Pre-Proposal_-_Presentation.pdf

PDF 2 MB Posted

Attached to
Vandenberg AFB Solar Electric RESA Federal contract opportunity
Solicitation number
SPE600-14-R-0418
Issued by
Defense Logistics Agency Energy

About this file

Pre-Proposal Presentation

View the file

Other files for this federal contract opportunity

Other files attached to Vandenberg AFB Solar Electric RESA, newest first.
File Type Posted
Amendment_0007_SPE600-14-R-0418.pdf PDF
Amendment_0006_SPE600-14-R-0418.pdf PDF
Vandenberg_RESA_SPE600-14-R-0418-_AMD_0005.pdf PDF
Attach_3_-REGS_Energy_Prod-HourlyIntervalProductionDataandPricingSchedules.xlsx XLSX spreadsheet
Amendment_0005_SPE600-14-R-0418.pdf PDF
Attachment_9_-_Cancellation_Ceiling-Vandenberg_AFB.pdf PDF
Attachment_2_-_Lease_(Draft).pdf PDF
Vandenberg_AFB_RFI_Group_2.pdf PDF
Attachment_4_-__Maps_of_Premises.pdf PDF
Vandenberg_RESA_SPE600-14-R-0418-_AMD_0004.pdf PDF
Attach_3_-REGS_Energy_Prod-HourlyIntervalProductionDataandPricingSchedules.xlsx XLSX spreadsheet
Amendment_0004_SPE600-14-R-0418.pdf PDF
Attachment_16_-_Environmental_Baseline_Survey_for_East_Housing_Area_Solar_Energy_Project.pdf PDF
Amendment_0003.pdf PDF
Registration_List_-_Site_Visit_Attendees.pdf PDF
Attach_3_-REGS_Energy_Prod-HourlyIntervalProductionDataandPricingSchedules.xlsx XLSX spreadsheet
Vandenberg_AFB_RFI_Group_1.pdf PDF
Attachment_4_-__Maps_of_Premises.pdf PDF
Attachment_9_-_Early_Termination_Fees_Schedule-Vandenberg_AFB.docx DOCX document
Amendment_0002_SPE600-14-R-0418.pdf PDF
Attachment_2_-_Lease_(Draft).pdf PDF
Attachment_15_-_Mitigation_Paln_for_East_Housing_Area_Solar_Energy_Project.pdf PDF
Attachment_11_-_Small_Business_Subcontracting_Plan.pdf PDF
Vandenberg_RESA_SPE600-14-R-0418-_AMD_0002.pdf PDF
Amendment_0001_SPE600-14-R-0418.pdf PDF
Vandenberg_RESA_SPE600-14-R-0418_per_Amendment_0001.pdf PDF
Attachment_4_-__Maps_of_Premises.pdf PDF
Attachment_6_-_Environmental_Assessment_for_East_Housing_Area_Solar_Energy_Project_Vandenberg_Air_Force_Base _CA.pdf PDF
Attachment_8_-_Hazardous_Waste_Management_Plan-_Vandenberg_AFB.pdf PDF
Attachment_5_-_Traffic_Control_Plan_(Example)_.pdf PDF
Attachment_2_-_Lease_(Draft).pdf PDF
Attachment_7_-_Work_Restrictions_and_Contractor_Access_for_Vandenberg_Air_Force_Base.pdf PDF
Vandenberg_RESA_SPE600-14-R-0418.pdf PDF
Attachment_3_-_REGS_Energy_Production_-_Hourly_Interval_Production_Data_and_Pricing_Schedules.xlsx XLSX spreadsheet
Attachment_9_-_Early_Termination_Fees_Schedule-Vandenberg_AFB.docx DOCX document
Attachment_4a_-_Vandenberg_AFB_Visitor_Map.pdf PDF
Attachment_10_-_Past_Performance_Information_Questionnaire.pdf PDF
Attachment_14_-_Community_Relations_Media_Visit_Request.docx DOCX document
Attachment_13_-_Engineering_Technical_Letter_(ETL)_14-6_Use_of_DER_IAW_IEEE_1547_Reqts_(Draft).pdf PDF
Attachment_1a_-_PG E_-_3_Year_Usage_Data.pdf PDF
Attachment_11_-_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_1_-_Vandenberg_AFB_15-Minute_Interval_Electricity_Usage_Data_.xlsx XLSX spreadsheet
Attachment_12_-_Wage_Determination.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vandenberg Air Force BaseVandenberg Air Force Base

30th Space Wing30th Space Wing

• Mission, Vision, and Priorities

• Base History and Statistics

• Launch Mission

• Major Tenant Units

• Energy Conservation Program

• Solar Project Plan

OverviewOverview

MISSION

Provide our unique capabilities for assured access to and from space for our nation

VISION

The World’s Most Innovative Space Launch and Landing Team

PRIORITIES

Mission People

Innovation

Began as Camp Cooke in 1941 As a tank and artillery training base during WWII and Korean War

Served as POW camp for Italian and German POWs

VandenbergVandenberg

Designated Vandenberg AFB in 1958

First Launch:

Thor missile Dec 1958

First Polar Orbiting Satellite:

Discoverer Feb 1959

1,900+ launches and counting

99,000 acres (3rd largest AF base)

45 miles of coastline

2.84 mile runway

SCHRIEVER AFB

Colorado

PATRICK AFB

Florida

PETERSON AFB

Colorado

BUCKLEY AFB

Colorado

VANDENBERG

Launch and Landing

‐Polar Orbit Satellites ‐ICBM Missile Tests ‐MDA Interceptor Tests ‐X‐37 Space Plane Landing

Vandenberg AFB

Spacelift

X‐37 Landing

USSTRATCOM Joint Functional Component Command (JFCC) SPACE – 14th Air Force (AFSTRAT)

614th Air and Space Operations Center 155 Units at 44 locations worldwide

MISSILE DEFENSE AGENCY

Operations and testing

576th FLIGHT TEST SQUADRON ICBM Testing

NATIONAL RECONNAISSANCE OFFICE

Payload Processing and Integration

381st TRAINING GROUP Training for space and intercontinental ballistic missile (ICBM) operations and maintenance forces

MISSION PARTNERS AT VANDENBERG

Energy ProgramEnergy Program Leader in Energy Conservation

California “Flex Your Power” Award DoE Federal Energy/Water Mgmt Award FEMP “Energy Champions” AF REAP Award

AF Pioneers Energy Efficient Technologies Led Solid State Lighting initiative Front‐runners in Energy Mgmt systems

Continually Exploring New Initiatives Renewables: Solar, Wind, Wave

Solar Project PlanSolar Project Plan Siting Considerations

1) Eastern Side of Base

2) Contiguous Area

3) Proximity to 70‐kV

4) Previously Disturbed

5) Min Environmental Impact

6) Off‐Base Access

7) Public Awareness

“Old East Housing Area”

Solar Project PlanSolar Project Plan On‐Site Connection to 70‐kV

Large Electrical Load Base Load: 17.5 MW Peak Load: 26.5 MW Annual Consumption: 170,000 MWh

Servicing Utility Company: PG&E

1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

DEFENSE LOGISTICS AGENCY

AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY

WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

DLA ENERGY

INSTALLATION ENERGY

Vandenberg AFB Pre-Proposal Conference

Cynthia Ralph and Bryan Simmons October 16, 2014

2 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Who we are and our mission

• DLA Energy Installation Energy contract programs

• Request for Proposal overview

– Statement of work

– Contract clauses

– Evaluation factors

– Proposal submission

• Milestones

• Points of Contact

• Questions/comments

Overview

Agenda

3 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

DLA Energy Overview

• Mission: To provide the Department of Defense and other government agencies with comprehensive energy solutions in the most effective and efficient manner possible.

• Vision: To be our customers’ first choice for energy solutions.

• Values:

• Warfighter needs guide us.

• Integrity defines us.

• Diversity strengthens us.

• Excellence inspires us.

4 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Actively administering over $2.5 billion in natural gas, electricity, coal, renewable energy and Energy Savings Performance Contracts for over 200 customers (DoD and Federal Civilian)

• Major focus areas include:

• Execution of renewable energy and energy conservation requirements utilizing power purchase agreements, ESPCs and looking at UESCs

• Execution of agreements for implementation of electricity demand response at federal facilities

• Continued support for renewable goals through purchase of renewable energy credits

DLA Energy Contract Programs Installation Energy

$2.5 billion

5 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Renewable Energy Supply Agreement for the provisioning, production, purchase and delivery of electricity generated by an on-site solar Renewable Energy Generation System at Vandenberg AFB

– Contractor procures/finances/installs/owns/operates/maintains the solar PV array

– Government purchases electricity at fixed price per kWh

– 25-year generation/purchase term; nine (9) month construction period and three (3) month demolition period

– Use of property conveyed via separate real estate agreement

– Government reserves the right not to award contract

Request for Proposal

6 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Section B and Section C Supplies and Statement of Work

– CLIN 0001 Firm Fixed $/kWh Price

• Does NOT include RECs

– CLIN 0002 Firm Fixed $/kWh Price

• Does include RECs

– CLIN 0003 Firm Fixed $/kWh Price for energy security

– Government estimates the project size: 20 MW;

Contractor shall maximize space available

Statement of Work

7 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

– Firm fixed price per kWh; first year contract price can not exceed $.085/kWh; up to a 1.5 % escalation rate compounded annually considered

– Solar array must be fully operational within nine (9) months of contract award

Statement of Work, cont.

8 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

– Approximately 182 acres of land to be conveyed via separate out grant of a lease

• In-Kind Consideration

– cash payments, reduced rate

– Future microgrid capabilities through inverters

– Notice of Intent to Award; Interconnection

Statement of Work, cont.

9 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• General Terms and Conditions outlined within the RFP

– Contractor-specific T&Cs can be submitted with the proposal for government’s review and consideration

• Only the Contracting Officer can affect changes

• Contracting Officer’s Representative

– Upon award, an on-site COR will be appointed

Terms and Conditions

10 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Section I Contract Clauses

– System for Award Management (SAM)

– FAR 52.212-4 Contract Terms and Conditions

• Section K Representations, Certifications

– FAR 52.212-3 Offeror Representations and

Certifications – Commercial Items

– DFAR 252.225-7018 Photovoltaic Devices – Certificate

Contract Clauses

11 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• The proposed evaluation factors are:

Factor 1: Technical Capability/Risk

Factor 2: Past Performance Factor 3: Socioeconomic Consideration Factor 4: Price Proposal

Evaluation Factors

12 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Non-price evaluation factors are listed in descending order of importance. When combined, the non-price evaluation factors are approximately equal in importance as price.

Evaluation Factors, cont.

13 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Providers shall prepare the proposal according to the titles and page limits of each volume described below:

Proposal Submission

Volume Title Maximum Page Limit

I Technical Proposal (Written) 50 pages II Past Performance 10 pages III SocioEconomic Consideration 2 pages IV Price Proposal None V Contract Documentation None

14 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Providers shall provide hardcopies according to each volume described below:

Proposal Submission

Volume Title # of Hard Copies # of CD ROM

Copies I Technical Proposal (Written) 1 original & 3 copies 2 copies II Past Performance 1 original 2 copies III SocioEconomic Consideration 1 original 2 copies IV Price Proposal 1 original & 3 copies 2 copies V Contract Documentation 1 original 2 copies

15 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• Proposals shall cross reference Section C, Statement of Work, and their proposal.

• All amendments must be signed and returned.

• Any proposal, modification or revision received at the government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered.

Proposal Submission, cont.

16 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• RFP issuance: September 12, 2014

• Pre-proposal conference: October 16, 2014

• Cut-off for RFP questions: October 29, 2014

• RFP closing: November 12, 2014, 14:00 EST

Milestones

17 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

• DLA Energy Installation Energy, Fort Belvoir, VA

– Andrea Kincaid, 703.767.8669, andrea.kincaid@dla.mil

– Cynthia Ralph, 703.767.8566, cynthia.ralph@dla.mil

– Charlene Woods, 703.767.8583, charlene.miller@dla.mil

– Bryan Simmons, 703.767. 8531, bryan.simmons@dla.mil

– Callie Lake, 703.767.9275, callie.lake@dla.mil

Points of Contact mailto:andrea.kincaid@dla.mil mailto:cynthia.ralph@dla.mil mailto:charlene.miller@dla.mil mailto:bryan.simmons@dla.mil mailto:callie.lake@dla.mil

19 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

DEFENSE LOGISTICS AGENCY

AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY

WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

19 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT

WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP

Presentation was concluded with the site visit.