JA42_AF_B_Schedules_and_Price_Data_Sheets.pdf
PDF 98 KB Posted
- Solicitation number
- SPE60013R0809
- Issued by
-
Defense Logistics Agency Energy
About this file
JA42 AF B Schedules and Price Data Sheets
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DLA ENERGY UTILITIES PRIVATIZATION
B.7.5 Price Data Sheet 5 – Proposal 50-Year Charges to the Government a b c d e f g h i j k l m n
Contract Year
Applicable Tariff less
FIT
FIT for Applicable
Tariff
Credit for Purchase
Price
Recoverable Portion of Purchase
Price
Subtotal
CLIN 0001
(b+c+d+e)
ISDC
Projects less FIT
FIT for
ISDC
Projects
Subtotal
CLIN 0002
(g+h)
Transition Charges less FIT
FIT for Transition Charges
Subtotal
CLIN 0003
(j+k)
Total Contract
Costs (f+i+l)
Assumed Inflation Rate (%)
Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal
1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
WRIGHT-PATTERSON AFB SPE600-13-R-0809
UTILITIES PRIVATIZATION
Contract Items
CLIN 0001 - Utility Service Charge CLIN 0002 - Initial System Deficiency Corrections /
Connection Charges
CLIN 0003 - Transition Period Charges
26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Notes:
6. Column g: If the ISDC Project price is included in the Applicable Tariff less FIT, enter "Column b".
7. Column h: If the FIT for ISDC Project price is included in the FIT for Applicable Tariff, enter "Column c".
8. Column i: If the ISDC Project price and FIT for ISDC Project price are included in the Applicable Tariff and Applicable Tariff Less FIT, enter "Columns b & c".
1. Regulated offerors shall fill in each contract item for Years 1-50.
5. Column e: If Recoverable Portion of the Purchase Price is not included in the Applicable Tariff less FIT, enter the sum of the monthly amortized costs (i.e., the principal and interest) in the applicable contract year.
3. Column d: Enter the sum of the monthly amortized costs (i.e., principal and interest) of the Credit for Purchase Price associated with the applicable contract year detailed in Schedule 4.
4. Column e: If Recoverable Portion of the Purchase Price is included in the Applicable Tariff less FIT, enter "Column b".
2. The nominal dollar estimates are applicable to the specific years of the Contract and reflect the inflation rate assumption to be provided by the Government..
B.2.1 Schedule B-1 Regulated Tariff a
Available to offerors proposing regulated rates.
Utility System: ________________
CLIN Supplies/Services Qty Unit Unit Price Total 0001 Utility Services Charge 12 Months $10,000.00 $120,000.00
FP
The unit price is the Applicable Tariff(s) less the monthly credit as payment for the purchase price plus the recoverable portion of the purchase price.
Applicable Tariff $ 10,000.00
Monthly Credit for PP $ (2,000.00) # of Months 240 Interest Rate 4.5%
Recoverable Portion of PP $ 2,000.00 # of Months 240 Interest Rate 4.5%
Unit Price $ 10,000.00
Initial System Deficiency Corrections/ Upgrades/Connection Charges b
FFP
Transition Period
FP
b CLIN 0002 is required only if the tariff provides for separate identification of initial system deficiency corrections and connection charges. If separate identification is not provided, it will be assumed the tariff rate includes these costs.
0003 1 Each $50,000.00 $50,000.00 a Utility system to be filled in by the Offeror. A Schedule B-1 must be completed for each utility system offered. Utility systems are shown in paragraph B.1, Systems to be Privatized . Offerors shall provide a comprehensive description of proposed tariffs in their Price Proposals.
B.2.2 Schedule B-2 Fixed Price Economic Price Adjustment a
Available to offerors proposing a Fixed Price Economic Price Adjustment (FPEPA) Utility System: ________________
CLIN Supplies/Services Qty Unit Unit Price Total 0001 Utility Services Charge 12 Months $10,000.00 $120,000.00
FPEPA
The unit price is the Utility Services Charge less the monthly credit as payment for the purchase price (PP) plus the recoverable portion of the purchase price.
Utility Services Charge $ 10,000.00
Monthly Credit for PP $ (2,000.00) # of Months 240 Interest Rate 4.5%
Recoverable Portion of PP $ 2,000.00 # of Months 240 Interest Rate 4.5%
Unit Price $ 10,000.00
Initial System Deficiency Corrections/ Upgrades/Connec
FFP
Transition Period
FFP
b The offeror should enter the Utility Services Charge, as computed in Price Data Sheet 1.
0003 1 Each $50,000.00 $50,000.00 a Utility system to be filled in by the Offeror. A Schedule B-2 must be completed for each utility system offered. Utility systems are shown in paragraph B.1, Systems to be Privatized .
B.3.1 Price Data Sheet 1 – Utility Services Charge Component Monthly Charge
1. Operations and Maintenance (O&M)
2. Renewals and Replacements (R&R)
Total Utility Services Charge (to be entered into CLIN 0001 for Schedule B-1 (if applicable) and Schedule B-2)
B.3.2 Price Data Sheet 2 – Renewals and Replacements – 50-YEAR Plan Notes: For each inventory component/item listed in the utility specific attachment, clearly show the $ value of the planned R&R (if any) for each year 1-50 This Plan represents the offeror’s conceptual methodology that will be used for evaluation purposes.
Year 1 (Const
Year XX (Const $)
Year 50 (Const $)
Total
Residual Value in Year 50 (Const $)
New Item Service Life
New Item RCNItem Size Quantity Unit
Approx Year Installed
Existing Unit RCN
Planned Renewals & Replacements Existing Item Service
Life
First Expected Replacement
Date New Item New Unit Cost RCN
B.3.3 Price Data Sheet 3 – Initial System Deficiency Correction(s) / Upgrade(s) / Connection C
Project Name
Interest Rate
Project Cost (Current $)
Project Start Month
First Full Month Project will Be In Service
Amortization Period
(Months)
Monthly Charge
Charge(s) / Transition Period
B.3.4 Price Data Sheet 4 – Recoverable Portion of Purchase Price
Item Interest Rate Amount Amortization Period (Months) Monthly Charge
Recoverable Portion of Purchase Price
DLA ENERGY UTILITIES PRIVATIZATION
B.7.5 Price Data Sheet 6 – Proposal 50-Year Charges to the Government
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Contract Year
Operations & Maintenance less FIT FIT for O&M Other Costs & Credits, Net
FIT for Other Costs &
Credits, Net
Non Federal Income Taxes
& Fees
Purchase Price
Recovery Purchase
Price Credit
Renewals & Replacements less FIT FIT for R&R Subtotal CLIN
ISDC Projects Amortization less FIT FIT for ISDC
Projects Subtotal CLIN
Transition Charges less
FIT
FIT for Transition Charges
Subtotal CLIN
Total Contract
Costs Real Real Real Real Real Nominal Nominal Real Real -- Nominal Nominal Nominal Nominal Nominal Nominal --
1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
INSTALLATION NAME SOLICITATION NUMBER
UTILITIES PRIVATIZATION
Contract Items
CLIN 0001 - Utility Service Charge CLIN 0002 - Initial System Deficiency Corrections / Connection Charges CLIN 0003 - Transition Period Charges
25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Notes:
6. Column (e) should include all non-federal taxes, such as state income tax, property taxes, any local taxes, etc.
1. Offerors shall fill in each contract item for Years 1-50.
2. The real dollars estimates are applicable to the initial two years of the Contract and exclude the effects of inflation beyond the initial two-year pricing period.
3. The nominal dollars are applicable to the actual contract year in which the credit / charges / amortization will be invoiced under the Contract.
4. Column (b) should include all O&M and G&A related costs expenses including the O&M related profit (if any) and excluding the federal income tax (FIT) related to the O&M related profit (coumn (c).
5. Column (d) should include all other costs and credits on a net basis, including capital credits, etc.
13. Column (n) plus column (o) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the transition related expenses included in column (p), Subtotal CLIN 0003.
14. Column (c) plus Column (e) plus Column (j) should include all Federal Income taxes included in price proposal, except FIT related to ISDC charges (Column (m)) and/or Transition Charges (Column (o)), and should equal the Federal Income Tax shown on
7. Column (f) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the recoverable portion of the purchase price in the applicable contract year detailed in Schedule 4.
8. Column (g) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the purchase price credit in the applicable contract year.
9. The sum of columns (b) through and including column (g) should equal the total operation and maintenance (O&M) costs detailed in Schedule 1. The total O&M costs should include all costs including O&M related profit, income taxes, general and administrative (G&A), other costs and credits, non-federal income taxes, the pruchase price recovery and purchase price credit, etc. necessary to provide the utility service.
10. Column (h) plus column (i) should equal the total levelized R&R component costs detailed in Schedules 1 and 2.
11. Column (j), Subtotal CLIN 0001, should equal the sum of columns (b) through column (i).
12. Column (k) plus column (l) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the ISDC / connection charges in the applicable contract year detailed in Schedule 3. TH sum of which is totalled in Column (m), Subtotal CLIN 0002
| Price Data Sheet 5 |
| Schedule B-1 |
| Schedule B-2 |
| Price Data Sheet 1 |
| Price Data Sheet 2 |
| Price Data Sheet 3 |
| Price Data Sheet 4 |
| Price Data Sheet 6 |
File details come from the government source that posted it. Updated .