Questions & Answers for SP4702-21-R-0020:
Question #1 Scope of Work on sheet 3 of 6 Coded Notes.
#1 Ask to install (1) New Elkay Bar II Ultra Water Cooler Bottle Filling Station with built-in filtration system.
#2 Ask to install New Bottle Filling Station Aqua Bar II Ultra Water Cooler in the Buggy Room 164.
Need to know if both of these are to be the Aqua Bar II units in both locations? See attached models.
Elkay does make a similar free-standing unit but not a “Bar II”.
The Aqua Units do not have drain connection so the Buggy Room would not require a drain line to be installed. Please clarify if we are to install a new drain line.
Answer to Question 1- Please install the ELKAY EZH2O for all of them. Please see attached the submittal.
Question #2 Sheet 2 of 6 Intercom / Speaker System Plan: Is there an electrical routing plan / details for connecting the speakers Coded note #1 to the intercom coded note #2 at the front desk? Wiring to be feed through conduit?
Answer to Questions 2- Speakers will NOT be connected to the intercom. Intercom will be separate on the main door close to the receptionist. New two speakers to be installed on the locations marked on to the drawing and to be connected to the main amplifier. Wiring to be feed in conduit is not necessary. Please see attached submittals for BOGEN system.