SF30 SP470325Q00250001.pdf
PDF 21 KB Posted
- Attached to
- DSCR Building 59 C Bay Break Room Renovation
- Solicitation number
- SP470325Q0025
- Issued by
-
Defense Logistics Agency
About this file
This is a Standard Form 30 (Amendment/Modification) for solicitation SP470325Q0025, which amends the original solicitation for the Defense Supply Center Richmond (DSCR) Building 59 C Bay Break Room renovation project. The renovation work includes updating cabinets, countertops, sink, electrical, lighting, flooring and other improvements with an estimated contract value between $52,000-$75,000.
The solicitation is set aside for small businesses under NAICS code 236220 with a $45M size standard. Key dates include: site visit on February 4, 2025 at 0930; questions due February 7, 2025; answers posted around February 11, 2025; and quotes due February 28, 2025. The period of performance is 75 days after Notice to Proceed. Award will be made on a lowest price technically acceptable basis. Contractors must be within 120 miles of DSCR to be considered. Major requirements include: installing new commercial grade cabinets with soft-close features, quartz countertops, undermount sink, LED lighting, mini-split HVAC system, electrical circuits, and various finishes. The contractor must follow specific dust control measures and coordinate temporary relocation of break room equipment during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_V3 B59C Breakroom Statment of Work_V3.pdf | ||
| Questions and Ans.pdf | ||
| Site Visit Photos.pdf | ||
| Site Visit Attendance.pdf | ||
| SOW V2 B59C Breakroom.pdf | ||
| SP470325Q0025.pdf | ||
| Wage Determination.pdf | ||
| Tab 1 - SOW - B59C Break Room.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP4703 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP470325Q0025
X
2025 FEB 06
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DCSO RICHMOND DIVISION #1
6090 STRATHMORE RD.
RICHMOND VA 23237
USA
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 5 PAGES
SP470325Q0025 - 0001
Defense Supply Center Richmond (DSCR) Building 59 C Bay Break Room Renovation
This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-25-Q-0025 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 75 days after issuance of the Notice to Proceed (NTP).
DISCLOSURE OF MAGNITUDE
The dollar value of the ensuing contract is estimated to be between $52,000.00 and $75,000.00
This acquisition is set-aside for 100% small businesses.
The North American Industry Classification System (NAICS) Code is 236220 (Commercial and Industrial Building Construction).
The small business size standard is $45M.
Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA).
Partial proposals will not be accepted.
For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is defined as the commutable radius.
Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.
The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.
All questions pertaining to the solicitation must be submitted no later than 02/07/25 COB. Acceptable method of quote or inquiry submission is Email to Robert.Moragues@dla.mil.
Questions are due on February 07, 2025, end of day. Submit questions via email to Robert.Moragues@dla.mil.
Permissible answers will be posted publicly as an attachment under the same notice ID as the solicitation. Answers will be posted on, or around, February 11, 2025.
Quotes are due on February 28, 2025, end of day. Submit quotes via email to Robert.Moragues@dla.mil.
A Site visit is scheduled on location at Defense Supply Center Richmond(DSCR) on 02/04/25 @ 0930. There will only be one site visit; requests for additional site visits will not be honored. Persons interested in attending MUST pre-register through the link below. Processing by the Security Office can take up to 5 business days; interested parties are advised that a minimum of 3 business days is typically required. When following the link below, you will be prompted to enter a sponsor for the site visit. The Project Manager will serve as the sponsor for the site visit.
Please direct all questions pertaining to the site visit to the Project Manager. The Project Manager for this requirement is Mike OConnor<Michael.OConnor@dla.mil). Site visit meeting location is marked on the map found on p.45 of the attached SOW.
Access to Defense Supply Center Richmond is dictated by the language at the following location:
https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/
The point of contact (POC) for this solicitation is Robert “Lee” Moragues <Robert.Moragues@dla.mil>.
The POC for the site visit is Mike O'Connor<MIchael.OConnor@dla.mil>
Additional DSCR Visitor Information
A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the preenrollment website: https://dbids-global-enroll.dmdc.mil.
Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes will be electronically sent to the visiting person’s sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process.
PAGE 3 OF 5 PAGES
SP470325Q0025 - 0001
OBJECTIVES
To remodel the breakroom with updated cabinets, countertop, sink etc.
BACKGROUND
Building 59 C bay breakroom hasn’t been renovated in many years. The cabinets are broken, the walls are damaged, and the lighting is dated.
SPECIFIC REQUIREMENTS
The contractor shall.
• Provide two 20amp outlets from the power panel inside the modular building to the outside of the implant to be used for 1 refrigerator and one microwave. Run the power on top of the roof of the modular to the far side of the modular then down the wall. This work must be completed prior to any work in the breakroom.
• Hang plastic to cover the opening to the breakroom.
• Prepare all walls to level 4 IAW GA 214. The contractor must use a dustless vacuum system when preparing the walls to minimize dust. No dust can migrate out of the breakroom. Use of an additional HEPA filter system in addition to the dustless sanding is required. Submit a separate dust plan for approval.
• Prime and paint a minimum of 2 coats of satin sheen paint (IAW MPI), off white, provide samples for exact choice.
• Paint the door and frame, match existing color.
• Paint around bulletin boards.
• Remove and replace all cabinets with commercial grade cabinets with soft close hinges and soft close drawer glides.
Replace the current LF of cabinets with 8LF of cabinets. Photos of a representative cabinet type in other areas on DSCR are shown at the end of this document. Provide color, finish samples for selection. Provide the same amount of draws and doors as existing.
• Provide 6’ of additional base cabinets and countertop (match countertop no backsplash) on the wall where the microwaves are currently located.
• Cabinets, sinks etc. must meet ADA/ABA.
• Provide a solid surface quartz countertop and 4” quartz backsplash with marbling, 1.25” thick. Align the colors, patterns, and veining of the slabs to create nearly seamless transitions. Provide physical samples for selection.
• Provide a single undermount stainless steel sink the same dimensions as existing.
• Provide a new gooseneck type facet same as existing.
• Replace the plumbing under the sink (not in wall).
• Replace all ceiling tile with drop in textured tegular tile, fine fissured, white. Ceiling grid to remain. Remove sprinkler heads to install new tile.
• Replace cove base, match existing.
• Replace ceiling vents and diffusers, match existing, white.
• Replace all ceiling lights with drop in LED lights, color range 3500-4500, balanced white.
• Provide a motion sensor type light switch same as existing, almond.
• Replace all outlets, wall covers etc. with almond.
• Raise the outlets on the north wall so they are above the base cabinets.
• Replace mini blinds, match same as existing, almond.
• Replace the access panel that is missing its cover.
• Replumb the water line behind the fridge. Use a recessed box for the new water connections. Install this box 4’ AFF.
• Cover all smoke detectors to prevent dust from sounding the alarm.
• Provide a MERV 8 filter over the return for the duration of this project.
• Provide a new mini split system, sized the same as existing. Prefer a Mitsubishi unit. Replace the disconnect and wiring to the panel. This does not need to be connected to the building automation system.
• Provide one 20-amp circuit from the panel in the hallway to the breakroom. Locate the outlet above the north wall cabinets.
• Relocate one refrigerator, one microwave, the movable cabinet and the table and chairs to the outside of the implant to be used as a temporary break area. Return all items except the movable cabinet which shall be disposed of after the final inspection.
• Store the other refrigerator and all other items in the 59 D warehouse, return when the project is complete.
• Strip the wax completely off the floor. Rewax the floor 3 times using the same wax as the janitorial contractor.
• Meeting location for the site visit shown in the map at the end of this document.
• All government inspections shall take place on Tuesdays, Wednesdays or Thursday, regardless of when notice is provided.
Reference Attachment 1 - Statement of Work (SOW) for full and complete scope details.
PAGE 4 OF 5 PAGES
SP470325Q0025 - 0001
SECTION B
SUPPLIES/SERVICES: Z2AA-V00010975
ITEM DESCRIPTION:
See Attached Statement of Work.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 Z2AA-V00010975 1.000 MO $ ________________ $ ________________
Repair or Alteration of Office Buildings
PREP FOR DELIVERY:
See Attached Statement of Work.
PERIOD OF PERFORMANCE: 03/28/2025 - 06/06/2025
SC0400
DLA AVIATION
6090 STRATHMORE ROAD
BUSINESS OPERATIONS
RICHMOND VA 23237
US
SC0400
DLA AVIATION
6090 STRATHMORE ROAD
BUSINESS OPERATIONS
RICHMOND VA 23237
US
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7010707934 0001 N/A N/A N/A 01/21/2025
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 5 PAGES
SP470325Q0025 - 0001
SECTION J - LIST OF ATTACHMENTS
List of Attachments
Description File Name ATTACH_SOW_V2 SOW V2 B59C Breakroom.
File details come from the government source that posted it. Updated .