Amendment_0008.pdf

PDF 2 MB Posted

Attached to
Joint Base San Antonio (JBSA)
Solicitation number
SPE600-13-R-0805
Issued by

About this file

Amendment 0008

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.

10-83)PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

See Block 16C

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

DLA Energy FEEB SP0600 7. ADMINISTERED BY (If other than Item 6)

CODE

8725 JOHN J. KINGMAN ROAD, SUITE 3830

FT. BELVOIR, VA 22060-6222 FAX (703) 767-8506

Daniel Ferry/DLA Energy/FEEBA/daniel.2.ferry@dla.mil

PHONE (703) 767-8633 P.P. 8.2

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

X

9a. AMENDMENT OF SOLICITATION NO.

SPE600-13-R-0805

9b. DATED (SEE ITEM 11) October 31, 2012

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [XX] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning __1__ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A. I2.05 CHANGES-FIXED PRICE (AUG 87)

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 43.01 OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ x ] is required to sign this document and return __1__ copies to the issuing office.

13. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter w

See following page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

PATTI J. RIVERA

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

April 25, 2013

SPE600-13-R-0805

JOINT BASE SAN ANTONIO, TEXAS

Amendment 0008 Page 2 of 2

The purpose of this amendment is to incorporate the following changes into subject solicitation:

1) Delete and replace in its entirety, Section J., Attachment JA1 - Joint Base San Antonio Electric Distribution System. JA1 is appended to this document as Attachment 1.

2) Delete and replace in its entirety, Section J., Attachment JA2 - Joint Base San Antonio Natural Gas Distribution System. JA2 is appended to this document as Attachment 2.

3) Delete and replace in its entirety, Section J., Attachment JA3 - Joint Base San Antonio Water Distribution System. JA3 is appended to this document as Attachment 3.

4) Delete and replace in its entirety, Section J., Attachment JA4 - Joint Base San Antonio AFB Wastewater System. JA4 is appended to this document as Attachment 4.

AIR FORCE UTILITIES PRIVATIZATION - REQUEST FOR PROPOSAL (RFP) ATTACHMENT JA1

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-1

ATTACHMENT JA1

Joint Base San Antonio Electric Distribution System

Table of Contents JOINT BASE SAN ANTONIO ELECTRIC DISTRIBUTION SYSTEM ............................................. JA1-1

TABLE OF CONTENTS .................................................................................................................................. JA1-1 LIST OF TABLES .................................................................................................................................. JA1-1

JA1 JOINT BASE SAN ANTONIO ELECTRIC DISTRIBUTION SYSTEM ..................................... JA1-2 JA1.2 ELECTRIC DISTRIBUTION SYSTEM DESCRIPTION .............................................................................. JA1-2

JA1.2.1 Electric Distribution System Fixed Equipment Inventory ......................................................... JA1-2 JA1.2.2 Electric Distribution System Non-Fixed Equipment and Specialized Tools ........................... JA1-36 JA1.2.3 Electric Distribution System Manuals, Drawings, and Records ............................................. JA1-37

JA1.3 SPECIFIC SERVICE REQUIREMENTS ................................................................................................. JA1-37 JA1.4 CURRENT SERVICE ARRANGEMENT ................................................................................................ JA1-39

JA1.4.1 JBSA-LAK and JBSA-LAKTA Current Service Arrangement ................................................. JA1-39 JA1.4.2 JBSA-RND Current Service Arrangement .............................................................................. JA1-40

JA1.5 METERING ...................................................................................................................................... JA1-40 JA1.5.1 Existing Meters ....................................................................................................................... JA1-40 JA1.5.2 Required New Meters ............................................................................................................. JA1-40

JA1.6 MONTHLY SUBMITTALS.................................................................................................................. JA1-40 JA1.7 ENERGY-SAVINGS PROJECTS .......................................................................................................... JA1-41 JA1.8 SERVICE AREA ................................................................................................................................ JA1-41 JA1.9 OFF-INSTALLATION SITES .............................................................................................................. JA1-42 JA1.10 SPECIFIC TRANSITION REQUIREMENTS ......................................................................................... JA1-42 JA1.11 INITIAL SYSTEM DEFICIENCY CORRECTIONS (ISDC).................................................................... JA1-42 JA1.12 RIGHT OF ACCESS TO THE UTILITY SYSTEM ................................................................................. JA1-42

JA1.12.1 Map of the Utility System ...................................................................................................... JA1-42 JA1.12.2 Lateral Extent of the Right-of-Access, and Points of Demarcation ...................................... JA1-43 JA1.12.3 Environmental Baseline Survey ............................................................................................ JA1-48

LIST OF TABLES

TABLE 1 - FIXED INVENTORY – JBSA ............................................................................................ JA1-5 TABLE 2 - SPARE PARTS – JBSA .................................................................................................. JA1-37 TABLE 3 - SPECIALIZED VEHICLES AND TOOLS – JBSA ............................................................. JA1-37 TABLE 4 - MANUALS, DRAWINGS, AND RECORDS – JBSA ........................................................ JA1-37 TABLE 5 - EXISTING METERS – JBSA .......................................................................................... JA1-40 TABLE 6 - REQUIRED NEW METERS – JBSA ............................................................................... JA1-40 TABLE 7 - ENERGY-SAVINGS PROJECTS – JBSA ......................................................................... JA1-41 TABLE 8 - SERVICE CONNECTIONS AND DISCONNECTIONS – JBSA ......................................... JA1-42 TABLE 9 - INITIAL SYSTEM DEFICIENCY CORRECTIONS - JBSA ............................................... JA1-42 TABLE 10 - STANDARD POINTS OF DEMARCATION ................................................................... JA1-43 TABLE 11 - UNIQUE POINTS OF DEMARCATION – JBSA ........................................................... JA1-46

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-2

JA1 Joint Base San Antonio Electric Distribution System

JA1.1 Joint Base San Antonio Overview Joint Base San Antonio (JBSA) was formed in 2009 as a result of the 2005 Base Closure and Realignment Commission (BRAC) mandate to consolidate support operations at the three San Antonio Department of Defense (DoD) installations: JBSA-Ft. Sam Houston (JBSA-FSH), JBSA-Lackland Air Force Base (JBSA-LAK), and JBSA-Randolph Air Force Base (JBSA-RND) by the formation of the 502nd Air Base Wing (ABW) as part of the Air Force Air Education and Training Command (AETC). On 24 July 2009 Air Force Brig. Gen. Len Patrick became the first commander of the 502nd ABW. Gen. Patrick’s command has been established at

JBSA-FSH.

JBSA is comprised of several Geographically Separated Units (GSUs) including the four main locations of: JBSA-FHS, JBSA-RNH, JBSA-LAK, and JBSA-Lackland Training Annex (JBSA-LAKTA). JBSA also includes the GSUs of JBSA-Camp Bullis (JBSA-CB), JBSA-Seguin Auxiliary Field (JBSA-SAF), and JBSA-Canyon Lake Recreation Area (JBSA-CLRA).

JBSA consists of approximately 42,852 acres of land, 3,441 buildings and major facilities, and numerous smaller structures. The population of JBSA is approximately 77,565 persons.

Near-term BRAC related construction of new facilities is over $2 Billion.

JA1.2 Electric Distribution System Description

JA1.2.1 Electric Distribution System Fixed Equipment Inventory The JBSA electric distribution system consists of all appurtenances physically connected to the distribution system from the point of demarcation defined by the Right of Access. The JBSA electric distribution system solicitation includes only those systems located at JBSA- LAK, JBSA-LAKTA, and JBSA-RND.

The distribution system consists of the items listed in Table 1 “Fixed Inventory - JBSA Electric Distribution System” in Section JA1.2.1.2 Inventory. The actual inventory of items sold will be in the bill of sale at the time the system is transferred. The following description and inventory is included to provide the Offeror with a general understanding of the size and configuration of the distribution system. The Government makes no representation that the inventory is accurate. The Offeror shall base its Schedule B and Price Schedule Data Sheets on the Table 1 inventory below. However, the Offeror should use the following sources of information for developing other aspects of its proposal: site inspections, information in the technical library, and other pertinent information.

Specifically excluded from the electric distribution system privatization are:

• All meters.

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-3

At JBSA-LAK:

• Wilford Hall Medical Center (WHMC) fed from Total Energy Plant (TEP)

• CPS owned power line traversing JBSA-LAK without connection to the JBSA-LAK electric system

At JBSA-LAK and JBSA-LAKTA:

• Parking and security lighting fed from buildings

• Emergency generators

• All facilities directly served by City Public Service (CPS)

• Electric systems within privatized military family housing (MFH) area as denoted by points of demarcation (PODs).

At JBSA-RND:

• JBSA-RND Airfield and Ramp Lighting

• Parking and security lighting fed from buildings

• Emergency generators

Other GSU locations excluded:

• JBSA-SAF

• JBSA-FSH

• JBSA-CB

• JBSA-CLRA

JA1.2.1.1 Description The JBSA electric distribution systems included in this solicitation include the electric distribution systems at:

• JBSA-LAK and JBSA-LAKTA, as well as

• JBSA-RND.

JA1.2.1.1.1 JBSA-LAK Description

JBSA-LAK is served by City Public Service (CPS) at 3-phase, 13.2 kV, by four feeders. Three of the feeders are in use and the fourth is a standby. Each feeder has three fused disconnects at the top of each service pole. These feeders run down the pole then underground into the Main Switching Station. The switching station is located just south of the Valley Hi Drive gate. The main switchgear has a tie breaker connected to each of the feeders. The tie breaker switchgear feeds power to distribution switchgear with seven feeders that provide power to the location. The distribution system for JBSA-LAK is 3 phase delta.

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-4

Currently CPS owns and maintains an overhead primary power line that crosses JBSA-LAK but does not serve the location. This line enters JBSA-LAK from the Medina substation and splits into north and south branches on the location. There are no tie switches between this line and any of the location circuits.

JA1.2.1.1.2 JBSA-LAKTA Description JBSA-LAKTA is served by CPS at 13.2 kV, 3-phase with one primary overhead feeder from the Medina Substation. Where this feeder extends onto the location, the service transitions underground to the main switching station. The switching station is located on the East side of the JBSA-LAKTA. The switchgear consists of metal clad gear with one incoming breaker and four distribution breakers. The distribution cables leave the switchgear underground and transition to overhead outside of the switchgear building. The majority of JBSA- LAKTA is served by overhead lines.

JA1.2.1.1.3 JBSA-RND Description JBSA-RND is served by CPS at 3-phase 13.8 kV, from four primary feeders near the West Gate. These feeders run underground into the Main Switching Station, Building 1034. The JBSA-RND electric distribution system consists of sixteen looped circuits, each at 13.8 kV.

These circuits provide power to pad-mounted sectionalizing switches and pad-mounted transformers that provide power to the entire location.

The underground primary distribution feeders consist of 15 kV, 750 kcmil cables in concrete encased duct bank. The main switching station feeds four other switching stations located around the location. These switching stations are the North Switching Station (Building 260), the South Switching Station (Building 847), the East Switching Station (Building 573), and the West Switching Station (Building 672). The power distribution system is a loop feed system with open type switching to provide power to each location through at least two paths. There is also direct underground wiring that connects each of the switching stations together.

JA1.2.1.2 Inventory Table 1 provides a general list of the major electric distribution system fixed assets for the JBSA electric distribution system included in the sale. The design life column indicated in Table 1 is used by the Government in the development of the Government Should Cost Estimate. The design life is not mandated in the Offeror’s proposal. However, the proposal must clearly explain the use of any system component design life that significantly differs from the published Government design life.

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-5

TABLE 1

Fixed Inventory – JBSA Electric Distribution System

Item Size Quantity Unit Approximate Year of

Construction

Design Life (Years)

JBSA-LAK

Duct bank

1 x 1 Duct bank, PVC – concrete encased 4” 347 LF 1968 100

1 x 1 Duct bank, PVC – concrete encased 4” 347 LF 1970 100

1 x 1 Duct bank, PVC – concrete encased 4” 831 LF 1971 100

1 x 1 Duct bank, PVC – concrete encased 4” 347 LF 1972 100

1 x 1 Duct bank, PVC – concrete encased 4” 347 LF 1973 100

1 x 1 Duct bank, PVC – concrete encased 4” 347 LF 1974 100

1 x 1 Duct bank, PVC – concrete encased 4” 845 LF 1975 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,185 LF 1980 100

1 x 1 Duct bank, PVC – concrete encased 4” 845 LF 1981 100

1 x 1 Duct bank, PVC – concrete encased 4” 761 LF 1982 100

1 x 1 Duct bank, PVC – concrete encased 4” 845 LF 1983 100

1 x 1 Duct bank, PVC – concrete encased 4” 845 LF 1985 100

1 x 1 Duct bank, PVC – concrete encased 4” 969 LF 1986 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,245 LF 1988 100

1 x 1 Duct bank, PVC – concrete encased 4” 761 LF 1989 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,091 LF 1990 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,091 LF 1991 100

1 x 1 Duct bank, PVC – concrete encased 4” 4,881 LF 1992 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,400 LF 1993 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,417 LF 1994 100

1 x 1 Duct bank, PVC – concrete encased 4” 249 LF 1995 100

1 x 1 Duct bank, PVC – concrete encased 4” 4,058 LF 1996 100

1 x 1 Duct bank, PVC – concrete encased 4” 761 LF 1997 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,005 LF 1998 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,282 LF 1999 100

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-6

1 x 1 Duct bank, PVC – concrete encased 4” 5,709 LF 2000 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,384 LF 2001 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,212 LF 2002 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,384 LF 2003 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,212 LF 2004 100

1 x 1 Duct bank, PVC – concrete encased 4” 3,456 LF 2005 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,834 LF 2006 100

1 x 1 Duct bank, PVC – concrete encased 5” 1,384 LF 1987 100

1 x 1 Duct bank, PVC – concrete encased 6” 300 LF 2010 100

1 x 2 Duct bank, PVC – concrete encased 4” 175 LF 2010 100

1 x 2 Duct bank, PVC – concrete encased 6” 8065 LF 2010 100

1 x 1 Duct bank, PVC – concrete encased 6” 300 LF 2011 100

1 x 2 Duct bank, PVC – concrete encased 4” 10,923 LF 2011 100

1 x 2 Duct bank, PVC – concrete encased 5” 820 LF 2011 100

1 x 2 Duct bank, PVC – concrete encased 6” 200 LF 2011 100

2 x 2 Duct bank, PVC – concrete encased 4” 1150 LF 2011 100

2 x 2 Duct bank, PVC – concrete encased 5” 2415 LF 2011 100

2 x 2 Duct bank, PVC – concrete encased 6” 3420 LF 2011 100

Switch

3 Pole Gang Operated Switch, 15 kV 600 A 56 Ea 1984 35

3 Pole Gang Operated Switch, 15 kV 600 A 115 Ea 1995 35

3 Pole Gang Operated Switch, 15 kV 900 A 4 Ea 2011 35

15 kV 2-way Pad-mount Iso-switch 600 A 2 Ea 2010 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 1968 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 1990 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 1992 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 1994 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 1996 35

15 kV 3-way Pad-mount Iso-switch 600 A 2 Ea 1999 35

15 kV 3-way Pad-mount Iso-switch 600 A 2 Ea 2000 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-7

15 kV 3-way Pad-mount Iso-switch 600 A 3 Ea 2004 35

15 kV 3-way Pad-mount Iso-switch 600 A 6 Ea 2010 35

15 kV 3-way Pad-mount Iso-switch 600 A 8 Ea 2011 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 1971 35

15 kV 4-way Pad-mount Iso-switch 600 A 1 Ea 1986 35

15 kV 4-way Pad-mount Iso-switch 600 A 3 Ea 1988 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 1990 35

15 kV 4-way Pad-mount Iso-switch 600 A 3 Ea 1992 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 1994 35

15 kV 4-way Pad-mount Iso-switch 600 A 3 Ea 1996 35

15 kV 4-way Pad-mount Iso-switch 600 A 1 Ea 1998 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 1999 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 2000 35

15 kV 4-way Pad-mount Iso-switch 600 A 1 Ea 2001 35

15 kV 4-way Pad-mount Iso-switch 600 A 1 Ea 2002 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 2005 35

15 kV 4-way Pad-mount Iso-switch 600 A 1 Ea 2006 35

15 kV 4-way Pad-mount Iso-switch 600 A 5 Ea 2010 35

15 kV 4-way Pad-mount Iso-switch 600 A 1 Ea 2011 35

15 kV 5-way Pad-mount Iso-switch 600 A 1 Ea 2010 35

15 kV 6-way Pad-mount Iso-switch 600 A 1 Ea 2005 35

Equipment Pad, Concrete 6’x6’x6” 1 Ea 1968 60

Equipment Pad, Concrete 6’x6’x6” 1 Ea 1970 60

Equipment Pad, Concrete 6’x6’x6” 3 Ea 1971 60

Equipment Pad, Concrete 6’x6’x6” 1 Ea 1972 60

Equipment Pad, Concrete 6’x6’x6” 1 Ea 1973 60

Equipment Pad, Concrete 6’x6’x6” 1 Ea 1974 60

Equipment Pad, Concrete 6’x6’x6” 2 Ea 1975 60

Equipment Pad, Concrete 6’x6’x6” 5 Ea 1980 60

Equipment Pad, Concrete 6’x6’x6” 2 Ea 1981 60

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-8

Equipment Pad, Concrete 6’x6’x6” 3 Ea 1982 60

Equipment Pad, Concrete 6’x6’x6” 2 Ea 1983 60

Equipment Pad, Concrete 6’x6’x6” 2 Ea 1985 60

Equipment Pad, Concrete 6’x6’x6” 4 Ea 1986 60

Equipment Pad, Concrete 6’x6’x6” 6 Ea 1987 60

Equipment Pad, Concrete 6’x6’x6” 5 Ea 1988 60

Equipment Pad, Concrete 6’x6’x6” 3 Ea 1989 60

Equipment Pad, Concrete 6’x6’x6” 6 Ea 1990 60

Equipment Pad, Concrete 6’x6’x6” 7 Ea 1991 60

Equipment Pad, Concrete 6’x6’x6” 35 Ea 1992 60

Equipment Pad, Concrete 6’x6’x6” 4 Ea 1993 60

Equipment Pad, Concrete 6’x6’x6” 25 Ea 1994 60

Equipment Pad, Concrete 6’x6’x6” 13 Ea 1995 60

Equipment Pad, Concrete 6’x6’x6” 26 Ea 1996 60

Equipment Pad, Concrete 6’x6’x6” 1 Ea 1997 60

Equipment Pad, Concrete 6’x6’x6” 8 Ea 1998 60

Equipment Pad, Concrete 6’x6’x6” 35 Ea 1999 60

Equipment Pad, Concrete 6’x6’x6” 18 Ea 2000 60

Equipment Pad, Concrete 6’x6’x6” 6 Ea 2001 60

Equipment Pad, Concrete 6’x6’x6” 10 Ea 2002 60

Equipment Pad, Concrete 6’x6’x6” 6 Ea 2003 60

Equipment Pad, Concrete 6’x6’x6” 9 Ea 2004 60

Equipment Pad, Concrete 6’x6’x6” 15 Ea 2005 60

Equipment Pad, Concrete 6’x6’x6” 13 Ea 2006 60

Equipment Pad, Concrete 6’x6’x6” 27 Ea 2011 60

Overhead Circuit

Primary Aerial Cable, 15 kV ACSR #1/0 9,600 SCLF 1984 50

Primary Aerial Cable, 15 kV ACSR #1/0 13112 SCLF 1995 50

Primary Aerial Cable, 15 kV ACSR #2 6,600 SCLF 1984 50

Primary Aerial Cable, 15 kV ACSR #2 70,176 SCLF 1995 50

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-9

Primary Aerial Cable, 15 kV ACSR #4 2,950 SCLF 1984 50

Primary Aerial Cable, 15 kV ACSR #4 97,291 SCLF 1995 50

Primary Aerial Cable, 15 kV ACSR #4/0 19,500 SCLF 1984 50

Primary Aerial Cable, 15 kV ACSR #4/0 10,290 SCLF 1995 50

Primary Aerial Cable, 15 kV ACSR #6 2,950 SCLF 1984 50

Primary Aerial Cable, 15 kV ACSR #6 29,647 SCLF 1995 50

Primary Aerial Cable, 15 kV ACSR 336 kcmil 101,590 SCLF 1984 50

Primary Aerial Cable, 15 kV ACSR 500 kcmil 4,110 SCLF 1995 50

Primary Aerial Cable, 15 kV ACSR 336 kcmil 110,285 SCLF 1995 50

Secondary Wire, 600V, Cu #2 50 SCLF 1983 50

Secondary Wire, 600V, Cu #2 250 SCLF 1992 50

Secondary Wire, 600V, Cu #2 200 SCLF 1993 50

Secondary Wire, 600V, Cu #2 250 SCLF 1994 50

Secondary Wire, 600V, Cu #2 150 SCLF 1995 50

Secondary Wire, 600V, Cu #2 500 SCLF 1996 50

Secondary Wire, 600V, Cu #2 100 SCLF 1997 50

Secondary Wire, 600V, Cu #2 50 SCLF 1998 50

Secondary Wire, 600V, Cu #2 300 SCLF 1999 50

Secondary Wire, 600V, Cu #2 450 SCLF 2000 50

Secondary Wire, 600V, Cu #2 50 SCLF 2004 50

Secondary Wire, 600V, Cu #2 50 SCLF 2005 50

Utility Pole, Wood 45’ 353 Ea 1984 35

Utility Pole, Wood 40’ 4 Ea 2010 35

Utility Pole, Wood 45’ 11 Ea 2011 35

Utility Pole, Wood 55’ 13 Ea 2011 35

Underground Circuit

Primary 15 kV Wire, Cu #1 619 SCLF 1984 20Note1

Primary 15 kV Wire, Cu #1 29,165 SCLF 1995 45

Primary 15 kV Wire, Cu #1 10,395 SCLF 2011 45

Primary 15 kV Wire, Cu #1/0 3,216 SCLF 1984 20 Note1

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-10

Primary 15 kV Wire, Cu #1/0 28,811 SCLF 1995 45

Primary 15 kV Wire, Cu #2 15,832 SCLF 1984 20 Note1

Primary 15 kV Wire, Cu #2 26,191 SCLF 1995 45

Primary 15 kV Wire, Cu #2 125 SCLF 2010 45

Primary 15 kV Wire, Cu #2 400 SCLF 2011 45

Primary 15 kV Wire, Cu #2/0 24,822 SCLF 1995 45

Primary 15 kV Wire, Cu #2/0 840 SCLF 2011 45

Primary 15 kV Wire, Cu #4 1,534 SCLF 1984 20 Note1

Primary 15 kV Wire, Cu #4 5,841 SCLF 1995 45

Primary 15 kV Wire, Cu #4/0 618 SCLF 1984 20 Note1

Primary 15 kV Wire, Cu #4/0 20,625 SCLF 1995 45

Primary 15 kV Wire, Cu 250 kcmil 2540 SCLF 1995 45

Primary 15 kV Wire, Cu 250 kcmil 8910 SCLF 2011 45

Primary 15 kV Wire, Cu 500 kcmil 30,499 SCLF 1995 45

Primary 15 kV Wire, Cu 500 kcmil 53635 SCLF 2011 45

Primary 15 kV Wire, Cu 750 kcmil 2,920 SCLF 1984 20 Note1

Primary 15 kV Wire, Cu 750 kcmil 18,330 SCLF 2011 45

Cable Termination

Cable Termination 15 kV 3 Ea 1968 45

Cable Termination 15 kV 3 Ea 1970 45

Cable Termination 15 kV 9 Ea 1971 45

Cable Termination 15 kV 3 Ea 1972 45

Cable Termination 15 kV 3 Ea 1973 45

Cable Termination 15 kV 3 Ea 1974 45

Cable Termination 15 kV 6 Ea 1975 45

Cable Termination 15 kV 15 Ea 1980 45

Cable Termination 15 kV 6 Ea 1981 45

Cable Termination 15 kV 9 Ea 1982 45

Cable Termination 15 kV 6 Ea 1983 45

Cable Termination 15 kV 6 Ea 1985 45

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-11

Cable Termination 15 kV 12 Ea 1986 45

Cable Termination 15 kV 18 Ea 1987 45

Cable Termination 15 kV 15 Ea 1988 45

Cable Termination 15 kV 9 Ea 1989 45

Cable Termination 15 kV 15 Ea 1990 45

Cable Termination 15 kV 212 Ea 1991 45

Cable Termination 15 kV 84 Ea 1992 45

Cable Termination 15 kV 24 Ea 1993 45

Cable Termination 15 kV 81 Ea 1994 45

Cable Termination 15 kV 45 Ea 1995 45

Cable Termination 15 kV 108 Ea 1996 45

Cable Termination 15 kV 9 Ea 1997 45

Cable Termination 15 kV 24 Ea 1998 45

Cable Termination 15 kV 123 Ea 1999 45

Cable Termination 15 kV 81 Ea 2000 45

Cable Termination 15 kV 18 Ea 2001 45

Cable Termination 15 kV 30 Ea 2002 45

Cable Termination 15 kV 18 Ea 2003 45

Cable Termination 15 kV 30 Ea 2004 45

Cable Termination 15 kV 48 Ea 2005 45

Cable Termination 15 kV 39 Ea 2006 45

Cable Termination 15 kV 67 Ea 2011 45

Grounding

Ground Rod, Cu ¾” x 8’ 4 Ea 1968 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1970 35

Ground Rod, Cu ¾” x 8’ 12 Ea 1971 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1972 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1973 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1974 35

Ground Rod, Cu ¾” x 8’ 8 Ea 1975 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-12

Ground Rod, Cu ¾” x 8’ 20 Ea 1980 35

Ground Rod, Cu ¾” x 8’ 8 Ea 1981 35

Ground Rod, Cu ¾” x 8’ 12 Ea 1982 35

Ground Rod, Cu ¾” x 8’ 8 Ea 1983 35

Ground Rod, Cu ¾” x 8’ 8 Ea 1985 35

Ground Rod, Cu ¾” x 8’ 16 Ea 1986 35

Ground Rod, Cu ¾” x 8’ 24 Ea 1987 35

Ground Rod, Cu ¾” x 8’ 20 Ea 1988 35

Ground Rod, Cu ¾” x 8’ 12 Ea 1989 35

Ground Rod, Cu ¾” x 8’ 20 Ea 1990 35

Ground Rod, Cu ¾” x 8’ 28 Ea 1991 35

Ground Rod, Cu ¾” x 8’ 92 Ea 1992 35

Ground Rod, Cu ¾” x 8’ 16 Ea 1993 35

Ground Rod, Cu ¾” x 8’ 88 Ea 1994 35

Ground Rod, Cu ¾” x 8’ 52 Ea 1995 35

Ground Rod, Cu ¾” x 8’ 104 Ea 1996 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1997 35

Ground Rod, Cu ¾” x 8’ 28 Ea 1998 35

Ground Rod, Cu ¾” x 8’ 140 Ea 1999 35

Ground Rod, Cu ¾” x 8’ 72 Ea 2000 35

Ground Rod, Cu ¾” x 8’ 24 Ea 2001 35

Ground Rod, Cu ¾” x 8’ 40 Ea 2002 35

Ground Rod, Cu ¾” x 8’ 24 Ea 2003 35

Ground Rod, Cu ¾” x 8’ 36 Ea 2004 35

Ground Rod, Cu ¾” x 8’ 60 Ea 2005 35

Ground Rod, Cu ¾” x 8’ 52 Ea 2006 35

Ground Rod, Cu ¾” x 8’ 60 Ea 2010 35

Ground Rod, Cu ¾” x 8’ 110 Ea 2011 35

Ground Wire, Bare Cu #4/0 45 SCLF 1968 35

Ground Wire, Bare Cu #4/0 45 SCLF 1970 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-13

Ground Wire, Bare Cu #4/0 135 SCLF 1971 35

Ground Wire, Bare Cu #4/0 45 SCLF 1972 35

Ground Wire, Bare Cu #4/0 45 SCLF 1973 35

Ground Wire, Bare Cu #4/0 45 SCLF 1974 35

Ground Wire, Bare Cu #4/0 90 SCLF 1975 35

Ground Wire, Bare Cu #4/0 225 SCLF 1980 35

Ground Wire, Bare Cu #4/0 90 SCLF 1981 35

Ground Wire, Bare Cu #4/0 135 SCLF 1982 35

Ground Wire, Bare Cu #4/0 90 SCLF 1983 35

Ground Wire, Bare Cu #4/0 90 SCLF 1985 35

Ground Wire, Bare Cu #4/0 180 SCLF 1986 35

Ground Wire, Bare Cu #4/0 270 SCLF 1987 35

Ground Wire, Bare Cu #4/0 225 SCLF 1988 35

Ground Wire, Bare Cu #4/0 135 SCLF 1989 35

Ground Wire, Bare Cu #4/0 235 SCLF 1990 35

Ground Wire, Bare Cu #4/0 315 SCLF 1991 35

Ground Wire, Bare Cu #4/0 1120 SCLF 1992 35

Ground Wire, Bare Cu #4/0 180 SCLF 1993 35

Ground Wire, Bare Cu #4/0 1010 SCLF 1994 35

Ground Wire, Bare Cu #4/0 585 SCLF 1995 35

Ground Wire, Bare Cu #4/0 1190 SCLF 1996 35

Ground Wire, Bare Cu #4/0 45 SCLF 1997 35

Ground Wire, Bare Cu #4/0 320 SCLF 1998 35

Ground Wire, Bare Cu #4/0 1590 SCLF 1999 35

Ground Wire, Bare Cu #4/0 810 SCLF 2000 35

Ground Wire, Bare Cu #4/0 270 SCLF 2001 35

Ground Wire, Bare Cu #4/0 450 SCLF 2002 35

Ground Wire, Bare Cu #4/0 270 SCLF 2003 35

Ground Wire, Bare Cu #4/0 405 SCLF 2004 35

Ground Wire, Bare Cu #4/0 675 SCLF 2005 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-14

Ground Wire, Bare Cu #4/0 585 SCLF 2006 35

Ground Wire, Bare Cu #4/0 675 SCLF 2010 35

Ground Wire, Bare Cu #4/0 1780 SCLF 2011 35

Transformer

Pole-mount Transformer, 15kV 10 kVA 7 Ea 2011 35

Pole-mount Transformer, 15kV 25 kVA 1 Ea 1992 35

Pole-mount Transformer, 15kV 25 kVA 1 Ea 1993 35

Pole-mount Transformer, 15kV 25 kVA 1 Ea 2000 35

Pole-mount Transformer, 15kV 50 kVA 2 Ea 1992 35

Pole-mount Transformer, 15kV 50 kVA 2 Ea 1993 35

Pole-mount Transformer, 15kV 50 kVA 2 Ea 1994 35

Pole-mount Transformer, 15kV 50 kVA 2 Ea 1995 35

Pole-mount Transformer, 15kV 50 kVA 7 Ea 1996 35

Pole-mount Transformer, 15kV 50 kVA 2 Ea 1997 35

Pole-mount Transformer, 15kV 50 kVA 1 Ea 1998 35

Pole-mount Transformer, 15kV 50 kVA 1 Ea 2000 35

Pole-mount Transformer, 15kV 75 kVA 1 Ea 1983 35

Pole-mount Transformer, 15kV 75 kVA 1 Ea 1996 35

Pole-mount Transformer, 15kV 75 kVA 1 Ea 2004 35

Pole-mount Transformer, 15kV 100 kVA 1 Ea 1994 35

Pole-mount Transformer, 15kV 100 kVA 1 Ea 1996 35

Pole-mount Transformer, 15kV 100 kVA 6 Ea 1999 35

Pole-mount Transformer, 15kV 100 kVA 6 Ea 2000 35

Pole-mount Transformer, 15kV 112.5 kVA 1 Ea 1995 35

Pole-mount Transformer, 15kV 167 kVA 2 Ea 1994 35

Pole-mount Transformer, 15kV 167 kVA 1 Ea 1996 35

Pole-mount Transformer, 15kV 167 kVA 1 Ea 2000 35

Pole-mount Transformer, 15kV 167 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 45 kVA 1 Ea 1982 35

Pad-mount Transformer, 15kV, inc pad 45 kVA 1 Ea 1992 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-15

Pad-mount Transformer, 15kV, inc pad 45 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 1 Ea 1982 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 2 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 2 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 1 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 2 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 4 Ea 2011 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 1991 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 1993 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 3 Ea 1998 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 112.5 kVA 1 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1971 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 2 Ea 1980 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1986 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1988 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1990 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1991 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 2 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 3 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 5 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 6 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 3 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 2000 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 2001 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 2002 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-16

Pad-mount Transformer, 15kV, inc pad 150 kVA 2 Ea 2004 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 2 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 3 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1975 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1981 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 3 Ea 1987 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1989 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1990 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1991 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 4 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 3 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 5 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1998 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 2 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 2000 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 2 Ea 2001 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 2 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 2003 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 3 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 1970 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 3 Ea 1987 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 2 Ea 1989 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 1991 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 1993 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 2 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 5 Ea 1996 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-17

Pad-mount Transformer, 15kV, inc pad 300 kVA 12 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 2 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 2003 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1972 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1973 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1980 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1981 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1982 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1985 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1986 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 2 Ea 1991 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1993 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 3 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 2 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1997 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1998 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 8 Ea 2000 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 2 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 2 Ea 2003 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 3 Ea 2004 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 3 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1975 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1980 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1983 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1985 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1986 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1988 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-18

Pad-mount Transformer, 15kV, inc pad 750 kVA 6 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 6 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 6 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 2000 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 2 Ea 2001 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 2 Ea 2003 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 2004 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 2 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 2 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 1980 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 1992 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 1993 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 2 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 1998 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 2 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 2 Ea 2000 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 2 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 1 Ea 1991 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 1 Ea 1994 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 1 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 1 Ea 2000 35

Pad-mount Transformer, 15kV, inc pad 2000 kVA 1 Ea 1974 35

Pad-mount Transformer, 15kV, inc pad 2000 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 2000 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 2000 kVA 1 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 2500 kVA 1 Ea 1999 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-19

Pad-mount Transformer, 15kV, inc pad 2500 kVA 8 Ea 2011 35

Current Transformer 400 A 12 Ea 1986 35

Current Transformer 400 A 18 Ea 1987 35

Current Transformer 400 A 15 Ea 1988 35

Current Transformer 400 A 9 Ea 1989 35

Current Transformer 400 A 21 Ea 1990 35

Current Transformer 400 A 24 Ea 1991 35

Current Transformer 400 A 141 Ea 1992 35

Current Transformer 400 A 27 Ea 1993 35

Current Transformer 400 A 99 Ea 1994 35

Current Transformer 400 A 33 Ea 1995 35

Current Transformer 400 A 30 Ea 1996 35

Current Transformer 400 A 12 Ea 1997 35

Current Transformer 400 A 12 Ea 1998 35

Current Transformer 400 A 12 Ea 1999 35

Current Transformer 400 A 12 Ea 2000 35

Current Transformer 400 A 12 Ea 2001 35

Current Transformer 400 A 9 Ea 2002 35

Current Transformer 400 A 9 Ea 2003 35

Current Transformer 400 A 9 Ea 2004 35

Current Transformer 400 A 9 Ea 2005 35

Current Transformer 400 A 9 Ea 2006 35

Vaults

Utility Vault, Concrete 6’x10’x6’ 42 Ea 1984 60

Utility Vault, Concrete 6’x10’x6’ 120 Ea 1995 60

Utility Vault, Concrete 6’x10’x6’ 3 Ea 2010 60

Utility Vault, Concrete 6’x10’x6’ 5 Ea 2011 60

Utility Vault, Concrete 8’x8’x7’ 24 Ea 2011 60

Utility Vault, Concrete 10’x10’x7’ 7 Ea 2011 60

Utility Vault, Concrete 12’x15’x7’ 1 Ea 2011 60

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-20

Street Lighting

Street Light HPS Luminaire 250 W 50 EA 1995 20

Street Light Pole, Steel w/ concrete base 20' 50 EA 1995 35

Street light wire, 600 V, Cu #10 10,000 SCLF 1995 50

Capacitor Bank, 15 kV 0.75 MVAR 3 Ea 2011 35

Circuit Breaker, Vacuum, 15 kV 1200 A 13 Ea 2011 35

Circuit Breaker, Vacuum, 15 kV 2000 A 6 Ea 2011 35

Ground Test Station 15 kV 2 Ea 2011 20

Lightning Arrestor 15 kV 33 Ea 2011 30

ATC 5-8

Utility Pole, Wood 45’ 11 Ea 2013 35

Utility Pole, Wood 55’ 13 Ea 2013 35

Utility Vault, Concrete 6’x10’x6’ 1 Ea 2013 60

Utility Vault, Concrete 8’x8’x7’ 24 Ea 2013 60

Utility Vault, Concrete 10’x10’x7’ 7 Ea 2013 60

1 x 2 Duct bank, PVC – concrete encased 4” 3645 LF 2013 100

1 x 2 Duct bank, PVC – concrete encased 5” 770 LF 2013 100

2 x 2 Duct bank, PVC – concrete encased 4” 1150 LF 2013 100

2 x 2 Duct bank, PVC – concrete encased 5” 2415 LF 2013 100

2 x 2 Duct bank, PVC – concrete encased 6” 3320 LF 2013 100

Primary 15 kV Wire, Cu #1 10,395 SCLF 2013 45

Primary 15 kV Wire, Cu #2/0 840 SCLF 2013 45

Primary 15 kV Wire, Cu 250 kcmil 8910 SCLF 2013 45

Primary 15 kV Wire, Cu 500 kcmil 9105 SCLF 2013 45

Primary 15 kV Wire, Cu 750 kcmil 18,330 SCLF 2013 45

Pole-mount Transformer, 15kV 10 kVA 7 Ea 2013 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 4 Ea 2013 35

Pad-mount Transformer, 15kV, inc pad 2500 kVA 8 Ea 2013 35

15 kV 3-way Pad-mount Iso-switch 600 A 8 Ea 2013 35

Equipment Pad, Concrete 6’x6’x6” 8 Ea 2013 60

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-21

Cable Termination 15 kV 67 Ea 2013 45

Ground Wire, Bare Cu #4/0 1080 SCLF 2013 35

Ground Rod, Cu ¾” x 8’ 87 Ea 2013 35

JBSA-LAKTA

1 x 1 Duct bank, PVC – concrete encased 4” 13,594 LF 1968 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,446 LF 1995 100

1 x 1 Duct bank, PVC – concrete encased 4” 105 LF 1996 100

1 x 1 Duct bank, PVC – concrete encased 4” 210 LF 1997 100

1 x 1 Duct bank, PVC – concrete encased 4” 105 LF 1998 100

1 x 1 Duct bank, PVC – concrete encased 4” 2,142 LF 1999 100

1 x 1 Duct bank, PVC – concrete encased 4” 105 LF 2000 100

1 x 1 Duct bank, PVC – concrete encased 4” 105 LF 2001 100

1 x 1 Duct bank, PVC – concrete encased 4” 1,025 LF 2002 100

1 x 1 Duct bank, PVC – concrete encased 4” 7,439 LF 2005 100

1 x 1 Duct bank, PVC – concrete encased 4” 461 LF 2006 100

3 Pole Gang Operated Switch, 15 kV 600 A 14 Ea 1965 35

3 Pole Gang Operated Switch, 15 kV 600 A 6 Ea 1995 35

Main Switching Station, Gang operated switch 15 kV 1 Ea 1985 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 1995 35

15 kV 3-way Pad-mount Iso-switch 600 A 2 Ea 2005 35

15 kV 3-way Pad-mount Iso-switch 600 A 1 Ea 2006 35

15 kV 4-way Pad-mount Iso-switch 600 A 2 Ea 1999 35

15 kV 4-way Pad-mount Iso-switch 600 A 12 Ea 2005 35

Equipment Pad, Concrete 6'x6'x6" 1 Ea 1995 60

Equipment Pad, Concrete 6'x6'x6" 2 Ea 1999 60

Equipment Pad, Concrete 6'x6'x6" 14 Ea 2005 60

Equipment Pad, Concrete 6'x6'x6" 1 Ea 2006 60

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-22

Overhead Circuit

Aerial Cable, 15 kV ACSR #1/0 425 SCLF 1995 50

Aerial Cable, 15 kV ACSR #2 245,943 SCLF 1965 50

Aerial Cable, 15 kV ACSR #2 46,737 SCLF 1995 50

Aerial Cable, 15 kV ACSR #4 40,991 SCLF 1965 50

Aerial Cable, 15 kV ACSR #4/0 284 SCLF 1995 50

Aerial Cable, 15 kV ACSR 336 kcmil 28,378 SCLF 1965 50

Aerial Cable, 15 kV ACSR 336 kcmil 23,369 SCLF 1995 50

Secondary Wire, 600V, Cu #2 50 SCLF 1997 50

Secondary Wire, 600V, Cu #2 50 SCLF 2000 50

Secondary Wire, 600V, Cu #2 100 SCLF 2002 50

Secondary Wire, 600V, Cu #2 100 SCLF 2005 50

Electric pole, wood 40’ 964 Ea 1965 35

Electric pole, wood 40’ 312 Ea 1995 35

Primary 15 kV Wire, Cu #1/0 40,782 SCLF 1968 20 Note1

Primary 15 kV Wire, Cu #1/0 4,008 SCLF 1995 45

Primary 15 kV Wire, Cu #1/0 292 SCLF 1996 45

Primary 15 kV Wire, Cu #1/0 620 SCLF 1997 45

Primary 15 kV Wire, Cu #1/0 292 SCLF 1998 45

Primary 15 kV Wire, Cu #1/0 5,937 SCLF 1999 45

Primary 15 kV Wire, Cu #1/0 292 SCLF 2000 45

Primary 15 kV Wire, Cu #1/0 292 SCLF 2001 45

Primary 15 kV Wire, Cu #1/0 2,841 SCLF 2002 45

Primary 15 kV Wire, Cu #1/0 20,618 SCLF 2005 45

Primary 15 kV Wire, Cu #1/0 1,237 SCLF 2006 45

Cable Termination 15 kV 3 Ea 1968 45

Cable Termination 15 kV 39 Ea 1995 45

Cable Termination 15 kV 3 Ea 1996 45

Cable Termination 15 kV 6 Ea 1997 45

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-23

Cable Termination 15 kV 3 Ea 1998 45

Cable Termination 15 kV 57 Ea 1999 45

Cable Termination 15 kV 3 Ea 2000 45

Cable Termination 15 kV 3 Ea 2001 45

Cable Termination 15 kV 27 Ea 2002 45

Cable Termination 15 kV 198 Ea 2005 45

Cable Termination 15 kV 12 Ea 2006 45

Ground Rod, Cu ¾” x 8’ 4 Ea 1968 35

Ground Rod, Cu ¾” x 8’ 44 Ea 1995 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1996 35

Ground Rod, Cu ¾” x 8’ 8 Ea 1997 35

Ground Rod, Cu ¾” x 8’ 4 Ea 1998 35

Ground Rod, Cu ¾” x 8’ 52 Ea 1999 35

Ground Rod, Cu ¾” x 8’ 4 Ea 2000 35

Ground Rod, Cu ¾” x 8’ 4 Ea 2001 35

Ground Rod, Cu ¾” x 8’ 36 Ea 2002 35

Ground Rod, Cu ¾” x 8’ 96 Ea 2005 35

Ground Rod, Cu ¾” x 8’ 8 Ea 2006 35

Ground Wire, Bare Cu #4/0 45 SCLF 1968 35

Ground Wire, Bare Cu #4/0 495 SCLF 1995 35

Ground Wire, Bare Cu #4/0 45 SCLF 1996 35

Ground Wire, Bare Cu #4/0 90 SCLF 1997 35

Ground Wire, Bare Cu #4/0 45 SCLF 1998 35

Ground Wire, Bare Cu #4/0 585 SCLF 1999 35

Ground Wire, Bare Cu #4/0 45 SCLF 2000 35

Ground Wire, Bare Cu #4/0 45 SCLF 2001 35

Ground Wire, Bare Cu #4/0 405 SCLF 2002 35

Ground Wire, Bare Cu #4/0 1,080 SCLF 2005 35

Ground Wire, Bare Cu #4/0 90 SCLF 2006 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-24

Pad-mount Transformer, 15kV, inc pad 37.5 kVA 1 Ea 2001 35

Pad-mount Transformer, 15kV, inc pad 75 kVA 1 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 2 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1996 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1997 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 1 Ea 1998 35

Pad-mount Transformer, 15kV, inc pad 150 kVA 3 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 225 kVA 1 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 2 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 5 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 1 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 300 kVA 3 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1968 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 1997 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 2 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 2 Ea 1999 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 3 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 500 kVA 1 Ea 2002 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 750 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 1995 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 1000 kVA 1 Ea 2006 35

Pad-mount Transformer, 15kV, inc pad 1500 kVA 2 Ea 1995 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-25

Pad-mount Transformer, 15kV, inc pad 1500 kVA 3 Ea 2005 35

Pad-mount Transformer, 15kV, inc pad 2000 kVA 1 Ea 2005 35

Pole-mount Transformer, 15kV 25 kVA 1 Ea 1997 35

Pole-mount Transformer, 15kV 25 kVA 1 Ea 2000 35

Pole-mount Transformer, 15kV 50 kVA 1 Ea 2002 35

Pole-mount Transformer, 15kV 75 kVA 1 Ea 2002 35

Pole-mount Transformer, 15kV 100 kVA 2 Ea 2005 35

Current Transformer 400 A 12 Ea 1995 35

Current Transformer 400 A 3 Ea 1996 35

Current Transformer 400 A 6 Ea 1997 35

Current Transformer 400 A 3 Ea 1998 35

Current Transformer 400 A 33 Ea 1999 35

Current Transformer 400 A 3 Ea 2000 35

Current Transformer 400 A 3 Ea 2001 35

Current Transformer 400 A 9 Ea 2002 35

Current Transformer 400 A 30 Ea 2005 35

Current Transformer 400 A 6 Ea 2006 35

Vaults

Utility Vault, Concrete 8’x14’x7’ 15 Ea 1995 60

Circuit Breaker

Circuit Breaker, Vacuum, 15 kV 1200 A 5 Ea 1985 35

JBSA-RND

1 x 2 Duct bank, PVC–concrete encased 4” 300 LF 1980 100

1 x 2 Duct bank, PVC –concrete encased 4” 200 LF 1986 100

1 x 2 Duct bank, PVC –concrete encased 4” 6,600 LF 1987 100

1 x 2 Duct bank, PVC –concrete encased 4” 2,900 LF 1988 100

1 x 2 Duct bank, PVC –concrete encased 4” 2,500 LF 1989 100

1 x 2 Duct bank, PVC–concrete encased 4” 300 LF 1990 100

1 x 2 Duct bank, PVC –concrete encased 4” 600 LF 1991 100

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-26

1 x 2 Duct bank, PVC –concrete encased 4” 1,100 LF 1992 100

1 x 2 Duct bank, PVC –concrete encased 4” 44,880 LF 1993 100

1 x 2 Duct bank, PVC –concrete encased 4” 1,700 LF 1994 100

1 x 2 Duct bank, PVC –concrete encased 4” 144,964 LF 1995 100

1 x 2 Duct bank, PVC –concrete encased 4” 51,498 LF 1996 100

1 x 2 Duct bank, PVC –concrete encased 4” 600 LF 1997 100

1 x 2 Duct bank, PVC –concrete encased 4” 15,697 LF 1998 100

1 x 2 Duct bank, PVC –concrete encased 4” 4,100 LF 1999 100

1 x 2 Duct bank, PVC –concrete encased 4” 600 LF 2000 100

1 x 2 Duct bank, PVC –concrete encased 4” 900 LF 2001 100

1 x 2 Duct bank, PVC –concrete encased 4” 900 LF 2003 100

1 x 2 Duct bank, PVC –concrete encased 4” 1,800 LF 2004 100

1 x 2 Duct bank, PVC –concrete encased 4” 1,500 LF 2005 100

1 x 2 Duct bank, PVC –concrete encased 4” 900 LF 2008 100

1 x 2 Duct bank, PVC –concrete encased 4” 300 LF 2009 100

1 x 2 Duct bank, PVC –concrete encased 5” 5,500 LF 1998 100

1 x 2 Duct bank, PVC –concrete encased 6” 580 LF 2011 100

Main Switching Station, Gang operated switch 15 kV, 750 kcmil 1 Ea 2005 35

Circuit Breaker, Vacuum, 15 kV 1200 A 16 Ea 2005 35

Substation Current Transformer 15 kV 16 Ea 2005 35

Protective Relays 15 kV 16 Ea 2005 35

Lightning Arrester 15 kV 1 Ea 2005 30

North Switching Station, Gang operated switch 15 kV, 750 kcmil 1 Ea 1990 35

Circuit Breaker, Vacuum, 15 kV 1200 A 10 Ea 1990 35

Substation Current Transformer 15 kV 7 Ea 1990 35

Protective Relays 15 kV 7 Ea 1990 35

Lightning Arrester 15 kV 1 Ea 1990 30

East Switching Station, Gang operated switch 15 kV, 750 kcmil 1 Ea 2010 35

Circuit Breaker, Vacuum, 15 kV 1200 A 7 Ea 2010 35

(Attachment JA1 Electric Distribution System Template – 27FEB12) User Edited: ver51 15Apr13

JA1-27

Substation Current Transformer 15 kV 6 Ea 2010 35

Protective Relays 15 kV 6 Ea 2010 35

Lightning Arrester 15 kV 1 Ea 2010 30

South Switching Station, Gang operated switch 15 kV, 750 kcmil 1

Ea 1988 35

Circuit Breaker, Vacuum, 15 kV 1200 A 7 Ea 1988 35

Substation Current Transformer 15 kV 7 Ea 1988 35

Substation disconnect switch 15 kV 3 Ea 1988 35

Protective Relays 15 kV 7 Ea 1988 35

Lightning Arrester 15 kV 1 Ea 1988 30

West Switching Station, Gang operated switch 15 kV, 750 kcmil 1 Ea 2010 35

Circuit Breaker, Vacuum, 15 kV 1200 A 7…