TechSpec_Furniture_Fume Hood.pdf

PDF 154 KB Posted

Attached to
PTC Columbus Lab Furniture Pre-solicitation Synopsis
Solicitation number
SP4706-24-Q-0007
Issued by

About this file

This pre-solicitation synopsis outlines requirements for laboratory furniture and a fume hood replacement for the Metallurgical Lab located at the Defense Logistics Agency Product Test Center in Columbus, Ohio. The scope of work includes providing all new cabinetry, workstations, desks, tables, chairs, countertops, and a replacement fume hood. The contractor will be responsible for assembly, installation, and functional testing of the new fume hood. Quotes are required to include part numbers for 62 items ranging from cabinets, tables, and chairs to accessories for the new fume hood. The contractor will work with lab staff to schedule delivery and installation while facility upgrades are underway. Invoicing will be through the Wide Area Workflow system. The performance period is anticipated to begin in June or July 2024.

View the file

Other files

File Type Posted
Rev 1_SOW_Furniture and Fume Hood.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifica�ons Metallurgical Lab furniture and Fume Hood replacement.

DLA Land and Mari�me Engineering and Technical Support Directorate Product Test Center, Mechanical, VTM

I. The contractor shall provide all labor, tools, transportation, supplies, supervision, assembly, etc. (except as noted), necessary to provide laboratory grade furniture, and fume/vapor hood replacement to the Supply Center Columbus (DSCC), DLA Land and Maritime, Product Test Center Division, Metallurgical Lab, Columbus, Ohio. The laboratory grade furniture and fume/vapor hood shall meet the following salient characteristics:

a. Base, legs, backs, cabinets, cases, tabletops, and frames shall be constructed of heavy gage steel with at least 18-20 gage thickness.

b. Surfaces shall have a protec�ve coa�ng to prevent against rust and be chemical resistant.

c. Standing and counter heights should be standard 35” high x 22’ deep.

d. Acids/Corrosive/Flammable storage cabinets shall be of reinforced steel and coated to prevent corrosion with a standard height of 35” high x 22” deep.

e. Wall cases are to have a minimum of two shelves, glass framed, hinged, and constructed of heavy gage steel with at least 18-20 gage thickness.

f. Fume Hood must meet Industry ASHRAE 110, and OSHA Standards, 1910.1003.

g. Fume Hood selected must be of an Airfoil Bypass design.

h. Fume Hood’s air flow shall be at minimum of 75 feet Per Minute at Face Velocity. (DLA Industrial

Hygienists will be required to test once installa�on is complete).

i. Selected Fume Hood must be able to adapt to current air blower configura�on. (DLA facili�es will be consulted prior to finalizing for connec�ng to exis�ng vents).

j. Selected Fume Hood must be able to provide switching for lights and blower.

k. Selected Fume Hood must be able to be configured for at minimum 16x12x8” drop-in sink.

l. Tabletop for fume hood shall be black in color and be chemical resistant.

m. Chairs shall be composed of vinyl, spring tension adjustable, nylon bases, nylon casters with foot rings.

I. The contractor shall provide all labor, tools, transportation, supplies, supervision, assembly, etc. (except as noted), necessary to provide laboratory grade furniture, and fume/vapor hood replacement to the Supply Center Columbus (DSCC), DLA Land ...

File details come from the government source that posted it. Updated .