JA42 AF B Schedules and Price Data Sheets

View the file

Other files

File Type Posted
SPE60013R0809_Amendment_0014_20150624.pdf PDF
SPE600-13-R-0809_Amendment_0013_JA41_Wage_Determinations_FINAL.pdf PDF
SPE600-13-R-0809_Amendment_0013_FINAL_061615.pdf PDF
20150312_SPE60013R0809_Amendment_0012.pdf PDF
20140404_SPE60013R0809_Amendment_0011.pdf PDF
20140116_SPE60013R0809__Amendment_0010.pdf PDF
20131125_SPE60013R0809_Amendment_0008.pdf PDF
20131120_SPE60013R0809_Amendment_0007.pdf PDF
20131115_SPE60013R0809_Amendment_0006.pdf PDF
20131115-SPE600-13-R-0809_WPAFB_Q A_Set_6.pdf PDF
20130918_SPE60013R0809_Amendment_0005.pdf PDF
20130812_SPE60013R0809_Amendment_0004.pdf PDF
20130725_-_SPE600-13-R-0809_WPAFB_Q A_Set_1.pdf PDF
20130722_SPE60013R0809_Amendment_0003.pdf PDF
20130620_Amendment_0002.pdf PDF
2013-20-03_WPAFB__Industry_PPC_Briefing.pptx PPTX presentation
WPAFB_Preproposal_Conference_Attendees.pdf PDF
JA41_Wage_Determination_-_AMENDMENT_0001.pdf PDF
20130516_SPE60013R0809_Amendment_0001.pdf PDF
JA39_Past_Performance_Information.pdf PDF
JE1_Subcontracting_Plan.pdf PDF
JA40_Example_Completion_of_Schedule_B-2_ _Price_Data_Sheets_for_FP-EPA_Type_Contracts.pdf PDF
JA38_Federal_Equivalents.pdf PDF
JR2_Tech_Eval_Categories.pdf PDF
JA43_No_Current_Specialty_Training_Requirements.pdf PDF
JR1_AF_Sample_Bill_of_Sale.pdf PDF
JA41_Wage_Determination.pdf PDF
20130516_SPE60013R0809_RFP_WPAFB.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA ENERGY UTILITIES PRIVATIZATION

B.7.5 Price Data Sheet 5 – Proposal 50-Year Charges to the Government a b c d e f g h i j k l m n

Contract Year

Applicable Tariff less

FIT

FIT for Applicable

Tariff

Credit for Purchase

Price

Recoverable Portion of Purchase

Price

Subtotal

CLIN 0001

(b+c+d+e)

ISDC

Projects less FIT

FIT for

ISDC

Projects

Subtotal

CLIN 0002

(g+h)

Transition Charges less FIT

FIT for Transition Charges

Subtotal

CLIN 0003

(j+k)

Total Contract

Costs (f+i+l)

Assumed Inflation Rate (%)

Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal

1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

WRIGHT-PATTERSON AFB SPE600-13-R-0809

UTILITIES PRIVATIZATION

Contract Items

CLIN 0001 - Utility Service Charge CLIN 0002 - Initial System Deficiency Corrections /

Connection Charges

CLIN 0003 - Transition Period Charges

26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Notes:

6. Column g: If the ISDC Project price is included in the Applicable Tariff less FIT, enter "Column b".

7. Column h: If the FIT for ISDC Project price is included in the FIT for Applicable Tariff, enter "Column c".

8. Column i: If the ISDC Project price and FIT for ISDC Project price are included in the Applicable Tariff and Applicable Tariff Less FIT, enter "Columns b & c".

1. Regulated offerors shall fill in each contract item for Years 1-50.

5. Column e: If Recoverable Portion of the Purchase Price is not included in the Applicable Tariff less FIT, enter the sum of the monthly amortized costs (i.e., the principal and interest) in the applicable contract year.

3. Column d: Enter the sum of the monthly amortized costs (i.e., principal and interest) of the Credit for Purchase Price associated with the applicable contract year detailed in Schedule 4.

4. Column e: If Recoverable Portion of the Purchase Price is included in the Applicable Tariff less FIT, enter "Column b".

2. The nominal dollar estimates are applicable to the specific years of the Contract and reflect the inflation rate assumption to be provided by the Government..

B.2.1 Schedule B-1 Regulated Tariff a

Available to offerors proposing regulated rates.

Utility System: ________________

CLIN Supplies/Services Qty Unit Unit Price Total 0001 Utility Services Charge 12 Months $10,000.00 $120,000.00

FP

The unit price is the Applicable Tariff(s) less the monthly credit as payment for the purchase price plus the recoverable portion of the purchase price.

Applicable Tariff $ 10,000.00

Monthly Credit for PP $ (2,000.00) # of Months 240 Interest Rate 4.5%

Recoverable Portion of PP $ 2,000.00 # of Months 240 Interest Rate 4.5%

Unit Price $ 10,000.00

Initial System Deficiency Corrections/ Upgrades/Connection Charges b

FFP

Transition Period

FP

b CLIN 0002 is required only if the tariff provides for separate identification of initial system deficiency corrections and connection charges. If separate identification is not provided, it will be assumed the tariff rate includes these costs.

0003 1 Each $50,000.00 $50,000.00 a Utility system to be filled in by the Offeror. A Schedule B-1 must be completed for each utility system offered. Utility systems are shown in paragraph B.1, Systems to be Privatized . Offerors shall provide a comprehensive description of proposed tariffs in their Price Proposals.

B.2.2 Schedule B-2 Fixed Price Economic Price Adjustment a

Available to offerors proposing a Fixed Price Economic Price Adjustment (FPEPA) Utility System: ________________

CLIN Supplies/Services Qty Unit Unit Price Total 0001 Utility Services Charge 12 Months $10,000.00 $120,000.00

FPEPA

The unit price is the Utility Services Charge less the monthly credit as payment for the purchase price (PP) plus the recoverable portion of the purchase price.

Utility Services Charge $ 10,000.00

Monthly Credit for PP $ (2,000.00) # of Months 240 Interest Rate 4.5%

Recoverable Portion of PP $ 2,000.00 # of Months 240 Interest Rate 4.5%

Unit Price $ 10,000.00

Initial System Deficiency Corrections/ Upgrades/Connec

FFP

Transition Period

FFP

b The offeror should enter the Utility Services Charge, as computed in Price Data Sheet 1.

0003 1 Each $50,000.00 $50,000.00 a Utility system to be filled in by the Offeror. A Schedule B-2 must be completed for each utility system offered. Utility systems are shown in paragraph B.1, Systems to be Privatized .

B.3.1 Price Data Sheet 1 – Utility Services Charge Component Monthly Charge

1. Operations and Maintenance (O&M)

2. Renewals and Replacements (R&R)

Total Utility Services Charge (to be entered into CLIN 0001 for Schedule B-1 (if applicable) and Schedule B-2)

B.3.2 Price Data Sheet 2 – Renewals and Replacements – 50-YEAR Plan Notes: For each inventory component/item listed in the utility specific attachment, clearly show the $ value of the planned R&R (if any) for each year 1-50 This Plan represents the offeror’s conceptual methodology that will be used for evaluation purposes.

Year 1 (Const

Year XX (Const $)

Year 50 (Const $)

Total

Residual Value in Year 50 (Const $)

New Item Service Life

New Item RCNItem Size Quantity Unit

Approx Year Installed

Existing Unit RCN

Planned Renewals & Replacements Existing Item Service

Life

First Expected Replacement

Date New Item New Unit Cost RCN

B.3.3 Price Data Sheet 3 – Initial System Deficiency Correction(s) / Upgrade(s) / Connection C

Project Name

Interest Rate

Project Cost (Current $)

Project Start Month

First Full Month Project will Be In Service

Amortization Period

(Months)

Monthly Charge

Charge(s) / Transition Period

B.3.4 Price Data Sheet 4 – Recoverable Portion of Purchase Price

Item Interest Rate Amount Amortization Period (Months) Monthly Charge

Recoverable Portion of Purchase Price

DLA ENERGY UTILITIES PRIVATIZATION

B.7.5 Price Data Sheet 6 – Proposal 50-Year Charges to the Government

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Contract Year

Operations & Maintenance less FIT FIT for O&M Other Costs & Credits, Net

FIT for Other Costs &

Credits, Net

Non Federal Income Taxes

& Fees

Purchase Price

Recovery Purchase

Price Credit

Renewals & Replacements less FIT FIT for R&R Subtotal CLIN

ISDC Projects Amortization less FIT FIT for ISDC

Projects Subtotal CLIN

Transition Charges less

FIT

FIT for Transition Charges

Subtotal CLIN

Total Contract

Costs Real Real Real Real Real Nominal Nominal Real Real -- Nominal Nominal Nominal Nominal Nominal Nominal --

1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

INSTALLATION NAME SOLICITATION NUMBER

UTILITIES PRIVATIZATION

Contract Items

CLIN 0001 - Utility Service Charge CLIN 0002 - Initial System Deficiency Corrections / Connection Charges CLIN 0003 - Transition Period Charges

25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$

Notes:

6. Column (e) should include all non-federal taxes, such as state income tax, property taxes, any local taxes, etc.

1. Offerors shall fill in each contract item for Years 1-50.

2. The real dollars estimates are applicable to the initial two years of the Contract and exclude the effects of inflation beyond the initial two-year pricing period.

3. The nominal dollars are applicable to the actual contract year in which the credit / charges / amortization will be invoiced under the Contract.

4. Column (b) should include all O&M and G&A related costs expenses including the O&M related profit (if any) and excluding the federal income tax (FIT) related to the O&M related profit (coumn (c).

5. Column (d) should include all other costs and credits on a net basis, including capital credits, etc.

13. Column (n) plus column (o) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the transition related expenses included in column (p), Subtotal CLIN 0003.

14. Column (c) plus Column (e) plus Column (j) should include all Federal Income taxes included in price proposal, except FIT related to ISDC charges (Column (m)) and/or Transition Charges (Column (o)), and should equal the Federal Income Tax shown on

7. Column (f) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the recoverable portion of the purchase price in the applicable contract year detailed in Schedule 4.

8. Column (g) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the purchase price credit in the applicable contract year.

9. The sum of columns (b) through and including column (g) should equal the total operation and maintenance (O&M) costs detailed in Schedule 1. The total O&M costs should include all costs including O&M related profit, income taxes, general and administrative (G&A), other costs and credits, non-federal income taxes, the pruchase price recovery and purchase price credit, etc. necessary to provide the utility service.

10. Column (h) plus column (i) should equal the total levelized R&R component costs detailed in Schedules 1 and 2.

11. Column (j), Subtotal CLIN 0001, should equal the sum of columns (b) through column (i).

12. Column (k) plus column (l) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the ISDC / connection charges in the applicable contract year detailed in Schedule 3. TH sum of which is totalled in Column (m), Subtotal CLIN 0002

Price Data Sheet 5
Schedule B-1
Schedule B-2
Price Data Sheet 1
Price Data Sheet 2
Price Data Sheet 3
Price Data Sheet 4