Text version
RFP Document RFP Section Reference Question
Mechanical
Solicitation
Instruction to
Offerors
Section 1.19
INSTRUCTIONS
TO OFFEROR
Page 1 second paragraph
Section 1.19
INSTRUCTIONS TO
OFFEROR;
subparagraph
1.19.1.7.4 VOLUME
III – PRICING
PROPOSAL Section B states
NOTE: The below CLINs 0001 through
4002 are for reference / future Task
Orders award purposes only and the
Government does not expect this to be filled in when IDIQ proposals are submitted
“Offerors shall submit a completed pricing schedule for CLINs 0001 through
4003, and the pricing summary. The offeror shall type his proposed prices in the pricing schedule.”
These two statements contradict each other. Should the offeror complete CLINS
0001 – 4002? If yes, please provide a plug number for Materials(s) CLINS and confirm that there is not a CLIN 4003.
ANSWER: No, the Offeror does not need to fill out CLINs 0001 – 4002. Please refer to question #14 for the appropriate pricing tables.
Solicitation
Instruction to
Offerors
2. Section 1.7 KEY
PERSONNEL (a)
The Contractor shall assign to this contract the following key personnel:
(Insert employee’s name beside their
Title/Position.)
• Project Manager
• On-site Supervisor
• Shift Supervisor
Are these key personnel funded on the
IDIQ contract or the Task Orders level or both? Are they full-time, onsite positions and if yes, will the Government provide pricing CLINS on the IDIQ level for 1920 annual hours for these key positions?
ANSWER: Only the Task Order level is funded. The positions are not full-time positions but are required to complete work under each individual task order
Solicitation
Instruction to Offerors
1.9 CONTRACT
ADMINISTRATION
DATA
Should the offeror include 1.9
CONTRACT ADMINISTRATION DATA
information in our price volume or another location of our proposal?
ANSWER: The information required under 1.9 CONTRACT ADMINISTRATION DATA should only be included within
Volume I Technical Approach.
Solicitation
Instruction to
Offerors
1.16 TASK ORDER
MANAGEMENT -
CONTRACT
CLAUSES (pages 12- 57)
Does the offeror need to include
CONTRACT CLAUSES (pages 12-57) if we are current in our System for Award
Management (SAM) www.sam.gov registration?
ANSWER: All contractors are required to provide Representations and Certifications from the System for Award
Management (SAM) along with their Solicitation Response.
http://www.sam.gov/
Solicitation
Instruction to Offerors
1.19.1.2.1 Factor 1
Technical
Approach/Risk Proposal Subfactor 1
Factor 1 Technical Approach/Risk
Proposal Subfactor 1 – mentions a
Transition Plan and is the only reference to a Transition Plan in the RFP.
Is a Transition Plan Required in the proposal? If yes under which factor and subfactor?
ANSWER: No. A Transition Plan is not required for this acquisition.
Solicitation
Instruction to
Offerors
1.19.1.2.1 Factor 1
Technical
Approach/Risk
Proposal Subfactor 1
Factor 1 Technical Approach/Risk
Proposal Subfactor 1, ends the section with, The contractor shall demonstrate in detail and address each of the following in the Technical Proposal
Please explain what information should go in Factor 1 - Subfactor 1- Approach and
Experience in Understanding the
Government's Requirements. Is there instruction information missing from this section of the proposal? If yes, please provide instruction on what the offeror is to “demonstrate in detail and address each of the following in the Technical
Proposal”.
ANSWER: The information required for Factor 1 Sub-Factor 1 are the following: Technical Plan, Quality Control Plan, Key Personnel Plan, Resumes.
NOTE: As previously stated under Question 5, No. A Transition Plan is not required for this acquisition.
Solicitation
Instruction to
Offerors
1.19.1.3.1 Factor 1
Key Personnel –
Subfactor 2
Licensing, certifications, training, specific experience requirements, etc…
The proposal shall discuss the following in reference to licensing, certifications, training.
Please provide the missing instruction to
“discuss the following in reference to licensing, certifications, training.”
ANSWER: The various licensing, certifications, and training are included throughout the Performance Work Statement.
Solicitation
Instruction to Offerors
1.19.1.4.1 - Price
Proposal
The price proposal will be evaluated to ensure the proposed total acquisition price and the labor mix satisfies the Government’s requirements.
The labor mix is provided by the
Government, how will this be used as an evaluation criteria?
ANSWER: The Labor Mix will be evaluated based on the sample task order vendor response required to perform the task per RS Means.
Solicitation
Instruction to Offerors page 63 of Section
1.19.1.6 VOLUME I –
TECHNICAL
APPROACH
The table on page 63 of Section 1.19.1.6
VOLUME I – TECHNICAL
APPROACH states that the page limit for Factor 3 is 28 pages.
Is the correct page limit 25 pages?
ANSWER: The correct page limit is 25 pages as referenced on Page 60 under Section 1.19.1.4 FACTOR 3 – Management
Approach.
Solicitation
Instruction to Offerors
11. 1.19.1.7.1
VOLUME II – PAST
PERFORMANCE
All sections of Volume II shall be contained in the same 3- ring binder.
Please confirm that this proposal is electronic delivery and that no hard copies are required.
ANSWER: Yes. All proposals shall be sent electronically to Ron Fairley at Ronald.fairley@dla.mil and Beverly Williams at
Beverly.j.williams@dla.mil.
Solicitation
1.19.1.7.2 Past
Performance Project
Descriptions
Instruction to
Offerors
Each project description shall be no greater than two (2) 8.5x11 inch pages using a 12-point new courier font
For consistency will the Government allow the past performance to be in the same standard (8-1/2 by 11 inch, Times New
Roman text, Min. 10 pitch font as the
Technical Volume?
ANSWER: Yes. The Government will allow for the same font as requested.
Solicitation
Instruction to Offerors
13. 1.19.1.7.3 Past
Performance Matrix
Will the Government please provide the
Past Performance Matrix or is the Offeror format acceptable?
ANSWER: The Government will provide a Past Performance Matrix as part of an Amendment to this Solicitation.
Solicitation
Instruction to Offerors
1.19.1.7.3.1 Client
Authorization Letter
Please confirm that 1.19.1.7.3.1 Client
Authorization Letter is only required for commercial past performance customers.
ANSWER: Yes. The Authorization Letter is only required from Commercial Past Performance.
Solicitation
Instruction to
Offerors
15. 1.19.1.7.4
VOLUME III –
PRICING PROPOSAL
Will the Government provide a pricing spreadsheet?
ANSWER: The Contractor will price the following tables from the Instruction to Offerors as part of Volume III – Factor 5, Price/Cost Proposal:
Base Year Alteration and Repair Table
Option Year-1 Alteration and Repair Table
Option Year-2 Alteration and Repair Table
Option Year-3 Alteration and Repair Table
Option Year-4 Alteration and Repair Table
Sample
Statement of Work
Is there a requirement for the offeror to remove an existing cooling system and lines or just install a new system/lines?
ANSWER: Removal of existing system is not required
Statement of
Work
Are all adequate power, supply, and return lines already provided to the server room?
ANSWER: Electrical requirements not included in this order. See SOW item3, supply and return chilled water lines are to be provided and installed by the offeror.
PWS Page 1 - Table of
Contents and Page 14 of 49
C1.10 REPLACEMENT,
MODERNIZATION, RENOVATION
The TOC lists C1.10 REPLACEMENT, MODERNIZATION, RENOVATION however there is not a PWS description of
C.1.10 on page 14. Please provide the
PWS description for this section.
ANSWER:
Please revise Table of Contents
C.1.10 SECTION INTENTIONALLY BLANK
Statement of
Work
#2 Page 1 The contractor shall provide and install new APC Cooling Units for server rooms indicated on drawings.
Please provide the Manufacturer and
Model Number of the APC units and the desired number of units. This is necessary to determine the physical size and specific electrical and mechanical requirements.
ANSWER:
Manufacturer: APC
Product Line: APC In ROW RC
Model No.: ACRC301S
PWS ATTACHMENT 1:
PERFORMANCE
REQUIREMENTS
SUMMARY
PERFORMANCE
REQUIREMENTS
SUMMARY TABLE 1
(PRS) Page 33
Clin 2 LIST OF RECORDS AND
REPORTS
Attachment 1 on page 33 lists CLIN 2 List of Records and Reports. The pricing tables do not contain this CLIN. Please clarify.
ANSWER: Vendors need to reference the Contract Line Item (CLIN) structure within the Instruction to Offerors. The Performance
Work Statement will be amended to remove the reference to the List of Records and Reports under CLIN 0002. The reference to
CLIN 0003 will be deleted in its entirety.
PWS ATTACHMENT C.15
SCHEDULE OF
DEDUCTIONS
The contractor is to populate unit and extended price. This table will match
CLIN Pricing on IDIQ Task Order
The Pricing Instructions do not mention
Attachment C.15, nor do the pricing tables in the instructions have Clin 2 LIST OF
RECORDS AND REPORTS. Please clarify pricing instruction regarding this matter.
ANSWER: Please reference number nineteen (19) above referencing the removal of List of Records and Reports.
PWS C.18 CLIN
STRUCTURE
CLIN 0001- 1 IDIQ Alterations Work
CLIN 0002- Materials
Should Clin 2 LIST OF RECORDS AND
REPORTS be added to this section?
ANSWER: Please reference number nineteen (19) above referencing the removal of List of Records and Reports.
PWS C.8 / C.9.2.3.5.2 .4 C.8 States that all licenses will be provided 5 days after contract start, C.9.2.3.5.2.4 states that licenses for the
Shift Supervisor will be provided with the proposal
Will the government confirm that licenses held by the shift supervisor and other key personnel will be provided 5 days after contract start?
ANSWER: Key personnel licenses required along with the proposal. Remaining licenses are due 5 days after contract start.
Amendments SF 30 Will the Government provide SF 30s for the Amendments?
ANSWER: For the purpose of this requirement no SF 30s were issued in Beta.SAM.gov., on any of the Amendments. A signed copy of the SF 1449 will be an acknowledgment of all the requirements and Amendments under this requirement.