H Road Parking Renovation pre-bid RFI responses.docx
DOCX document 16 KB Posted
- Attached to
- DSCR H Road Parking
- Solicitation number
- SP4703-26-R-0007
- Issued by
-
Defense Logistics Agency
About this file
This file contains pre-bid Request for Information (RFI) responses for the DSCR H Road Parking Renovation project (Solicitation SP4703-26-R-0007). The document addresses four key contractor inquiries regarding project execution. The government confirmed that brick clad force protection barriers along H Road will be relocated by the government prior to paving replacement. Striping specifications for the run path require a thickness of 15±1 mils when wet, with centerline striping dimensions of approximately 5" x 30" and 30" spacing between markings. Weekend work is permitted upon request but requires coordination with the DLA Project Manager, with a mandatory two-week advance notice for approval. The new run path surface material differs from the existing surface; no historical construction information is available, and the new path must be constructed per the Statement of Work specifications.
The underlying solicitation is a firm-fixed-price RFP issued by the Defense Logistics Agency's Defense Supply Center Richmond (DSCR) for Highway, Street, and Bridge Construction (NAICS 237310) set-aside for 100% small businesses with a $19M size standard. The contract has a 90-day period of performance and will be awarded to the lowest priced, technically acceptable offeror. Contractors must be located within 120 miles of DSCR, registered in SAM prior to award, and must identify a prime contractor-owned point of mobilization. The site visit is scheduled for June 2, 2026 at 10:00am, and all inquiries must be submitted to nicholas.mace@dla.mil no later than 7 business days prior to the closing date. Past performance data from CPARS and SPRS will be evaluated as part of technical acceptability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 dated 06-10-2026 Solicitation SP4703-26-R-0007.pdf | ||
| Section M.pdf | ||
| DSCR-H Road Parking Reno-SOW.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H Road Parking Renovation RFI’s
1. Please confirm that the brick clad force protection barriers located along H Rd will be relocated by the government in order for the paving to be replaced beneath them?
Confirmed
2. Please confirm whether there is a specified thickness requirement for the striping associated with the run path work.
Thickness of striping shall be 15 ± 1 mils when wet.
Additionally, please provide or verify the required striping dimensions, including widths, lengths, spacing, and any other applicable measurements shown in the design intent, to ensure accurate pricing and installation.
Running path centerline striping dimensions are to be approximately 5”x30” with 30” spacing between.
3. Please confirm whether weekend work will be permitted for this project.
Weekend work is permitted upon request.
If weekend work is allowed, please provide any applicable requirements, restrictions, notification procedures, access limitations, noise restrictions, security coordination requirements, or approval processes that must be followed prior to performing work on Saturdays or Sundays.
Weekend work is permitted upon request and is to be coordinated through the DLA Project Manager, 2 weeks notice prior to the outside of business hours work request is needed for DLA to process and approve the request.
Additionally, please identify the appropriate point of contact for coordinating weekend work activities. This information is requested to facilitate project scheduling, manpower planning, and accurate execution of the work.
The DLA Project Manager as listed in the SOW.
4. Please confirm whether the specified material for the proposed run path to be installed, is a confirmed match with the existing run path surface material currently in place.
It is not.
If not, please provide any available information regarding the construction history of the existing run path, including the original surface material, dimensions, and any known repairs or modifications that have been performed.
None available. New path is to be constructed per the SOW.