Q and A SP470326Q0026.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
DSCR - Elk Pasture - Dry Swale 3 Project
Solicitation number
SP470326Q0026
Issued by

About this file

This is a Questions and Answers file for solicitation SP470326Q0026, a Defense Logistics Agency Request for Quote (RFQ) for the DSCR Elk Pasture Dry Swale 3 Project. The file documents one substantive question and response regarding construction specifications: a bidder inquired whether precast concrete is allowable for the dry swale construction, and the Contracting Officer confirmed that it is permissible, noting that the SOW has been revised under Section 3 (Specific Requirements, Dry Swale 3 Construction) to explicitly include this option.

The underlying solicitation is a firm-fixed-price acquisition set aside 100% for small businesses (NAICS 238910 - Site Preparation Contractors, with a $19M size standard) with an estimated award value between $125,000 and $175,000. The contract will have a 60-day period of performance from notice to proceed. A site visit was scheduled for April 2, 2026 at 10:00 AM, with a question deadline of April 6, 2026 (COB) and a quote submission deadline of April 17, 2026 (COB). Quotes must be submitted via email to Contracting Officer Robert Moragues. Award will be made to the Lowest Priced Technically Acceptable offeror. The work is located in Chesterfield County, Virginia, and bidders must maintain a place of business within 125 miles of the site. Amendment 0001 revised the SOW to allow precast concrete and change the underdrain system from 12" RCP to 6" PVC.

View the file

Other files

File Type Posted
SF30 SP470326Q00260002.pdf PDF
Pre-Bid site visit sign in sheet.pdf PDF
DSCR - Swale 3 - SOW - Rev 1.pdf PDF
SF30 SP470326Q00260001.pdf PDF
SOW_DSCR_Swale 3.pdf PDF
SF1449_SP470326Q0026.pdf PDF
2021 09 03 Elk Pasture Site Plans.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionFileSectionQuestionGovernment ResponseResponse from:
1DSCR - Swale 3 - SOW - Rev 1.pdf3.Specific Requirements, Dry Swale 3 ConstructionIs the use of precast concrete allowable?Yes. The SOW has been revised under the section referenced in cell C2 to include the option of precast.Contracting Officer