File Type Posted
Amendment 03 Continue sheet SF30.pdf PDF
Amendment 03-SP4702-21-R-0020-SF30.pdf PDF
Questions-Answers for SP4702-21-R-0020.pdf PDF
Amendment 02-SP4702-21-R-0020-SF30.pdf PDF
Amendment 02 Continue sheet SF30.pdf PDF
Amendment 01-SP4702-21-R-0020-SF30 (1).pdf PDF
Continue sheet SF30.pdf PDF
Revised SPEC 20007.pdf PDF
Attachment 02-ENG FORM 93.pdf PDF
Attachment 03-DSCC Excavation Permit.pdf PDF
Attachment 01-Wage Rate DOL.pdf PDF
Attachment 08-CSC-20006 NEPA Review Checklist.xlsx XLSX spreadsheet
SP4702-21-R-0020.pdf PDF
Attachment 06-Drawings 3-1708 CSC-20007.pdf PDF
Attachment 04-ENG FORM 4025-R.pdf PDF
Attachment 09-Contractor Access Badge Request.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

DLA Installation Support - Engineering Cost Estimate

DATE:05/05/2021

PROJECT NO. CSC-20007

DRAWING NO. 3-1708

PROJECT TITLE: M & R Building 22

ARCHITECT/ENGINEER: Sinan Falah

REFERENCE SOURCE: RS Means Cost Data, 2020

ESTIMATOR: Sinan Falah
PRELIMINARY DESIGNxFINAL DESIGNOTHER
ITEM CSI NUMBER/ REFERENCE NOTESITEM DESCRIPTIONQUANTITYMATERIALLABOREQUIPMENTTOTAL COST
NO. OF UNITSUNIT OF MEASURECOST PER UNITTOTALUNIT MANHOURSTOTAL MANHOURSRATE PER HOURTOTAL
General Conditions1LS
WEST PENN 25224 SPEAKER CABLE1LS
BOGEN SPT30A HORN SPEAKERS$2LS
FRONT DOOR INTERCOM/ DOOR STATION/
MASTER STATION1SF
All cutting and bracing cost1EA
Pluming Demolition, Water closet, wall mounted0EA
Purchase of specified water fountain ELKAY EZH2O3EA
Water fountain, install including all cutting and bracing cost3EA
Hauling2LS
SUB TOTAL$0.00
OVERHEAD (18%)$0.00
PROFIT (10%)$0.00
BOND (2.5%)$0.00
TOTAL COST$0.00

Contractor Bid Form

CONTRACTOR BID FORM
PROJECTCSC 20007SHEET1OF1
DATE PREPARED
LOCATIONCDCOFFEROR NAME
BID ITEMSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS$ - 0
2Existing Conditions1LS$ - 0
3Concrete1LS$ - 0
4Masonry1LS$ - 0
5Metals1LS$ - 0
6Wood, Plastics, and Composites1LS$ - 0
7Thermal and Moisture Protection1LS$ - 0
8Openings1LS$ - 0
9Finishes1LS$ - 0
10Specialties1LS$ - 0
11Equipment1LS$ - 0
12Furnishings1LS$ - 0
13Special Construction1LS$ - 0
14Conveying Equipment1LS$ - 0
21Fire Suppression1LS$ - 0
22Plumbing1LS$ - 0
23Heating, Ventilating, and Air Conditioning1LS$ - 0
25Integrated Automation1LS$ - 0
26Electrical1LS$ - 0
27Communications1LS$ - 0
28Electronic Safety and Security1LS$ - 0
31Earthwork1LS$ - 0
32Exterior Improvements1LS$ - 0
33Utilities1LS$ - 0
34Transportation1LS$ - 0
SUB-TOTAL COST$ - 0$ - 0$ - 0
OVERHEAD$ - 0
PROFIT$ - 0
BOND$ - 0
TOTAL COST$ - 0

&"Arial,Regular"&10SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 image1.png image2.png