provide historical consumption data.
ANSWER: Contractor delivers fuel to emergency generator with CE Power Production.
300 gallons issued on average per month.
48. Based on the very small operation, is the contractor required to employee an alternate Accountant who has successfully completed the FMD course as defined in Appendix D of the PWS?
ANSWER: Yes.
49. Do contractor employees who deliver fuel to the MAF-R’s require a SECRET security clearance?
ANSWER: See Question 25.
50. Typically, a completed DLAH Form 1728 is submitted to DLA for each contractor employee to ensure a NACI (National Agency Check and Inquires) investigation is conducted with favorable adjudication results required. Appendix AF states that the contractor is required to submit all required information on their employees who will be performing MAF-R fuel deliveries to the Air Force Security Forces for completion of a National Agency Check (NAC) investigation. Is this investigation in addition to the
NACI?
ANSWER: Yes, for Entry Authorization Letter for MAF entry.
51. Please provide historical workload data for lab testing and supplies.
ANSWER: Quantities and durations are estimates only;
Malmstrom: 1,200 samples per year.
FE Warren: 2 R-11s, 4 MF-Rs, 6 ground product receipts per month on average
52. How are classified REPOL reports submitted?
ANSWER: REPOLs are submitted monthly via SIPRNET located in the Deployment Readiness Center. 2 contractors require SIPRNET accounts.
Malmstrom:
53. The Hours of Operations Table shows Distribution hours as 0700 - 0200. The helipad hours are from 0700-2300. What Distribution services are performed after 2300 hours?
ANSWER: Helipad hours are from 0700-0200
54. The Workload Information Table lists “number of receipts per period,” but doesn’t define the period the data provided covers. Please clarify.
ANSWER: Monthly.
55. The Workload Information Table shows the average number of receipts per month as 7.
Does this include all products? If yes, please provide a breakdown by product grade.
ANSWER: Quantities and durations are estimates only; 2 DS1, 1 BIO, 1 E85, 1 GUR, 2
JAA
56. The Workload Information Table shows the average number of refueling by shift as 6-8 day shift and 2-4 nights. Does this include all grades of product? If yes, please provide a breakdown by product grade.
ANSWER: Jet A aircraft refuels.
57. The Workload Information Table shows the number of base organizational tanks supported as 21. Does this include the MAF-R tanks?
ANSWER: No
58. The Workload Information Table under “Other base specific items” shows 77 Organizational Tank Inspections. Is this the average for each year, or does this represent the biennial requirement?
ANSWER: Biennial
59. The information provided in OTHER REQUIREMENTS paragraph a, notes there are 165 missile field sites the contractor supports for accounting and ordering of fuel. In paragraph b of this section, we are advised that only 15 of the missile field sites with 3-4 tanks per site are inspected under the organizational tank program. Does this mean the remaining 150 missile field sites don’t have tanks requiring inspection IAW AFI 23- 204?
ANSWER: Yes
60. Appendix A to the CBA lists several employee classifications under the heading Fuels Distribution, several of which clearly don’t apply (i.e. Supply Technician, Supply Inspector, and others). Although there is a category for “Systems Operator;” however, it is unclear is this is referring to a Supply Systems Operator or a Fuels Distribution Systems Operator (FDSO). Please clarify if this is the classification we should use for the FDSO.
ANSWER: Wage Determination CBA-2017-10176 and CBA-2017-9958 are included for purposes of offerors’ compliance with the requirements of Solicitation Provision 52.222-41(f) and the CBA is attached for offeror’s reference. Determination of assigned duties is the responsibility of the offeror.
61. Appendix A to the CBA lists and employee classification for the Fuels Manager.
Normally, management personnel are classified as “exempt” employees under the terms of the Fair Labor Standards Act (FLSA) and it would appear to be a conflict of interest between the Company and the Union for the manager to be a member of the Union.
Please clarify if the incumbent Fuels Manager is in fact a member of the Union and is classified as a “non-exempt” employee as defined by the FLSA.
ANSWER:
Based on available information, the current Fuels Manager is understood to be a member of the union.
The Government has no response on exempt and non-exempt employees under the
FLSA.
62. The CBA contains a Supplemental Agreement which sets forth wage and fringe benefits which take effect October 1, 2017. Please confirm if these are the rates we should use for pricing our proposal.
ANSWER: The rates currently effective under the predecessor contract are the rates effective October 1, 2016. Price adjustments will be handled in accordance with solicitation provision 52.222-43. ***Please note that the CBA WD for Malmstrom AFB, MT, has been updated to CBA-2017-10176 to reflect the current rates that are established in the 2016 CBA agreement. Please disregard the 2017 rates of CBA- 2017-9952 as these rates have not gone into effect as of yet.
63. The Government Furnished Equipment (GFE) List in the PWS does not include the following lab equipment items. Please clarify which, if any, of these items are in fact
GFE.
• Vacuum pump
• Refractometer
• Solvent Dispenser
• Crash Kit
ANSWER: All are GFE
FE Warren:
64. The Workload Information Table shows the average number of refueling by shift as 10. Does this include all grades of product? If yes, please provide a breakdown by product grade.
ANSWER: Quantities and durations are estimates only; 9 aviation, 1 ground products
65. Please provide the historical average number of refueling operations that occur between the hours of 1600-1800.
ANSWER: Quantities and durations are estimates only; 2-4 on average
66. The Government Furnished Equipment (GFE) List in the PWS does not include the following lab equipment items. Please clarify which, if any, of these items are in fact GFE.
• Vacuum pump
• Oven
• Analytical Balance
• Flash Tester
• Refractometer
• Microscope
• Hydrometers
• Solvent Dispensers
• Crash Kit
ANSWER: None. However, WYANG fuels lab is equipped with the above mention, except crash kit. Contractor is responsible for providing that kit.
67. Addendum A to the CBA provides wage and fringe benefit rates effective October 1, 2016.
Normally wage rates change annually, which for this location would be the same day the period of performance begins on October 1, 2017. Since the rates for 2017 are not posted to the CBA, please confirm the 2016 rates should be used to price our proposal and that a request for equitable adjustment may be submitted if the rates change after contract award.
ANSWER: The rates currently effective under the predecessor contract are the rates effective October 1, 2016. Price adjustments will be handled in accordance with solicitation provision 52.222-43.
68. The narrative description of Base Specific Requirements in PWS Appendix AF II F.E.
Warren does not state the required response time during normal hours of operation. Could the Government please provide?
ANSWER: 30 minutes
69. Reference PWS Paragraph C-5.3.4 and Appendix AF, FE Warren AFB: The PWS paragraph states that the building and maintenance requirements will be defined in the Appendix;
however, we do not see that information. Please clarify.
ANSWER: No unique requirements exist for this location. Contractor is responsible for day-to-day cleanliness of the facilities and calling in facility work orders to Base Civil Engineering as needed. Contractor is responsible for snow removal from operational systems/areas not plowed by the base.