Rev 1_SOW_Furniture and Fume Hood.pdf

PDF 178 KB Posted

Attached to
PTC Columbus Lab Furniture Pre-solicitation Synopsis
Solicitation number
SP4706-24-Q-0007
Issued by

About this file

This performance work statement and pre-solicitation synopsis outline requirements for laboratory furniture and a fume hood replacement for the Metallurgical Lab located at the Defense Logistics Agency Product Test Center in Columbus, Ohio. The scope of work includes providing and installing new cabinetry, workstations, desks, tables, countertops, chairs, and a new fume hood to replace aging and deficient equipment. The contractor will be responsible for assembly, installation, and functional testing of all new furniture and the fume hood. A total of 62 different items are listed as needed deliverables. The contractor must be able to schedule work during the planned June to July 2024 refitting of the lab facility by DLA. Invoicing will be submitted through the Wide Area Workflow system.

View the file

Other files

File Type Posted
TechSpec_Furniture_Fume Hood.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

1. Metallurgical Lab Furniture and Fume Hood Replacement

07 March 2024

Requiring Activity: DLA Product Test Center Division, Mechanical Lab, located at Cols, Ohio.

Contracting Activity: DLA Contracting Services located at Cols, Ohio.

2. Introduction

The Material’s Laboratory will be undergoing equipment and configuration upgrades to mitigate environmental and safety concerns. The purpose of this Performance Work Statement will give notice that the Lab will require new Furniture, such as: chemical resistant countertops, worktables, chairs, cabinetry and Fume Hood for a proper and safe workspace.

3. Background

During the 2022 Industrial Hygienist Inspection it was discovered that Materials Lab needed to separate wet and dry sanding operations, replace broken and aging furniture, and update the lab’s fume/vapor hood. Testing also discovered a lack of proper worksurfaces, flooring and equipment necessary to combat heavy metal dust and chemical contamination. It was decided by the Materials Lab associates and MPTC Management that the lab was deficient in all areas of customer material workflow and personal protection from hazardous materials. During the initial meetings it was decided to completely reorganize and refit the lab with the proper power requirements, cabinetry, wet and dry sanding and cutting equipment. By providing the proper laboratory grade furniture the MPTC can increase workflow efficiency and provide a safer workspace for associates.

The mitigation of dust and creation of segregated machine operations will require new work areas to include desks, tables, chairs, cabinetry and chemical resistant countertops for use within a fume hood. The fume hood evaluation concluded that the existing hood is currently in decay cannot be repaired and will need to be replaced.

All the furniture and fume hood accessories to include chemical storage will need advanced ordering to ensure they are on station immediately after the Lab receives the refit of power, machine removal, flooring, drainage and room separation actions. The refit will be conducted by DLA Facilities and or outside contracting and will have a strict timeline for completion.

Proposed start dates are June or July 2024.

Once DLA Facility refit is concluded and new furniture is on station, The Lab Tech Supply Company will be able to assemble and configure components. Having the components on station will decrease the Lab’s downtime and ensure continuity of operations for material testing.

4. Scope

The scope of work will focus on having the furniture and fume hood ordered and on station while DLA Facilities and Contractors are readying the lab for occupation. The Contractor, Lab Tech Supply Company will be responsible for the assemblance and placement of cabinetry components, tables, chairs, workstation etc. and fume hood. They are also responsible for any electrical wiring of lighting and operation power to workstations and fume hood. The Contractor will also be required to functional check operation and airflow of the newly installed. Fume hood.

5. Applicable Directives

None

6. Performance Requirements

The Contractor, Lab Tech Supply Company shall be required to assemble and make ready all cabinetry, workstations, desks, drawers, tables, countertops in accordance with drawings supplied during quotation.

The Contractor, Lab Tech Supply Company shall be required to assemble and install fume hood, countertop, underneath chemical storage lockers, overhead airflow hood and function test for proper operation.

7. Deliverables

Items Needed Item # Quan�ty Part Number

1 3 LT27-SPL

2 9 B2930-220 3 7 A043622-000

4 3 KSP2436

5 2 LF29-7

6 7 W30336-2GH

7 4 B3518-040 8 2 B3524-040

9 4 KSP2936

10 8 B3530-220

11 2 CF35-14

12 7 B3530-220

13 4 LF35-7

14 2 B2918-F10 15 2 A045422-002

16 2 KSP2440

17 2 L29-22

18 2 CF29-14

19 2 F8448-00021

20 1 ASB3536-200

21 1 FSB3536-200

22 2 LF-35-11

23 1 LT27-FH72

24 1 B-606

25 1 OF-1083

26 1 F-200 27 1 F-210 28 2 F-225 29 1 F-319 30 3 F-320 31 1 F-110 32 1 F-300 33 1 M-5008

34 4 LT03-WS1.0CHM

35 1 LT03-FHT-72

36 2 LT03-COSINKD

37 1 LT-03-SD15

38 6 LT03-SMITH-ON

39 1 LT27-BS3035-060

40 4 LT27-LF35-7

41 1 LT27-BS39635-20S

42 1 WS1.0CHM

43 1 LT03-SD55

44 1 LT03-OUTL-S03R

45 11 LT03-COFIXTURE

46 1 LT17-L414-8VB-BH

47 1 LT03-PB2424-4

48 1 LT03-DT24

49 4 LT27-F4884-2SH21

50 1 LT27-F4884-2GH21

51 3 LT01-CH1058SV

52 5 LT01-CH1000SV

53 1 LT27-BS4835-024

54 1 LT27-BS4835-080

55 1 LT27SPL

56 1 LT-BS4835-200

57 1 LT03-WS1.0CHM

58 1 LT03-SMTH-ON

59 1 LT27-BS4835-210

60 2 LT27-LF-35-1

61 1 LT12-CUSTOMER ENGINEERING

62 1 LT25-CUSTOMER INSTALL

63 1 LT00-CUSTOMER FREIGHT

8. Contractor Information: please list what type of Experience, Past Performance, Certifications, and/or Scheduling Needs that are required from the Contractor

No previous past performances have been observed from Lab Tech Supply Company.

Lab Tech Supply Company shall keep in contact with the Materials Lab and work to schedule as best time frame available.

All items such as in cabinetry, desks, chairs, tabletops, countertops accessories and fume hood shall be tracked as a deliverable, and the Materials Lab associates shall be kept informed as to the delivery dates.

Associates:

William Myers 614-692-7074 Mark Watkins 614-692-9988 Daryl Bernard 614-692-8259 Nick Bloom 614-692-1239 Jeff Fleeger, Supervisor 614-692-4954

9. Place of Performance

DSCC Columbus 3990 East Broad Street Whitehall, OH 43213

Shipped receivables will be sent to building 17.

ATTN: William Myers 614-692-7074 Jeff Fleeger 614-692-4954

Work to be performed will take place at:

Building 9, Section 1

Room 009-1-109 Materials Laboratory POC: William Myers 614-692-7074

Work to be performed will take place at:

Building 11 Fixture Room POC: Nick Bloom 614-692-1239

10. Travel (if applicable)

No line-item travel was itemized in quote.

11. Invoicing

Payment of invoices will be accomplished by payment through the Defense Finance and Accounting Service. Invoices will be submitted to the Wide Area Workflow system in accordance with DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports and DFARS 252.232- 7006 Wide Area Workflow Payment Instructions within 10 workdays after the conclusion of each training session.

12. WAWF Acceptance DODAAC#

TM Lab is SL0702.

13. Point of Contacts

The Government Contract Officer:

TBD

The Government Contract Officer Representative (COR):

Kyle Palmer Kyle.Palmer@dla.mil 614-692-8860

DLA Land and Maritime Product Test Center, T Office 3990 E. Broad St., Columbus, OH Bldg. 9, Section 1

William Myers 614-692-7074

The Government Technical Representative/Project Manager:

Name: TBD (email address TBD) Phone Number: TBD Address: TBD

File details come from the government source that posted it. Updated .