AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60014R0509

X

2014 SEP 08

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

06 NOV 2014

3. EFFECTIVE DATE

Opening/Closing Date Changed to:

2014 SEP 08 / 2014 NOV 19

TIME 9:00 AM

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUED ON NEXT PAGE

A. Amendment 0003 is hereby issued to extend the closing date of the solicitation. This amendment also incorporate the following clauses FAR 52.242-15 Stop Work Order (Aug 1989) and DFARS 252.211-7007 Reporting Of Government-Furnished Property (Aug 2012). The wording in paragraph C-5.1 of the PWS has been changed to reference performance delay for Camp Del Din. This amendment also provides responses to offeror’s questions submitted under this Italy solicitation (SPE600-14-R-0509). The previous reference to this solicitation in amendment 0002 as SP0600-14-R-0509 is corrected to SPE600-14-R-0509. All other terms and conditions remain unchanged.

A. The closing date of the solicitation is hereby extended from October 28, 2014 to November 12, 2014 at 9:00am Fort Belvoir, VA time.

B. The following clauses are hereby incorporated:

1. FAR 52.242-15 STOP WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of Clause)

2. DFARS 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)

(a) Definitions. As used in this clause— “Commercial and Government entity (CAGE) code” means—

(i) A code assigned by the Defense Logistics Agency Logistics Information Service to identify a commercial or Government entity; or

(ii) A code assigned by a member of the North Atlantic Treaty Organization that the Defense Logistics Agency Logistics Information Service records and maintains in the CAGE master file. The type of code is known as an “NCAGE code.”

“Contractor-acquired property” has the meaning given in FAR clause 52.245-1. Upon acceptance by the Government, contractor-acquired property becomes Government-furnished property.

“Government-furnished property” has the meaning given in FAR clause 52.245-1.

“Item unique identification (IUID)” means a system of assigning, reporting, and marking DoD property with

PAGE 2 OF 6 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SPE60014R0509-0003

unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items.

“IUID Registry” means the DoD data repository that receives input from both industry and Government sources and provides storage of, and access to, data that identifies and describes tangible Government personal property. The IUID Registry is—

(i) The authoritative source of Government unit acquisition cost for items with unique item identification (see DFARS 252.211-7003) that were acquired after January 1, 2004;

(ii) The master data source for Government-furnished property; and

(iii) An authoritative source for establishing the acquisition cost of end-item equipment.

“National stock number (NSN)” means a 13-digit stock number used to identify items of supply. It consists of a four-digit Federal Supply Code and a nine-digit National Item Identification Number.

“Nomenclature” means—

(i) The combination of a Government-assigned type designation and an approved item name;

(ii) Names assigned to kinds and groups of products; or

(iii) Formal designations assigned to products by customer or supplier (such as model number or model type, design differentiation, or specific design series or configuration).

“Part or identifying number (PIN)” means the identifier assigned by the original design activity, or by the controlling nationally recognized standard, that uniquely identifies (relative to that design activity) a specific item.

“Reparable” means an item, typically in unserviceable condition, furnished to the Contractor for maintenance, repair, modification, or overhaul.

“Serially managed item” means an item designated by DoD to be uniquely tracked, controlled, or managed in maintenance, repair, and/or supply systems by means of its serial number.

“Supply condition code” means a classification of materiel in terms of readiness for issue and use or to identify action underway to change the status of materiel (see http://www2.dla.mil/j-6/dlmso/elibrary/manuals/dlm/dlm_pubs.asp).

“Unique item identifier (UII)” means a set of data elements permanently marked on an item that is globally unique and unambiguous and never changes, in order to provide traceability of the item throughout its total life cycle. The term includes a concatenated UII or a DoD recognized unique identification equivalent.

“Unit acquisition cost” has the meaning given in FAR clause 52.245-1.

(b) Reporting Government-furnished property to the IUID Registry. Except as provided in paragraph (c) of this clause, the Contractor shall report, in accordance with paragraph (f), Government-furnished property to the IUID Registry as follows:

(1) Up to and including December 31, 2013, report serially managed Government-furnished property with a unit-acquisition cost of $5,000 or greater.

(2) Beginning January 1, 2014, report—

(i) All serially managed Government-furnished property, regardless of unit-acquisition cost; and

(ii) Contractor receipt of non-serially managed items. Unless tracked as an individual item, the Contractor shall report non-serially managed items to the Registry in the same unit of packaging, e.g., original manufacturer’s package, box, or container, as it was received.

(c) Exceptions. Paragraph (b) of this clause does not apply to–

(1) Contractor-acquired property;

(2) Property under any statutory leasing authority;

(3) Property to which the Government has acquired a lien or title solely because of partial, advance, progress, or performance-based payments;

(4) Intellectual property or software;

(5) Real property; or

(6) Property released for work in process.

(d) Data for reporting to the IUID Registry. To permit reporting of Government-furnished property to the IUID Registry, the Contractor’s property management system shall enable the following data elements in addition to those required by paragraph (f)(1)(iii) (A)(1) through (3), (5), (7), (8), and (10) of the Government Property clause of this contract (FAR 52.245-1):

(1) Received/Sent (shipped) date.

(2) Status code.

(3) Accountable Government contract number.

PAGE 3 OF 6 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

(4) Commercial and Government Entity (CAGE) code on the accountable Government contract.

(5) Mark record.

(i) Bagged or tagged code (for items too small to individually tag or mark).

(ii) Contents (the type of information recorded on the item, e.g., item internal control number).

(iii) Effective date (date the mark is applied).

(iv) Added or removed code/flag.

(v) Marker code (designates which code is used in the marker identifier, e.g., D=CAGE, UN=DUNS, LD=DODAAC).

(vi) Marker identifier, e.g., Contractor’s CAGE code or DUNS number.

(vii) Medium code; how the data is recorded, e.g., barcode, contact memory button.

(viii) Value, e.g., actual text or data string that is recorded in its human-readable form.

(ix) Set (used to group marks when multiple sets exist).

(6) Appropriate supply condition code, required only for reporting of reparables, per Appendix 2 of DoD 4000.25-2-M, Military Standard Transaction Reporting and Accounting Procedures manual (http://www2.dla.mil/j-6/dlmso/elibrary/manuals/dlm/dlm_pubs.asp).

(e) When Government-furnished property is in the possession of subcontractors, Contractors shall ensure that reporting is accomplished using the data elements required in paragraph (d) of this clause.

(f) Procedures for reporting of Government-furnished property. Except as provided in paragraph (c) of this clause, the Contractor shall establish and report to the IUID Registry the information required by FAR clause 52.245-1, paragraphs (e) and (f)(1)(iii), in accordance with the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

(g) Procedures for updating the IUID Registry.

(1) Except as provided in paragraph (g)(2), the Contractor shall update the IUID Registry at https://iuid.logisticsinformationservice.dla.mil/ for changes in status, mark, custody, condition code (for reparables only), or disposition of items that are—

(i) Received by the Contractor;

(ii) Delivered or shipped from the Contractor’s plant, under Government instructions, except when shipment is to a subcontractor or other location of the Contractor;

(iii) Consumed or expended, reasonably and properly, or otherwise accounted for, in the performance of the contract as determined by the Government property administrator, including reasonable inventory adjustments;

(iv) Disposed of; or

(v) Transferred to a follow-on or other contract.

(2) The Contractor need not report to the IUID Registry those transactions reported or to be reported to the following DCMA etools:

(i) Plant Clearance Automated Reutilization and Screening System (PCARSS); or

(ii) Lost, Theft, Damaged or Destroyed (LTDD) system.

(3) The contractor shall update the IUID Registry as transactions occur or as otherwise stated in the Contractor’s property management procedure.

(End of clause)

C. Paragraph C-5.1 of the PWS is rewritten to read:

C-5.1 Fuel Operations: The Contractor shall operate and perform maintenance on the existing capitalized U. S.

Army facilities in Italy listed in (Appendix E) to support normal base operations, deployments, exercises, and contingencies as well as during periods of heightened security. Performance for Camp Del Din will begin upon completion of capitalization renovations currently in progress. Contractor performance will be evaluated and payment based on the standards identified in Appendix E. Fuel operations and maintenance at the fuel facilities must be safely and efficiently conducted to requisition, receive, store, and issue petroleum products with appropriate controls to ensure adequate fuel quality and inventory accuracy.

D. Incorporate the following questions and responses:

Q1. With Italian labor laws pertaining to keeping and protecting the incumbent workforce in effect, please provide the number of Italian and non-Italian employees.

PAGE 4 OF 6 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

A1. DLA Energy is not permitted to release information regarding the workforce of the current contractor.

Q2. Please confirm the Defense Base Act (DBA) insurance requirements do not apply since this is a non-SOFA contract.

A2. In accordance with FAR 28.305(b), the Defense Base Act does not apply to this solicitation.

Q3. Will non-US personnel be excluded from working on this contract due to security requirements as listed in FAR 52.204-9000?

A3. Non-US personnel are not excluded based on FAR Clause 52.204-9000.

Q4. Please provide a list of all observed Italian holidays and confirm if they are observed in addition to the US holidays during the contract.

A4. Refer to PWS paragraph C-5.1.1 (para 2) Hours of Operations which states, “It is the service provider responsibility to ensure customers continue to receive uninterrupted service/support during both U.S./Italian National Holiday.”

Q5. What collateral duties are allowed to be performed by the TM and BLSA (PWS Section C-5.2)?

A5. Refer to DoD 4140.1-R, DoD Supply Chain Material Management Regulation and DoD 4161.02-M, DoD Manual for the Performance of Contract Property Administration for detailed information regarding TM and BLSA roles and responsibilities.

Q6. With the 10MB size limit on the bidcustodian@dla.mil mailbox, can we break up our proposal into more than one email if the total size of the proposal is greater than 10MB to meet the electronic submission requirements? If not allowed, what other remedies are offered to the offerors for an electronic submission.

A6. The proposal can be sent in more than one email if that is required to meet the size requirement of the bidcustodian@dla.mil mailbox.

Q7. Are resumes still a requirement for the Terminal Manager? Or will this requirement be waived?

A7. Yes, Resumes remain a requirement for all locations in accordance with Appendix –F of the PWS.

Q8. Considering this procurement is evaluated as a Lowest Priced Technically Acceptable procurement, will the Government perform a price reasonableness evaluation to ensure each offeror’s price proposal adequately considers all costs including payroll taxes, social taxes, corporate taxes, vehicle registration costs, Host Nation registration fee, and other indirect costs of doing business in Italy.

A8. The solicitation will be evaluated based on Lowest Priced Technically Acceptable for a commercial item.

Price reasonableness will not be used as an evaluation method unless it is determined necessary by the Contracting Officer.

Q9. Will the Government reimburse the service provider for the cost of fuel for refueling vehicles?

A9. The Government will not reimburse the contractor for the cost of fuel used to operate the refueling vehicles.

PAGE 5 OF 6 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

Q10. Will the Government provide the laboratory equipment necessary for performing the required sampling and testing of fueling equipment and facilities?

A10. The Government will not provide laboratory equipment necessary for performing the required sampling and testing of fueling equipment and facilities? It is the responsibility of the Offeror to provide and perform necessary testing on petroleum products as required IAW the latest addition of MIL-STD 3004.

Q11. What are the security requirements – are clearances, special forms, and background checks required?

Will the Government provide the forms?

A11. In accordance with C-5.6.1 Base Access Requirements, all contractor personnel must meet prescribed policy and procedure requirements in accordance with Army in Europe Regulation (AER) 190-16.

PAGE 6 OF 6 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: