Amendment SP4705-08-R-0015 P00002.doc
DOC document 49 KB Posted
- Attached to
- DLA HQ Complex Maintenance Service
- Solicitation number
- SP4705-08-R-0015
- Issued by
-
Defense Logistics Agency Headquarters
About this file
This is the second amendment to this solicitation SP4705-08-R-0015. Please see attachment file as well for Site Visit Forms. Please fill out the forms and e-mail them to me jose.villanueva dla.mil with your request.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment Three | — | |
| SITE VISIT FORMS.pub | PUB file | |
| Amendment to Solicitation SP4705-08-R-0015 P00001.doc | DOC document | |
| Solicitation to be Posted Aug 29 2008.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to incorporate questions and answers, cutoff date for Q&A, and expand on FAR 52.212-2. The changes are as follows.
1. The following questions and answers are hereby incorporated:
a. Question: Page 6, of MOD/AMEND 001 VOLUME I—TECHNICAL, it states “Volume I shall consist of seven (7) sections. The table below identified each section and page limit.” -
This table only shows six (6) sections; please clarify if something is missing.
Answer: The table has six (6) sections.
b. Question: Page 9 of MOD/AMEND 001 “Past Performance Project Description Format” item #15
FACILITY MAINTAINED contractor is to identify the facility maintained and provide a general description of the applicable system maintained; item #16 DESCRIBE SYSTEMS
MAINTAINED contractor is to provide a general description of the applicable system maintained. It appears that there is duplicate information being requested in #15 and #16 as both are asking for “general description of the applicable system maintained” - is this correct?
Answer: 15.
FACILITY MAINTAINED: Identify the facility maintained and general description of the requirements (i.e. electrical system, electronic security system, etc.).
16.
DESCRIBE SYSTEMS MAINTAINED: Provide a general description of the applicable system maintained (i.e. electrical system, electronic security system, etc.)
Fifteen is asking for the facility maintained and a description of the requirements. Sixteen is asking for the system in the facility.
c. Question: Page 12 of MOD/AMEND 001, section C.1.2.2 Facility Security Clearance: it states “The
Contractor shall, immediately upon award and prior to commencement of work, provide the Contracting Officer with written verification of an Active Facility Security Clearance at the Secret level. After validation by the Government the Notice to proceed will be issued. The Contractor shall provide a copy of the FCL with the Technical Proposal, Volume I.” - Is it a requirement to currently have a FCL prior to bidding on the solicitation and if the contractor does not provide a copy of the FCL with the Technical
Proposal, will the contractor be disqualified.
Answer: An active facility security clearance needs to be submitted via Mr. Jose M. Villanueva’s e-mail: jose.villanueva@dla.mil when requesting a site visit appointment and a copy of the active security clearance in the submission of the Volume I Technical Support. Failure to provide the active facility security clearance will result in a non-responsive proposal. FAR clause 52.212-2 is revised for reference.
d. Question: When is the cut off date for all questions to be submitted to the Contract Specialist?
Answer: See section titled “Question and Answers Instructions” added to this amendment. The due date is Sept 25, 2008.
e. Question: Page 10 of MOD/AMEND 001, Volume III Cost Proposal - How many sections does this
Volume contain, because it notes two sections in one location on the page, and three sections in another location on page 10.
Answer: 2
f. Question: Page 32 of MOD/AMEND 001, Phase In-Plan states “Contractor shall develop a phase in plan for submittal as part of Volume I— Past Performance, of the Technical Proposal.
What part of Volume I should it be under, as Volume I—Technical Proposal does not?
have a “Past Performance” section noted.
The Phase In-Plan should be part of the Technical Proposal. On page 32, it should not have said Past Performance.
2. The following information on the site visit is hereby revised to read as follows:
A site visit will be held on 25 September 2008 @ 10:00 A.M. Interested parties are requested to provide the Company’s Cage Code and Name of Company to verify an active facility security clearance. After verification of an active Facility Security Clearance, the company will be requested to provide the names of two attendees which currently hold a secret level clearance. An additional attendee will be permitted to attend if the company is a subcontractor to the prime contractor. The subcontractor attendee must hold an active secret security clearance. The attached form must be completed an returned no later than 22 September 2008.
The attached form must be sent to Jose Villanueva via email of the names of those who will be attending the site visit. Please arrive at the front gate of Defense Logistics Agency (DLA) at 8725 John J. Kingman Road, Fort Belvoir, VA at least 15 minutes prior to the arranged time in order to secure a visitor pass. Limit the number of attendees to no more than two representatives from each company. To gain access to the installation you will need to have a government issued ID (e.g. drivers license, state issued photo ID) for every individual, and vehicle registration and insurance for each vehicle. Once you have entered to the gates, proceed to the flags to check in the building. Ms Leeann Bell or Mr. Mike Watts will be the point of contact for the site visit. If any problems, please contact Jose Villanueva @ 703-767-1208. Please note the site visit is only designed to allow interested parties the opportunity to visit the facility for viewing of the building, structures and related systems and equipment at DLA Headquarters Complex. Any technical questions should be reduced to writing and sent via email directly to the Contract Specialist at jose.villanueva@dla.mil within 24 hours after the site visit.
Prior to a site visit be scheduled, company must provide to the Contract Specialist: Company Name, Full Name(s) (no more than two (2) persons per company for the site visit), SSN(s), Date of Birth, and Cage Code, and provide a cut off date for that requirement to be submitted.
Visit Authorization Letter
Subject: Initial Badge/Badge Renewal
3. FAR 52.212.2, Commercial Evaluation, is hereby revised to correct the first paragraph of paragraph (a) to read:
52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror who currently holds an active facility security clearance and whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
4. Except as provided herein, all terms and conditions of the subject document, as heretofore changed, remains unchanged and in full force and effect.
(End of Summary of Changes)